Letter Sequence Approval |
---|
EPID:L-2018-LLA-0016, License Amendment Request Focused Adoption of NEI 99-01. Revision 6 Unusual Event Fire-Related Emergency Action Level Scheme (Approved, Closed) |
|
MONTHYEARL-2018-031, License Amendment Request Focused Adoption of NEI 99-01. Revision 6 Unusual Event Fire-Related Emergency Action Level Scheme2018-01-31031 January 2018 License Amendment Request Focused Adoption of NEI 99-01. Revision 6 Unusual Event Fire-Related Emergency Action Level Scheme Project stage: Request ML18037A6192018-02-0808 February 2018 Letter to Licensee Individual Notice of Consideration of Issuance of Amendments to Fols, Proposed NSHC, and Opportunity for Comment & Hearing Project stage: Other NRC-2018-0025, St. Lucie Plant, Units 1 and 2 - Letter to Licensee Individual Notice of Consideration of Issuance of Amendments to Fols, Proposed NSHC, and Opportunity for Comment & Hearing2018-02-0808 February 2018 St. Lucie Plant, Units 1 and 2 - Letter to Licensee Individual Notice of Consideration of Issuance of Amendments to Fols, Proposed NSHC, and Opportunity for Comment & Hearing Project stage: Approval ML18046A7122018-03-26026 March 2018 Issuance of Amendments Regarding the Unusual Event Fire Related Emergency Action Level Scheme Project stage: Approval 2018-02-08
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-117, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report ML24093A2612024-04-0202 April 2024 – Investigation Summary, Office of Investigations Case Number 2-2023-005 L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-045, Report of 10 CFR 72.48 Plant Changes2024-03-27027 March 2024 Report of 10 CFR 72.48 Plant Changes 2024-09-09
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML22020A4032022-02-0707 February 2022 Summary of November 17, 2021, Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests (EPIDs L-2021-LLI-0000 and L-2021-LLI-0002) ML21342A2092022-01-14014 January 2022 Issuance of Amendment Nos. 252 and 207 to Allow Risk-Informed Completion Times (RICT) for the 120-Volt Alternating Current (AC) Instrument Bus Requirements ML21022A2192021-02-26026 February 2021 Issuance of Amendment No. 206 to Replace the Current Time-Limited Reactor Coolant System Pressure/Temperature Limit Curves and LTOP Setpoints with Curves and Setpoints That Will Remain Effective for 55 Effective Full Power Years ML20259A2982020-11-18018 November 2020 Issuance of Amendment No. 205 Regarding Modification of the Reactor Coolant Pump Flywheel Inspection Program ML20237F2572020-10-30030 October 2020 Issuance of Amendment Nos. 251 and 204 Regarding Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 Development of Emergency Action Levels for Non-Passive Reactors ML19266A0722020-01-27027 January 2020 Issuance of Amendment Nos. 250 and 202 Regarding Technical Specification Changes to Allow the Performance of Selected Emergency Diesel Generator Surveillance Requirements During Power Operation ML19248C2382019-11-20020 November 2019 Issuance of Amendment No. 201 Regarding Technical Specification Changes to Eliminate Requirements of Iodine Removal System ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 ML19203A1662019-07-26026 July 2019 Issuance of Exigent Amendment No. 248 Technical Specification 3/4.8.1 Change to Allow for a One-Time Extension of the Allowed Outage Time for One Emergency Diesel Generator ML19113A0992019-07-0202 July 2019 Issuance of Amendments Regarding Adoption of Risk-Informed Completion Times in Technical Specifications ML19058A4922019-04-23023 April 2019 Issuance of Amendment 198 Regarding Technical Specification Changes to Reduce the Number of Control Element Assemblies ML18274A2242018-11-0202 November 2018 Issuance of Amendment Nos. 246 and 197 Regarding Technical Specifications Site Area Map ML18129A1492018-07-0909 July 2018 Issuance of Amendments Regarding Technical Specification Changes Related to the Auxiliary Feedwater System (CAC Nos. MG0237 and MG0238; EPID L-2017-LLA-0296) ML18046A7122018-03-26026 March 2018 Issuance of Amendments Regarding the Unusual Event Fire Related Emergency Action Level Scheme ML17257A0152017-10-31031 October 2017 Issuance of Amendments Regarding Technical Specification Changes Related to the Reactor Protection System and Limiting Condition for Operation 3.0.5 ML17248A3792017-10-23023 October 2017 Issuance of Amendments to Revise the Renewed Facility Operating Licenses Fire Protection License Conditions (CAC Nos. MF9681 and MF9682; EPID L-2017-LLA-0230) ML17235A5652017-10-0505 October 2017 Issuance of Amendments Regarding Technical Specification Changes Related to Component Cyclic or Transient Limits ML17195A2912017-08-14014 August 2017 Issuance of Amendments Regarding Relocation of Radiation Monitor Requirements from Technical Specifications to Licensee-Controlled Documents ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17038A2252017-03-29029 March 2017 Issuance of Amendment No. 188 Regarding Emergency Diesel Generator Day Tank Volume ML16251A1282016-12-0505 December 2016 Issuance of Amendments to Update Appendix B to the Renewed Facility Operating License to Incorporate the 2016 Biological Opinion ML16166A4242016-10-0505 October 2016 St. Lucie Plant, Unit Nos. 1 and 2 - Issuance of Amendments Regarding the Use of a New Computer Code to Model the Containment Vacuum Analyses ML16183A1382016-09-19019 September 2016 Issuance of Amendments Regarding Technical Specification Change to Eliminate the Moderator Temperature Coefficient Surveillance Test at the End of Cycle ML16210A3742016-08-30030 August 2016 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-422, Revision 2 ML16103A3972016-07-28028 July 2016 Issuance of Amendments Regarding Removal of Technical Specification for Cleaning Fuel Oil Storage Tank Sediment and Relocating Procedures to Licensee Controlled Documents L-2016-120, License Amendment Request EDG Day Tank Fuel Volume Change2016-06-21021 June 2016 License Amendment Request EDG Day Tank Fuel Volume Change ML16124A3832016-05-25025 May 2016 St. Lucie Plant, Unit No. 1 - Issuance of Amendment Regarding Changes to the Snubber Surveillance Requirements (CAC No. MF6490) ML16063A1212016-04-19019 April 2016 Redacted - Issuance of Amendment Regarding License Amendment Request for the Transitioning to Areva Fuel ML15344A3462016-03-31031 March 2016 Issuance of Amendments Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with Title 10 of the Code of Federal Regulations Section 50.48(c) (CAC Nos. MF1373 & MF1374) ML15356A6112016-03-0707 March 2016 Issuance of Amendments Regarding Request to Standardize the Required Actions for Inoperability of Auxiliary Feedwater Pumps ML16034A0802016-03-0707 March 2016 Issuance of Amendments Regarding Technical Specification Change to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents ML15195A6552015-08-27027 August 2015 Issuance of Amendments Regarding Change to Technical Specification 6.8.4.h., Containment Leakage Rate Testing Program ML15121A1822015-06-0505 June 2015 Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML14350A0082015-06-0101 June 2015 Issuance of Amendment to Revise the Requirement Regarding the Shift Technical Advisor ML14343A9182015-02-27027 February 2015 Issuance of Amendments to Revise Limiting Condition for Operation 3.0.4 and Surveillance Requirement 4.0.4 ML14064A1292014-03-31031 March 2014 Issuance of Amendment Regarding the Use of M5 Alloy Fuel Cladding in Core Reload Applications ML13164A2652013-08-30030 August 2013 Issuance of Amendments Revising Station Battery Connection Resistances Acceptance Criteria in Technical Specifications ML13150A3372013-06-18018 June 2013 Issuance of Amendments Revision Station Battery Connection Resistances Acceptance Criteria in Technical Specifications ML12339A1092012-12-17017 December 2012 Issuance of Amendments Regarding Revision to Cyber Security Plan Milestone 6 ML12235A4632012-09-24024 September 2012 Issuance of Amendment Regarding Extended Power Uprate ML12263A2242012-09-19019 September 2012 Public - Issuance of Amendment Regarding New Fuel Vault and Spent Fuel Pool Nuclear Criticality Analysis ML12156A2082012-07-0909 July 2012 Issuance of Amendment Regarding Extended Power Uprate ML12181A0192012-07-0909 July 2012 Issuance of Amendment Regarding Extended Power Uprate (Redacted) ML12052A2212012-03-30030 March 2012 Issuance of Amendments Regarding TSTF-513 Change, Revision 3, Revise Pressurized Water Reactor Operability Requirements and Actions for Reactor Coolant System Leakage Instrumentation ML11196A0792011-08-31031 August 2011 Issuance of Amendments Regarding Approval of the St. Lucie Cyber Security Plan ML1034404952010-12-28028 December 2010 Issuance of Amendments Regarding Deletion of the Structural Integrity Technical Specification Update of Accident Monitoring Instrumentation Requirements and Various Administrative Changes ML1009902752010-05-31031 May 2010 Issuance of Amendment Regarding Control Element Assembly Drop Time ML0917003142009-06-30030 June 2009 Issuance of Amendments Regarding Technical Specification Requirements Associated with Refueling Water Tank Minimum Contained Volume of Borated Water (TAC Nos. MD9208 and MD9209) ML0909602702009-05-27027 May 2009 License Amendment, Implementation of TSTF-511, Revision 0, Eliminate Working Hour Restriction from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0909701742009-04-14014 April 2009 Issuance of Amendments Regarding Relocation of the Existing Surveillance Requirements Associated with Diesel Fuel Oil Testing Program (Tac MD9261 and MD9262) 2022-02-07
[Table view] Category:Safety Evaluation
MONTHYEARML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML24078A2622024-03-26026 March 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML24017A2092024-03-12012 March 2024 – Issuance of Amendment Nos. 254 and 209 to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24005A2772024-02-20020 February 2024 Issuance of Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications ML23219A0032023-09-0101 September 2023 SLRA SER Rev 1 ML23200A1462023-07-21021 July 2023 Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1 and 2 ML22255A1022022-09-21021 September 2022 Authorization and Safety Evaluation for Alternative Relief Request No. 10 - Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality or Safety ML22038A1872022-02-0909 February 2022 Authorization and Safety Evaluation for Relief Request No. 19 (RR19) - the Use of an Alternative to ASME Code Case N-729-6 for Replacement Reactor Vessel Closure Head Penetration Nozzle 85 ML21342A2092022-01-14014 January 2022 Issuance of Amendment Nos. 252 and 207 to Allow Risk-Informed Completion Times (RICT) for the 120-Volt Alternating Current (AC) Instrument Bus Requirements ML21236A1312021-09-30030 September 2021 Authorization of RR 15 Regarding Extension of ASME Requirements Related to Reactor Pressure Vessel Weld Examinations from 10 to 20 Years ML21022A2192021-02-26026 February 2021 Issuance of Amendment No. 206 to Replace the Current Time-Limited Reactor Coolant System Pressure/Temperature Limit Curves and LTOP Setpoints with Curves and Setpoints That Will Remain Effective for 55 Effective Full Power Years ML21027A2262021-02-17017 February 2021 Approval of Alternative to ASME Code, Section XI to Use an Alternative Inservice Inspection Schedule for the Reaction Vessel Closure Head Bolting ML20329A4022021-02-0303 February 2021 Approval of Alternative to Use ASME Code Case N-513-4 for Alternative Repair of Intake Cooling Water System ML20259A2982020-11-18018 November 2020 Issuance of Amendment No. 205 Regarding Modification of the Reactor Coolant Pump Flywheel Inspection Program ML20237F2572020-10-30030 October 2020 Issuance of Amendment Nos. 251 and 204 Regarding Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 Development of Emergency Action Levels for Non-Passive Reactors ML20099A3482020-06-25025 June 2020 Safety Evaluation for Relief Request for Fifth Ten-Year Inservice Inspection (ISI) Interval - Alternative Risk-Informed Inservice Inspection Program for Class 1 and 2 Piping Welds ML20023B3782020-02-19019 February 2020 Safety Evaluation for Relief Request RR-16, Alternate Repair of 2B Boric Acid Makeup Pump Revision for the Fourth 10-Year Inservice Inspection Interval ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19266A0722020-01-27027 January 2020 Issuance of Amendment Nos. 250 and 202 Regarding Technical Specification Changes to Allow the Performance of Selected Emergency Diesel Generator Surveillance Requirements During Power Operation ML19254B5332019-09-30030 September 2019 Safety Evaluation for Relief Request RR#15, Revision 0, Regarding Limited Piping Examinations ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 ML19203A1662019-07-26026 July 2019 Issuance of Exigent Amendment No. 248 Technical Specification 3/4.8.1 Change to Allow for a One-Time Extension of the Allowed Outage Time for One Emergency Diesel Generator ML19115A2812019-05-31031 May 2019 Safety Evaluation for Relief Request No. 6 for the Fifth 10 Year Inservice Inspection Interval ML19058A4922019-04-23023 April 2019 Issuance of Amendment 198 Regarding Technical Specification Changes to Reduce the Number of Control Element Assemblies ML18274A2242018-11-0202 November 2018 Issuance of Amendment Nos. 246 and 197 Regarding Technical Specifications Site Area Map ML18256A0982018-10-30030 October 2018 Safety Evaluation for Relief Request No.5 for the Fifth 10-Year Inservice Inspection Interval ML18129A1492018-07-0909 July 2018 Issuance of Amendments Regarding Technical Specification Changes Related to the Auxiliary Feedwater System (CAC Nos. MG0237 and MG0238; EPID L-2017-LLA-0296) ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML18046A7122018-03-26026 March 2018 Issuance of Amendments Regarding the Unusual Event Fire Related Emergency Action Level Scheme ML18018A0332018-01-26026 January 2018 Safety Evaluation of Relief Requests for the Fifth 10-Year Inservice Testing Program (EPID L-2017-LLR-0113; L-2017-LLR-0017, L-2017-LLR-0018, L-2017-LLR-0119, L-2017-LLR-0120, L-2017-LLR-0121, and L-2017-LLR-0122) ML17334A9362018-01-0404 January 2018 Relief from the Requirements of the ASME Code Regarding Relief Request No. 17, Revision 0, for the Fourth 10-Year Inservice Inspection Interval (CAC No. MF9826; EPID L-2017-LLR-0043) ML17341A4422018-01-0404 January 2018 Relief from the Requirements of the ASME Code Relief Request No. 3 for the Fifth 10-Year Inservice Inspection Interval (CAC No. MF9288; EPID L-2017-LLR-0003) ML17257A0152017-10-31031 October 2017 Issuance of Amendments Regarding Technical Specification Changes Related to the Reactor Protection System and Limiting Condition for Operation 3.0.5 ML17263A1202017-10-27027 October 2017 Inservice Inspection Plan Fourth 10-Year Interval Relief Request No. 16 (CAC No. MF9827; EPID L-2017-LLR-0044) ML17248A3792017-10-23023 October 2017 Issuance of Amendments to Revise the Renewed Facility Operating Licenses Fire Protection License Conditions (CAC Nos. MF9681 and MF9682; EPID L-2017-LLA-0230) ML17235A5652017-10-0505 October 2017 Issuance of Amendments Regarding Technical Specification Changes Related to Component Cyclic or Transient Limits ML17219A1742017-08-31031 August 2017 Relief from the Requirements of the ASME Code Regarding Relief Request 12 for the Fourth 10-Year Inservice Inspection Interval ML17195A2912017-08-14014 August 2017 Issuance of Amendments Regarding Relocation of Radiation Monitor Requirements from Technical Specifications to Licensee-Controlled Documents ML17132A1672017-07-10010 July 2017 Inservice Inspection Plan Fourth 10 Year Interval Relief Request No. 13 ML17110A2702017-05-10010 May 2017 Inservice Inspection Plan Fourth 10-year Interval Relief Request No. 14 Rev 0 - ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17038A2252017-03-29029 March 2017 Issuance of Amendment No. 188 Regarding Emergency Diesel Generator Day Tank Volume ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16251A1282016-12-0505 December 2016 Issuance of Amendments to Update Appendix B to the Renewed Facility Operating License to Incorporate the 2016 Biological Opinion ML16292A7612016-11-0202 November 2016 Inservice Inspection Plan Fourth 10 Year Interval Relief Request No. 11 ML16166A4242016-10-0505 October 2016 St. Lucie Plant, Unit Nos. 1 and 2 - Issuance of Amendments Regarding the Use of a New Computer Code to Model the Containment Vacuum Analyses ML16183A1382016-09-19019 September 2016 Issuance of Amendments Regarding Technical Specification Change to Eliminate the Moderator Temperature Coefficient Surveillance Test at the End of Cycle 2024-09-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 M3.rch 26, 2018 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power & Light Company Mail Stop EX/JB 700 Universe Blvd. Juno Beach, FL 33408
SUBJECT:
ST. LUCIE PLANT, UNIT NOS. 1 AND 2 -ISSUANCE OF AMENDMENTS REGARDING THE UNUSUAL EVENT FIRE RELATED EMERGENCY ACTION LEVEL SCHEME (EPID L-2018-LLA-0016)
Dear Mr. Nazar:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment Nos. 244 and 195 to Renewed Facility Operating License Nos. DPR-67 and NPF-16 for the St. Lucie Plant, Unit Nos. 1 and 2 (St. Lucie 1 and 2), respectively.
These amendments consist of changes to the renewed facility operating licenses in response to Florida Power and Light Company's application dated January 31, 2018. The amendments revise the Emergency Plan for St. Lucie 1 and 2 to adopt a limited scope of the Nuclear Energy Institute 99-01, Revision 6, Emergency Activation Level scheme for the fire-related notification of unusual event. A copy of the safety evaluation is also enclosed.
The Notice of Issuance will be included in the Commission's biweekly Federal Register notice. Docket Nos. 50-335 and 50-389
Enclosures:
- 1. Amendment No. 244 to DPR-67 2. Amendment No. 195 to NPF-16 3. Safety Evaluation cc: Listserv Perry H. Buckberg, Senior Project Manager Plant Licensing Branch 11-2 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 FLORIDA POWER & LIGHT COMPANY DOCKET NO. 50-335 ST. LUCIE PLANT UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 244 Renewed License No. DPR-67 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that: A. The application for amendment by Florida Power & Light Company (FPL, the licensee), dated January 31, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; 8. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1 2. Accordingly, by Amendment No. 244, Renewed Facility Operating License No. DPR-67 is amended as set forth in the licensee's application dated January 31, 2018, and evaluated in the NRC staff's safety evaluation for this amendment.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 90 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Brian E. Holian, Acting Director Office of Nuclear Reactor Regulation Date of Issuance:
March 2 6, 2 o 1 s UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 FLORIDA POWER & LIGHT COMPANY ORLANDO UTILITIES COMMISSION OF THE CITY OF ORLANDO, FLORIDA AND FLORIDA MUNICIPAL POWER AGENCY DOCKET NO. 50-389 ST. LUCIE PLANT UNIT NO. 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 195 Renewed License No. NPF-16 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that: A. The application for amendment by Florida Power & Light Company (FPL, the licensee), dated January 31, 2018, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; 8. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 2 2. Accordingly, by Amendment No. 195, Renewed Facility Operating License No. NPF-16 is amended as set forth in the licensee's application dated January 31, 2018, and evaluated in the NRC staffs safety evaluation for this amendment.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 90 days of issuance.
FOR THE NUCLEAR REGULA TORY COMMISSION Brian E. Holian, Acting Director Office of Nuclear Reactor Regulation Date of Issuance:
March 2 6 , 2 O 1 8 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 244 AND 195 TO RENEWED FACILITY OPERATING LICENSES NOS. DPR-67 AND NPF-16 FLORIDA POWER AND LIGHT COMPANY, ET AL. ST. LUCIE PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-335 AND 50-389
1.0 INTRODUCTION
By letter dated January 31, 2018 (Reference 1 ), Florida Power and Light Company, et al. (the licensee) requested amendments to Renewed Facility Operating License Nos. DPR-67 and NPF-16 for the St. Lucie Plant, Unit Nos. 1 and 2, respectively.
The proposed amendments would revise Notification of Unusual Event Emergency Action Level (EAL) HU2, "FIRE within the PROTECTED AREA Not Extinguished Within 15 Minutes of Detection OR EXPLOSION within the PROTECTED Area," which is currently based on the Nuclear Energy Institute (NEI) document NEI 99-01, Revision 5, "Methodology for Development of Emergency Action Levels," dated February 2008 (Reference 2), to one based on NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors," dated November 2012 (Reference 3). Revision 6 of NEI 99-01 was endorsed by the U.S. Nuclear Regulatory Commission (NRC, the Commission) in a letter dated March 28, 2013 (Reference 4).
2.0 REGULATORY EVALUATION
The applicable regulations and guidance for the emergency plans are provided in Sections 2.1 and 2.2 as follows: 2.1 Regulations Title 1 O of the Code of Federal Regulations (10 CFR), Section 50.47, "Emergency plans," sets forth emergency plan requirements for nuclear power reactors.
The regulations in 1 O CFR 50.47(a)(1
)(i) state, in part, that: ... no initial operating license for a nuclear power reactor will be issued unless a finding is made by the NRC that there is reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency.
Section 50.47(b) establishes the planning standards that the onsite and offsite emergency response plans must meet for NRC staff to make a finding that there is reasonable assurance that adequate protective measures can and will be taken in the event of a radiological Enclosure 3 emergency.
Planning Standard (4) of this section requires that onsite and offsite emergency response plans meet the following standard:
A standard emergency classification and action level scheme, the bases of which include facility system and effluent parameters, is in use by the nuclear facility licensee, and State and local response plans call for reliance on information provided by facility licensees for determinations of minimum initial offsite response measures.
Section 50.47(b)(4) requires the use of a standard emergency classification and action level scheme, assuring that implementation methods are relatively consistent throughout the industry for a given reactor and containment design while simultaneously providing an opportunity for a licensee to modify its EAL scheme as necessary to address plant-specific design considerations or preferences.
Section IV.B of Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities," to 10 CFR Part 50, states, in part: The means to be used for determining the magnitude of, and for continually assessing the impact of, the release of radioactive materials shall be described, including emergency action levels that are to be used as criteria for determining the need for notification and participation of local and State agencies, the Commission, and other Federal agencies, and the emergency action levels that are to be used for determining when and what type of protective measures should be considered within and outside the site boundary to protect health and safety. The emergency action levels shall be based on in-plant conditions and instrumentation in addition to onsite and offsite monitoring.
By June 20, 2012, for nuclear power reactor licensees, these action levels must include hostile action that may adversely affect the nuclear power plant. 2.2 Guidance The EAL development guidance was initially established in Generic Letter (GL) 79-50, "Emergency Plans Submittal Dates," dated October 10, 1979 (Reference 5). This guidance was subsequently revised in NUREG-0654/FEMA-REP-1, Revision 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," November 1980 (Reference 6), which was endorsed by NRC Regulatory Guide (RG) 1.101, Revision 2, "Emergency Planning and Preparedness for Nuclear Power Reactors," October 31, 1981 (Reference 7), as an approach acceptable to the NRC for the development of an EAL scheme. As industry and regulatory experience was gained with the implementation and use of EAL schemes, the industry issued revised EAL scheme development guidance to reflect lessons learned, numerous of which have been provided to the NRC for review and endorsement as generic (i.e., non-plant-specific)
EAL development guidance.
Most recently, the industry provided NEI 99-01, Revision 6, to the NRC, which the NRC staff endorsed by letter dated March 28, 2013, as acceptable generic (i.e., not plant-specific)
EAL scheme development guidance.
Although the EAL development guidance contained in NEI 99-01, Revision 6, is generic and may not be entirely applicable for some non-passive, large light water reactor (LWR) designs, it bounds the most typical accidenUevent scenarios for which emergency response is necessary, in a format that allows for industry standardization and consistent regulatory oversight.
Licensees may choose to develop plant-specific EAL schemes using NEI 99-01, Revision 6, with appropriate plant-specific alterations as applicable.
NRC Regulatory Issue Summary (RIS) 2003-18, including Supplements 1 and 2, "Use of NEI 99-01, 'Methodology for Development of Emergency Action Levels'" (Reference 8), also provides guidance for developing or changing a standard EAL scheme. In addition, this RIS and its supplements provide recommendations to assist licensees, consistent with Section IV. B of Appendix E to 10 CFR Part 50, in determining whether to seek prior NRC approval of deviations from the guidance.
In summary, the NRC staff considers NEI 99-01, Revision 6, an acceptable method to develop plant-specific EALs that meet the requirements of Section IV.B of Appendix E to 10 CFR Part 50 and planning standard 10 CFR 50.47(b)(4), with the understanding that licensees may want to develop EALs that differ from the guidance document as allowed in RG 1.101. 2.3 NRC Staff Review The NRC staff verified that the proposed EAL scheme is consistent with the guidance provided in NEI 99-01, Revision 6, to assure that the proposed EAL scheme meets the requirements of Section IV of Appendix E to 10 CFR Part 50 and 10 CFR 50.47(b)(4).
To aid in understanding the nomenclature used in this safety evaluation, the following conventions are used:
- The Recognition Category letter is the first letter for the EAL: o H -Hazards and Other Conditions Affecting Plant Safety
- The second letter signifies the emergency classification level: o U = Notification of Unusual Event (UE), and
- The number denotes the sequential subcategory designation from the plant-specific EAL scheme. 3.0 TECHNICAL EVALUATION The intent of EAL HU2 is to ensure that an emergency classification is declared based upon the effect that a fire may have on the facility, which would be indicative of a potential degradation of the level of safety of the plant. This EAL is primarily intended to ensure that key emergency response organization members and offsite response organizations are aware of the fire, and post-event damage assessments are promptly implemented.
Indications of a protracted fire involving radioactive materials are bounded by Fission Barrier Matrix EALs, as well as the abnormal radiation/radiological effluent EALs. The licensee chose to modify this EAL by using a site-specific implementation method that uses a modified numbering format other than that provided in the generic EAL scheme development guidance.
The NRC staff verified that the numbering, sequencing, formatting and logical progression for this EAL are consistent with the overall EAL scheme development guidance and address the plant-specific implementation strategies provided, and are, therefore, consistent with a standard EAL scheme, as required by 10 CFR 50.47(b)(4).
The NRC staff also verified that the EAL is worded in an unambiguous manner that addresses human factors engineering and user-friendliness concerns, is technically complete for this classification level, addresses completeness and accuracy issues raised in Appendix 1 to NUREG-0654, and uses objective and observable values based on site-specific indications.
The NRC staff has reviewed the technical bases for the proposed EAL change and the licensee's evaluation of the proposed change. The NRC staff has concluded that the proposed change meets the requirements in Section IV. B.1 of Appendix E to 10 CFR Part 50 and planning standard 10 CFR 50.47(b)(4).
Therefore, the NRC staff concludes that the licensee's proposed EAL change, as set forth in the licensee's application dated January 31, 2018, is acceptable and provides reasonable assurance that the licensee can and will take adequate protective measures in the event of a radiological emergency in accordance with 10 CFR 50.47(a)(1
)(i). Specifically, the staff concludes that the licensee's updated site-specific EAL and technical basis provided by Attachment 2, "Clean Copy of the Proposed St. Lucie EAL Scheme," of the January 31, 2018, application is acceptable for implementation.
4.0 FINAL
NO SIGNIFICANT HAZARDS CONSIDERATION The NRC's regulation in 10 CFR 50.92(c) states that the NRC may make a final determination, under the procedures in 10 CFR 50.91, that a license amendment involves no significant hazards consideration if operation of the facility, in accordance with the amendment, would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. An evaluation of the issue of no significant hazards consideration is presented below: 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response:
No. The proposed change does not impact the physical configuration or function of plant structures, systems, or components (SSCs) or the manner in which SSCs are operated, maintained, modified, tested, or inspected.
No actual facility equipment or accident analyses are affected by the proposed changes. The change revises the St. Lucie fire-related unusual event EAL scheme to be consistent with the NRC endorsed EAL scheme contained in NEI 99-01, Revision 6, "Methodology for Development of Emergency Action Levels," but does not alter any of the requirements of the Operating License or the Technical Specifications.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated? Response:
No. The proposed change does not involve a physical alteration of the plant (no new or different type of equipment will be installed).
The proposed change does not create any new failure modes for existing equipment or any new limiting single failures.
Additionally, the proposed change does not involve a change in the methods governing normal plant operation, and all safety functions will continue to perform as previously assumed in the accident analyses.
Thus, the proposed change does not adversely affect the design function or operation of any structures, systems, and components important to safety. No new accident scenarios, failure mechanisms, or limiting single failures are introduced as a result of the proposed change. The proposed change does not challenge the performance or integrity of any safety-related system. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety? Response:
No. The margin of safety associated with the acceptance criteria of any accident is unchanged.
The proposed change will have no effect on the availability, operability, or performance of safety-related systems and components.
The proposed change will not adversely affect the operation of plant equipment or the function of equipment assumed in the accident analysis.
The proposed amendment does not involve changes to any safety analyses assumptions, safety limits, or limiting safety system settings.
The changes do not adversely impact plant operating margins or the reliability of equipment credited in the safety analyses.
Therefore, the proposed change does not involve a significant reduction in a margin of safety. Based on the above evaluation, the NRC staff concludes that the three standards of 1 O CFR 50.92(c) are satisfied.
Therefore, the NRC staff has made a final determination that no significant hazards consideration is involved for the proposed amendments and that the amendments should be issued as allowed by the criteria contained in 10 CFR 50.91.
5.0 STATE CONSULTATION
In accordance with the Commission's regulations, the NRC staff notified the State of Florida official (Ms. Cynthia Becker, M.P.H., Chief of the Bureau of Radiation Control, Florida Department of Health) on February 14, 2018, of the proposed issuance of the amendments.
The State official had no comments. 6.0 ENVIRONMENTAL CONSIDERATION The amendments change administrative procedures for the fire-related notification of unusual event. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.
The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding published in the Federal Register on February 14, 2018 (83 FR 6621 ). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
7.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
8.0 REFERENCES
- 1. Snyder, M. J., Florida Power & Light Company, letter to U.S. Nuclear Regulatory Commission, "License Amendment Request Focused Adoption of NEI 99-01, Revision 6, Unusual Event Fire-Related Emergency Action Level Scheme," dated January 31, 2018 (ADAMS Accession No. ML 18031 B011). 2. NEI 99-01, Revision 5, "Methodology for Development of Emergency Action Levels," dated February, 2008 (ADAMS Accession No. ML080430552
[package]).
- 3. NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors," dated November 21, 2012 (ADAMS Accession No. ML 13091A209
[package]).
- 4. Thaggard, M., U.S. Nuclear Regulatory Commission, letter to Ms. Susan Perkins-Grew, Nuclear Energy Institute, "U.S. Nuclear Regulatory Commission Review and Endorsement of NEI 99-01, Revision 6, dated November, 2012 (TAC No. D92368)," dated March 28, 2013 (ADAMS Accession No. ML 12346A463).
- 5. U.S. Nuclear Regulatory Commission, Generic Letter 79-50, "Emergency Plans Submittal Dates," dated October 10, 1979 (ADAMS Accession No. ML031320278).
- 6. U.S. Nuclear Regulatory Commission and Federal Emergency Management Agency, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," NUREG-0654/FEMA-REP-1, Revision 1, dated November 1980 (ADAMS Accession No. ML040420012). 7. U.S. Nuclear Regulatory Commission, "Emergency Planning and Preparedness for Nuclear Power Reactors," Regulatory Guide 1.101, Revision 2, October 31, 1981 (ADAMS Accession No. ML090440294), Revision 3, August 31, 1992 (ADAMS Accession No. ML003740302), and Revision 4, dated July 31, 2003 (ADAMS Accession No. ML032020276).
- 8. U.S. Nuclear Regulatory Commission, Regulatory Issue Summary 2003-18, "Use of NEl-99-01, 'Methodology for Development of Emergency Action Levels,' Revision 4, dated January 2003," dated October 8, 2003, including Supplement 1 dated July 13, 2004, and Supplement 2 dated December 12, 2005 (ADAMS Accession Nos. ML032580518, ML041550395, and ML051450482, respectively).
Principal Contributor:
Raymond Hoffman, NSIR Date: March 26, 2018
SUBJECT:
ST. LUCIE PLANT, UNIT NOS. 1 AND 2 -ISSUANCE OF AMENDMENTS REGARDING THE UNUSUAL EVENT FIRE RELATED EMERGENCY ACTION LEVEL SCHEME (EPID L-2018-LLA-0016)
DATED MARCH 26, 2018 DISTRIBUTION:
PUBLIC RidsNrrDorl RidsNrrDorlLpl2-2 RidsNrrOd RidsNsirDpr RidsNsirDprRlb RidsACRS_MailCTR RidsNrrPMStLucie RidsRgn2MailCenter RidsNrrLABClayton MNorris, NSIR RHoffman, NSIR ADAMS A ccess1on N ML 18046A712
- o. OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA NAME PBuckberg BClayton DATE 02/21/2018 03/07/2018 OFFICE DORL/LPL2-2/BC(A)
NRR/DORL/D NAME BTindell JGiitter DATE 03/19/2018 03/19/2018
- b *1 1y e-ma1 **b d >Y memoran um NSIR/DPR/RLB**
OGC-NLO* JAnderson CKanatas 02/08/2018 03/07/2018 NRR/D(A) DORL/LPL2-2/PM BHolian (MEvans for) PBuckberg 03/23/2018 03/26/2018 OFFICIAL RECORD COPY