ML072570628: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 5: Line 5:
| author name = Vaaler M
| author name = Vaaler M
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-2
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-2
| addressee name = Walt T D
| addressee name = Walt T
| addressee affiliation = Carolina Power & Light Co
| addressee affiliation = Carolina Power & Light Co
| docket = 05000261
| docket = 05000261
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:PAM Instrumentation
{{#Wiki_filter:PAM Instrumentation 3.3.3 Actions (continued)
 
====3.3.3 Actions====
(continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. One or more Functions C.1 Restore one channel 7 days with two required to OPERABLE status.channels inoperable.
CONDITION REQUIRED ACTION COMPLETION TIME C. One or more Functions C.1 Restore one channel 7 days with two required to OPERABLE status.channels inoperable.
D. ---------NOTE ---------
D. ---------NOTE ---------

Revision as of 20:41, 12 July 2019

Correction to Technical Specification Pages Issued with Amendment No. 216 Issued on July 16, 2007
ML072570628
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/18/2007
From: Vaaler M
NRC/NRR/ADRO/DORL/LPLII-2
To: Walt T
Carolina Power & Light Co
Vaaler, Marlayna, NRR/DORL 415-3178
Shared Package
ML072570124 List:
References
TAC MD4250
Download: ML072570628 (1)


Text

PAM Instrumentation 3.3.3 Actions (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. One or more Functions C.1 Restore one channel 7 days with two required to OPERABLE status.channels inoperable.

D. ---------NOTE ---------

D.1 Restore required 7 days Only applicable to channel to OPERABLE Functions 3, 4, 19, status.22, 23, and 24.-.--------------------

One or more Functions with one required channel inoperable.

E. Required Action and E.1 Enter the Condition Immediately associated Completion referenced in Time of Condition C Table 3.3.3-1 for the or D not met. channel.F. As required by F.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Required Action E.1 AND and referenced in Table 3.3.3-1. F.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HBRSEP Unit No. 2 3.3-30 Amendment No. 216