MONTHYEARIR 05000382/20253012024-09-0303 September 2024 Notification of NRC Initial Operator Licensing Examination 05000382/2025301 IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22083A0622022-03-0909 March 2022 Wat 2022-02 Draft Written Comments ML22083A0652022-03-0909 March 2022 WAT-2022-02 Draft Outline Comments ML22083A0642022-03-0909 March 2022 Wat 2022-02 Final Outlines ML22083A0592022-03-0909 March 2022 Wat 2022-02 Draft Op Test Comments ML22080A2292022-03-0909 March 2022 WAT-2022-02 Final Written Exam ML22080A2282022-03-0909 March 2022 WAT-2022-02 Final Op Test ML22083A0602022-03-0909 March 2022 Wat 2022-02 Draft Operating Test ML22083A0632022-03-0909 March 2022 Wat 2022-02 Draft Written Exam ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms ML22083A0612022-03-0909 March 2022 Wat 2022-02 Draft Outlines W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis IR 05000382/20223012021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20267A2132020-08-26026 August 2020 08 Final Operating Test IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20294A1372020-08-26026 August 2020 08 Public Forms ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18349A0052018-11-14014 November 2018 11 W3-2018-11 Public Forms W3F1-2018-0071, 10 W3-2018-11 Post-Exam Analysis2018-11-14014 November 2018 10 W3-2018-11 Post-Exam Analysis ML18333A3482018-11-14014 November 2018 9_W3-2018-11 Final Operating Test ML18333A3472018-11-14014 November 2018 8_W3-2018-11 Final Written Exam ML18333A3412018-11-14014 November 2018 2 W3-2018-11 Draft Outline Comments ML18333A3452018-11-14014 November 2018 6_W3-2018-11 Draft Operating Test Comments ML18333A3462018-11-14014 November 2018 7_W3-2018-11 Final Outlines ML18333A3402018-11-14014 November 2018 1 W3-2018-11 Draft Outlines ML18333A3422018-11-14014 November 2018 3 W3-2018-11 Draft Written Exam ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 2024-09-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000382/20253012024-09-0303 September 2024 Notification of NRC Initial Operator Licensing Examination 05000382/2025301 IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22083A0632022-03-0909 March 2022 Wat 2022-02 Draft Written Exam ML22083A0592022-03-0909 March 2022 Wat 2022-02 Draft Op Test Comments ML22083A0622022-03-0909 March 2022 Wat 2022-02 Draft Written Comments ML22083A0602022-03-0909 March 2022 Wat 2022-02 Draft Operating Test ML22083A0652022-03-0909 March 2022 WAT-2022-02 Draft Outline Comments ML22083A0612022-03-0909 March 2022 Wat 2022-02 Draft Outlines ML22083A0642022-03-0909 March 2022 Wat 2022-02 Final Outlines ML22080A2292022-03-0909 March 2022 WAT-2022-02 Final Written Exam ML22080A2282022-03-0909 March 2022 WAT-2022-02 Final Op Test W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms IR 05000382/20223012021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 And Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis ML20267A2132020-08-26026 August 2020 08 Final Operating Test ML20294A1372020-08-26026 August 2020 08 Public Forms IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18333A3422018-11-14014 November 2018 3 W3-2018-11 Draft Written Exam ML18333A3462018-11-14014 November 2018 7_W3-2018-11 Final Outlines ML18333A3482018-11-14014 November 2018 9_W3-2018-11 Final Operating Test ML18333A3412018-11-14014 November 2018 2 W3-2018-11 Draft Outline Comments W3F1-2018-0071, 10 W3-2018-11 Post-Exam Analysis2018-11-14014 November 2018 10 W3-2018-11 Post-Exam Analysis ML18333A3452018-11-14014 November 2018 6_W3-2018-11 Draft Operating Test Comments ML18349A0052018-11-14014 November 2018 11 W3-2018-11 Public Forms ML18333A3402018-11-14014 November 2018 1 W3-2018-11 Draft Outlines ML18333A3472018-11-14014 November 2018 8_W3-2018-11 Final Written Exam ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 2024-09-03
[Table view] |
Text
ES-401 GG-2021-10 Written Examination Review Worksheet Form ES-401-9
- 1. LOK 2. LOD 6
7 Ans Letter CFR 8
Q#
(F/H)
(1-5) stem focus cueing T/F cred dist partial job link minutia
- /
units back-ward K/A SRO-only B/M/N U/E/S A/B/C/
D 55.41 55.43 Explanation rev0 of questions (used for first validation)
Rev1 of questions for second validation Rev2 of questions after final changes made.
1 H
2 N
S D
7 2
F 3
N S
B 10 3
H 3
N S
C 7
4 F
3 N
S B
7 5
H 3
N S
D 5
6 H
3 N
S A
7 Need to improve the stem to ask "what item receives a signal to open or close as a result of the CURRENT stem conditions?"
Stem corrected with rev 2 question and is now Sat.
7 F
2 N
S C
7 8
H 3
N S
B 5
9 H
3 N
S A
7 10 F
3 N
S D
7 11 H
3 N
S A
7 12 F
3 N
S B
10 13 H
3 B
S C
7 2009 NRC Q57 14 F
3 N
S C
14 15 F
3 N
S B
8 16 F
3 N
S A
10 17 F
2 B
S C
10 2017 NRC
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other a Rev 3
ES-401 GG-2021-10 Written Examination Review Worksheet Form ES-401-9 18 H
3 N
S D
7 19 F
3 N
S B
7 20 F
3 N
S D
10 21 H
3 N
S B
5 22 H
2 N
S C
5 2006 NRC-after validation determined that two answers could be correct (this was a bank question with rev1) so wrote new question. With rev 2 of the question it is Sat.
23 H
3 N
S B
7 24 H
2 N
S D
7 Licensee requested a change to stem values and answer because of poor validation. NRC agreed to accept the changes and question is Sat with the rev 2 file.
25 H
3 N
S A
7 26 H
3 B
S C
7 2015 NRC 27 F
3 N
S D
5 didn't validate well.Licensee stated that there is confusion on 5gpd setpoint, and the IR is low at 2.5. Licensee made two changes to the question and NRC agreed with these changes and question is sat with rev2 question.
28 H
3 N
S A
7 29 F
2 N
S D
7 Licensee noted that Q29 and Q54 ovelap on SA valve, need to change one. Changed Q54 so this question is Sat with Rev 2.
30 F
3 N
S B
7 31 H
3 N
S B
5 a Rev 3
ES-401 GG-2021-10 Written Examination Review Worksheet Form ES-401-9 32 F
3 B
S B
7 2018 NRC Q41 stem edit for step in EOP. Complete in rev2 and is now Sat.
33 F
3 N
S A
10 34 H
3 N
S A
7 35 H
3 B
S D
5 36 H
3 N
S B
5 37 H
2 N
S D
7 38 H
3 N
S D
7 Trip path is incorrect. NRC corrected and is now Sat with rev 2.
39 F
3 N
S A
7 changed stem of question after validation (two correct answers) because these valves have both N and air accumulators. Question is Sat with rev 2.
40 H
3 N
S A
10 2012 NRC 41 H
2 B
S B
7 2010 NRC 42 H
3 N
S D
10 43 H
3 N
S A
10 44 H
3 N
S A
7 45 H
2 N
S C
10 changed stem after validation because part 2 of B and D could be argued correct at all times.
With rev 2 of question it is now Sat.
46 F
3 N
S C
10 47 F
3 N
S C
7 48 H
3 B
S C
7 2008 NRC a Rev 3
ES-401 GG-2021-10 Written Examination Review Worksheet Form ES-401-9 49 F
3 N
S C
14 50 F
2 N
S A
7 51 F
3 N
S C
7 52 F
2 N
S A
7 53 H
3 N
S C
5 54 H
2 N
S B
4 must change due to overlap with Q29. New question written after first validation. With rev 2 of the question file it is now Sat.
55 H
3 M
S D
7 mod from 2008 NRC Q27 56 F
3 B
S D
10 2010 NRC Q67 57 H
3 N
S A
10 stem focus was poor, licensee repaired stem and with Rev 2 of question it is now Sat.
58 F
2 N
S D
10 59 F
3 B
S A
5 2009 NRC Q9 60 H
3 N
S C
5 Poor validation (licensee states LOD = 5). Licensee wrote new question. With Rev 2 question it is now Sat.
61 H
2 M
S A
7 Mod from 2017 NRC Q21 62 H
3 B
S A
5 2012 NRC Q58 a Rev 3
ES-401 GG-2021-10 Written Examination Review Worksheet Form ES-401-9 63 F
2 N
S B
10 need to change distracter D because "Discipline Supervisor" is a fleet term for Entergy but is not used at Wat-3 and confused validators. Licensee used a different distracter and with Rev 2 file it is now Sat.
64 F
2 B
S A
2 2010 NRC Q69 65 F
2 N
S B
10 66 F
3 N
S B
7 67 F
3 N
S A
11 68 F
2 N
S B
7 69 H
2 B
S C
12 2012 NRC Q73 70 H
2 N
S C
12 71 F
2 N
S C
10 Licensee requested stem improvement after validation. NRC agreed to stem mod and with rev2 the question is now Sat.
72 F
2 N
S B
10 73 H
3 M
S C
5 mod from 2009 NRC Q61 74 H
3 N
S D
10 Licensee stated LOD = 5 for complexity of pump start times and memorization values. Wrote new question after first validation.
Question is Sat with rev 2 question.
75 H
3 N
S D
7 76 H
3 B
S A
5 2012 NRC Q11 SRO 77 F
3 M
S D
5 2006 NRC Q87 a Rev 3
ES-401 GG-2021-10 Written Examination Review Worksheet Form ES-401-9 78 H
3 B
S C
5 2015 NRC SROQ13 79 F
3 N
S A
1 80 H
3 N
S C
5 Didn't validate well.Licensee stated that LOD is 5 on this question. Modified stem and choices to reduce LOD and with rev2 question is now Sat.
81 H
3 B
S D
5 2017 NRC Q76 82 F
3 N
S B
2 Rev 1 question didn't validate well so modified stem slightly and with rev2 question is now Sat.
83 H
3 N
S B
2 Licensee didn't like question on basis of operational validity to take out all heater banks during a single maintenance activity.
Proposed modified stem and and with rev2 of question it is now Sat.
84 H
3 B
S C
5 2011 NRC Q77 85 H
2 N
S B
5 Didn't validate well due to LOD 5 contention by licensee. Modified question and choices with rev2 and it is now Sat.
86 H
2 B
S A
2 2015 NRC SRO Q8 87 H
3 B
S B
5 2006 NRC Q91 88 H
3 B
S A
5 2014 NRC Q86 89 H
3 M
S A
5 2014 SRO Q86 a Rev 3
ES-401 GG-2021-10 Written Examination Review Worksheet Form ES-401-9 90 H
3 N
S C
2 91 H
3 M
S D
5 2018 NRC Exam Wrote new question and it didn't validate well due to LOD 5 by licensee. KA was too obscure for NI's and core voiding. Changed KA and wrote modified question for second validation and with this change (Rev2) it is now Sat.
92 H
2 M
S B
4 2014 Q8 SRO NRC Wrote new question but licensee stated that valves no longer leak due to repairs and procedure had been updated during exam dev.
Licensee sent updated procedure.
Modified a 2014 question to replace this question and with rev2 it is now Sat.
93 H
3 B
S D
6 2008 NRC After first validation agreed that there were too many Inst Air topics on this exam so changed KA to refueling topic to meet sample requirements of 55.43.
Wrote new question on Refueling, didn't validate well so selected a bank question with rev 2 and question is now Sat.
94 F
2 N
S C
5 question didn't validate well and licensee proposed new question on Fluorides. It didn't validate well.
New question on Clorides and it validated better and with Rev 2 this question is now Sat. a Rev 3
ES-401 GG-2021-10 Written Examination Review Worksheet Form ES-401-9 95 H
2 N
S B
2 96 F
2 N
S C
3 97 H
3 N
S D
5 98 F
3 B
S A
4 2017 NRC SRO Q23 99 F
3 N
S D
5 100 H
3 N
S A
5 Results Table RO LOK -H 41 54.67 Avg RO LOD 2.71 Flaws 10 CFR Distribution RO LOK-F 34 AVG SRO LOD 2.76 Stem focus 0
41(b)1 0
43(b)1 1 SRO LOK - H 18 Overall LOD 2.72 Cues 0
41(b)2 1
43(b)2 5 SRO LOK - F 7
T/F 0
41(b)3 0
43(b)3 1 Cred Dist 0
41(b)4 1
43(b)4 2 RO Bank 12 16 SRO Bank 9
36 Partial 0
41(b)5 13 43(b)5 15 RO Mod 3
4 SRO Mod 4
16 job link 0
41(b)6 0
43(b)6 1 RO New 60 80 SRO New 12 48 units 0
41(b)7 35 43(b)7 0 minutia 0
41(b)8 1
Total Bank 21 21 backward 0
41(b)9 0
Total Mod 7
7 KA 0
41(b)10 19 Total New 72 72 SRO-only 0
41(b)11 1
LOD = 1 0
41(b)12 2
RO Sat 75 100 SRO Sat 25 100 41(b)13 0
RO Unsat 0
0 SRO Unsat 0
0 Answer Dist ( in %)
41(b)14 2
RO Edit 0
0 SRO Edit 0
0 RO-A 20 SRO-A 7
RO-B 19 SRO-B 6
Total Sat 100 100 Total Unsat 0
0 RO-C 19 SRO-C 6
Total Edit 0
0 RO-D 17 SRO-D 6 a Rev 3
Question Overlap with the Previous Two NRC Exams QA form ES-401-6 item 4 requires 4 or less questions on RO exam from previous two NRC exams, SRO portion two or less questions from previous two NRC exams*
- if this is exceeded, the region shall call NRR to explain why/reasons.
RO overlap from previous two NRC exams (2018-11 AND 2020-08 EXAMS)
Q32 2018-11 Q41 SRO overlap from the previous two NRC exams (2018-11 AND 2020-08 EXAMS)
Q91 modified from 2018-11
Questions Requiring References to Answer 6-10 questions rule of thumb on SRO portion of exam are allowed to be open reference, while the RO exam is generally none RO Questions that require hand-outs none SRO Questions that require hand-outs Q100 EAL wall chart