IR 05000247/2010405: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 07/06/2010
| issue date = 07/06/2010
| title = IR 05000247-10-405; Entergy Nuclear Operations; 05/08/2010 - 05/09/2010; Indian Point Unit 2, NRC Material Control and Accounting Program Inspection Report
| title = IR 05000247-10-405; Entergy Nuclear Operations; 05/08/2010 - 05/09/2010; Indian Point Unit 2, NRC Material Control and Accounting Program Inspection Report
| author name = Powell R J
| author name = Powell R
| author affiliation = NRC/RGN-I/DRP
| author affiliation = NRC/RGN-I/DRP
| addressee name = Pollock J E
| addressee name = Pollock J
| addressee affiliation = Entergy Nuclear Operations, Inc
| addressee affiliation = Entergy Nuclear Operations, Inc
| docket = 05000247
| docket = 05000247
Line 31: Line 31:
OffiCIAL USE ONLY SECURITY RELATED INfORMATION SECURITY RELATED In accordance with 10 CFR 2.390{b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)( 1).
OffiCIAL USE ONLY SECURITY RELATED INfORMATION SECURITY RELATED In accordance with 10 CFR 2.390{b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)( 1).


Sincerely,IRA! Raymond J. Powell, Chief Technical Support and Assessment Branch Division of Reactor Projects Docket No. 50-247 License No. DPR-26 Nonpublic  
Sincerely, IRA! Raymond J. Powell, Chief Technical Support and Assessment Branch Division of Reactor Projects Docket No. 50-247 License No. DPR-26 Nonpublic Enclosure:
 
NRC Inspection Report 05000247/2010405 w/Attachment: Supplemental Information (CONTAINS (OUO*SRI>>
===Enclosure:===
NRC Inspection Report 05000247/2010405  
 
===w/Attachment:===
Supplemental Information (CONTAINS (OUO*SRI>>
cc w/enclj w/OUO-SRI D. Gagnon, Security Manager D. Frazier, New York State Homeland Security F. Murray, New York State Energy Research and Development Authority cc wlo encl; wlo OUO-SRI: Distribution via ListServ SECURITY REbATED INFORMATION OFFICll\l USE ONLY
cc w/enclj w/OUO-SRI D. Gagnon, Security Manager D. Frazier, New York State Homeland Security F. Murray, New York State Energy Research and Development Authority cc wlo encl; wlo OUO-SRI: Distribution via ListServ SECURITY REbATED INFORMATION OFFICll\l USE ONLY
}}
}}

Revision as of 07:58, 11 July 2019

IR 05000247-10-405; Entergy Nuclear Operations; 05/08/2010 - 05/09/2010; Indian Point Unit 2, NRC Material Control and Accounting Program Inspection Report
ML101870485
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 07/06/2010
From: Racquel Powell
Division Reactor Projects I
To: Joseph E Pollock
Entergy Nuclear Operations
References
IR-10-405
Download: ML101870485 (4)


Text

OffiCIAL USE ONLY SECURITY RELATED INfORMATION July 6,2010 Mr. Joseph Site Vice President Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB Buchanan, NY 10511-0249 INDIAN POINT UNIT 2 -NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT NO. 05000247/2010405

Dear Mr. Pollock:

On June 9, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Indian Point Nuclear Generating Unit 2. The inspection covered one of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on June 9, 2010, with Mr. Rich Burroni, System Engineering Manager, and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

I When separated from the Enclosure, this Ldocument is DECONTROLLED.

OffiCIAL USE ONLY SECURITY RELATED INfORMATION SECURITY RELATED In accordance with 10 CFR 2.390{b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)( 1).

Sincerely, IRA! Raymond J. Powell, Chief Technical Support and Assessment Branch Division of Reactor Projects Docket No. 50-247 License No. DPR-26 Nonpublic Enclosure:

NRC Inspection Report 05000247/2010405 w/Attachment: Supplemental Information (CONTAINS (OUO*SRI>>

cc w/enclj w/OUO-SRI D. Gagnon, Security Manager D. Frazier, New York State Homeland Security F. Murray, New York State Energy Research and Development Authority cc wlo encl; wlo OUO-SRI: Distribution via ListServ SECURITY REbATED INFORMATION OFFICll\l USE ONLY