{{#Wiki_filter:e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMONDA VIRGINIA 23261 W. L. STEWART VxcE PRESXDENT NUCLEAR OPERATIONS August 5, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
{{#Wiki_filter:e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMONDA VIRGINIA 23261 W. L. STEWART VxcE PRESXDENT NUCLEAR OPERATIONS August 5, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Serial No. 439 NO/WDC:acm Docket No. 50-280 License No. DPR-32 AMENDMENT TO OPERATING LICENSE DPR-32 SURRY POWER STATION UNIT NO. 1 PROPOSED TECHNICAL SPECIFICATION CHANGE Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating License DPR-32 for the Surry Power Station, Unit No. 1. The proposed change is enclosed.
Serial No. 439 NO/WDC:acm Docket No. 50-280 License No. DPR-32 AMENDMENT TO OPERATING LICENSE DPR-32 SURRY POWER STATION UNIT NO. 1 PROPOSED TECHNICAL SPECIFICATION CHANGE Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating License DPR-32 for the Surry Power Station, Unit No. 1. The proposed change is enclosed.
We are requesting that Technical Specification 4.17.A for inaccessible snubbers be given an administrative extension for 21 days. This extension will allow continued operation of Surry Unit 1 until Surry Unit 2 returns to power operations following an extended refueling outage. This extension will maximize the use of our nuclear units and minimize the cost of replacement power, and the cost to the consumer, during a high load period. The proposed change is provided in Attachment  
We are requesting that Technical Specification 4.17.A for inaccessible snubbers be given an administrative extension for 21 days. This extension will allow continued operation of Surry Unit 1 until Surry Unit 2 returns to power operations following an extended refueling outage. This extension will maximize the use of our nuclear units and minimize the cost of replacement power, and the cost to the consumer, during a high load period. The proposed change is provided in Attachment
: 1. A discussion of the proposed change is provided in Attachment  
: 1. A discussion of the proposed change is provided in Attachment
: 2. This request has been reviewed and approved by the Surry Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that this request does not pose an unreviewed safety question as defined in 10 CFR 50.59. We have reviewed this request in accordance with the criteria in 10 CFR
: 2. This request has been reviewed and approved by the Surry Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that this request does not pose an unreviewed safety question as defined in 10 CFR 50.59. We have reviewed this request in accordance with the criteria in 10 CFR
* 170.22. Since this request involves a safety issue which the staff should be able to determine does not involve a significant hazards consideration for Unit 1 a Class III license amendment fee is required.
* 170.22. Since this request involves a safety issue which the staff should be able to determine does not involve a significant hazards consideration for Unit 1 a Class III license amendment fee is required.
A check in the amount of $4,000 is enclosed in payment of the required fees. Attachments:  
A check in the amount of $4,000 is enclosed in payment of the required fees. Attachments:
: 1. 2. 3. Proposed Technical Specification Discussion of Proposed Technical Voucher Check for $4,000 Very truly yours, c./! f'IJJ-W. L. Stewart 1100/ Change 1/ I Specification Change Rec.~ W/ e"ec ~"tsa.t~ ',.,., 000* 0 0 I   
: 1. 2. 3. Proposed Technical Specification Discussion of Proposed Technical Voucher Check for $4,000 Very truly yours, c./! f'IJJ-W. L. Stewart 1100/ Change 1/ I Specification Change Rec.~ W/ e"ec ~"tsa.t~ ',.,., 000* 0 0 I   
-----------=--
-----------=--

Revision as of 10:45, 25 April 2019

Application for Amend to License DPR-32,changing Tech Spec 4.17.A to Allow Inaccessible Snubbers Administrative Extension for 21 Days for Return to Operation.Class III Fee Encl
ML18141A074
Person / Time
Site: Surry Dominion icon.png
Issue date: 08/05/1983
From: STEWART W L
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: DENTON H R, VARGA S A
Office of Nuclear Reactor Regulation
Shared Package
ML18141A075 List:
References
439, NUDOCS 8308110182
Download: ML18141A074 (4)


Text

e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMONDA VIRGINIA 23261 W. L. STEWART VxcE PRESXDENT NUCLEAR OPERATIONS August 5, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Serial No. 439 NO/WDC:acm Docket No. 50-280 License No. DPR-32 AMENDMENT TO OPERATING LICENSE DPR-32 SURRY POWER STATION UNIT NO. 1 PROPOSED TECHNICAL SPECIFICATION CHANGE Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating License DPR-32 for the Surry Power Station, Unit No. 1. The proposed change is enclosed.

We are requesting that Technical Specification 4.17.A for inaccessible snubbers be given an administrative extension for 21 days. This extension will allow continued operation of Surry Unit 1 until Surry Unit 2 returns to power operations following an extended refueling outage. This extension will maximize the use of our nuclear units and minimize the cost of replacement power, and the cost to the consumer, during a high load period. The proposed change is provided in Attachment

1. A discussion of the proposed change is provided in Attachment
2. This request has been reviewed and approved by the Surry Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that this request does not pose an unreviewed safety question as defined in 10 CFR 50.59. We have reviewed this request in accordance with the criteria in 10 CFR
  • 170.22. Since this request involves a safety issue which the staff should be able to determine does not involve a significant hazards consideration for Unit 1 a Class III license amendment fee is required.

A check in the amount of $4,000 is enclosed in payment of the required fees. Attachments:

1. 2. 3. Proposed Technical Specification Discussion of Proposed Technical Voucher Check for $4,000 Very truly yours, c./! f'IJJ-W. L. Stewart 1100/ Change 1/ I Specification Change Rec.~ W/ e"ec ~"tsa.t~ ',.,., 000* 0 0 I

=--

-e e VIRGINIA ELEcTRic AND PoWER CowPANY To Harold R. Denton cc: Mr. James P. O'Reilly Regional Administrator Region II Mr. D. J. Burke NRC Resident Inspector Surry Power Station Mr. J. Don Neighbors NRC Project Manager-Surry Operating Reactors Branch No.I Division of Licensing Mr. Charles Price Department of Health 109 Governor Street Richmond, Virginia 23219

--=.:------=-

~. --------~-e COMMONWEALTH OF VXRGINIA) ) CITY OF RICHMOND ) e The foregoing document was acknowledged before me, in and for the City and Connnonwealth aforesaid, today by W, L. Stewart who is Vice President Nuclear Operations, of the Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief. -:xL Acknowledged before me this day of , 19 -~-3~~-My Commission expires: , 19 ----------

Notary Public (SEAL) S/001 I __J e e ATTACHMENT 1