ML17037C550: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 12: Line 12:
| document type = Letter, Response to Request for Additional Information (RAI)
| document type = Letter, Response to Request for Additional Information (RAI)
| page count = 4
| page count = 4
| project =
| stage = Other
}}
}}



Revision as of 22:07, 26 April 2019

Letter Respond to a Letter of July 26, 1973 Requesting Additional Information Concerning Two Aspects of Design and Operation of Unit 1 and Advising That Responses Will Be Submitted on or Before September 10, 1973
ML17037C550
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/02/1973
From: Raymond P D
Niagara Mohawk Power Corp
To: Ziemann D L
US Atomic Energy Commission (AEC)
References
Download: ML17037C550 (4)


Text

AEC DI~iIBUTION FOR, PART 50 DOCKET MA AL (TEMPORARY FORM)PILE: Niagara Mohawk Power Corp Syracuse, N.Y.13202 Philip D.Raymond DATE OF DOC 8-2-73 DATE REC'D 8-7-73 LTR-MEMO RPT OTHER TO: Mr.Ziemann ORIG CC OTHER SENT AEC PDR CLASS UNCLASS PROP INFO INPU NO'REC'D DOCKET NO: 50-220 DESCRIPTION:

ltr re our 7-26-73...advising requested info willbe submitted on or before 9-10-73 ENCLOSURES:

PLANT NAME: Nine Point Unit gl'rACKNOWLED GEO LIN KOT REMOVE FOR ACTION/INFORMATION BUTLER(L)W/.Copies CLARK(L)W/Copies GOLLER(L)W/Copies KNIEL(L)W/Copies SCHWENCER(L)

W/Copies STOLZ(L)W/Copies VASSALLO(L)

W/Copies SCHEMEL(L)

W/Copies NIEMANN (L)W//Copies DICKER(E)W/Copies KNIGHTON (E)W/Copies YOUNGBLOOD(E)

W/Copies INTERNAL DISTRIBUTION REGAN(E)W/Copies W/Copies W/Copies W/Copies G FIL DR'GC, RMM P-506A MUNTZING/STAPF

~SE GIAliBUSSO BOYD MOORE (L)(BWR)DEYOUNG (L)(PWR)~SKOVHOLT (L)P, COLLINS G OPR ILE&REGION(3)MORRIS STEELE TECH REVIEW~NDRIE SCHROEDER MACCARY KNIGHT PAWLICKI SHAO S TELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO LONG LAINAS BENAROYA VOLI2iER DEN TON GRIMES GAIRiILL KASTNER BALLARD SPANGLER ENVI RO MULLER DICKER KNIGHTON YOUNG BLOOD REGAN PROJECT LDR HARLESS LIC ASST BROWN (E)CAIGGS (L)GEARIN (L)GOULBOURNE (L)LEE (L)MAIGRET (L)SERVICE (L)SHEPPARD (E)SMITH (L)TEETS (L)WADE (E)WILLIAMS (E)WILSON (L)A/T IND BEAIIMAN SALTZMAN ANS CDONALD DUBE INFO C.MILES 1-LOCAL PDR 1-DTIE(ABERNATHY) 1-NSXC(BUCHANAN) 1-ASLB(YORE/SAYRE/

WOODARD/"H" ST.16-CYS ACRS HOLDING EXTERNAL DISTRIBUTION (1)(2)(9)-NATIONAL LAB'S 1-'R.Schoonmaker,OC,GT,D"323 1-R.CATLIN, E-256-GT 1-CONSULTANT'S NEWMARK/BLE iE/AGBABIAN 1-GERALD ULRIKSON., ORNL 1-PDR"SAN/LA/NY 1-GERALD LELLOUCHE BROOKHAVEN NAT.LAB 1"AGMED(WALTER KOESTER HM-C-427-GT

"'A1~RD<<<<MULLER

<<F'99 e'GT I A'I I NIAGARA MOHAWK POWER CORPORATION 1" i%I>m;NIAGARA'MOHAWK 300 ERIE BOULEVARD WEST SYRACUSE, N.Y.13202 August 2,'LS t1r.Denni s L.Zi emann Chief, Operating Reactors Branch No.2 Directorate of Licensing United States Atomic Energy Commission Washington, D.C.20545

Dear!1r.Ziemann:

p~aif E~I Z4H'7 Re: Nine t<ile Point Unit 1 Docket No.50-220 Your letter of July 26, 1973 requested additional information concerning two aspects of design and operation of Nine flile Point Unit 1.This information is presently being prepared by our engineering staff.The responses to Section B of the attachment to your letter will be submitted on or before September 10, 1973.These responses concern the access platform addition to the refueling bri'dge structure.

The information requested in Section A of the attachment to your letter concerns the quality assurance program for Nine flile Point Unit 1 operation.

'Much of this information is similar to the information requested in your Nay 21, 1973 letter on the same subject.To preclude unnecessary iterations, the responses to the quality assurance requests contained in both of your letters will be combined into a single response.All of the information on quality assurance, including that previously requested, will be submitted on'r before November 23, 1973.Very truly yours, Philip D.Raymond Vice President-Engineering lj I'v