Line 3: Line 3:
| issue date = 07/26/2010
| issue date = 07/26/2010
| title = 2010-10-Draft Outline Comments
| title = 2010-10-Draft Outline Comments
| author name = Apger G W
| author name = Apger G
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name =  
| addressee name =  

Revision as of 06:19, 11 July 2019

2010-10-Draft Outline Comments
ML102070183
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/26/2010
From: Apger G
Operations Branch IV
To:
Entergy Operations
References
50-382/10-302 50-382/10-302
Download: ML102070183 (2)


Text

Attachment 6 OBDI 202 - IOLE Process DRAFT OUTLINE COMMENTS Facility: Waterford 3 First Exam Date:October 4, 2010 (OP)

Written Exam Outline (7-13-10) Comment Resolution 1 RO T2G1 System 062: Generic 2.2.17 is not in the list of KAs in ES-401 D.1.b. Reselect. KA reselected 2 RO T1G2 EAPE 076: Generic 2.1.14 is not in the list of KAs in ES-401 D.1.b. Reselect. KA reselected 3 SRO T2G2 System 076: Generic 2.4.22 is not in the list of KAs in ES-401 D.1.b. Reselect. KA reselected Administrative JPM Outline (7-12-10) Comment Resolution 1 Every exam has had an EP classification (back to 2006). Ensure this is unique when submitting the draft JPM. No action required. Note to facility only.

Control Room / In-Plant System JPM Outline (7-12-10) Comment Resolution 1 S1-Used on 2009 Exam (P) Comment only. No action required. 2 S4-Used on 2009 Exam (P) Comment only. No action required. 3 S6-Used on 2010 Re-take (P) Comment only. No action required. 4 P3-Modified from 2010 Retake JPM Comment only. No action required. Simulator Scenario Outline Comments (7-13-10) Comment Resolution Sc1 A) Event 5 should be split out. The component malfunction is a

separate event. B) Events 8 and 9 are not events (component malfunctions). They are actions required by SEE MARKUP pdf file. Comments incorporated Attachment 6 OBDI 202 - IOLE Process procedure for the 2 nd major event. One is a critical task. The

other annotates the wrong

generator. C) Second critical task depends on break size. Need to maintain pressure above 945psig or this is no longer a CT.

Sc2 A) Post trip events are the same as scenario 2 on the 2009 exam as well as the initial conditions.

Swap out-of-service train and

faulted EDG. Change the starting power. B) Missing horizontal borders between events 2,3 and 4,5. Did not use this in 2009. Scenario OK as is.

Sc3 A) Change this to start at the critical hold (1E-8 [Westinghouse parlance]), and require rods to be bumped out to establish SUR and bring Rx to POAH; then hold

at Mode 2 power. B) Once there, fail a steam dump, TDAFWP or something to give a positive reactivity excursion, requiring action to prevent transition to Mode 1. LOW POWER MODE 3 Events changed and comments incorporated Sc4 A) Can we let the condition in event 5 degrade until tripping the pump is required? After SPTA has been entered, initiate event 6. B) Horizontal borders missing.

C) Remove Spare from Op-test number. We don't know the spare until after validation. Comments incorporated