IR 05000369/2008001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML082330217
| number = ML080630008
| issue date = 08/20/2008
| issue date = 02/03/2008
| title = IR 05000369-08-001, and IR 05000370-08-008, for McGuire Nuclear Station, Preliminary Great than Green Finding
| title = Annual Assessment Letter - McGuire 2007 End-of-Cycle Letter (NRC Inspection Report 05000369-08-001 and 05000370-08-001)
| author name = Wert L D
| author name = Weaver K D
| author affiliation = NRC/RGN-II/DNMS
| author affiliation = NRC/RGN-II/DRP/RPB1
| addressee name = Hamilton B H
| addressee name = Hamilton B H
| addressee affiliation = Duke Energy Carolinas, LLC, Duke Power Co
| addressee affiliation = Duke Energy Corp, Duke Power Co
| docket = 05000369, 05000370
| docket = 05000369, 05000370, 07200038
| license number = NPF-009, NPF-017
| license number = NPF-009, NPF-017
| contact person =  
| contact person =  
| case reference number = EA-08-220
| case reference number = IR-08-001
| document report number = IR-08-008
| document type = Inspection Plan, Letter
| package number = ML082330241
| page count = 7
| document type = Letter, Inspection Report
| page count = 110
}}
}}


Line 20: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 March 3, 2008 Duke Power Company LLC
 
d/b/a Duke Energy Carolinas, LLC ATTN: Mr. Bruce Site Vice President McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-8985
 
SUBJECT: ANNUAL ASSESSMENT LETTER - MCGUIRE NUCLEAR STATION (NRC INSPECTION REPORT 05000369/2008001 AND 05000370/2008001)
 
==Dear Mr. Hamilton:==
On February 5, 2008, the NRC staff completed its performance review of the McGuire Nuclear
 
Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
 
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will include the security cornerstone review and resultant inspection plan.
 
Overall, McGuire Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC
=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections, which include: containment sump blockage; implementation of B.5.b mitigating strategies; reactor coolant system dissimilar metal butt welds; hydrogen igniter backup power verification (not yet scheduled); and operator licensing examinations.
 
Additionally, the staff considered whether a substantive cross-cutting issue exists in the area of problem identification and resolution. Inspection reports issued during the period document four separate findings, each with a cross-cutting aspect of "appropriate and timely corrective actions." However, two of the findings represent the identical performance deficiency discovered on separate units. These two findings concerned foreign material that had been in the sump for over 10 years, found in both Unit 1 and Unit 2 Emergency Core Cooling System (ECCS) sumps during sump replacement. Refueling outage inspections of the inside of each sump were credited to prevent clogging of the ECCS throttle valves, as a compensatory
 
DPC 2measure for a design deficiency discovered in 1996. The cause of the inadequate previous inspections to find the debris was the same for both units. This one shared performance deficiency was documented on each unit, during the unit's refueling outage, but was separated in time by about 6 months. Consequently, the agency's plant issue numbering system indicates two separate report numbers for this shared performance deficiency. For the purpose of evaluating whether a substantive cross-cutting issue existed, we treated this common issue for each unit as one performance deficiency. Additionally, you have addressed this trend in problem identification and resolution by entering it into your corrective action program with plans to perform a full root cause analysis in order to prevent future recurrence. Accordingly, we do not believe a substantive cross-cutting issue exists at this time.
 
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
 
The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
 
In accordance with 10 CFR 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4647 with any questions you may have regarding this letter or the inspection plan.
 
Sincerely,/RA/ Kathy D. Weaver, Acting Chief Reactor Projects Branch 1
 
Division of Reactor Projects Docket Nos.: 50-369, 50-370, 72-38 License Nos.: NPF-9, NPF-17
 
===Enclosure:===
McGuire Inspection/Activity Plan
 
cc w/ encl: (See page 3)
 
_________________________ OFFICE RII:DRP RII:DRP SIGNATURE EJS /RA/ KDW /RA/ NAME EStamm KWeaver DATE 02/26/2008 03/03/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO DPC 3cc w/encls:
C. J. Thomas Regulatory Compliance Manager (MNS)
Duke Power Company LLC
 
d/b/a Duke Energy Carolinas, LLC Electronic Mail Distribution
 
R. L. Gill, Jr., Manager Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC
 
d/b/a Duke Energy Carolinas, LLC 526 South Church Street Charlotte, NC 28202
 
Lisa F. Vaughn Associate General Counsel and Managing Attorney Duke Energy Corporation
 
526 South Church Street-EC 07H
 
Charlotte, NC 28202
 
Kathryn B. Nolan Senior Counsel Duke Energy Corporation
 
526 South Church Street-EC 07H
 
Charlotte, NC 28202
 
David A. Repka Winston & Strawn LLP Electronic Mail Distribution
 
Beverly Hall, Chief, Radiation Protection Section N. C. Department of Environmental Health & Natural Resources Electronic Mail Distribution
 
County Manager of Mecklenburg County 720 East Fourth Street Charlotte, NC 28202
 
DPC 4Letter to Bruce from Kathy D. Weaver dated March 3, 2008
 
SUBJECT: ANNUAL ASSESSMENT LETTER - MCGUIRE NUCLEAR STATION (NRC INSPECTION REPORT 05000369/2008001 AND 05000370/2008001)
 
Distribution w/encl
: J. Stang, NRR C. Evans, RII L. Slack, RII
 
OE Mail ROP Reports
 
INPO RIDSNRRDIRS PUBLIC
 
NRC Resident Inspector U.S. Nuclear Regulatory Commission 12700 Hagers Ferry Rd Huntersville, NC 28078
 
McGuire Inspection / Activity Plan 03/01/2008
-06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2008 06:28:33 Report 22 2 PSB1-RP-RADIATION PROTECTION OCCUPATIONAL WK1 Other Routine Operation of an Independent Spent Fuel Storage Installation at Operating Plants 03/03/2008 03/07/2008 1, 2 60855.1 IP Baseline Inspections A ccess Control to Radiologically Significant Areas 03/03/2008 03/07/2008 1, 2 7112101 IP Baseline Inspections A LARA Planning and Controls 03/03/2008 03/07/2008 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 03/03/2008 03/07/2008 1, 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 03/03/2008 03/07/2008 1, 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 03/03/2008 03/07/2008 1, 2 71151-PR01 IP 3 EB3ISI-U2 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 03/10/2008 03/14/2008 2 7111108P IP 3 PSB1-RP-RADIATION PROTECTION OCCUPATIONAL WK2 Baseline Inspections A ccess Control to Radiologically Significant Areas 03/17/2008 03/21/2008 1, 2 7112101 IP Baseline Inspections A LARA Planning and Controls 03/17/2008 03/21/2008 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 03/17/2008 03/21/2008 1, 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 03/17/2008 03/21/2008 1, 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 03/17/2008 03/21/2008 1, 2 71151-PR01 IP 1 EB1-SUMP-TI 2515/166 CONTAINMENT SUMP INSPECTION Safety Issues Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
03/31/2008 04/04/2008 2 2515/166 IP 1 EB3TI172-TI-172 Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 04/07/2008 04/11/2008 1, 2 2515/172 IP 4 OL EXAM-INITIAL EXAM PREP Not Applicable MCGUIRE/MAY 2008 EXAM AT POWER FACILITIES 04/21/2008 04/25/2008 1 V23282 3 OL EXAM-INITIAL EXAM Not Applicable MCGUIRE/MAY 2008 EXAM AT POWER FACILITIES 05/12/2008 05/23/2008 1 V23282 2 OL RQ-REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 06/09/2008 06/13/2008 1, 2 7111111B IP 1 PI&R-PREP TRIP-PROBLEM ID AND RESOL Baseline Inspections Identification and Resolution of Problems 06/30/2008 07/03/2008 1, 2 71152B IP 5 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 08/11/2008 08/15/2008 1, 2 71152B IP Baseline Inspections Identification and Resolution of Problems 08/25/2008 08/29/2008 1, 2 71152B IP 1 EB3ISI-U1 ISI Baseline Inspections Inservice Inspection Activities - PWR 09/29/2008 10/03/2008 1 7111108P IP 1 EB3SGISI-U1 SG ISI Baseline Inspections Inservice Inspection Activities - PWR 10/02/2008 10/06/2008 1 7111108P IP This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
McGuire Inspection / Activity Plan 03/01/2008
-06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2008 06:28:33 Report 22 1 PSB1-EP-EP INSP EP Baseline Inspection A lert and Notification System Testing 10/06/2008 10/10/2008 1, 2 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 10/06/2008 10/10/2008 1, 2 7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 10/06/2008 10/10/2008 1, 2 7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 10/06/2008 10/10/2008 1, 2 7111405 IP Baseline Inspections Drill/Exercise Performance 10/06/2008 10/10/2008 1, 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 10/06/2008 10/10/2008 1, 2 71151-EP02 IP Baseline Inspections A lert & Notification System 10/06/2008 10/10/2008 1, 2 71151-EP03 IP 3 TI-171-B.5.B PHASE 2&3 Generic Safety Inspecti o Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 11/03/2008 11/07/2008 1, 2 2515/171 IP 5 TFPI-TFPI INSP Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]
03/09/2009 03/13/2009 1, 2 7111105P IP Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]
03/23/2009 03/27/2009 1, 2 7111105P IP 3 OL EXAM-INITIAL EXAM PREP Not Applicable MCGUIRE/MAY 2009 EXAM AT POWER FACILITIES 04/20/2009 04/24/2009 1 V23306 9 EB1-CDBI-COMPONENT DESIGN BASES INSPECTION Baseline Inspections Component Design Bases Inspection 05/04/2009 05/08/2009 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 05/18/2009 05/22/2009 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 06/01/2009 06/05/2009 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 06/15/2009 06/19/2009 1, 2 7111121 IP 3 OL EXAM-INITIAL EXAM - WEEK 1 Not Applicable MCGUIRE/MAY 2009 EXAM AT POWER FACILITIES 05/11/2009 05/15/2009 1 V23306 3 OL EXAM-INITIAL EXAM - WEEK 2 Not Applicable MCGUIRE/MAY 2009 EXAM AT POWER FACILITIES 05/18/2009 05/22/2009 1 V23306 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 16:48, 20 September 2018

Annual Assessment Letter - McGuire 2007 End-of-Cycle Letter (NRC Inspection Report 05000369-08-001 and 05000370-08-001)
ML080630008
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 02/03/2008
From: Weaver K D
NRC/RGN-II/DRP/RPB1
To: Hamilton B H
Duke Energy Corp, Duke Power Co
References
IR-08-001
Download: ML080630008 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 March 3, 2008 Duke Power Company LLC

d/b/a Duke Energy Carolinas, LLC ATTN: Mr. Bruce Site Vice President McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-8985

SUBJECT: ANNUAL ASSESSMENT LETTER - MCGUIRE NUCLEAR STATION (NRC INSPECTION REPORT 05000369/2008001 AND 05000370/2008001)

Dear Mr. Hamilton:

On February 5, 2008, the NRC staff completed its performance review of the McGuire Nuclear

Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will include the security cornerstone review and resultant inspection plan.

Overall, McGuire Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC

=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections, which include: containment sump blockage; implementation of B.5.b mitigating strategies; reactor coolant system dissimilar metal butt welds; hydrogen igniter backup power verification (not yet scheduled); and operator licensing examinations.

Additionally, the staff considered whether a substantive cross-cutting issue exists in the area of problem identification and resolution. Inspection reports issued during the period document four separate findings, each with a cross-cutting aspect of "appropriate and timely corrective actions." However, two of the findings represent the identical performance deficiency discovered on separate units. These two findings concerned foreign material that had been in the sump for over 10 years, found in both Unit 1 and Unit 2 Emergency Core Cooling System (ECCS) sumps during sump replacement. Refueling outage inspections of the inside of each sump were credited to prevent clogging of the ECCS throttle valves, as a compensatory

DPC 2measure for a design deficiency discovered in 1996. The cause of the inadequate previous inspections to find the debris was the same for both units. This one shared performance deficiency was documented on each unit, during the unit's refueling outage, but was separated in time by about 6 months. Consequently, the agency's plant issue numbering system indicates two separate report numbers for this shared performance deficiency. For the purpose of evaluating whether a substantive cross-cutting issue existed, we treated this common issue for each unit as one performance deficiency. Additionally, you have addressed this trend in problem identification and resolution by entering it into your corrective action program with plans to perform a full root cause analysis in order to prevent future recurrence. Accordingly, we do not believe a substantive cross-cutting issue exists at this time.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC

=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4647 with any questions you may have regarding this letter or the inspection plan.

Sincerely,/RA/ Kathy D. Weaver, Acting Chief Reactor Projects Branch 1

Division of Reactor Projects Docket Nos.: 50-369, 50-370, 72-38 License Nos.: NPF-9, NPF-17

Enclosure:

McGuire Inspection/Activity Plan

cc w/ encl: (See page 3)

_________________________ OFFICE RII:DRP RII:DRP SIGNATURE EJS /RA/ KDW /RA/ NAME EStamm KWeaver DATE 02/26/2008 03/03/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO DPC 3cc w/encls:

C. J. Thomas Regulatory Compliance Manager (MNS)

Duke Power Company LLC

d/b/a Duke Energy Carolinas, LLC Electronic Mail Distribution

R. L. Gill, Jr., Manager Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC

d/b/a Duke Energy Carolinas, LLC 526 South Church Street Charlotte, NC 28202

Lisa F. Vaughn Associate General Counsel and Managing Attorney Duke Energy Corporation

526 South Church Street-EC 07H

Charlotte, NC 28202

Kathryn B. Nolan Senior Counsel Duke Energy Corporation

526 South Church Street-EC 07H

Charlotte, NC 28202

David A. Repka Winston & Strawn LLP Electronic Mail Distribution

Beverly Hall, Chief, Radiation Protection Section N. C. Department of Environmental Health & Natural Resources Electronic Mail Distribution

County Manager of Mecklenburg County 720 East Fourth Street Charlotte, NC 28202

DPC 4Letter to Bruce from Kathy D. Weaver dated March 3, 2008

SUBJECT: ANNUAL ASSESSMENT LETTER - MCGUIRE NUCLEAR STATION (NRC INSPECTION REPORT 05000369/2008001 AND 05000370/2008001)

Distribution w/encl

J. Stang, NRR C. Evans, RII L. Slack, RII

OE Mail ROP Reports

INPO RIDSNRRDIRS PUBLIC

NRC Resident Inspector U.S. Nuclear Regulatory Commission 12700 Hagers Ferry Rd Huntersville, NC 28078

McGuire Inspection / Activity Plan 03/01/2008

-06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2008 06:28:33 Report 22 2 PSB1-RP-RADIATION PROTECTION OCCUPATIONAL WK1 Other Routine Operation of an Independent Spent Fuel Storage Installation at Operating Plants 03/03/2008 03/07/2008 1, 2 60855.1 IP Baseline Inspections A ccess Control to Radiologically Significant Areas 03/03/2008 03/07/2008 1, 2 7112101 IP Baseline Inspections A LARA Planning and Controls 03/03/2008 03/07/2008 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 03/03/2008 03/07/2008 1, 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 03/03/2008 03/07/2008 1, 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 03/03/2008 03/07/2008 1, 2 71151-PR01 IP 3 EB3ISI-U2 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 03/10/2008 03/14/2008 2 7111108P IP 3 PSB1-RP-RADIATION PROTECTION OCCUPATIONAL WK2 Baseline Inspections A ccess Control to Radiologically Significant Areas 03/17/2008 03/21/2008 1, 2 7112101 IP Baseline Inspections A LARA Planning and Controls 03/17/2008 03/21/2008 1, 2 7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 03/17/2008 03/21/2008 1, 2 7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 03/17/2008 03/21/2008 1, 2 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 03/17/2008 03/21/2008 1, 2 71151-PR01 IP 1 EB1-SUMP-TI 2515/166 CONTAINMENT SUMP INSPECTION Safety Issues Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

03/31/2008 04/04/2008 2 2515/166 IP 1 EB3TI172-TI-172 Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 04/07/2008 04/11/2008 1, 2 2515/172 IP 4 OL EXAM-INITIAL EXAM PREP Not Applicable MCGUIRE/MAY 2008 EXAM AT POWER FACILITIES 04/21/2008 04/25/2008 1 V23282 3 OL EXAM-INITIAL EXAM Not Applicable MCGUIRE/MAY 2008 EXAM AT POWER FACILITIES 05/12/2008 05/23/2008 1 V23282 2 OL RQ-REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 06/09/2008 06/13/2008 1, 2 7111111B IP 1 PI&R-PREP TRIP-PROBLEM ID AND RESOL Baseline Inspections Identification and Resolution of Problems 06/30/2008 07/03/2008 1, 2 71152B IP 5 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 08/11/2008 08/15/2008 1, 2 71152B IP Baseline Inspections Identification and Resolution of Problems 08/25/2008 08/29/2008 1, 2 71152B IP 1 EB3ISI-U1 ISI Baseline Inspections Inservice Inspection Activities - PWR 09/29/2008 10/03/2008 1 7111108P IP 1 EB3SGISI-U1 SG ISI Baseline Inspections Inservice Inspection Activities - PWR 10/02/2008 10/06/2008 1 7111108P IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

McGuire Inspection / Activity Plan 03/01/2008

-06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2008 06:28:33 Report 22 1 PSB1-EP-EP INSP EP Baseline Inspection A lert and Notification System Testing 10/06/2008 10/10/2008 1, 2 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 10/06/2008 10/10/2008 1, 2 7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 10/06/2008 10/10/2008 1, 2 7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 10/06/2008 10/10/2008 1, 2 7111405 IP Baseline Inspections Drill/Exercise Performance 10/06/2008 10/10/2008 1, 2 71151-EP01 IP Baseline Inspections ERO Drill Participation 10/06/2008 10/10/2008 1, 2 71151-EP02 IP Baseline Inspections A lert & Notification System 10/06/2008 10/10/2008 1, 2 71151-EP03 IP 3 TI-171-B.5.B PHASE 2&3 Generic Safety Inspecti o Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 11/03/2008 11/07/2008 1, 2 2515/171 IP 5 TFPI-TFPI INSP Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]

03/09/2009 03/13/2009 1, 2 7111105P IP Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]

03/23/2009 03/27/2009 1, 2 7111105P IP 3 OL EXAM-INITIAL EXAM PREP Not Applicable MCGUIRE/MAY 2009 EXAM AT POWER FACILITIES 04/20/2009 04/24/2009 1 V23306 9 EB1-CDBI-COMPONENT DESIGN BASES INSPECTION Baseline Inspections Component Design Bases Inspection 05/04/2009 05/08/2009 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 05/18/2009 05/22/2009 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 06/01/2009 06/05/2009 1, 2 7111121 IP Baseline Inspections Component Design Bases Inspection 06/15/2009 06/19/2009 1, 2 7111121 IP 3 OL EXAM-INITIAL EXAM - WEEK 1 Not Applicable MCGUIRE/MAY 2009 EXAM AT POWER FACILITIES 05/11/2009 05/15/2009 1 V23306 3 OL EXAM-INITIAL EXAM - WEEK 2 Not Applicable MCGUIRE/MAY 2009 EXAM AT POWER FACILITIES 05/18/2009 05/22/2009 1 V23306 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.