ML19108A235: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:/RA: Gerald J. McCoy for/}}
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 18, 2019 Mr. Ed Burchfield, Jr.
Site Vice President, Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672-0752
 
==SUBJECT:==
OCONEE NUCLEAR STATION - NRC EXAMINATION REPORT 05000269/2019301, 05000270/2019301, AND 05000287/2019301
 
==Dear Mr. Burchfield:==
 
During the period February 26-27, 2017, the Nuclear Regulatory Commission (NRC) administered a retake operating test to an employee of your company who had applied for a license to operate the Oconee Nuclear Station. At the conclusion of the test, the examiner discussed preliminary findings related to the operating test with those members of your staff identified in the enclosed report.
One Reactor Operator (RO) applicant passed the simulator scenario portion of the retake operating test. The entire JPM portion of the operating test and written examination were excused. There were no post-examination comments. One applicant was issued a license commensurate with the level of examination administered. A Simulator Fidelity Report is included in this report as Enclosure 2.
All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
 
E. Burchfield                              2 If you have any questions concerning this letter, please contact me at (404) 997-4528.
Sincerely,
                                            /RA: Gerald J. McCoy for/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55
 
==Enclosures:==
: 1. Report Details
: 2. Simulator Fidelity Report cc: Distribution via Listserv
 
___ML19108A235_            SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE            RII:DRS        RII:DRS SIGNATURE              AXG1          GJM1 for NAME                AGOLDAU        EGUTHRIE DATE                  4/17/2019      4/ 18 /2019 E-MAIL COPY?        YES    NO    YES      NO
 
U.S. NUCLEAR REGULATORY COMMISSION Examination Report Docket No.:                50-269, 50-270, 50-287 License No.:                DPR-38, DPR-47, DPR-55 Report No.:                05000269/2019301, 05000270/2019301, AND 05000287/2019301 Enterprise identifier:      L-2019-OLL-0041 Licensee:                  Duke Energy Carolinas, LLC Facility:                  Oconee Nuclear Station, Units 1, 2 and 3 Location:                  Seneca, SC Dates:                      Operating Test - February 26-27, 2019 Examiners:                  Andreas Goldau, Chief Examiner, Operations Engineer Approved by:                Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Enclosure 1
 
2
 
==SUMMARY==
 
ER 05000269/2019301, 05000270/2019301, AND 05000287/2019301; retake operating test February 26-27, 2019; Oconee Nuclear Station, Units 1, 2 and 3; Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted a retake examination in accordance with the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
The operating test was developed by the licensee.
The NRC administered the simulator scenario portion of the operating test during the period February 26-27, 2019. One Reactor Operator (RO) applicant passed the simulator scenario portion of the operating test. The entire JPM portion of the operating test and the written examination were excused. One applicant was issued a license commensurate with the level of examination administered.
There were no post-examination comments.
No findings were identified.
 
3 REPORT DETAILS
: 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations
: a. Inspection Scope The NRC reviewed the licensees examination security measures while preparing and administering the examination in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
The NRC administered the simulator scenario portion of the operating test during the period February 26-27, 2019. The NRC examiner evaluated one Reactor Operator (RO) applicant using the guidelines contained in NUREG-1021. Evaluation of the applicant and review of associated documentation was performed to determine if the applicant, who applied for a license to operate the Oconee Nuclear Station, met the requirements specified in 10 CFR Part 55, Operators Licenses.
The NRC evaluated the performance and fidelity of the simulation facility during the preparation and conduct of the operating test.
: b. Findings No findings were identified.
The licensee developed the operating test. All examination material was developed in accordance with the guidelines contained in Revision 11 of NUREG-1021. The NRC reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
One Reactor Operator (RO) applicant passed the simulator scenario portion of the operating test. The entire JPM portion of the operating test and the written examination were excused. One RO applicant was issued a license.
A copy of the individual examination report was sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
The licensee submitted no post-examination comments.
4OA6 Meetings, Including Exit Exit Meeting Summary On February 27, 2019, the NRC examination team discussed generic issues associated with the operating test with Mr. Ed Burchfield, Vice President-ONS, and members of the Oconee Nuclear Station staff. The examiners asked the licensee if any of the examination material was proprietary, or if any of the examination material received should be withheld from public disclosure. No proprietary information was identified.
 
4 KEY POINTS OF CONTACT Licensee personnel E. Burchfield, Vice President - ONS J. Steely, Training Manager P. Fisk, Plant Manager - ONS T. Doss, ILT Exam Team Supervisor D. George, ILT Class Supervisor R. Patterson, ILT Instructor S. Lark, NRC Exam Author NRC personnel A. Goldau, Chief Examiner
 
SIMULATOR FIDELITY REPORT Facility Licensee: Oconee Nuclear Station Facility Docket No.: 05000269, 05000270, AND 058000287 Operating Test Administered: February 26-27, 2019 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
No simulator fidelity or configuration issues were identified.
Enclosure 2}}

Latest revision as of 20:23, 19 October 2019

301 Exam Report
ML19108A235
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/18/2019
From: Eugene Guthrie
Division of Reactor Safety II
To: Burchfield E
Duke Energy Carolinas
References
50-269/19-01, 50-270/19-01, 50-287/19-01 50-269/OL-19, 50-270/OL-19, 50-287/OL-19
Download: ML19108A235 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 18, 2019 Mr. Ed Burchfield, Jr.

Site Vice President, Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672-0752

SUBJECT:

OCONEE NUCLEAR STATION - NRC EXAMINATION REPORT 05000269/2019301, 05000270/2019301, AND 05000287/2019301

Dear Mr. Burchfield:

During the period February 26-27, 2017, the Nuclear Regulatory Commission (NRC) administered a retake operating test to an employee of your company who had applied for a license to operate the Oconee Nuclear Station. At the conclusion of the test, the examiner discussed preliminary findings related to the operating test with those members of your staff identified in the enclosed report.

One Reactor Operator (RO) applicant passed the simulator scenario portion of the retake operating test. The entire JPM portion of the operating test and written examination were excused. There were no post-examination comments. One applicant was issued a license commensurate with the level of examination administered. A Simulator Fidelity Report is included in this report as Enclosure 2.

All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).

E. Burchfield 2 If you have any questions concerning this letter, please contact me at (404) 997-4528.

Sincerely,

/RA: Gerald J. McCoy for/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55

Enclosures:

1. Report Details
2. Simulator Fidelity Report cc: Distribution via Listserv

___ML19108A235_ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE AXG1 GJM1 for NAME AGOLDAU EGUTHRIE DATE 4/17/2019 4/ 18 /2019 E-MAIL COPY? YES NO YES NO

U.S. NUCLEAR REGULATORY COMMISSION Examination Report Docket No.: 50-269, 50-270, 50-287 License No.: DPR-38, DPR-47, DPR-55 Report No.: 05000269/2019301, 05000270/2019301, AND 05000287/2019301 Enterprise identifier: L-2019-OLL-0041 Licensee: Duke Energy Carolinas, LLC Facility: Oconee Nuclear Station, Units 1, 2 and 3 Location: Seneca, SC Dates: Operating Test - February 26-27, 2019 Examiners: Andreas Goldau, Chief Examiner, Operations Engineer Approved by: Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Enclosure 1

2

SUMMARY

ER 05000269/2019301, 05000270/2019301, AND 05000287/2019301; retake operating test February 26-27, 2019; Oconee Nuclear Station, Units 1, 2 and 3; Operator License Examinations.

Nuclear Regulatory Commission (NRC) examiners conducted a retake examination in accordance with the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.

The operating test was developed by the licensee.

The NRC administered the simulator scenario portion of the operating test during the period February 26-27, 2019. One Reactor Operator (RO) applicant passed the simulator scenario portion of the operating test. The entire JPM portion of the operating test and the written examination were excused. One applicant was issued a license commensurate with the level of examination administered.

There were no post-examination comments.

No findings were identified.

3 REPORT DETAILS

4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations
a. Inspection Scope The NRC reviewed the licensees examination security measures while preparing and administering the examination in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.

The NRC administered the simulator scenario portion of the operating test during the period February 26-27, 2019. The NRC examiner evaluated one Reactor Operator (RO) applicant using the guidelines contained in NUREG-1021. Evaluation of the applicant and review of associated documentation was performed to determine if the applicant, who applied for a license to operate the Oconee Nuclear Station, met the requirements specified in 10 CFR Part 55, Operators Licenses.

The NRC evaluated the performance and fidelity of the simulation facility during the preparation and conduct of the operating test.

b. Findings No findings were identified.

The licensee developed the operating test. All examination material was developed in accordance with the guidelines contained in Revision 11 of NUREG-1021. The NRC reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.

One Reactor Operator (RO) applicant passed the simulator scenario portion of the operating test. The entire JPM portion of the operating test and the written examination were excused. One RO applicant was issued a license.

A copy of the individual examination report was sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.

The licensee submitted no post-examination comments.

4OA6 Meetings, Including Exit Exit Meeting Summary On February 27, 2019, the NRC examination team discussed generic issues associated with the operating test with Mr. Ed Burchfield, Vice President-ONS, and members of the Oconee Nuclear Station staff. The examiners asked the licensee if any of the examination material was proprietary, or if any of the examination material received should be withheld from public disclosure. No proprietary information was identified.

4 KEY POINTS OF CONTACT Licensee personnel E. Burchfield, Vice President - ONS J. Steely, Training Manager P. Fisk, Plant Manager - ONS T. Doss, ILT Exam Team Supervisor D. George, ILT Class Supervisor R. Patterson, ILT Instructor S. Lark, NRC Exam Author NRC personnel A. Goldau, Chief Examiner

SIMULATOR FIDELITY REPORT Facility Licensee: Oconee Nuclear Station Facility Docket No.: 05000269, 05000270, AND 058000287 Operating Test Administered: February 26-27, 2019 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.

No simulator fidelity or configuration issues were identified.

Enclosure 2