ML14177A721: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:1NRR-PMDAPEm Resource From:Grange, Briana Sent:Tuesday, June 24, 2014 1:25 PM To:Finfera, Jennifer (jennifer_finfera@fws.gov)
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Grange, Briana Sent: Tuesday, June 24, 2014 1:25 PM To: Finfera, Jennifer (jennifer_finfera@fws.gov)


==Subject:==
==Subject:==
RE: Davis Besse operating license renewal Attachments:
RE: Davis Besse operating license renewal Attachments:
Toledo Edison 1980 - Bird Collision Study.pdf; NRC 1981 Letter regarding Bird Collision Study.pdf Hi Jenny, I was able to obtain a copy of Toledo Edison's 1980 bird mortality report, which documents the 1972-1979 surveys conducted at Davis-Besse. This report is attached as well as a 1981 letter from the NRC indicating  
Toledo Edison 1980 - Bird Collision Study.pdf; NRC 1981 Letter regarding Bird Collision Study.pdf Hi Jenny, I was able to obtain a copy of Toledo Edison's 1980 bird mortality report, which documents the 1972-1979 surveys conducted at Davis-Besse. This report is attached as well as a 1981 letter from the NRC indicating  


that the NRC would no longer require Toledo Edison to c onduct bird mortality surveys because the surveys had found "no significant adverse effect on bird populations."  
that the NRC would no longer require Toledo Edison to c onduct bird mortality surveys because the surveys had found "no significant adverse effect on bird populations."  

Revision as of 15:08, 9 July 2018

2014/06/24 NRR E-mail Capture - Davis Besse Operating License Renewal
ML14177A721
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/24/2014
From: Grange B A
NRC/NRR/DLR/RERGUB
To: Finfera J
US Dept of Interior, Fish & Wildlife Service
References
Download: ML14177A721 (27)


Text

1 NRR-PMDAPEm Resource From: Grange, Briana Sent: Tuesday, June 24, 2014 1:25 PM To: Finfera, Jennifer (jennifer_finfera@fws.gov)

Subject:

RE: Davis Besse operating license renewal Attachments:

Toledo Edison 1980 - Bird Collision Study.pdf; NRC 1981 Letter regarding Bird Collision Study.pdf Hi Jenny, I was able to obtain a copy of Toledo Edison's 1980 bird mortality report, which documents the 1972-1979 surveys conducted at Davis-Besse. This report is attached as well as a 1981 letter from the NRC indicating

that the NRC would no longer require Toledo Edison to c onduct bird mortality surveys because the surveys had found "no significant adverse effect on bird populations."

Please let me know if you need any other references or if I can answer any other questions for you during your review of NRC's effect determinations for Federally listed species that could be affected by the proposed Davis-Besse license renewal.

Briana ______________ Briana A. Grange Biologist U.S. Nuclear Regulatory Commission NRR/DLR/RERB (301) 415-1042 briana.grange@nrc.gov

Hearing Identifier: NRR_PMDA Email Number: 1403 Mail Envelope Properties (Briana.Grange@nrc.gov20140624132500)

Subject:

RE: Davis Besse operating license renewal Sent Date: 6/24/2014 1:25:26 PM Received Date: 6/24/2014 1:25:00 PM From: Grange, Briana Created By: Briana.Grange@nrc.gov Recipients: "Finfera, Jennifer (jennifer_finfera@fws.gov)" <jennifer_finfera@fws.gov> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 856 6/24/2014 1:25:00 PM Toledo Edison 1980 - Bird Collision Study.pdf 567511 NRC 1981 Letter regarding Bird Collision Study.pdf 71387

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: