| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. KING OF PRUSSIA, PA 19406-2713 April 26, 2018 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD. |
| | KING OF PRUSSIA, PA 19406-2713 April 26, 2018 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| NINE MILE POINT NUCLEAR STATION, UNIT 1 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS | | NINE MILE POINT NUCLEAR STATION, UNIT 1 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS |
|
| |
|
| ==Dear Mr. Hanson:== | | ==Dear Mr. Hanson:== |
|
| |
|
| In a telephone conversation on April 26, 2018 bet ween Mr. Peter Presby, Chief Examiner and Mr. Paul Isham, Facility Exam Author, arrangements were made for the administration of licensing examinations at Nine Mile Point, Unit 1, during the week of December 3, 2018. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of November 5, 2018. As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11 to NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary befo re the examinations are administered. To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by July 5, 2018. The NRC staff provided the written examination outline on January 2, 2018. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by September 18, 2018. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations, and tests before they are submitted to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. | | In a telephone conversation on April 26, 2018 between Mr. Peter Presby, Chief Examiner and Mr. Paul Isham, Facility Exam Author, arrangements were made for the administration of licensing examinations at Nine Mile Point, Unit 1, during the week of December 3, 2018. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of November 5, 2018. |
| B. Hanson 2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (OMB approval number 3150-0090) at least 60 days before the first examination date. Preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090) and medical certifications (OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
| | As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered. |
| | To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by July 5, 2018. The NRC staff provided the written examination outline on January 2, 2018. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by September 18, 2018. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations, and tests before they are submitted to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. |
| | Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. |
| | To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. |
| | Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. |
|
| |
|
| Although the minimum guidelines for receiving waiver or excusal requests is 30 days before the first examination date, the requests should be submitted as early in the process as possible. Guidance on processing such requests resulting from verbal inquiries by the licensee to the NRC is not binding. Any licensee submittals addre ssing this should be in the form of a written request. Licensee submittals should request a formal correspondence documenting their disposition. | | B. Hanson 2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (OMB approval number 3150-0090) at least 60 days before the first examination date. Preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090) and medical certifications (OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. |
| Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. | | Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. |
| | Although the minimum guidelines for receiving waiver or excusal requests is 30 days before the first examination date, the requests should be submitted as early in the process as possible. |
| | Guidance on processing such requests resulting from verbal inquiries by the licensee to the NRC is not binding. Any licensee submittals addressing this should be in the form of a written request. Licensee submittals should request a formal correspondence documenting their disposition. |
| | Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. |
| | The burden to the public for these voluntary information collections is estimated to average 2,250 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. Send comments regarding this burden estimate or any other aspects of these information collections, including suggestions for reducing the burden, to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to infocollects.resource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. |
| | Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). |
| | ADAMS is accessible on the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html. |
|
| |
|
| The burden to the public for these voluntary information collections is estimated to average 2,250 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. Send comments regarding this burden estimate or any other aspects of these information collections, including suggestions for reducing the burden, to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to infocollects.resource@nrc.gov
| | B. Hanson 3 After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates. |
| ; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
| | Thank you for your cooperation in this matter. Mr. Isham has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. Presby at (610) 337-5392 or me at (610) 337-5306. |
| | Sincerely, |
| | /RA/ |
| | Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.: 50-220 cc: Training Manager cc: Distribution via ListServ |
|
| |
|
| Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).
| | B. Hanson 4 |
| ADAMS is accessible on the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
| |
| B. Hanson 3
| |
| | |
| After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
| |
| | |
| Thank you for your cooperation in this matter. Mr. Isham has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Presby at (610) 337-5392 or me at (610) 337-
| |
| | |
| 5306.
| |
| | |
| Sincerely,
| |
| /RA/
| |
| Donald E. Jackson, Chief Operations Branch
| |
| | |
| Division of Reactor Safety
| |
| | |
| Docket No.: 50-220
| |
| | |
| cc: Training Manager
| |
| | |
| cc: Distribution via ListServ
| |
| | |
| B. Hanson 4 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| NINE MILE POINT NUCLEAR STATION, UNIT 1 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS dated April 26, 2018 DISTRIBUTION: (via email) DLew, RA (R1ORAMAIL RESOURCE) | | NINE MILE POINT NUCLEAR STATION, UNIT 1 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS dated April 26, 2018 DISTRIBUTION: (via email) |
| MFerdas, DRP DCollins, DRA (R1ORAMAIL RESOURCE) | | DLew, RA (R1ORAMAIL RESOURCE) MFerdas, DRP DCollins, DRA (R1ORAMAIL RESOURCE) MCatts, DRP DPelton, DRP (R1DRPMAIL RESOURCE) ARosebrook, DRP MGray, DRP (R1DRPMAIL RESOURCE) MHardgrove, DRP JYerokun, DRS (R1DRSMAIL RESOURCE) SObadina, DRP BWelling, DRS (R1DRSMAIL RESOURCE) DJackson, DRS, Ops Branch Chief EMiller, DRP, SRI PPresby, DRS, Chief Examiner BSienel, DRP, RI JBowen, RI OEDO ATrudell, DRP, AA RidsNrrDorlLpl1 Resource RidsNrrPMNineMilePoint Resource FILE: G:\DRS\Operations Branch\PRESBY\Exam FY19-NMP1 Dec 2018\ES-201-R11-CorpNotifyLtr.docx ADAMS PKG No. ML18115A437 ADAMS ACCESSION No.: ML18117A210 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS/OB:CE RI/DRS/OB:BC NAME PPresby DJackson DATE 04/26/2018 04/26/2018 OFFICIAL RECORD COPY}} |
| MCatts, DRP DPelton, DRP (R1DRPMAIL RESOURCE) ARosebrook, DRP MGray, DRP (R1DRPMAIL RESOURCE) MHardgrove, DRP JYerokun, DRS (R1DRSMAIL RESOURCE) | |
| SObadina, DRP BWelling, DRS (R1DRSMAIL RESOURCE) DJackson, DRS, Ops Branch Chief EMiller, DRP, SRI PPresby, DRS, Chief Examiner BSienel, DRP, RI JBowen, RI OEDO ATrudell, DRP, AA RidsNrrDorlLpl1 Resource RidsNrrPMNineMilePoint Resource | |
| | |
| FILE: G:\DRS\Operations Branch\PRESBY\Exam FY19-NMP1 Dec 2018\ES-201-R11-CorpNotifyLtr.docx ADAMS PKG No. ML18115A437 ADAMS ACCESSION No.: ML18117A210 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS/OB:CE RI/DRS/OB:BC NAME PPresby DJackson DATE 04/26/2018 04/26/2018 OFFICIAL RECORD COPY}} | |
|
---|
Category:Letter
MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01
[Table view] Category:License-Operator
MONTHYEARML24002B0852024-01-0202 January 2024 FY24 NMP2 Final QA Forms ML23347A0632023-12-13013 December 2023 NMP1 Retake FY23 Examination Files ML23257A1732023-09-14014 September 2023 Requalification Program Inspection ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23135A1562023-05-15015 May 2023 Final Qa/Related Forms IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 ML23123A0582023-05-0303 May 2023 Final Qa/Related Forms ML23109A0332023-04-19019 April 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21258A3552021-09-16016 September 2021 Requalification Program Inspection ML21137A1602021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21137A2402021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21137A1692021-05-17017 May 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21133A1472021-05-13013 May 2021 Final Qa/Related Forms (Folder 1) ML21133A2422021-05-13013 May 2021 Handouts to Applicants (Folder 3) ML21131A1892021-05-11011 May 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21123A1892021-05-0303 May 2021 Draft Written Examination (Folder 2) ML21123A1982021-05-0303 May 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21123A2242021-04-19019 April 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21123A2412021-04-19019 April 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21034A4742021-02-0303 February 2021 Handouts to Applicants (Folder 3) ML21034A4762021-02-0303 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21033A7962021-02-0202 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21033A5382021-02-0202 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21032A3232021-02-0101 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21032A2812021-02-0101 February 2021 Final Qa/Related Forms (Folder 1) ML21027A2592021-01-27027 January 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21008A3542021-01-0808 January 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21008A3322021-01-0808 January 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20350B7852020-12-11011 December 2020 Modified Question Source Information (Post 2020 Audit) (Folder 3) ML20120A5582020-04-30030 April 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20105A1762020-04-15015 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20055E0092020-01-15015 January 2020 Final Q/A Related Form - Form ES-401-6 (Folder 1) ML20055D8832020-01-15015 January 2020 Final Qa/Related Forms (Folder 1) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19337A5342019-11-29029 November 2019 Operator Licensing Examination Approval ML20055E0172019-10-28028 October 2019 Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) ML20055E0152019-10-28028 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML20055E0122019-10-28028 October 2019 NRC Comments on Draft Licensee-Developed Operating Test ML19289D0132019-10-15015 October 2019 September 4, 2019, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20055E0132019-10-15015 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) NMP1L3288, Fitness-for-Duty Response to Request for Information2019-07-0101 July 2019 Fitness-for-Duty Response to Request for Information ML19154A5672019-06-0303 June 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19151A8132019-05-31031 May 2019 Licensed Operator Positive Fitness-For-Duty Test 2024-01-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24002B0852024-01-0202 January 2024 FY24 NMP2 Final QA Forms ML23347A0632023-12-13013 December 2023 NMP1 Retake FY23 Examination Files ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23135A1562023-05-15015 May 2023 Final Qa/Related Forms IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 ML23123A0582023-05-0303 May 2023 Final Qa/Related Forms ML23109A0332023-04-19019 April 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A1692021-05-17017 May 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21137A2402021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21137A1602021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21133A2422021-05-13013 May 2021 Handouts to Applicants (Folder 3) ML21133A1472021-05-13013 May 2021 Final Qa/Related Forms (Folder 1) ML21131A1892021-05-11011 May 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21123A1982021-05-0303 May 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21123A1892021-05-0303 May 2021 Draft Written Examination (Folder 2) ML21123A2412021-04-19019 April 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21123A2242021-04-19019 April 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21034A4762021-02-0303 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21034A4742021-02-0303 February 2021 Handouts to Applicants (Folder 3) ML21033A7962021-02-0202 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21033A5382021-02-0202 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21032A2812021-02-0101 February 2021 Final Qa/Related Forms (Folder 1) ML21032A3232021-02-0101 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21027A2592021-01-27027 January 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21008A3322021-01-0808 January 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21008A3542021-01-0808 January 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML20350B7852020-12-11011 December 2020 Modified Question Source Information (Post 2020 Audit) (Folder 3) ML20120A5582020-04-30030 April 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20105A1762020-04-15015 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20055D8832020-01-15015 January 2020 Final Qa/Related Forms (Folder 1) ML20055E0092020-01-15015 January 2020 Final Q/A Related Form - Form ES-401-6 (Folder 1) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19337A5342019-11-29029 November 2019 Operator Licensing Examination Approval ML20055E0172019-10-28028 October 2019 Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) ML20055E0152019-10-28028 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML20055E0122019-10-28028 October 2019 NRC Comments on Draft Licensee-Developed Operating Test ML20055E0132019-10-15015 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML19151A8132019-05-31031 May 2019 Licensed Operator Positive Fitness-For-Duty Test RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML20055E0202019-04-22022 April 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18333A0182018-11-25025 November 2018 Initial Operator Licensing Operating Test Approval ML18088A7262018-05-21021 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18117A2102018-04-26026 April 2018 Senior Reactor and Reactor Operator Initial License Examinations RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations 2024-01-02
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406-2713 April 26, 2018 Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT 1 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS
Dear Mr. Hanson:
In a telephone conversation on April 26, 2018 between Mr. Peter Presby, Chief Examiner and Mr. Paul Isham, Facility Exam Author, arrangements were made for the administration of licensing examinations at Nine Mile Point, Unit 1, during the week of December 3, 2018. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of November 5, 2018.
As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by July 5, 2018. The NRC staff provided the written examination outline on January 2, 2018. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by September 18, 2018. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations, and tests before they are submitted to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.
Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
B. Hanson 2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (OMB approval number 3150-0090) at least 60 days before the first examination date. Preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090) and medical certifications (OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
Although the minimum guidelines for receiving waiver or excusal requests is 30 days before the first examination date, the requests should be submitted as early in the process as possible.
Guidance on processing such requests resulting from verbal inquiries by the licensee to the NRC is not binding. Any licensee submittals addressing this should be in the form of a written request. Licensee submittals should request a formal correspondence documenting their disposition.
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these voluntary information collections is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. Send comments regarding this burden estimate or any other aspects of these information collections, including suggestions for reducing the burden, to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to infocollects.resource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible on the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
B. Hanson 3 After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
Thank you for your cooperation in this matter. Mr. Isham has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. Presby at (610) 337-5392 or me at (610) 337-5306.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.: 50-220 cc: Training Manager cc: Distribution via ListServ
B. Hanson 4
SUBJECT:
NINE MILE POINT NUCLEAR STATION, UNIT 1 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS dated April 26, 2018 DISTRIBUTION: (via email)
DLew, RA (R1ORAMAIL RESOURCE) MFerdas, DRP DCollins, DRA (R1ORAMAIL RESOURCE) MCatts, DRP DPelton, DRP (R1DRPMAIL RESOURCE) ARosebrook, DRP MGray, DRP (R1DRPMAIL RESOURCE) MHardgrove, DRP JYerokun, DRS (R1DRSMAIL RESOURCE) SObadina, DRP BWelling, DRS (R1DRSMAIL RESOURCE) DJackson, DRS, Ops Branch Chief EMiller, DRP, SRI PPresby, DRS, Chief Examiner BSienel, DRP, RI JBowen, RI OEDO ATrudell, DRP, AA RidsNrrDorlLpl1 Resource RidsNrrPMNineMilePoint Resource FILE: G:\DRS\Operations Branch\PRESBY\Exam FY19-NMP1 Dec 2018\ES-201-R11-CorpNotifyLtr.docx ADAMS PKG No. ML18115A437 ADAMS ACCESSION No.: ML18117A210 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS/OB:CE RI/DRS/OB:BC NAME PPresby DJackson DATE 04/26/2018 04/26/2018 OFFICIAL RECORD COPY