Category:Letter
MONTHYEARIR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 ML24289A0312024-11-0808 November 2024 – Issuance of Amendments Related to the Removal of License Condition 2.F as Part of the Consolidated Line-Item Improvement Process (CLIIP) IR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 IR 05000458/20240032024-10-31031 October 2024 Integrated Inspection Report 05000458/2024003 RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000458/LER-2023-006, Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard2024-02-0808 February 2024 Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 IR 05000458/20230402024-01-18018 January 2024 – 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter 05000458/LER-2023-005, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-01-16016 January 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) 05000458/LER-2023-004, Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure2023-12-28028 December 2023 Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting 2024-09-24
[Table view] Category:Meeting Notice
MONTHYEARPMNS20241043, Notice of Meeting with Entergy Operations, Inc. Regarding Planned License Amendment Request for River Bend Station, Unit 12024-08-0909 August 2024 Notice of Meeting with Entergy Operations, Inc. Regarding Planned License Amendment Request for River Bend Station, Unit 1 PMNS20240488, End of Cycle Public Outreach2024-04-10010 April 2024 End of Cycle Public Outreach PMNS20231406, Presubmittal Meeting with Entergy Operations, Inc. for a Proposed Online Monitoring License Amendment Request2024-01-11011 January 2024 Presubmittal Meeting with Entergy Operations, Inc. for a Proposed Online Monitoring License Amendment Request PMNS20230412, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at River Bend Station2023-04-12012 April 2023 Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at River Bend Station PMNS20221160, Notice of Closed Meeting with Entergy Operations Inc. to Discuss Security Program Strategy Changes Applicable to the Entergy Fleet2022-11-0404 November 2022 Notice of Closed Meeting with Entergy Operations Inc. to Discuss Security Program Strategy Changes Applicable to the Entergy Fleet PMNS20220868, Notice of Meeting with Entergy Operations, Inc. to Discuss Planned License Amendment Requests for River Bend Station, Unit 12022-08-31031 August 2022 Notice of Meeting with Entergy Operations, Inc. to Discuss Planned License Amendment Requests for River Bend Station, Unit 1 PMNS20220554, Meeting Notice with Entergy Operations, Inc. Regarding a Presubmittal of a Relief Request for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit 32022-05-25025 May 2022 Meeting Notice with Entergy Operations, Inc. Regarding a Presubmittal of a Relief Request for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit 3 PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20211405, Pre-submittal Meeting for Entergy Operations, Inc., River Bend Station, Unit 1, IST Program Relief Request for Pressure Isolation Valve Testing Frequency2021-11-10010 November 2021 Pre-submittal Meeting for Entergy Operations, Inc., River Bend Station, Unit 1, IST Program Relief Request for Pressure Isolation Valve Testing Frequency ML21209A0222021-07-29029 July 2021 Closed Predecisional Enforcement Conference with River Bend Station IA-21-030, Closed Predecisional Enforcement Conference with an Employee of the River Bend Station2021-07-0606 July 2021 Closed Predecisional Enforcement Conference with an Employee of the River Bend Station PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek PMNS20210003, Presubmittal Meeting with Entergy Operations, Inc. Regarding a Planned License Amendment Request for River Bend Station, Unit 1, to Allow Receipt, Possession, and Use of Byproduct Materials from Other Entergy Stations2021-01-19019 January 2021 Presubmittal Meeting with Entergy Operations, Inc. Regarding a Planned License Amendment Request for River Bend Station, Unit 1, to Allow Receipt, Possession, and Use of Byproduct Materials from Other Entergy Stations ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML15092A9772015-04-0101 April 2015 Meeting Notice with Public to Discuss Any Regulatory Issues with River Bend Station ML13211A2022013-07-30030 July 2013 Notice of Meeting with to Discuss Issues Related to the River Bend Station ML12184A1452012-07-0202 July 2012 Notice of Meeting with River Bend Station to Discuss the Results of Their Recent Inspection Following the Loss of Service Water and Reactor Scram Event on May 24, 2012 ML11308A6602011-11-0202 November 2011 Notice of Closed Predecisional Enforcement Conference with River Bend Station ML1130103922011-10-28028 October 2011 Regulatory Conference with River Bend Station on 11-21-2011 ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML1110806572011-04-18018 April 2011 Notice of Meeting with Entergy Operations, Inc. to Discuss the Performance Results of January 1 Through December 31, 2010 River Bend ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1108106602011-03-14014 March 2011 Notice of Meeting with River Bend to Discuss Performance Results for the Period of January 1 Through December 31, 2010. Canceled ML1107307532011-03-14014 March 2011 Notice of Meeting with River Bend Station to Discuss Performance Results for the Period of January 1 Through December 31, 2010 ML1028709092010-10-18018 October 2010 Notice of Forthcoming Category 1 Public Meeting with Entergy Operation, Inc. to Discuss River Bend Preliminary Enforcement ML1022104342010-08-11011 August 2010 Cancelled Public Meeting Notice to with Energy Operations to Discuss Emergency Diesel Generators, Control Building Chillers and Licensee'S 2010 Business Plan ML1019005722010-07-0909 July 2010 Notice of Public Meeting with Entergy Operations, Inc. to Discuss Emergency Diesel Generators, Control Building Chillers, and Licensee'S 2010 Business Plan ML1007505712010-03-16016 March 2010 Meeting with Entergy Operations, Inc. to Discuss the Results of the Safety Culture Workplace Survey Conducted at Each Entergy Nuclear Plant in 2009 ML1007100622010-03-12012 March 2010 Notice of Open House with Members of the Public - River Bend Station ML0932702592009-11-23023 November 2009 Notice of Meeting with Entergy Operations to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML0919603922009-07-16016 July 2009 Notice of Meeting with Entergy Operations, Inc. to Discuss Requests for Relief Related to Second Extension of Various Inservice Examinations Scheduled for the Second Interval and the Implementation of Code Case N-716 ML0909603952009-04-0606 April 2009 Notice of Public Meeting to Discuss the Annual Assessment of River Bend Station ML0809401242008-04-0303 April 2008 Notice of End-of-Cycle Meeting for River Bend Station ML0716204772007-06-11011 June 2007 Rescheduled Notice of Public Meeting to Provide Entergy Operations, Inc. an Opportunity to Present to the NRC Their Plans for Improving Performance in the Areas of Human Performance and Corrective Action Program ML0713804912007-05-18018 May 2007 Notice of Public Meeting with Entergy Operations, Inc., to Provide the Licensee an Opportunity to Present to the NRC Their Plans for Improving Performance in the Areas of Human Performance and Corrective Action Program ML0709201682007-04-0202 April 2007 Notice of Meeting with Entergy Operations, Inc. River Bend Station End-of-Cycle Performance ML0709301972007-03-30030 March 2007 Notice of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Recent Organizational Changes, and Current Regulatory Issues ML0632503842006-11-21021 November 2006 Rescheduled Notice of Public Meeting with Entergy Operations, Inc. River Bend Station Corrective Action Program ML0631006782006-11-0606 November 2006 Public Meeting with Entergy Operations, Inc., to Provide Licensee an Opportunity to Present to NRC Their Plans for Improving Performance in Corrective Action Program ML0618706332006-07-0606 July 2006 Notice of Regulatory Conference Meeting with Entergy Operations, Inc. to Present to the NRC Their Perspective on the Facts and Process Used by the NRC to Arrive at the Preliminary White Finding Described in Inspection Report 05000458/200601 ML0621200972006-04-27027 April 2006 Individual Invitation to 05/17/2006 Public Annual Performance Assessment Meeting River Bend Station ML0610002932006-04-0606 April 2006 Notice of Meeting with Entergy Operations, Inc., to Describe the Reactor Oversight Process, Discuss Licensee Performance at River Bend Station During Calendar Year 2005, and Discuss Topics of Potential Interest to the Public ML0529803962005-10-25025 October 2005 Notice of Meeting with Entergy and River Bend Staff Rbs'S Amendment Request for Use of Fuel Building Cask Handling Crane for Dry Spent Fuel Cask Loading Operations ML0529700532005-10-24024 October 2005 Notice of Meeting with Entergy Operations, Inc ML0513103442005-05-0505 May 2005 end-of-cycle Public Meeting Invitation Letter for River Bend Station ML0512502582005-05-0505 May 2005 Notice of Meeting with Entergy Operations, Inc. end-of-cycle Performance Assessment for River Bend Station ML0508304502005-03-23023 March 2005 Notice of Meeting with Entergy, Operations, Inc. to Discuss 2004 Plant Performance Insights and Lessons Learned, Refuel Outage 12 Performance and Lessons Learned, and Future Station Initiatives to Improve Plant Performance ML0432007762004-11-15015 November 2004 Notice of Public Meeting with Entergy Operations, Inc. to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML0418403962004-07-0202 July 2004 Forthcoming Meeting with Licensees to Discuss Operator Licensing Program Policies and Recent Revisions ML0407903782004-03-19019 March 2004 end-of-cycle Public Mtg. to Describe the Reactor Oversight Process, Discuss Licensee Performance at River Bend Station During Calendar Year 2003, and Discuss Topics of Potential Interest to the Public 2024-08-09
[Table view] |
Text
April 6, 2009
Mr. Michael Perito
Vice President, Operations
Entergy Operations, Inc.
River Bend Station
5485 US Highway 61N
St. Francisville, LA 70775
SUBJECT:
MEETING ANNOUNCEMENT - PUBLIC MEETING/OPEN HOUSE RIVER BEND STATION, DOCKET NO. 50-458
Mr. Perito,
This letter confirms a Category 3 public meeting which has been scheduled for April 23, 2009, at 4:00 p.m. - 6:00 p.m. (CST). The enclosed meeting notice provides additional details. The
purpose of the meeting is to provide opportunities to discuss the annual assessment of River
Bend Station with the public. The NRC will be available to ensure the public's issues and
concerns are understood and considered.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspecti on in the NRC Public Document Room or from Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this m eeting, please contact me at (817) 860-8144.
Sincerely,
/RA/ Geoffrey Miller, Chief Projects Branch C Division of Reactor Projects
Docket No.: 50-458
License No.: NPF-47
Enclosure:
As stated
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
Enclosure April 6, 2009
SUBJECT:
PUBLIC MEETING/OPEN HOUSE REGARDING RIVER BEND STATION ANNUAL ASSESSMENT
FACILITY: River Bend Station
DOCKET: 50-458
DATE & TIME: Thursday, April 23, 2009 4:00 p.m. - 6:00 p.m. (CDT)
LOCATION: River Bend Station Training Center 5485 US Hwy 61 St. Francisville, LA 70775
PURPOSE: The purpose of the meeting/open house session is to provide opportunities to discuss the annual assessment of River Bend
Station with the public. The NRC's Policy Statement, "Enhancing
Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the
NRC Web site, www.nrc.gov. The NRC provides reasonable accommodation to participate where appropriate. If you need
reasonable accommodation to participate in this meeting, or need
this meeting notice or other information from the meeting in
another format (e.g. Braille, large print), please notify the NRC's
meeting contact. Determinations on requests for reasonable
accommodation will be made on a case-by-case basis.
CATEGORY: This is a Category 3 meeting. The public is invited to fully participate in this meeting/open house. The NRC will be available
to ensure the public's issues and concerns are understood and
considered by the NRC.
PARTICIPANTS: NUCLEAR REGULATORY COMMISSION
G. Miller, Chief, Project Branch C, Division of Reactor Projects G. Larkin, Senior Resident Inspector, Division of Reactor Projects C. Norton, Resident Inspector, Division of Reactor Projects
MEETING CONTACT: Geoffrey B. Miller Chief, Projects Branch C 817-860-8144
Geoffrey.Miller@nrc.gov UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 Entergy Operations, Inc.
DISTRIBUTION:
Senior Vice President
Entergy Nuclear Operations
P.O. Box 31995
Jackson, MS 39286-1995
Senior Vice President and COO
Entergy Operations, Inc.
P. O. Box 31995
Jackson, MS 39286-1995
Vice President, Oversight
Entergy Operations, Inc.
P. O. Box 31995
Jackson, MS 39286-1995
Senior Manager, Nuclear Safety &
Licensing
Entergy Nuclear Operations
P. O. Box 31995
Jackson, MS 39286-1995
Manager, Licensing
Entergy Operations, Inc.
River Bend Station
5485 US Highway 61N
St. Francisville, LA 70775
Attorney General
State of Louisiana
P. O. Box 94005
Baton Rouge, LA 70804-9005
Ms. H. Anne Plettinger
3456 Villa Rose Drive
Baton Rouge, LA 70806
President of West Feliciana
Police Jury
P. O. Box 1921
St. Francisville, LA 70775
Mr. Brian Almon
Public Utility Commission
William B. Travis Building
P. O. Box 13326 Austin, TX 78701-3326
Mr. Jim Calloway
Public Utility
Commission of Texas
1701 N. Congress Avenue Austin, TX 78711-3326 Louisiana Department of Environmental
Quality Radiological Emergency Planning and
Response Division
P. O. Box 4312
Baton Rouge, LA 70821-4312
Associate General Counsel
Entergy Nuclear Operations
P. O. Box 31995
Jackson, MS 39286-1995
Chief, Technological Hazards
Branch
FEMA Region VI
800 N. Loop 288 Denton, TX 76209-3698
Melanie Bueche, President
Pointe Coupee Parish Police Jury
P.O. Box 290
New Roads, LA 70760
Riley Berthelot, Jr., President
West Baton Rouge Parish Policy Jury
P.O. Box 757
Port Allen, LA 70767
Federal Emergency Management Agency
Region VI
ATTN: William E. Peterson, Regional
Director FRC 800 North Loop 288 Denton, TX 76209-3698
JoAnne Moreau, Director
Office of Homeland Security and
Emergency Preparedness
East Baton Rouge Parish
3773 Harding Blvd.
Baton Rouge, LA 70807
Don Ewing, Director
Office of Emergency Preparedness
Pointe Coupee Parish
P.O. Box 248
New Roads, LA 70760
Jesse Means, Jr., Director
Office of Homeland Security and
Emergency Preparedness
West Feliciana Parish Entergy Operations, Inc.
P.O. Box 796 St. Francisville, LA 70775
Louis Kent, President
East Feliciana Parish Policy Jury
P.O. Box 427
Kip Holden, Mayor-President
Office of the Mayor-President
East Baton Rouge Parish
222 St. Louis Street, 3 rd Floor Baton Rouge, LA 70802
Mike Futrell
Chief Administrative Officer
Office of the Mayor-President
East Baton Rouge Parish
P.O. Box 1471
Baton Rouge, LA 70821
Anthony Moran, Director
Office of Emergency Preparedness
West Baton Rouge Parish
2413 Ernest Wilson Dr.
Port Allen, LA 70767
Mark Cooper, Director Governor's Office of Homeland
Security and Emergency Preparedness
7667 Independence Blvd.
Baton Rouge, LA 70806
Glen Kent, Director
Office of Homeland Security and
Emergency Preparedness
East Feliciana Parish
P.O. Box 427
Clinton, LA 70722
The Honorable William D'Aquilla
Mayor, Town of St. Francisville
P.O. Box 400
St. Francisville, LA 70775
Jeffrey P. Meyers
Division Administrator
Emergency and Radiological Services
Division LA Dept. of Environmental Quality
P.O. Box 4312
Baton Rouge, LA 70821-4312
Entergy Operations, Inc.
Electronic distribution by RIV:
NRC Attendees
PMNS Resource, Mtg Announcement Coordinator
Elmo Collins, RA
Chuck Casto, DRA
Dwight Chamberlain, D:DRP
Roy Caniano, D:DRS
Anton Vegel, DD:DRP
Troy Pruett, DD:DRS
Bernard Stapleton, C:DRS/OB
Sue Bogle (OEWEB Resource)
Shawn Williams, OEDO RIV Coordinator
Eugene.Guthrie, OEDO RIV Backup Coordinator
OEMAIL, D/OE
Amy Powell, OCA
Kevin Williams, NSIR/DPR/EP
Robert Kahler, NSIR/DPR/EP
mortensengk@INPO.org
Fred Lyon, Project Manager, NRR
Geoffrey Miller, Branch Chief, PB/C
David Proulx, Senior Project Engineer, PB/C
Grant Larkin, Senior Resident Inspector
Charles Norton, Resident Inspector
Victor Dricks, Region IV PAO
Bill Maier, Region IV RSLO
Karla Fuller, Region IV RC
William Jones, Region IV ACES
Lucy Owen, Region IV RA Secretary
Judy Kilcrease, Region IV RA Secretary
Anita Tannenbaum, Region IV DRP Secretary
Dana Lackey, Region IV DRP Secretary
Lisa Day, Site Secretary
Kimberley Brewton, Region IV DRS Secretary
Tracy Karl, Region IV DRS Secretary
Deborah Harrison, Region IV DRS Secretary
Earnestine Clay, DRMA, TL
Denise Freeman, Region IV DNMS Secretary
Harold McKelvey, IRMB
Phil Longdo, Receptionist
Ann Mattila, Security Advisor
R:\_REACTORS\EOC and Midcycle\EOC Meeting Notices\2009\RB MN 4-23-09.doc
ADAMS ML090960395 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials GM Publicly Avail Yes No Sensitive Yes No Sens. Type Initials GM RIV/PE:DRP/C SPE:DRP/C PAO RSLO C:DRP/C BRice DProulx VLDricks WAMaier GMiller /RA/ /RA/ /RA/ /RA LOwen for/ /RA/ 04/01/2009 04/06/2009 04/01/2009 04/01/2009 04/06/2009 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax