ML18096B187: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 01/05/1993
| issue date = 01/05/1993
| title = LER 92-025-00:on 921206,identified That Analog Rod Position Indications for CR in Violation of TS 3.0.3.Caused by Equipment Failure.Work Order Has Been Initiated to Replace 2DI & 1D4 Signal Conditioning modules.W/930105 Ltr
| title = LER 92-025-00:on 921206,identified That Analog Rod Position Indications for CR in Violation of TS 3.0.3.Caused by Equipment Failure.Work Order Has Been Initiated to Replace 2DI & 1D4 Signal Conditioning modules.W/930105 Ltr
| author name = POLLACK M J, VONDRA C A
| author name = Pollack M, Vondra C
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name =  
| addressee name =  

Revision as of 13:08, 17 June 2019

LER 92-025-00:on 921206,identified That Analog Rod Position Indications for CR in Violation of TS 3.0.3.Caused by Equipment Failure.Work Order Has Been Initiated to Replace 2DI & 1D4 Signal Conditioning modules.W/930105 Ltr
ML18096B187
Person / Time
Site: Salem PSEG icon.png
Issue date: 01/05/1993
From: Pollack M, Vondra C
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-92-025, LER-92-25, NUDOCS 9301070182
Download: ML18096B187 (5)


Text

{{#Wiki_filter:. --- Pui'..1ic Service Electric *and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station u. s. Nuclear Regulatory Commission Document control Desk Washington, DC 20555

Dear Sir:

SALEM GENERATING STATION . LICENSE NO. DPR-70 DOCKET NO. 50-272 UNIT NO. 1 LICENSEE EVENT REPORT 92-025-00 January 5, 1993 Licensee Event requirements of 50.73(a) (2).(i) (B). thirty ( 3 O) days of Report is being submitted pursuant* to the Code of Federal Regulations lOCFR This report is required to be issued within event discovery. -MJP:pc Distribution 9.301070182 930105 . PDR ADOCK 05000272 PDR s Sincerely yours, . ;/ f i //) . / c .. A Vondra -General.Manager -Salem Operations / If I 1-fe!" -.(i l\lRC FOR!l;! 366 .U.S. NUCLEAR REGULATORY COMMISSION APPROVEO OMB NO. 3150-0104 (6-891 , EXPIRES: 4/30/92 ESTIMATED BURDEN PER RESPONSE .TO COMPLY WTH THIS LICENSEE EVENT-REPORT (LER) INFORMATION COlLECTION REQUEST: 50.0 HRS; FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS . AND REPORTS MANAGEMENT BRANCH (P-530), U.S. NUCLEAR .. REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO .I THE PAPERWORK R'EDUCTION PROJECT (3150-0104), OFFICE OF MANAGEMENT AND BUDG.ET, WASHINGTON, DC 20503. ** FACILITY NAME (1) I DOCK.ET NUMBER (2) I PAGE 131 Salem Generating Sta ti op -Unit 1 01s1010101 21 712 , OF 0 I 4 TITLE (4) -Tee:h Snee 3.0.3 entry; more than one analog rod position indicator per bank .. tl.npperable. EVENT DATE 15.l* LER NUMBER (6) REPORT DATE (71 OTHER FACILITIES INVOLVED (81 MONTH DAY YEAR YEAR *:*:*:*:*:* SEQUENTIAL

REVISION MONTH DAY YEAR FACILITY NAMES DOCKET NUMBERISI

  • .*.*.*.*.*

NUMBER :::::;:::: NUMBER i> 1 s Io Io* I o I I I -11 ol6 91 2 -ol 2 Is -o lo 0!1 ol s 91 2 9 *2 2 0 I 5 I 0 I 0 I 0 I I I OPERATING THIS REPORT IS SUBMITTED*PURSUANT TO THE OF 10 CFR §: (Chock one or more of the following) (111 MODE (9) 1 20.402(b) 20.405(cl 50.73(1)(2)(iv) 73.71(b) l 1; ,....__ ,_ ,....__ -POWER 20.406(11(1 llil 60.38(c)(1) 50.73(1)(2)(v) 73.71 (cl *LEVEL ----,....__ (10) 010 20.406(1)(1 l(ii) 50.38(c)(2) 50.73(1)(2)(vii) OTHER (Spacify in Abstract ---.....,..... below tJnd in Toxr, NRC Form 20.406(1)(1 l(iii) x 50.73(1112Hil 60.73111(2)(viii)(AI 366A) ----20.405(1)(1 l(lv) 60.73(1)(2l(ii) 50.73(11(2)(viii)(BI

,....,_ ,....__ - 20.405(1)(1 )(y) 50.73(1)(2)(iii) 50.73(1)(211*1 . LICENSEE CONTACT FOR THIS LER (12) NAME TELEPHONE NUMBER AREA CODE M.J. Pollack -LER Coordinator -610 19 313191-12 IO 12 12 COMPLETE ONE LINE FOR EACH COMPONENT .FAILURE OESCRIBED IN THIS REPORT (13) , ................ ........ ......... .... , ... >:::::::: .. ...... ....... MANUFAC* REPORTABLE 1:-:*:-:-.** ... , .. ,. , ... ,, ... ..... , .. MANUFAC* REPORTABLE CAUSE SYSTEM COMPONENT CAUSE SYSTEM COMPONENT , ..... , . ... , ... ...........

  • TUR ER TO NPRDS "'""* .. , ..... , .... , ... , .. TUR ER TO .NPRDS -[::::::: *.*. . ,., .. , . .... , ....... ..........

.. , ..... ..... , . ...........

.;.;.;.
-::-: ,., .... , ,., .. ,. 1:-:*:-:*

.... ........ .. , . ...........

  • [*:"""'"*

-:* , ... B AIA I IM 10 ID H I Oi 115 y ..... ,.* . ;.: ... , .. , . I I I I I I .. ... ,. "" *.-.*:*. ... , ... , I ..... *:-: :-::*: .-:*:*:*.'

  • .'::*:* "" *:-: -:*. *:*: ){} {{ ..... , .. . , ..........

!: .. :,:: :-:-:-:--:*::*:--:-: -:* ,., .. , ... , I I I I I i I !::::::::::::: ........ ....... , ........... I I I I I .I I :::::::: ., .........

  • .*. .. ..........

.......... ,. ' SUPPLEMENTAL REPORT EXPECTED 1141 MONTH DAY YEAR rxi 'EXPECTED .. SUBMISSION "J YES (If V"'* complete EXPECTED SUBMISSION DATE) DATE 1151 NO I I I . ABSTRACT (Limir to 1400 spsces. i.e .. approximately fiftef!n single.space typewritten /in.es} (161 On 12/6/92, at 1743 hours, during full power operation, the Control Room Operator identified that Analog Rod Position Indications (ARPis) for Control Rods 104 and 2Dl. were indicating greater than a+/- 12 step deviation from their group demand counter. Technical Specification 3.1.3.2.1 addresses.the operability requirement of *the "Reactivity Control System's" position indicating systems. Actions required when more than one ARP! per bank is inoperable exceed the Tech. Spec. Limiting Condition For Operation; therefore,. actions associated* with Tech. Spec. 3.0.3 apply (and was entered *on 12 / 6 / 9 2 ) . On 12/6/92, at 1816 hours, the *2n1 control rod position indication was corrected by adjustment of the signal conditioning module. Tech. Spec .. 3.0.3 was. subsequently exited. Technical Specification Action 3.1.3.2.la.a

  • remained in affect until the 1D4 control rod position indication was. corrected, at 1827 hours. The cause of the ARPis having greater than.+/- 12 step deviation from their group demand counter, for the two (2) control rods, is equipment failure. Signal conditioning modul*e drift was responsible for the two (2) control rods to be indicating greater than +/- ,12 steps from their group demand counter. The ARP! system electronics associated with the Westinghouse Signal Condition Module, will ha.ve some drift. aowever, it*is expected that this drift will not exceed the acceptable limit of + 12 steps from group demand within the 18 month calibration period. The signal conditioning module for the 2Dl and 1D4 control rod indicators are being rTplaced.

.. NRC .Form.366 16-891

  • LICENSEE EVENT REPORT (LER) TEXT CONTINUATION S al em Generating Station DOCKET NUMBER LER NUMBER PAGE Unit 1 5000272 92-025-00 2 of 4 PLANT AND SYSTEM IDENTIFICATION:

Westinghouse -.Pressurized Water Reactor Energy Industry Identification System (EIIS) codes are identified in the text as {xx} IDENTIFICATION OF OCCURRENCE: ' *Technical Specification 3.0'.3 entry; more than one analog rod position indicator per bank inoperable Event Dates:* 12/06/92 Report Date:

  • 1/05/93 This report was initiated by Incident Report No. 92-803. CONDITIONS PRIOR TO OCCURRENCE:

Mode 1 Reactor Power 100%--Unit Load 1150 MWe On,12/6/92 at 0315 hours, a power increase from 81% to 100% was initiated. As of 0715 hours, reactor power was ioo% with the control rods in manual. DESCRIPTION OF OCCURRENCE: On December 6, 1992, at 1743 hours, during full-power operation, the Control Room Operator identified that Analog Rod Position Indications (ARPis) for Control Rods 1D4 and 2Dl were indicating greater than a +/- 12 step deviation from their group demand counter. Technical Specification -3.1.3.2.1 addresses the operability requirement of the "Reactivity Control System's" {AA} position indicating systems. The indicators are determined operable by verifying that the* rod position indication system agrees within twelve (12) steps of the* group demand counters. Actions required when more than one ARPI per is inoperable exceed the Technical Specification 3.L3.2.l Limiting Condition .For Operation; therefore, actions associated with Technical Specification 3.0.3 apply (and was entered on December 6, 1992). Technical

3.0.3 states

"When a Limiting Condition for Operation is not met except provided in the associated ACTION requirements, within one hour action shall be initiated to place the unit in a MODE in which does n9t apply by placing it, as applicable, .in: .. 1. At least HOT STANDBY within the next 6 hours, 2. At least HOT SHUTDOWN within the following 6 hours, and ' . .. --LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station DOCKET.NUMBER LER NUMBER PAGE unit 1 5000212 92-025-00 3 of 4 DESCRIPTION OF OCCURRENCE: -(cont'd) 3. At least COLD SHUTDOWN within the subsequent 24 hours. Where corrective measures are completed that permit operation under the ACTION-requirements, the ACTION may be taken in -accordance with the specified time limits as measured from the -time of failure to meet the Limiting Condition of Operation. Exceptions to these requirements are stated -in the individual

  • On December 6, 1992., at 1816 hours, the 2Dl control rod position indication was corrected by adjustment of the signal -conditioning

_module. Technical Specification

3. o. 3 was subsequently exited. Technical Specification Action 3.1.3.2.la.a remained in affect until the control rod position indication was corrected, at 1827 hours. APPARENT CAUSE OF OCCURRENCE:

The cause of the ARPis having greater than +/- 12 step deviation from their group demand counter, for the two '(2) control -rods, is equipment failure. Maintenance-I&C investigation identified that signal conditioning module drift was responsible for the two (2) control rods to be indicating greater than+/- from their group demand counter. The ARPI system electronics settings, associated with the Westinghouse Signal Condition Module, will have some drift .. However, it is expected that this drift wiil not exceed the acceptable limit of +/- 12 steps from group demand within the 18 month calibration period .. ANALYSIS-OF OCCURRENCE: Operability of the ARPis is required to determine control rod position. This ensures with control rod alignment and insertion limits assumed in the accident analyses. Investigation of this event showed that actual rod positions (per group demand) were correct, with ortiy.the indication being wrong. However, -had a control rod actually been misaligned, the appropriate Technical Specification Action Statement requirements would have been met. The false rod positioning indication did not affect the health or safety of the public; however, since Technical Specification 3.0.3 was entered, this-event is-reportable to the Nuclear Regulatory Commission in accordance with Code of Federal Regulations lOCFR 50. 73 (a) (2) (i) (B). -CORRECTIVE ACTION: As stated in the* Description of Occurrence section, the 2Dl and 1D4 control rod position indications were corrected by adjustment of their conditioning modules. LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating station Unit 1 CORRECTIVE ACTION: (cont'd) DOCKET *NUMBER 5000272 LER NUMBER 92-025.;..00 .. PAGE 4 of. *4 A work order has be.en initiated to :r*eplace the. 201 and 104 signal conditioning modules. system is continuing its review of this event and similar prior events. Additional corrective action will be implemented based this MJP:pc SORC Mtg. 93-001 enera1* anager -, Salem Operations}}