ML080940124

From kanterella
Jump to navigation Jump to search
Notice of End-of-Cycle Meeting for River Bend Station
ML080940124
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/03/2008
From:
NRC Region 4
To:
References
Download: ML080940124 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION R E GI ON I V 611 RYAN PLAZA DRIV E, SUITE 400 ARLINGTON, TEXAS 76011-4005 April 3, 2008

SUBJECT:

MEETING WITH ENTERGY OPERATIONS, INC.

FACILITY:

River Bend Station DOCKET:

05000458 DATE & TIME:

Tuesday, April 29, 2008 6 p.m. (CDT)

LOCATION:

River Bend Station Training Center Auditorium 5485 US High 61 N St. Francisville, LA 70775-1050 PURPOSE:

The purpose of the meeting is to describe the reactor oversight process, discuss licensee performance at River Bend Station during calendar year 2007, and discuss topics of potential interest to the public. The annual assessment letter for River Bend Station is located at:

http:///www.nrc.gov/nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

CATEGORY:

This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the Nuclear Regulatory Commission after the business portion, but before the meeting is adjourned.

The Nuclear Regulatory Commission provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript of other information from the meeting in another format (e.g. Braille or large print), please notify the Nuclear Regulatory Commissions meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Entergy Operations, Inc.

PARTICIPANTS:

NUCLEAR REGULATORY COMMISSION A. Vegel, Deputy Director, Division of Reactor Projects R. Deese, Acting Chief, Project Branch C, Division of Reactor Projects G. Larkin, Senior Resident Inspector, Division of Reactor Projects C. Norton, Resident Inspector, Division of Reactor Projects Entergy Operations, Inc.

M. Perito, Vice President, Operations E. Olsen, General Manager, Plant Operations J. Roberts, Director, Nuclear Safety Assurance D. Lorfing, Manager, Plant Licensing MEETING CONTACT:

Richard W. Deese, Nuclear Regulatory Commision, Region IV (817) 276-6573 rwd@nrc.gov cc:

Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Senior Vice President and COO Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 General Manager Plant Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Director, Nuclear Safety & Licensing Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213-8298

Entergy Operations, Inc.

Director, Nuclear Safety & Licensing Entergy Services, Inc.

440 Hamilton Avenue White Plains, NY 10601 Senior Manager, Nuclear Safety & Licensing Entergy Services, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Attorney General State of Louisiana P.O. Box 94095 Baton Rouge, LA 70804-9005 H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 President, West Feliciana Parish Police Jury P.O. Box 1921 St. Francisville, LA 70775 Richard Penrod, Senior Environmental Scientist, State Liaison Officer Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA 71497 Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Jim Calloway Public Utility Commission of Texas 1701 N. Congress Avenue Austin, TX 78711-3326

Entergy Operations, Inc.

Louisiana Department of Environmental Quality Radiological Emergency Planning and Response Division P.O. Box 4312 Baton Rouge, LA 70821-4312 Louisiana Department of Environmental Quality Office of Environmental Compliance P.O. Box 4312 Baton Rouge, LA 70821-4312 Lisa R. Hammond, Chief Technological Hazards Branch National Preparedness Division FEMA Region VI 800 N. Loop 288 Denton, TX 76209

Entergy Operations, Inc.

E-Mail To:

( )

NRC Attendees PMNS Mtg Announcement Coordinator EEC E. Collins, RA ATH A. Howell, DRA DDC D. Chamberlain, D:DRP RCJ1 R. Caniano, D:DRS AXV A. Vegel, DD:DRP VDW1 V. Watkins, DD:DRS TWP T. Pruett, DD:DRS REL R. Lantz, C:DRS/OB OEWEB S. Bogle BAB2 Bruce Boger, ADRO OEMAIL D/OE JET3 J. Thorp KXW K. Williams, NSIR/DRP/EP CGM C. Miller, NSIR/DRP/EP DLP1 D. Pelton, RIV OEDO Coordinator FPB P. Bonnett JND J. Donohew, Project Manager, NRR RWD Acting Branch Chief, PBC WCW Senior Project Engineer, PBC GFL1 Senior Resident Inspector VLD V. Dricks, Region IV PAO WAM W. Maier, Region IV RSLO KSF K. Fuller, Region IV RC/ACES GMV M. Vasquez, Region IV Enforcement Specialist LAO, JAK Region IV RA Secretaries AMT Region IV DRP Secretaries LMB, LAR, TEK Region IV DRS Secretaries BST1, MJS Region IV DNMS Secretaries GSM1 Bub Mueller, IRMB LPL P. Longdo, Receptionist AMM A. Mattila, Security Advisor SUNSI Review Completed: _WCW_ ADAMS: YesG No Initials: _WCW_

Publicly Available Non-Publicly Available Sensitive Non-Sensitive R:\\_EOC Meeting Notice\\RB Meeting Notice 4-30-08.doc RIV:SPE:DRP/C C:DRP/C PAO RSLO WCWalker;vlh RWDeese VLDricks WAMaier

/RA/

/RA/

/RA/

/RA/ VHC for 3/19/08 3/27/08 3/28/08 3/27/08 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax