ML101900572

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting with Entergy Operations, Inc. to Discuss Emergency Diesel Generators, Control Building Chillers, and Licensee'S 2010 Business Plan
ML101900572
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/09/2010
From:
NRC/RGN-IV/DRP/RPB-C
To:
References
Download: ML101900572 (4)


Text

UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 July 9, 2010

SUBJECT:

PUBLIC MEETING WITH ENTERGY OPERATIONS, INC.

FACILITY: River Bend Station DOCKETS: 50-458 DATE & TIME: Monday, August 23, 2010 8:00 am to 9:30 am (CST)

LOCATION: NRC Region IV Office Training Conference Room 612 E. Lamar Boulevard, Suite 400 Arlington, TX 76011 PURPOSE: Public meeting to discuss emergency diesel generators, control building chillers, and licensees 2010 business plan.

CATEGORY 1: This is a Category 1 Meeting. The public is invited to observe this meeting and will have the opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Members of the public can participate in the meeting by calling 1-800-952-9677 and requesting to be connected to the River Bend public meeting bridge.

PARTICIPANTS: NRC Elmo Collins, Regional Administrator Anton Vegel, Deputy Director, DRP Roy Caniano, Director, DRS Troy Pruett, Deputy Director, DRS Thomas Farnholtz, Chief, Engineering Branch 1, DRS Vince Gaddy, Chief, Branch C, DRP

Entergy Operations, Inc. PARTICIPANTS: (Continued)

Grant Larkin, Senior Resident Inspector Bob Hagar, Senior Project Engineer, DRP UTILITY Jerry Roberts, Director, Nuclear Safety Assurance Harry Goodman, Director, Engineering Eric Olson, Site Plant General Manager Mike Perito, Site Vice President MEETING CONTACT: Bob Hagar Senior Project Engineer 817-276-6546 Bob.Hagar@NRC.gov

Entergy Operations, Inc. DISTRIBUTION: Louisiana Department of Environmental Senior Vice President and COO Quality Entergy Operations, Inc Radiological Emergency Planning and P. O. Box 31995 Response Division Jackson, MS 39286-1995 P. O. Box 4312 Baton Rouge, LA 70821-4312 Vice President, Oversight Entergy Operations, Inc. Joseph A. Aluise P. O. Box 31995 Associate General Counsel - Nuclear Jackson, MS 39286-1995 Entergy Services, Inc.

639 Loyola Avenue Senior Manager, Nuclear Safety & New Orleans, LA 70113 Licensing Entergy Nuclear Operations Chief, Technological Hazards P. O. Box 31995 Branch Jackson, MS 39286-1995 FEMA Region VI 800 N. Loop 288 Manager, Licensing Denton, TX 76209-3606 Entergy Operations, Inc.

5485 US Highway 61N Institute of Nuclear Power Operations St. Francisville, LA 70775 (INPO)

Records Center Attorney General 700 Galleria Parkway SE, Suite 100 State of Louisiana Atlanta, GA 30339 P. O. Box 94005 Baton Rouge, LA 70804-9005 Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 President of West Feliciana Police Jury P. O. Box 1921 St. Francisville, LA 70775 Mr. Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 Austin, TX 78701-3326 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Avenue Austin, TX 78711-3326

Entergy Operations, Inc. Electronic Distribution:

NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, RA Chuck Casto, DRA Dwight Chamberlain, D:DRP Roy Caniano, D:DRS Anton Vegel, DD:DRP Troy Pruett, DD:DRS Mark Haire, C:DRS/OB Sue Bogle (OEWEB Resource)

Leigh Trocine, OEDO RIV Coordinator OEMAIL, D/OE Jenny Weil, OCA mortensengk@INPO.org Alan Wang, Project Manager, NRR Vince Gaddy, Branch Chief, PB/C Bob Hagar, Senior Project Engineer, PB/C Grant Larkin, Senior Resident Inspector Charles Norton, Resident Inspector Victor Dricks, Region IV PAO Lara Uselding, Region IV PAO Bill Maier, Region IV RSLO Karla Fuller, Region IV RC William Jones, Region IV ACES Lucy Owen, Region IV RA Administrative Assistant Anita Tannenbaum, Region IV DRP Administrative Assistant Dana Lackey, Region IV DRP Administrative Assistant Verlyn Jenkins, Region IV DRP Administrative Assistant Lisa Day, Site Administrative Assistant Kimberly Brewton, Region IV DRS Administrative Assistant Tracy Karl, Region IV DRS Administrative Assistant Deborah Harrison, Region IV DRS Administrative Assistant Denise Freeman, Region IV DNMS Administrative Assistant Earnestine Clay, DRMA, TL Harold McKelvey, IRMB Phil Longdo, Receptionist Ann Mattila, Security Advisor R:\_REACTOR\_RB\2010\RB August 23, 2010-MN.docx ADAMS ML ADAMS: No x Yes x SUNSI Review Complete Reviewer Initials: VGG x Publicly Available x Non-Sensitive Non-publicly Available Sensitive SPE:DRP/C C:DRP/C BHagar VGGaddy VLDricks

/RA/ /RA/ /RA/

7/8/10 7/9/10 7/9/10 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax