| number = ML17115A421
| number = ML17115A421
| issue date = 04/25/2017
| issue date = 04/25/2017
| title = 2017/04/25 NRR E-mail Capture - Withdrawal of Draft RAI Regarding Perry'S LAR Re TSTF-501, Revision 1
| title = Withdrawal of Draft RAI Regarding Perry'S LAR Re TSTF-501, Revision 1
| author name = Green K J
| author name = Green K J
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1

Revision as of 15:13, 6 February 2019

Withdrawal of Draft RAI Regarding Perry'S LAR Re TSTF-501, Revision 1
ML17115A421
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 04/25/2017
From: Green K J
Plant Licensing Branch III
To: Lashley P H
FirstEnergy Nuclear Operating Co
References
Download: ML17115A421 (2)


Text

1 NRR-PMDAPEm Resource From: Green, Kimberly Sent: Tuesday, April 25, 2017 1:45 PM To: Lashley, Phil H. (phlashley@firstenergycorp.com)

Cc:Heintz, Calvin J. (cjheintz@firstenergycorp.com)

Subject:

Withdrawal of Draft RAI Regarding Pe rry's LAR re TSTF-501, Revision 1

Dear Mr. Lashley:

By letter to the U.S. Nuclear Regulatory Commission (NRC) dated October 27, 2016, FirstEnergy Nuclear Operating Company submitted a request to modify the Perry Nuclear Power Plant, Unit 1, technical specifications (TSs) to revise TS 3.8.3, "Diesel Fuel Oil, Lube Oil, and Starting Air," by removing the current stored diesel fuel oil and lube oil numerical volume requirements in the TS and placing them in the TS Bases so that they may be modified under licensee control, and also modifying the TS so that the stored diesel fuel oil and lube oil inventory will require that a 7-day supply be available for each diesel generator. The proposed changes are consistent with NRC-approved Revision 1 to Technical Specification Task Force (TSTF) Improved Standard Technical Specifications (STS) Change Traveler TSTF-501, "Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control."

By email dated April 6, 2017 (Agencywide Docum ents Access and Management System Accession No. ML17114A153), I informed you of the NRC staff's need for a dditional information to complete its review and transmitted a draft request for additional information (RAI). The purpose of the draft RAI was to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed.

During further review by the NRC staff, it determined that sufficient information already exists on the docket to support its regulatory findings. Therefore, the NRC is withdrawing its draft RAI. No additional information is needed at this time in order for the staff to complete its review. However, if the NRC staff should determine that additional information regarding this amendment request is needed in the future, I will contact you.

Should you have any questions or require additional information regarding this matter, please contact me.

Sincerely, Kimberly Green, Sr. Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

(301) 415-1627

kimberly.green@nrc.gov

Hearing Identifier: NRR_PMDA Email Number: 3471 Mail Envelope Properties (Kimberly.Green@nrc.gov20170425134500)

Subject:

Withdrawal of Draft RAI Regarding Perry's LAR re TSTF-501, Revision 1 Sent Date: 4/25/2017 1:45:03 PM Received Date: 4/25/2017 1:45:00 PM From: Green, Kimberly Created By: Kimberly.Green@nrc.gov Recipients: "Heintz, Calvin J. (cjheintz@firstenergycorp.com)" <cjheintz@firstenergycorp.com> Tracking Status: None "Lashley, Phil H. (phlashley@firstenergycorp.com)" <phlashley@firstenergycorp.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2137 4/25/2017 1:45:00 PM