|
|
Line 2: |
Line 2: |
| | number = ML11154A134 | | | number = ML11154A134 |
| | issue date = 06/02/2011 | | | issue date = 06/02/2011 |
| | title = Prairie Island Nuclear Generating Plant, Units 1 and 2 - Supplement to License Amendment Request (LAR) to Revise the Physical Security Plan | | | title = Supplement to License Amendment Request (LAR) to Revise the Physical Security Plan |
| | author name = Schimmel M A | | | author name = Schimmel M A |
| | author affiliation = Xcel Energy, Northern States Power Co | | | author affiliation = Xcel Energy, Northern States Power Co |
Line 14: |
Line 14: |
| | page count = 3 | | | page count = 3 |
| | project = TAC:ME5897, TAC:ME5898 | | | project = TAC:ME5897, TAC:ME5898 |
| | stage = RAI | | | stage = Supplement |
| }} | | }} |
|
| |
|
Revision as of 00:20, 9 February 2019
Letter Sequence Supplement |
---|
|
|
|
|
---|
Category:Letter
MONTHYEARML24298A0552024-10-30030 October 2024 Response to Alternative RR-10, Auxiliary Feedwater Valve Testing IR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums ML24060A1232024-03-27027 March 2024 To Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds 05000282/LER-2023-001-01, Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables2024-03-21021 March 2024 Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24010A0582024-03-0505 March 2024 Amendment No. 12 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 IR 05000282/20230062024-02-28028 February 2024 Annual Assessment Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2023006 and 05000306/2023006) 2024-09-27
[Table view] |
Text
SAFEGUARDS INFORMATION Prairie Island Nuclear Generating Plant U XcelEnergy 1717 Wakonade Drive East Welch. MN 55089 June 2, 2011 L-PI-1 1-54 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Units 1 and 2 Dockets 50-282 and 50-306 License Nos. DPR-42 and DPR-60 Supplement to License Amendment Request (LAR) to Revise the Physical Security Plan (TAC Nos. ME5897 and ME5898)
Reference:
- 1. Letter from NSPM to NRC, L-PI-1 1-020, "License Amendment Request (LAR) to Revise the Physical Security Plan", dated March 18, 2011.2. Letter from NSPM to NRC, L-PI-11-021, "Technical Evaluation and Supporting Information in Support of License Amendment Request (LAR)to Revise the Physical Security Plan", dated March 18, 2011.3. Letter from NSPM to NRC, L-PI-11-50, "Supplement to License Amendment Request (LAR) to Revise the Physical Security Plan", dated May, 4, 2011.In References 1 and 2, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), requested an amendment to the Operating License for the Prairie Island Nuclear Generating Plant (PINGP) to revise the PINGP Physical Security Plan. Reference 3 then provided supplemental information as requested by NRC in an email dated April 26, 2011.The NRC staff subsequently made NSPM aware of errors in Reference
- 3. In addition, NSPM identified that a staffing decision made subsequent to the initial submittal (Reference 1 and 2) affected the Security Plan page submitted in Reference 2.Therefore for purposes of clarity this corrected supplement supersedes Reference 3 in its entirety.
The substantive changes made to the enclosures relative to Reference 3 are identified with colored text and sidebars as appropriate.
WHEN SEPARATED FROM THE ENCLOSURES 2 AND 3 THIS LETTER MAY BE DECONTROLLED.
S F UII SAFEGUARDS INFORMATION pac SAFEGUARDS INFORMATION Document Control Desk Page 2 Subsequent to making the original submittal (Reference
- 1) NSPM reconsidered the proper basis for categorical exclusion of this amendment request from environmental review. Enclosure 1, "Revised Environmental Consideration" replaces the Environmental Considerations and the basis for categorical exclusion from environmental review provided in Section 5 of Enclosure 1 to Reference 1.Enclosure 2 includes an additional page of the PINGP Security Plan affected by the proposed change and the proposed rewording.
Enclosure 3 provides additional information describing the effects of the proposed change at the request of the NRC staff.NSPM submits this submittal in accordance with the provisions of 10 CFR 50.90.The information provided in this letter does not impact the conclusions of the Determination of No Significant Hazards Consideration presented in the March 18, 2011 submittal.
In accordance with 10 CFR 50.91, NSPM is notifying the State of Minnesota of this LAR supplement by transmitting a copy of this letter (without safeguards information) to the designated State Official.Enclosure 2 to this letter, "Additional Affected Page" and Enclosure 3 "Additional Supporting Information", contain Safeguards Information.
Therefore, NSPM requests that these enclosures be withheld from public disclosure in accordance with 10 CFR 73.22.If there are any questions or if additional information is needed, please contact Leonard Sueper at 612-330-6917.
Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
I declare under penalty of perjury that the foregoing is true and correct.Executed on-Mark A. Schimme Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company -Minnesota Enclosures (3)SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION Document Control Desk Page 3 cc: Administrator, Region III, USNRC NRR Project Manager, PINGP, USNRC (without safeguards information)
Resident Inspector, PINGP, USNRC (without safeguards information)
State of Minnesota (without safeguards information)
SAFEGUARDS INFORMATION