{{#Wiki_filter:ISI-T-200.0 SUSQUEHANNA STEAMELECTRICSTATIONUNIT2INSERVICE INSPECTION PROGRAMPI.AN'!PUMPANDVALVEOPERATIONAL TESTINGCompliance withNRCGenericLetter89-04Responses toNRCComments'i':,;::::;.':-,"'.:Pr'ep'ar'etI':b'j:>.':::::.:'.':.':;'.':
{{#Wiki_filter:ISI-T-200.0 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 2 INSERVICE INSPECTION PROGRAM PI.AN'!PUMP AND VALVE OPERATIONAL TESTING Compliance with NRC Generic Letter 89-04 Responses to NRC Comments'i':,;::::;.':-,"'.:Pr'ep'ar'etI':b'j:>.':::::.:'.':.':;'.':
Signatures onFileSignatures onFile'.,;.',,,''pprov'ed:bj,;~>'<5:::':::::::::
Signatures on File Signatures on File'.,;.',,,''pprov'ed:bj,;~>'<5:::':::::::::
Date'.!':
Date'.!': 9307020026 930623 PDR ADOCK 05000387 G PDR 2T-1 Rev.5 05j98 it O'1 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 2 PUMP AND VALVE INSERVICE INSPECTION TESTING PROGRAM TITLE: Page 2T-1 DESCRIPTION:
9307020026 930623PDRADOCK05000387GPDR2T-1Rev.505j98 itO'1 SUSQUEHANNA STEAMELECTRICSTATIONUNIT2PUMPANDVALVEINSERVICE INSPECTION TESTINGPROGRAMTITLE:Page2T-1DESCRIPTION:
Page 2D-1 Page 2D-2 LEGENDS: Page 2LV-1 Page 2LV-2 Page 2LP-1 VALVE TABLES: Page 2VT-1 Page 2VT-2 Page 2VT-3 Page 2VT-4 Page 2VT-5 Page 2VT-6 Page 2VT-7 Page 2VT-8 Page 2VT-9 Page 2VT-10 Page 2VT-11 Page 2VT-12 Page 2VT-13 Page 2VT-14:,:j>>::,":;.:',";
Page2D-1Page2D-2LEGENDS:Page2LV-1Page2LV-2Page2LP-1VALVETABLES:Page2VT-1Page2VT-2Page2VT-3Page2VT-4Page2VT-5Page2VT-6Page2VT-7Page2VT-8Page2VT-9Page2VT-10Page2VT-11Page2VT-12Page2VT-13Page2VT-14:,:j>>::,":;.:',";
:'::Reiisioii':::::."''-'';::'::'::
:'::Reiisioii':::::."''-'';::'::'::
:'":.;:::;:::-'::,,",3::>Dated::'::::.':i::;:;';;::~;;.".,"
:'":.;:::;:::-'::,,",3::>Dated::'::::.':i::;:;';;::~;;.".," 05/93 05/93 05/93 12/91 05/93 12/91 12/91 12/91 12/91 12/91 12/91 05/93 05/93 12/91 12/91 12/91 12/91 12/91 12/91 12/91 LEP-1 05/93  
05/9305/9305/9312/9105/9312/9112/9112/9112/9112/9112/9105/9305/9312/9112/9112/9112/9112/9112/9112/91LEP-105/93  


~%'I, ISI-T-200.0 Page2VT-43Page2VT-44Page2VT-45Page2VT-46Page2VT-47Page2VT-48Page2VT-49Page2VT-50Page2VT-51Page2VT-52Page2VT-53Page2VT-54Page2VT-55Page2VT-56Page2VT-57Page2VT-58Page2VT-59Page2VT-60Page2VT-61Page2VT-62Page2VT-63Page2VT-64Page2VT-65Page2VT-66Page2VT-67Page2VT-68Page2VT-69Page2VT-70LEP-3512/9105/9305/9312/9105/9305/9312/9112/9112/9112/9112/9112/9112/9112/9112/9112/9105/9305/9305/9305/9305/9305/9305/9305/9305/9305/9305/9305/9305/93 ISI-T-200.0 Page2VT-71-PUMPTABLES:Page2PT-1Page2PT-2Page2PT-3Page2PT-4RELIEFREQUESTS:
~%'I, ISI-T-200.0 Page 2VT-43 Page 2VT-44 Page 2VT-45 Page 2VT-46 Page 2VT-47 Page 2VT-48 Page 2VT-49 Page 2VT-50 Page 2VT-51 Page 2VT-52 Page 2VT-53 Page 2VT-54 Page 2VT-55 Page 2VT-56 Page 2VT-57 Page 2VT-58 Page 2VT-59 Page 2VT-60 Page 2VT-61 Page 2VT-62 Page 2VT-63 Page 2VT-64 Page 2VT-65 Page 2VT-66 Page 2VT-67 Page 2VT-68 Page 2VT-69 Page 2VT-70 LEP-3 5 12/91 05/93 05/93 12/91 05/93 05/93 12/91 12/91 12/91 12/91 12/91 12/91 12/91 12/91 12/91 12/91 05/93 05/93 05/93 05/93 05/93 05/93 05/93 05/93 05/93 05/93 05/93 05/93 05/93 ISI-T-200.0 Page 2VT-71-PUMP TABLES: Page 2PT-1 Page 2PT-2 Page 2PT-3 Page 2PT-4 RELIEF REQUESTS: Page 2RRT-1 Page 2RR1-1 Page 2RR2-1 Page 2RR2-2 Page 2RR3-1 Page 2RR4-1 Page 2RR5-1 Page 2RR6-1:,:;','.'::.',::.::":;:
Page2RRT-1Page2RR1-1Page2RR2-1Page2RR2-2Page2RR3-1Page2RR4-1Page2RR5-1Page2RR6-1:,:;','.'::.',::.::":;:
Revisioii";.";:j",.':;;":;,:"::,':::i:;:::.'"i'::
Revisioii";.";:j",.':;;":;,:"::,':::i:;:::.'"i'::
';j.",:9ate'I,':'':,;';:';:'!;:,j:
';j.",:9ate'I,':'':,;';:';:'!;:,j:
05/9312/9112/9112/9112/9112/9105/9312/9112/9105/9305/9305/9305/93Page2RR7-1Page2RRS-1Page2RR9-1Page2RR10-1Page2RR10-2Page2RR11-1Page2RR12-1Page2RR13-1Page2RR14-1Page2RR15-1Page2RR16-1Page2RR17-1Page2RR17-2LEP-4412/9112/9112/9105/9305/9305/9312/9105/9312/9112/9105/9312/9112/9105/93 ISI-T-200.0 Page2RR17-3Page2RR18-1Page2RR19-1Page2RR20-1Page2RR20-2Page2RR21-1Page2RR22-1Page2RR23-1Page2RR24-1Page2RR24-2Page2RR25-1Page2RR26-1Page2RR27-1Page2RR28-1Page2RR29-1Page2RR30-1Page2RR31-1Page2RR32-1Page2RR33-1Page2RR34-1Page2RR35-1Page2RR36-1Page2RR37-1Page2RR38-1Page2RR39-1Page2RR40-1Page2RR41-1Page2RR42-1LEP-55512/9112/9112/9112/9105/9312/9112/9105/9312/9112/9112/9105/9312/9112/9105/9305/9312/9112/9105/9312/9112/9112/9105/9305/9305/9312/9112/9112/9105/93  
05/93 12/91 12/91 12/91 12/91 12/91 05/93 12/91 12/91 05/93 05/93 05/93 05/93 Page 2RR7-1 Page 2RRS-1 Page 2RR9-1 Page 2RR10-1 Page 2RR10-2 Page 2RR11-1 Page 2RR12-1 Page 2RR13-1 Page 2RR14-1 Page 2RR15-1 Page 2RR16-1 Page 2RR17-1 Page 2RR17-2 LEP-4 4 12/91 12/91 12/91 05/93 05/93 05/93 12/91 05/93 12/91 12/91 05/93 12/91 12/91 05/93 ISI-T-200.0 Page 2RR17-3 Page 2RR18-1 Page 2RR19-1 Page 2RR20-1 Page 2RR20-2 Page 2RR21-1 Page 2RR22-1 Page 2RR23-1 Page 2RR24-1 Page 2RR24-2 Page 2RR25-1 Page 2RR26-1 Page 2RR27-1 Page 2RR28-1 Page 2RR29-1 Page 2RR30-1 Page 2RR31-1 Page 2RR32-1 Page 2RR33-1 Page 2RR34-1 Page 2RR35-1 Page 2RR36-1 Page 2RR37-1 Page 2RR38-1 Page 2RR39-1 Page 2RR40-1 Page 2RR41-1 Page 2RR42-1 LEP-5 5 5 12/91 12/91 12/91 12/91 05/93 12/91 12/91 05/93 12/91 12/91 12/91 05/93 12/91 12/91 05/93 05/93 12/91 12/91 05/93 12/91 12/91 12/91 05/93 05/93 05/93 12/91 12/91 12/91 05/93  
~v ISI-T-200.0 Page2RR43-1Page2RR44-1Page2RR45-1Page2RR46-1Page2RR47-1Page2RR48-1Page2RR49-1Page2RR50-1Page2RR51-1Page2RR52-1Page2RR53-1Page2RR54-1Page2RR55-1Page2RR55-2Page2RR56-1Page2RR57-1Page2RR58-1Page2RR58-2Page2RR58-3Page2RR584Page2RR58-5Page2RR59-1Page2RR60-1Page2RR60-2Page2RR61-1Page2RR61-2Page2RR62-1Page2RR63-1:;:.':.:;:,";.:;:..;':::
~v ISI-T-200.0 Page 2RR43-1 Page 2RR44-1 Page 2RR45-1 Page 2RR46-1 Page 2RR47-1 Page 2RR48-1 Page 2RR49-1 Page 2RR50-1 Page 2RR51-1 Page 2RR52-1 Page 2RR53-1 Page 2RR54-1 Page 2RR55-1 Page 2RR55-2 Page 2RR56-1 Page 2RR57-1 Page 2RR58-1 Page 2RR58-2 Page 2RR58-3 Page 2RR584 Page 2RR58-5 Page 2RR59-1 Page 2RR60-1 Page 2RR60-2 Page 2RR61-1 Page 2RR61-2 Page 2RR62-1 Page 2RR63-1:;:.':.:;:,";.:;:..;':::
Rem)vari':,
Rem)vari':, i:;:~:: i 4 LEP-6''::;:::;:.','::::.:'I::
i:;:~::i4LEP-6''::;:::;:.','::::.:'I::
9ated::,::i.;'i.:.;'i!:::::;;.':;:.
9ated::,::i.;'i.:.;'i!:::::;;.':;:.
12/9112/9105/9312/9112/9105/9305/9312/9112/9112/9105/9305/9312/9112/9112/9112/9112/9112/9112/9112/9112/9105/9305/9305/9305/9305/0305/9305/9305/93 ISI-T-200.0 Page2RR64-1Page2RR64-2Page2RR65-1Page2RR65-2Page2RR66-1Page2RR66-2Page2RR67-1Page2RR68-1512/9105/9312/9105/9305/9305/9305/9305/93LEP-7,05/93 ISI-T-200.0 SUSQUEHANNA STEAMELECTRICSTATIONUNIT2PUMPANDVALVEINSERVICE INSPECTION TESTINGPROGRAMThepumpandvalveISItestingprogramattheSusquehanna SESUnit2willbeconducted inaccordance withthe1980EditionofSectionXIoftheASMEBoilerandPressureVesselCodeincorporating throughtheWinter1981Addenda.Specificexceptions fromtheserequirements areincludedhereasReliefRequests.
12/91 12/91 05/93 12/91 12/91 05/93 05/93 12/91 12/91 12/91 05/93 05/93 12/91 12/91 12/91 12/91 12/91 12/91 12/91 12/91 12/91 05/93 05/93 05/93 05/93 05/03 05/93 05/93 05/93 ISI-T-200.0 Page 2RR64-1 Page 2RR64-2 Page 2RR65-1 Page 2RR65-2 Page 2RR66-1 Page 2RR66-2 Page 2RR67-1 Page 2RR68-1 5 12/91 05/93 12/91 05/93 05/93 05/93 05/93 05/93 LEP-7, 05/93 ISI-T-200.0 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 2 PUMP AND VALVE INSERVICE INSPECTION TESTING PROGRAM The pump and valve ISI testing program at the Susquehanna SES Unit 2 will be conducted in accordance with the 1980 Edition of Section XI of the ASME Boiler and Pressure Vessel Code incorporating through the Winter 1981 Addenda.Specific exceptions from these requirements are included here as Relief Requests.The inservice portion of the program commences at the receipt of the Operating License.Requirements for specific components commence concurrent with Technical Specification operability requirements.
Theinservice portionoftheprogramcommences atthereceiptoftheOperating License.Requirements forspecificcomponents commenceconcurrent withTechnical Specification operability requirements.
For valves so equipped, remote position indicators will be utilized to demonstrate valve operability.
Forvalvessoequipped, remotepositionindicators willbeutilizedtodemonstrate valveoperability.
Proper functioning of these position indicators will be demonstrated at least once every 24 months.Safety valve and relief valve pressure setpoint testing will be conducted using test procedures which incorporate the testing methods of Section 4.09 of ANSI/ASME PTC 25.3-1976.
Properfunctioning ofthesepositionindicators willbedemonstrated atleastonceevery24months.Safetyvalveandreliefvalvepressuresetpointtestingwillbeconducted usingtestprocedures whichincorporate thetestingmethodsofSection4.09ofANSI/ASME PTC25.3-1976.
PTC 25.3 Section 0, Section 1, Section 2, Section 3 paragraphs 3.06, 3.07, 3.10, and Section 4 paragraphs 4.01, 4.02 (4.023 only)and 4.09 pertain to the safety/relief valve pressure setpoint testing required by IWV-3512, in varying degrees, and will be complied with, accordingly.
PTC25.3Section0,Section1,Section2,Section3paragraphs 3.06,3.07,3.10,andSection4paragraphs 4.01,4.02(4.023only)and4.09pertaintothesafety/relief valvepressuresetpointtestingrequiredbyIWV-3512, invaryingdegrees,andwillbecompliedwith,accordingly.
PTC 25.3 Section 3 paragraphs 3.01, 3.02, 3.03, 3.05, 3.08, 3.09, Section 4 paragraphs 4.02 (4.021-4.022 and 4.024-4.029), 4.03, 4.04, 4.05, 4.06, 4.07, 4.08, Section 5 and Section 6 all pertain to more complex safety/relief valve capacity testing, (normally performed by valve manufacturers) rather than pressure setpoints tests, and will be disregarded due to their inapplicability to pressure setpoint testing.The provisions of Paragraph IWV-3511 shall begin at the receipt of the operating license.Thermal relief devices are excluded from the program.With the exception of valves providing a high pressure to low pressure boundary (pressure isolation function), valve leakage rate testing and acceptance criteria will be based on 10CFR50 Appendix J requirements as discussed in FSAR Subsection 6.2.6 and Susquehanna SES Technical Specification 3/4.6.1.2.
PTC25.3Section3paragraphs 3.01,3.02,3.03,3.05,3.08,3.09,Section4paragraphs 4.02(4.021-4.022and4.024-4.029),4.03,4.04,4.05,4.06,4.07,4.08,Section5andSection6allpertaintomorecomplexsafety/relief valvecapacitytesting,(normally performed byvalvemanufacturers) ratherthanpressuresetpoints tests,andwillbedisregarded duetotheirinapplicability topressuresetpointtesting.Theprovisions ofParagraph IWV-3511shallbeginatthereceiptoftheoperating license.Thermalreliefdevicesareexcludedfromtheprogram.Withtheexception ofvalvesproviding ahighpressuretolowpressureboundary(pressure isolation function),
Pressure isolation function testing is discussed below.Excess flow check valves are installed on instrument lines penetrating containment in accordance with Regulatory Guide 1.11.As such, the lines are sized and/or orificed such that off-site doses will be substantially below 10CFR100 limits in the event of a rupture.Therefore, individual leak rate testing of these valves is not required for conformance with 10CFR50, Appendix J requirements.
valveleakageratetestingandacceptance criteriawillbebasedon10CFR50AppendixJrequirements asdiscussed inFSARSubsection 6.2.6andSusquehanna SESTechnical Specification 3/4.6.1.2.
Functional testing of valves to verify closure can be accomplished by the process of venting the instrument side of the valve while the process side is under pressure.Such testing is required by Technical Specification 4.6.3.4 at least once per 18 months.Testing on a more frequent basis is not feasible for several reasons.Instruments serviced by these valves frequently have interlock or actuation functions that would be interfered with should testing be performed during plant operation.
Pressureisolation functiontestingisdiscussed below.Excessflowcheckvalvesareinstalled oninstrument linespenetrating containment inaccordance withRegulatory Guide1.11.Assuch,thelinesaresizedand/ororificedsuchthatoff-sitedoseswillbesubstantially below10CFR100limitsintheeventofarupture.Therefore, individual leakratetestingofthesevalvesisnotrequiredforconformance with10CFR50,AppendixJrequirements.
Also, process liquid will be contaminated to some degree, requiring 2D-1 Rev.5 05/93  
Functional testingofvalvestoverifyclosurecanbeaccomplished bytheprocessofventingtheinstrument sideofthevalvewhiletheprocesssideisunderpressure.
/P~1k ISI-T-200.0 special measures to collect flow from the vented instrument side.Functional testing with verification that flow is checked will be performed at least once per 18 months per Technical Specification 4.6.3 via SI-299-220 through 234.A listing of excess flow check valves can be found in Technical Specification Table 3.6.3-1.Relief Request 33 pertains to excess flow check valve testing.Check valves whose safety function is to open will be full-stroke tested.Since disc position is'ot always observable, verification of the safety analysis design flowrate through the valve is considered an adequate demonstration of the full-stroke requirement.
SuchtestingisrequiredbyTechnical Specification 4.6.3.4atleastonceper18months.Testingonamorefrequentbasisisnotfeasibleforseveralreasons.Instruments servicedbythesevalvesfrequently haveinterlock oractuation functions thatwouldbeinterfered withshouldtestingbeperformed duringplantoperation.
This convention is in agreement with NRC Generic Letter 89-04, Position 1.Limit stroke times for power operated valves are provided and controlled in a general plant procedure in accordance with the NRC guidance provided by"Minutes of the Public Meetings on Generic Letter 89-04" (NRC Response to Question 38).Where devices monitoring appropriate parameters exist, permanently installed instrumentation will be used during pump performance testing.Both permanent plant instrumentation and measuring and test equipment will be maintained by the Instrumentation and Controls Section in accordance with their administrative procedures.
Also,processliquidwillbecontaminated tosomedegree,requiring 2D-1Rev.505/93  
For those requirements of the Code which are impractical to test, Relief Requests have been included in this program.These Relief Requests provide the impractical test requirement, basis for relief and the proposed alternative testing.Also included as Relief Request are our Cold Shutdown Test Justifications and are so indicated.
/P~1k ISI-T-200.0 specialmeasurestocollectflowfromtheventedinstrument side.Functional testingwithverification thatflowischeckedwillbeperformed atleastonceper18monthsperTechnical Specification 4.6.3viaSI-299-220 through234.AlistingofexcessflowcheckvalvescanbefoundinTechnical Specification Table3.6.3-1.ReliefRequest33pertainstoexcessflowcheckvalvetesting.Checkvalveswhosesafetyfunctionistoopenwillbefull-stroke tested.Sincediscpositionis'otalwaysobservable, verification ofthesafetyanalysisdesignflowratethroughthevalveisconsidered anadequatedemonstration ofthefull-stroke requirement.
2D-2 Rev.5 05/93 ISI-T-200.0 LE F R VALVE TABL Valve Number: Unique system designated valve identification HV-hand switch-operated valve SV-solenoid-operated valve PSV-pressure safety/relief valve XV-excess flow check valve FV-flow control valve PSE-rupture disks 5SME Class: ASME.Code Classes 1, 2, and 3 S-non-code valve which performs a safety-related function P&ID Coordinates:
Thisconvention isinagreement withNRCGenericLetter89-04,Position1.Limitstroketimesforpoweroperatedvalvesareprovidedandcontrolled inageneralplantprocedure inaccordance withtheNRCguidanceprovidedby"MinutesofthePublicMeetingsonGenericLetter89-04"(NRCResponsetoQuestion38).Wheredevicesmonitoring appropriate parameters exist,permanently installed instrumentation willbeusedduringpumpperformance testing.Bothpermanent plantinstrumentation andmeasuring andtestequipment willbemaintained bytheInstrumentation andControlsSectioninaccordance withtheiradministrative procedures.
Location of valve on P&ID drawing Section XI Valve Category: A-valves with specified maximum leakage rate B-valves with no specified maximum leakage rate C-self-actuating (check, relief valves)D-actuated by energy source capable of only one operation (rupture disks, explosive valves)Active: Valves required to change position to accomplish specified safety function Passive: Valves not required to change position to accomplish specified safety function Size: Nominal valve size in inches Valve Type: C-Check valve B-Butterfly valve G-Gate valve GL-Globe valve RV-Pressure relief valve XFC-Excess Flow Check valve RD-Rupture Disk BA-Ball valve X-Shear (explosive valve)SC-Stop Check valve 2LV-1 Rev.4 12/91  
Forthoserequirements oftheCodewhichareimpractical totest,ReliefRequestshavebeenincludedinthisprogram.TheseReliefRequestsprovidetheimpractical testrequirement, basisforreliefandtheproposedalternative testing.AlsoincludedasReliefRequestareourColdShutdownTestJustifications andaresoindicated.
2D-2Rev.505/93 ISI-T-200.0 LEFRVALVETABLValveNumber:Uniquesystemdesignated valveidentification HV-handswitch-operated valveSV-solenoid-operated valvePSV-pressuresafety/relief valveXV-excessflowcheckvalveFV-flowcontrolvalvePSE-rupturedisks5SMEClass:ASME.Code Classes1,2,and3S-non-codevalvewhichperformsasafety-related functionP&IDCoordinates:
LocationofvalveonP&IDdrawingSectionXIValveCategory:
A-valveswithspecified maximumleakagerateB-valveswithnospecified maximumleakagerateC-self-actuating (check,reliefvalves)D-actuatedbyenergysourcecapableofonlyoneoperation (rupturedisks,explosive valves)Active:Valvesrequiredtochangepositiontoaccomplish specified safetyfunctionPassive:Valvesnotrequiredtochangepositiontoaccomplish specified safetyfunctionSize:NominalvalvesizeininchesValveType:C-CheckvalveB-Butterfly valveG-GatevalveGL-GlobevalveRV-PressurereliefvalveXFC-ExcessFlowCheckvalveRD-RuptureDiskBA-BallvalveX-Shear(explosive valve)SC-StopCheckvalve2LV-1Rev.412/91  


ISI-T-200.0 ActuatorType:M-MotorA-AirS-SolenoidH-Hand(manual)--None(self-actuated)
ISI-T-200.0 Actuator Type: M-Motor A-Air S-Solenoid H-Hand (manual)--None (self-actuated)
E/H-Electro-hydraulic RemotePositionIndicator:
E/H-Electro-hydraulic Remote Position Indicator:
X-valveisequippedwithanRPI(RPI)--valveisnotequippedwithanRPINormalPosition:
X-valve is equipped with an RPI (RPI)--valve is not equipped with an RPI Normal Position: C-closed 0-open Test Requirements:
C-closed0-openTestRequirements:
Q-quarterly exercise test MT-stroke time measurement concurrent with quarterly exercise test LT.-leakage rate test once per 24 months CV-quarterly check valve exercise test SRV-safety/relief valve lift setpoint test in accordance with ASME PTC 25.3-1976, Section 4.09 (testing schedule per Table IWV-3510-1)
Q-quarterly exercisetestMT-stroketimemeasurement concurrent withquarterly exercisetestLT.-leakageratetestonceper24monthsCV-quarterly checkvalveexercisetestSRV-safety/relief valveliftsetpointtestinaccordance withASMEPTC25.3-1976, Section4.09(testingscheduleperTableIWV-3510-1)
DT-category D test requirement Relief Request: Yes/No and number(s)of applicable relief request(s)
DT-categoryDtestrequirement ReliefRequest:Yes/Noandnumber(s) ofapplicable reliefrequest(s)
Testing Alternative:
TestingAlternative:
CS-Testing shall commence no later than 48 hours after the plant enters Cold Shutdown (Operational Condition 4)from Power Operation.
CS-Testingshallcommencenolaterthan48hoursaftertheplantentersColdShutdown(Operational Condition 4)fromPowerOperation.
Valves in this category are subject to testing if they have not been tested in the previous 92 days.Testing shall continue until all subject valves are tested or the plant begins startup.Testing at subsequent cold shutdowns will commence with those valves having the longest interval (if greater than 92 days)since previous tests.This definition applies to all relief requests with cold shutdown alternative testing.Relief Request 68 pertains to the definition of this code.RR-every 18 or 24 months as specified in relief request See relief request-specific guidance in individual relief request Remarks: Notes on any special methods of testing.If identified as a pressure isolation valve, additional leak rate testing will be performed (water as test medium)at 1000+10 psig with an acceptance criterion of 1 gpm.Valve testing configurations will be similar to that utilized for containment local leak rate testing.2LV-2 Rev.5*05/93 ISI-T-200.0 RP T BL Pump Number: Pump Name: ASME Class: Unique designated pump identification number Commonly recognized pump name ASME Code Classes 1, 2, and 3 S-non-code pump which performs a'safety-related function Parameters Measured: Required test measurements in accordance with Section XI, Subsection IWP X-Parameter will be required to be measured Specific code exemptions listed Test Frequency:
Valvesinthiscategoryaresubjecttotestingiftheyhavenotbeentestedintheprevious92days.Testingshallcontinueuntilallsubjectvalvesaretestedortheplantbeginsstartup.Testingatsubsequent coldshutdowns willcommencewiththosevalveshavingthelongestinterval(ifgreaterthan92days)sinceprevioustests.Thisdefinition appliestoallreliefrequestswithcoldshutdownalternative testing.ReliefRequest68pertainstothedefinition ofthiscode.RR-every18or24monthsasspecified inreliefrequestSeereliefrequest-specificguidanceinindividual reliefrequestRemarks:Notesonanyspecialmethodsoftesting.Ifidentified asapressureisolation valve,additional leakratetestingwillbeperformed (waterastestmedium)at1000+10psigwithanacceptance criterion of1gpm.Valvetestingconfigurations willbesimilartothatutilizedforcontainment localleakratetesting.2LV-2Rev.5*05/93 ISI-T-200.0 RPTBLPumpNumber:PumpName:ASMEClass:Uniquedesignated pumpidentification numberCommonlyrecognized pumpnameASMECodeClasses1,2,and3S-non-codepumpwhichperformsa'safety-related functionParameters Measured:
Scheduled test implementation frequency Relief Request Number: Reference to individual relief requests from code requirements Remarks: Notes on methods of testing.2LP-1 Rev.4 12/91 ISI-T-200.0 2VT-1 Rev.4 12/91 SERVICE WATER M-2109 Sheet 2 Valve Number O 0 0 0 Xg 8 g o g e V))S 5 O B~5 0 l4 O'ZJ 0 S4 O X 6 6'F Rclicf Request Rcq*'d Testing Altcmativc Remarks A B C D HV-20943A2 3 HV-20943B2 3 C-8 E-8 X X B B 0 0 Q,MT Q,MT No No SERVICE WATER M-2110 Valve Number O 0 0 Q S 5 O 0 8S O g~O C4 Rclicf Rcqucst Rcq'd TcstIng Alternative A B C D HV-21024A1 3 B-5 HV-21024A2 3 A-5 X X X 10 B 10 B X C Q,MT C QMT No No HV-21024B1 3 C-5 X 10 B X C Q,MT No HV-21024B2 3 C-5 X 10 B X C QMT
Requiredtestmeasurements inaccordance withSectionXI,Subsection IWPX-Parameter willberequiredtobemeasuredSpecificcodeexemptions listedTestFrequency:
Scheduled testimplementation frequency ReliefRequestNumber:Reference toindividual reliefrequestsfromcoderequirements Remarks:Notesonmethodsoftesting.2LP-1Rev.412/91 ISI-T-200.0 2VT-1Rev.412/91 SERVICEWATERM-2109Sheet2ValveNumberO000Xg8gogeV))S5OB~50l4O'ZJ0S4OX66'FRclicfRequestRcq*'dTestingAltcmativc RemarksABCDHV-20943A2 3HV-20943B2 3C-8E-8XXBB00Q,MTQ,MTNoNo SERVICEWATERM-2110ValveNumberO00QS5O08SOg~OC4RclicfRcqucstRcq'dTcstIngAlternative ABCDHV-21024A1 3B-5HV-21024A2 3A-5XXX10B10BXCQ,MTCQMTNoNoHV-21024B1 3C-5X10BXCQ,MTNoHV-21024B2 3C-5X10BXCQMT


EMERGENCY SERVICEWATERM-2111SIleetIValveNumbero8$OgRclicfRequestR~'dTestulgAlternative RcmarkeHV-21143A HV-21143B 3B-23h4ABCDXXBAXBAXQ,MTNoQ,MTNoHV-21144AHV-21144B 2-11-1322-11-1332-11-1342-11-1352-11-165A 3GC3E-73F43G-43E-73E-73FPXXXXXXXXXXBMXBMX0Q,MTYcsQ,MTYcsCVCVCVCVCV5959596459645964596424RRRRSecRclicfRequestOpentestonlyOpentestonlyOpentestonlyOpentestonlyClosuretestonly 0
EMERGENCY SERVICE WATER M-2111 SIleet I Valve Number o 8$O g Rclicf Request R~'d Testulg Alternative Rcmarke HV-21143A HV-21143B 3 B-2 3 h4 A B C D X X B A X B A X Q,MT No Q,MT No H V-21144A HV-21144B 2-11-132 2-11-133 2-11-134 2-11-135 2-11-165A 3 GC 3 E-7 3 F4 3 G-4 3 E-7 3 E-7 3 FP X X X X X X X X X X B M X B M X 0 Q,MT Ycs Q,MT Ycs CV CV CV CV CV 59 59 59 64 59 64 59 64 59 64 24 RR RR Sec Rclicf Request Open test only Open test only Open test only Open test only Closure test only 0
EMERGENCY SERVICEWATERM-2111SheetI(Continued)
EMERGENCY SERVICE WATER M-2111 Sheet I (Continued)
ValveNumber8Ps.89OgE~COC4~5Rclicf.RequestRcq'dTcsttngAltcrnatwc RcmarlyABCD2-1I-165B3D4X0CVYcs24SccRclicfRcquestClosuretestonlyChI&CtC)C)
Valve Number 8 P s.89 O g E~C O C4~5 Rclicf.Request Rcq'd Tcsttng Altcrnatwc Rcm arly A B C D 2-1 I-165B 3 D4 X 0 CV Ycs 24 Scc Rclicf Rcqu est Closure test only Ch I&Ct C)C)
RHRSERVICEWATERM-2112'''-.',"'=;"':$
RHR SERVICE WATER M-2112'''-.',"'=;"':$
Valv'e:,i;:.;"
Valv'e:,i;:.;""::::;;.';;";-':-::.;:::'Nu'mbe't'"";i'"',-';:-';
"::::;;.';;";-':-::.;:::'Nu'mbe't'"";i'"',-';:-';
'?''"?'?'.::,:.W?:~?N x?''.c'."y,','C;,,:gp:,", g, t/I:.;g'.,p':c.?x'::C':?::Q?C/',''?~~~.',: Relief/-,",,.'";Requ'est'::
'?''"?'?'.::,:.W?:~?Nx?''.c'."y,','C;,,:gp:,",
g,t/I:.;g'.,p':c.?x'::C':?::Q?C/',''?~~~.',
:Relief/-,",,
.'";Requ'est'::
iR'e'q'd:"i:":"?
iR'e'q'd:"i:":"?
'O''?:?;M):?8&"Cc,:@4':k',;~+),.g?.-.':":;Te'stinj;:;":.'>
'O''?:?;M):?8&" Cc,:@4': k',;~+),.g?.-.':":;Te'stin j;:;":.'>!':Alt'e'mative'.,',: 4?7:::;".:.Rem'arks':,'::
!':Alt'e'mative'.,',
.,';;:;%g(:%:.;',:.2-12401 2-12403 HV-21210A HV-21210B PSV-21212A PS V-21212B HV-21215A HV-21215B HV-212F073A HV-212F073B 3 C-2 3 G-2 3 C-5 3 G-5 3 B7 3 F-7 3 C-7 3 G-7 3 A-5 3 E-5 X X X X X X X X X 20 20 20 20 20 20 B B RV RV B B X X X C CV C CV C QMT C'MT C SRV C SRV C QMT C Q,MT C Q,MT C Q,MT No No No No No No No No No No HV-212F074A S A-5 X X GL=A 0 Q MT Yes 38 See Relief Request Rapid acting vlv.
:4?7:::;".:.Rem'arks':,'::
P A V'C 5 r, C 4 RHR SERVICE WATER M-2112 (Continued)
.,';;:;%g(:%:.;',:.2-124012-12403HV-21210A HV-21210B PSV-21212A PSV-21212BHV-21215A HV-21215B HV-212F073A HV-212F073B 3C-23G-23C-53G-53B73F-73C-73G-73A-53E-5XXXXXXXXX202020202020BBRVRVBBXXXCCVCCVCQMTC'MTCSRVCSRVCQMTCQ,MTCQ,MTCQ,MTNoNoNoNoNoNoNoNoNoNoHV-212F074A SA-5XXGL=A0QMTYes38SeeReliefRequestRapidactingvlv.
PAV'C5r,C4 RHRSERVICEWATERM-2112(Continued)
-';"'-",:.Valve'i:";-.',".:.'."::
-';"'-",:.Valve'i:";-.',".:.'."::
';:"''::Numbel,.::,
';:"''::Numbel,.::, HV-212F074B HV-212F075A HV-212F075B S E-5 2 A-5 2 E-5::: 'A'::,::g,"3!i".':,:,',Cj".'~":-:;::"D,'
HV-212F074B HV-212F075A HV-212F075B SE-52A-52E-5:::'A'::,::g,"3!i".':,:,',Cj".'~":-:;::"D,'
X X I GL A 6 G M 6 G M X X m~x;m r,~";:.q<<j""'8:>F')":(a:p;K%~,.x 0 Q,MT C Q,MT C Q,MT.R'elief;,;:.
XXIGLA6GM6GMXXm~x;mr,~";:.q<<j""'8:>F')":(
a:p;K%~,.
x0Q,MTCQ,MTCQ,MT.R'elief;,;:.
-"''Req'ue<<si,:
-"''Req'ue<<si,:
,'Req',d'':;;YesNoNo38.';,'-'''Tes'tin j':;;:;,;:";A1teiiiative,,';.".,
,'Req',d'':;;Yes No No 38.';,'-'''Tes'tin j':;;:;,;:";A1teiiiative,,';."., See Relief Request ,""-Reiiiarks,:.
SeeReliefRequest,""-Reiiiarks,:.
Rapid acting vlv.O g M O O O J 4 REACTOR BUILDING CLOSED COOLING WATER M-2113 Vaivc Number j 8 O 8 O C4 8S O g~'O H 0 l4 Rclicf ducat R~'d Testing Altcraativc Rcmarka A B C D HV-21313 HV-21314 H V-21345 HV-21346 2 C-I 2 C-3 2 C-I 2 C-3 X X 4 G 4 G 4 G 4 G X 0 0 0 Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT CS CONTAINMENT INSTRUMENT GAS M-2126 Sheet I Valve"-,"." Number O.-;Q 4 0'Rclicf, Request Rej'd,;g Testing.-Altcrnatiyc Reins rks 2-26-018 2-26429 2-26-O72 2-26474 2-26-152 2-26-154 2-26-164 2 AW 2 C-5 2 E-8 2 C-8 A-8 X X X X X 0 0 CV CV CV,LT Ycs CV,LT Ycs CV,LT Ycs CV,LT Ycs CV,LT Ycs RR RR RR RR Closure test only.Closure test only.Closure test only, verify operation during leak test.Closure test only, verify operation during leak test.Verify operation during leak test.Verify operation during leak test.Closure test only, verify operation during leak test.PS V-22643 SV-22643 B-6 3 B4 X X RV GL S SRV Q,MT No 38 58 Scc Relief Rcqu est.Rapid acting valve.
Rapidactingvlv.OgMOOO J4 REACTORBUILDINGCLOSEDCOOLINGWATERM-2113VaivcNumberj8O8OC48SOg~'OH0l4RclicfducatR~'dTestingAltcraativc RcmarkaABCDHV-21313HV-21314HV-21345HV-213462C-I2C-32C-I2C-3XX4G4G4G4GX000Q,MT,LTQ,MT,LTQ,MT,LTQ,MT,LTCS CONTAINMENT INSTRUMENT GASM-2126SheetIValve"-,"."NumberO.-;Q40'Rclicf,RequestRej'd,;gTesting.-Altcrnatiyc Reinsrks2-26-0182-264292-26-O722-264742-26-1522-26-1542-26-1642AW2C-52E-82C-8A-8XXXXX00CVCVCV,LTYcsCV,LTYcsCV,LTYcsCV,LTYcsCV,LTYcsRRRRRRRRClosuretestonly.Closuretestonly.Closuretestonly,verifyoperation duringleaktest.Closuretestonly,verifyoperation duringleaktest.Verifyoperation duringleaktest.Verifyoperation duringleaktest.Closuretestonly,verifyoperation duringleaktest.PSV-22643SV-22643B-63B4XXRVGLSSRVQ,MTNo3858SccReliefRcquest.Rapidactingvalve.
CONTAINMENT INSTRUMENT GAS M-2126 Shcct I (Continued)
CONTAINMENT INSTRUMENT GASM-2126ShcctI(Continued)
''.Valve: "" Number,'A B','v~;S"5 4'~rl.~O"'g>r>w ,'" g'~,:~8,':~%~~i'p Rclicf Request R~'d.0 4'P Testing-Altcrnatiyc,Remarks h7 C)SV-22644 PS V-22648 SV-22648 SV-22649 SV-22651 SV-22654A 2 A4 3 C-5 3 C4 2 C4 2 E-7 2 A-8 X X X X X X X GL S RV GL S GL S GL S GL S X X X 0 0 0 Q,MT SRV Q,MT Q,MT Q,MT, LT Q,MT, LT No 38 58 38 58 38 58 3 38 58 4 38 58 Scc Rclicf Request.Scc Rclicf Rcqu est.Scc Rclicf Rcqucst.Rapid acting valve.Rapid acting valve.Rapid acting valve.Rapid acting valve.Rapid acting valve.  
''.Valve:""Number,'AB','v~;S"54'~rl.~O"'g>r>w,'"g'~,:~8,':~%~~i'p RclicfRequestR~'d.04'PTesting-Altcrnatiyc, Remarksh7C)SV-22644PSV-22648SV-22648SV-22649SV-22651SV-22654A 2A43C-53C42C42E-72A-8XXXXXXXGLSRVGLSGLSGLSGLSXXX000Q,MTSRVQ,MTQ,MTQ,MT,LTQ,MT,LTNo3858385838583385843858SccRclicfRequest.SccRclicfRcquest.SccRclicfRcqucst.Rapidactingvalve.Rapidactingvalve.Rapidactingvalve.Rapidactingvalve.Rapidactingvalve.  


CONTAINMENT INSTRUMENT GASM-2126ShcctI(Continued)
CONTAINMENT INSTRUMENT GAS M-2126 Shcct I (Continued)
ValveNumberOOl489Ogit~RclicfRcqucstRcq'd,-TestingAltcrnativc RemaresSV-22654B ABC92C-7XXGLX0Q,MT,LT43858Rapidactingvalve.SV-226612F-7XXGLX0Q,MT,LT3858SccRclicfRcqucst.Rapidactingvalve.SV-226712G-7XGLQ,MT,LT3858SccRclicfRcqucst.Rapidactingvalve.tJn(IJOOCO CONTAINMENT INSTRUMENT GASM-2126Shcct2ValveNumber'E00A4~e0O8'SSOE~~l-~cc~OODe0$RclicfRequestRcq'dTestingAlternative RemarltsABC-DHV-22603SV-22605D-9D-9XXGL'XGLS00Q,MT,LTQ,MT,LTNo3858SceRclicfRequest.Rapidactingvalve.
Valve Number O O l4 89 O g it~Rclicf Rcqucst Rcq'd,-Testing Altcrnativc Rema res SV-22654B A B C 9 2 C-7 X X GL X 0 Q,MT, LT 4 38 58 Rapid acting valve.SV-22661 2 F-7 X X GL X 0 Q,MT, LT 38 58 Scc Rclicf Rcqucst.Rapid acting valve.SV-22671 2 G-7 X GL Q,MT, LT 38 58 Scc Rclicf Rcqucst.Rapid acting valve.tJ n (IJ O O CO CONTAINMENT INSTRUMENT GAS M-2126 Shcct 2 Valve Number'E 0 0 A 4~e 0 O 8'S S O E~~l-~cc~O O De 0$Rclicf Request Rcq'd Testing Alternative Rema rlts A B C-D HV-22603 SV-22605 D-9 D-9 X X GL'X GL S 0 0 Q,MT, LT Q,MT, LT No 38 58 Sce Rclicf Request.Rapid acting valve.
MSIVLEAKAGECONTROLSYSTEMM-2139ValveNumberI0nC4OOg6~VP4e-aOOFRclicfRequestRcq'd.,TestingtcmatiyeCRemarkiABCDHV-239F001B 1HV-239F001F 1D-3G-3XX2G2GXQ,MT,LTYcsQ,MT,LTYcsRcduccdPressureLeakTest.RcduccdPrcssureLeakTest.HV-239F001K 1G-3XX2GXQ,MT,LTYcsRcduccdPrcssureLeakTest.HV-239FOOI P1H-3X2GXQ,MT,LTYcsReducedPressureLeakTest.HV-239F002B HV-239F002F 2HV-239F002K 2HV-239F002P 2E-3G-3G-3H-3XXX2G2G2G2GXXXQ,MTQ,MTQ,MTQ,MTCSCAIJCOC)<<9 MSIVLEAKAGECONTROLSYSTEMM-2139(Continued)
MSIV LEAKAGE CONTROL SYSTEM M-2139 Valve Number I 0 n C4 O O g 6~V P4 e-a O O F Rclicf Request Rcq'd., Testing tcmatiye C Rema rki A B C D HV-239F001B 1 HV-239F001F 1 D-3 G-3 X X 2 G 2 G X Q,MT,LT Ycs Q,MT,LT Ycs Rcduccd Pressure Leak Test.Rcduccd Prcssure Leak Test.HV-239F001K 1 G-3 X X 2 G X Q,MT,LT Ycs Rcduccd Prcssure Leak Test.HV-239FOOI P 1 H-3 X 2 G X Q,MT,LT Ycs Reduced Pressure Leak Test.H V-239F002B HV-239F002F 2 HV-239F002K 2 HV-239F002P 2 E-3 G-3 G-3 H-3 X X X 2 G 2 G 2 G 2 G X X X Q,MT Q,MT Q,MT Q,MT CS CA IJ CO C)<<9 MSIV LEAKAGE CONTROL SYSTEM M-2139 (Continued)
ValveNumberOle0O8SOE-cffOfO'CS~O0PfffReliefRequest~Tcating,Rcq'dkAlternative RemarksABCD'V-239F003B HV-239F003F HV-239F003K HV-239F003P HV-239F006 HV-239F007 HV-239F008 HV-239F009 2E-52G-32G-32H32D-82E-82D-82D-8XXXXXXXMXGMXGMXGMXGMXGMXGMXGMXCQMTCQ,MTCQ,MTCQMTCQMTCQ,MTCQMTCQ,MTNoNoNoNoCS NUCLEARBOILERM-2141SheetIValve.Number8ODeg-,8SO6~c48CO~I0DeRclicfRcqucatRcq'dTestingAlternative RemarksAB.C-'PSV-24137APSV-24137BPSV-24137CPSV-24137DPSV-24137EPSV-24137FPSV-24137GPSV-24137HPSV-24137JHAHQH-4HQH-4H-4H-4H4XXXXXX.XXXXXXXRVRVRVRVRVRVRVRVRVCSRVCSRVCSRVCSRVCSRVCSRVCSRVCSRVrCSRVYcsSceRclicfRcqucst.SceRclicfRcqucst.SceReliefRcqucst.SceReliefRcqucst.SceRclicfRcquest.SceRclicfRcqucst.SccRclicfRequest.SceRclicfRequest.SccRclicfRcqucst.
Valve Number O le 0 O 8S O E-c ff O f O'CS~O 0 P fff Relief Request~Tcating , Rcq'd k Alternative Remarks A B C D'V-239F003B H V-239F003F H V-239F003K HV-239F003P HV-239F006 HV-239F007 HV-239F008 H V-239F009 2 E-5 2 G-3 2 G-3 2 H3 2 D-8 2 E-8 2 D-8 2 D-8 X X X X X X X M X G M X G M X G M X G M X G M X G M X G M X C QMT C Q,MT C Q,MT C QMT C QMT C Q,MT C QMT C Q,MT No No No No CS NUCLEAR BOILER M-2141 Sheet I Valve.Number 8 O De g-,8S O 6~c48 C O~I 0 De Rclicf Rcqu cat Rcq'd Testing Alternative Remarks A B.C-'PS V-24137A PS V-24137B PS V-24137C PS V-24137D PS V-24137E PS V-24137F PS V-24137G PS V-24137H PS V-24137J HA HQ H-4 HQ H-4 H-4 H-4 H4 X X X X X X.X X X X X X X RV RV RV RV RV RV RV RV RV C SRV C SRV C SRV C SRV C SRV C SRV C SRV C SRV r C SRV Ycs Sce Rclicf Rcqucst.Sce Rclicf Rcqucst.Sce Relief Rcqucst.Sce Relief Rcqucst.Sce Rclicf Rcqu est.Sce Rclicf Rcqucst.Scc Rclicf Request.Sce Rclicf Request.Scc Rclicf Rcqucst.
NUCLEARBOILERM-2141Sheet1(Continued)
NUCLEAR BOILER M-2141 Sheet 1 (Continued)
ValveNumberO00a4leOeOOOOE~ssP8'RclicfRequestRcq'dTestingAlternative RemarksABCDIJChPSV-24137KPSV-24137LPSV-24137MPSV-24137NPSV-24137P XXXXXRVRVRVRVRVCSRVCSRVCSRVCSRVCSRVSccRclicfRcquest.SecRclicfRcqucst.SceRclicfRcqucst.SccRclicfRcquest.SccRclicfRequest.PSV-24137RPSV-24137S PSV-241F013A 1C4XXXXRVRVRVCSRVCS+CSRVNoSceRclicfRequest.SccRclicfRcquest.IIJ4I7IIJes NUCLEARBOILERM-2141SheetI(Continued)
Valve Number O 0 0 a 4 le O e O O O O E~ss P8'Rclicf Request Rcq'd Testing Alternative Remarks A B C D IJ Ch PS V-24137K PS V-24137L PS V-24137M PS V-24137N PSV-24137P X X X X X RV RV RV RV RV C SRV C SRV C SRV C SRV C SRV Scc Rclicf Rcqu est.Sec Rclicf Rcqucst.Sce Rclicf Rcqucst.Scc Rclicf Rcqu est.Scc Rclicf Request.PS V-24137R PSV-24137S PSV-241F013A 1 C4 X X X X RV RV RV C SRV C S+C SRV No Sce Rclicf Request.Scc Rclicf Rcqu est.I IJ 4 I7I IJ es NUCLEAR BOILER M-2141 Sheet I (Continued)
ValveNumberOO-C4O0E~VeRO$4VtReliefRequestRcq'dTestingAlternative RcmarirsPSV-241F013B IPSV-241F013CIPSV-241F013DIPSV-241F013E IABC,DXXXXRVRVRVRVCSRVCSRVCSRVCSRVNoNoNoNoPSV-241F013FIPSV-241F013G IXXRVRVACSRVNoCSRVQYcs10ADSValve.PSV-'241F013HIRVCSRVNoPSV-241F013J IRVACSRVQYcs10RRADSValve.PSV-241F013K IPSV-241F013L ICAXXXRVARVASRV,Q(CSRVQYcs1010RRADSValve.ADSValve.  
Valve Number O O-C4 O 0 E~V eR O$4 Vt Relief Request Rcq'd Testing Alternative Rcmarirs PS V-241F013B I PSV-24 1 F013C I PS V-24 1 F013 D I PS V-241F013E I A B C, D X X X X RV RV RV RV C SRV C SRV C SRV C SRV No No No No PSV-241 F013 F I PSV-241F013G I X X RV RV A C SRV No C SRV Q Ycs 10 ADS Valve.PS V-'241 F013H I RV C SRV No PSV-241F013J I RV A C SRV Q Ycs 10 RR ADS Valve.PS V-241F013K I PS V-241F013L I CA X X X RV A RV A SRV,Q (C SRVQ Ycs 10 10 RR ADS Valve.ADS Valve.  


NUCLEARBOILERM-2141Shcct1(Continued)
NUCLEAR BOILER M-2141 Shcct 1 (Continued)
Valvc-'Number;'OABC;,,D'II",n'"ctInt'l;iIt,ntnVReliefRequestRcq'd',.'esting
Valvc-'Number;'O A B C;,, D'II" , n'" ctI nt'l;i It, nt n V Relief Request Rcq'd',.'esting
'AltctnativeRemarksIJ00PSV-241F013M PSV-241F013N CA1CAXXXRVARVASRV,QYcsSRV,QYcs10IORRADSValve.ADSValve.PSV-241F013P PSV-241F013R PSV-241F013S HV-241F016 HV-241F019 1C41C41C-41E4E-6XXXXXXRVRVRVGMXGMX00SRVSRVSRVQ,MT,LTQ,MT,LTNoNoNoNoNoHV-241F020 2E-7XGLMX0QgTNo NUCLEARBOILERM-2141SheetI(Continued)
'Alt ctnative Remarks IJ 00 PSV-241F013M PS V-241F013N CA 1 CA X X X RV A RV A SRV,Q Ycs SRV,Q Ycs 10 IO RR ADS Valve.ADS Valve.PS V-241F013P PS V-241F013R PSV-241F013S HV-241F016 H V-241F019 1 C4 1 C4 1 C-4 1 E4 E-6 X X X X X X RV RV RV G M X G M X 0 0 SRVSRV SRV Q,MT, LT Q,MT, LT No No No No No HV-241F020 2 E-7 X GL M X 0 QgT No NUCLEAR BOILER M-2141 Sheet I (Continued)
ValveNumberABCD5oolgOE~"'oRFF8ReliefRcqucstRcq'dTestinggtcrnativc oRemarksHV-241F022A HV-241F022B HV-241F022C IC-5XIC-5XIC-5XX262626GLAGLAGLA000Q,MT,LTQ,MT,LTQ,MT,LTYesSccRclicfRequest.SccRclicfRequest.SccReliefRcqucat.Rcduecdprcssureleaktestinrcvcf5cdirection.
Valve Number A B C D 5 o o lg O E~"'oR F F 8 Relief Rcqucst Rcq'd Testing gtcrnativc o Remarks HV-241F022A HV-241F022B H V-241F022C I C-5 X I C-5 X I C-5 X X 26 26 26 GL A GL A GL A 0 0 0 Q,MT, LT Q,MT, LT Q,MT, LT Yes Scc Rclicf Request.Scc Rclicf Request.Scc Relief Rcqu cat.Rcduecd prcssure leak test in rcvcf5c direction.
RcduccdPfC55UICleaktestinIcvcrscdirection.
Rcduccd PfC55UIC leak test in Icvcrsc direction.
Rcduccdprc55ufcleaktestinfCVCfsCdirection.
Rcduccd prc55ufc leak test in fCVCfsC direction.
NUCLEARBOILERM-2141Sheet1(Continued)
NUCLEAR BOILER M-2141 Sheet 1 (Continued)
C/gA?(S,rValveNumber".'xC.1ABC-;-D..'Relief:
C/gA?(S,r Valve Number".'x C.1 A B C-;-D..'Relief: '-Rcqucsi Rcq'd: 'h ,,, Testing.'Altcrnativc IJ lJ o HV-241F022D 241 F024A 241F024B 241F024C 241F024D HV-241F02&A A-5 3 A-5 A-5 A-5 X X X X 26 GL 1 C 1 C I C I C 26 GL A X 0 0 0 0 0 Q,MT, LT CV CV CV CV Q,MT, LT Scc Rclicf Rcqucst.Scc Rclicf Rcqucst.Rcduccd pressure leak test in reverse direction.
'-Rcqucsi Rcq'd:'h,,,Testing.'Altcrnativc IJlJoHV-241F022D 241F024A241F024B241F024C241F024DHV-241F02&A A-53A-5A-5A-5XXXX26GL1C1CICIC26GLAX00000Q,MT,LTCVCVCVCVQ,MT,LTSccRclicfRcqucst.SccRclicfRcqucst.Rcduccdpressureleaktestinreversedirection.
Closure test only.Closure test only.Closure test only.Closure test only.Reduced pressure leak test.I IJ o I IJ CO C)O NUCLEAR BOILER M-2141 Sheet I (Continued)
Closuretestonly.Closuretestonly.Closuretestonly.Closuretestonly.Reducedpressureleaktest.IIJoIIJCOC)O NUCLEARBOILERM-2141SheetI(Continued)
Valve Number O".=;cl 0 O O x O E~~o c4~O 8.'elief~Request Rcq'd..Testing Alternative Remarks HV-241F028B HV-241F028C HV-241F028D A--" B.'C;-.D.1 C-7 X 1 C-7 X 1 C-7 X X 26 26 26 GL A GL A GL A X 0 0 0 Q,MT, LT Q,MT, LT Q,MT, LT Sce Rclicf Rcqu est.Scc Rclicf Rcqucst.Sce Rclicf Rcqu cat.Rcduccd prcssure leak teat.Rcduccd prcssure leak test.Rcduccd prcssure leak test.241F029A 241 F029B 241 F029C 241 F029D 2 A-7 2 A-7 2 A-7 2 A-7 X X X X 0 CV 0 CV 0 dv 0 CV Ycs Ycs RR Closure test only.Closure test only.Closure test only.Closure test only.
ValveNumberO".=;cl0OOxOE~~oc4~O8.'elief~RequestRcq'd..TestingAlternative RemarksHV-241F028B HV-241F028C HV-241F028D A--"B.'C;-.D.1C-7X1C-7X1C-7XX262626GLAGLAGLAX000Q,MT,LTQ,MT,LTQ,MT,LTSceRclicfRcquest.SccRclicfRcqucst.SceRclicfRcqucat.Rcduccdprcssureleakteat.Rcduccdprcssureleaktest.Rcduccdprcssureleaktest.241F029A241F029B241F029C241F029D2A-72A-72A-72A-7XXXX0CV0CV0dv0CVYcsYcsRRClosuretestonly.Closuretestonly.Closuretestonly.Closuretestonly.
NUCLEAR BOILER M-2141 Sheet 1 (Continued)
NUCLEARBOILERM-2141Sheet1(Continued)
Valve Number C O~o 0$4 o O E~O-oN 6 g 6 F 8 Relief Rcqucst Rcq'd Teatmg , Qtoernatiye Remarks.A 8 C D IJ IJ IJ PS V-241F037A 3 PSV-241F037B 3 PS V-241 F037C 3 PS V-241 F037D 3 PS V-241F037E 3 PSV-241F037F 3 PS V-241 F037G 3 PSV-241F037H 3 X X X X X X'X X RV RV RV RV RV RV RV RV C SRV C SRV C SRV C SRV C SRV C SRV SRV f C SRV Ycs Ycs Ycs Scc Rclicf Request.Scc Rclicf Request.Sec Rclicf Rcqu cat.Scc Relief Rcqucst.Scc Rclicf Rcqucst.Scc Rclicf Request.Scc Relief Rcqu cat.Scc Relief Request.
ValveNumberCO~o0$4oOE~O-oN6g6F8ReliefRcqucstRcq'dTeatmg,Qtoernatiye Remarks.A8CDIJIJIJPSV-241F037A 3PSV-241F037B 3PSV-241F037C3PSV-241F037D3PSV-241F037E 3PSV-241F037F 3PSV-241F037G3PSV-241F037H 3XXXXXX'XXRVRVRVRVRVRVRVRVCSRVCSRVCSRVCSRVCSRVCSRVSRVfCSRVYcsYcsYcsSccRclicfRequest.SccRclicfRequest.SecRclicfRcqucat.SccReliefRcqucst.SccRclicfRcqucst.SccRclicfRequest.SccReliefRcqucat.SccReliefRequest.
NUCLEAR BOILER M-2141 Shcct 1 (Continued)
NUCLEARBOILERM-2141Shcct1(Continued)
Valve Number C O\+De O'o g g~O~O$4 oI O Rclicf Rcqucst Req'd Testing Alternative PSV-241F037J PS V-241 F037K PS V-241F037L 3 G4 3 G4 3 GR A B, C 9 X X 6 RV 6 RV 6 RV SRV SRV SRV Scc Rclicf Rcqucst.Scc Rclicf Request.Scc Rclicf Rcqu est.PS V-241 F037M PS V-241F037N PS V-241F037P PS V-241 F037R PSV-241F037S 3 G4 3 G4 G-4 3 G4 3 GP X X X X X X 6 RV 6 RV 6 RV 6 RV 6 RV SRV SRV SRV SRV SRV Scc Rclicf Rcqucst.Scc Rclicf Rcqucst.Scc Rclicf Request.Scc Rclicf Rcqucst.Scc Rclicf Request.
ValveNumberCO\+DeO'ogg~O~O$4oIORclicfRcqucstReq'dTestingAlternative PSV-241F037J PSV-241F037KPSV-241F037L 3G43G43GRAB,C9XX6RV6RV6RVSRVSRVSRVSccRclicfRcqucst.SccRclicfRequest.SccRclicfRcquest.PSV-241F037MPSV-241F037N PSV-241F037P PSV-241F037RPSV-241F037S 3G43G4G-43G43GPXXXXXX6RV6RV6RV6RV6RVSRVSRVSRVSRVSRVSccRclicfRcqucst.SccRclicfRcqucst.SccRclicfRequest.SccRclicfRcqucst.SccRclicfRequest.
NUCLEAR BOILER M-2141 Sheet 2 Valve Number Cll 0 O n O I BS O g~c4 8 O'a nI IN Relief Rcqucst Rcq'd Testing Alternative A B-C,D 241%17 241%18 H V-24107B H V-'24182A HV-24182B 241 F010A 2 F-3 X 2 F-3 X E-3 C-2 X 2 E-2 X 1 C4 X X X X 24 24 GL GL H H 0 0 LT LT CV Q,MT, LT Q,MT, LT CV,LT No No No No No Sce Rclicf Request.Open check only.Closure check only.241F010B H V-241F032A HV-241F032B 1 E4 X 2 C-2 X 2 E-2 X 24 24 24 SC SC M X 0 0 0 CV,LT Q,MT, LT Q,CV, MT,LT Scc Relief Rcqu est.12 CS 12 CS Closure test only.Closure test only.
NUCLEARBOILERM-2141Sheet2ValveNumberCll0OnOIBSOg~c48O'anIINReliefRcqucstRcq'dTestingAlternative AB-C,D241%17241%18HV-24107BHV-'24182A HV-24182B 241F010A2F-3X2F-3XE-3C-2X2E-2X1C4XXXX2424GLGLHH00LTLTCVQ,MT,LTQ,MT,LTCV,LTNoNoNoNoNoSceRclicfRequest.Opencheckonly.Closurecheckonly.241F010BHV-241F032A HV-241F032B 1E4X2C-2X2E-2X242424SCSCMX000CV,LTQ,MT,LTQ,CV,MT,LTSccReliefRcquest.12CS12CSClosuretestonly.Closuretestonly.
REACTOR RECIRCULATION M-2143 S!lect I.y (h~-""" Valve"'-~h Number h~A',-B;,."'C.9 Y(l'.Ch,'Y, h'0 h hh h Y;C ,'..\+'Rclicf'-Rcq'nest'cq'd'-YL j Y ,Testing Alternative Y'cmarits HV-243 F019 1 B4 X 3/4 GL A X Q,MT, LT 38 Scc Rclicf Rcqucst.Rapid acting valve.IJ&HV-243 F020 HV-243 F031A HV-243F031B HV-243F032A HV-243F032B 1 B4 X I F-8 I F-8 1 F-8 I F-8 X X X X 1 GL 28 G 28 G 4 G 4 G A X M X M X M X M X Q,MT, LT 0 QMT O Q,MT O Q,MT 0 Q,MT No No 38 16 CS 16 CS Sce Rclicf Request.Rapid acting valve.  
REACTORRECIRCULATION M-2143S!lectI.y(h~-"""Valve"'-~hNumberh~A',-B;,."'C.9Y(l'.Ch,'Y,h'0hhhhY;C,'..\+'Rclicf'-Rcq'nest'cq'd'-YLjY,TestingAlternative Y'cmaritsHV-243F0191B4X3/4GLAXQ,MT,LT38SccRclicfRcqucst.Rapidactingvalve.IJ&HV-243F020HV-243F031AHV-243F031B HV-243F032A HV-243F032B 1B4XIF-8IF-81F-8IF-8XXXX1GL28G28G4G4GAXMXMXMXMXQ,MT,LT0QMTOQ,MTOQ,MT0Q,MTNoNo3816CS16CSSceRclicfRequest.Rapidactingvalve.  


REACTORRECIRCULATION M-2143SIlcct2Valve.,'.,:
REACTOR RECIRCULATION M-2143 SIlcct 2 Valve.,'.,:-Numbcr-.=,'.'.
-Numbcr-.=,'.'.
O.trt~(,rh'h'R'A.B"..C,.D o 8,t O l4 O"?Rciicf'-'olucst Rcq'd I-,",...Testing;AltcrnatiYc v,i,X, , i-Rcrnarirs
O.trt~(,rh'h'R'A.B"..C,.Do8,tOl4O"?Rciicf'-'olucst Rcq'dI-,",...Testing;AltcrnatiYc v,i,X,,i-Rcrnarirs
'".'43F013A 243F013B XV-243 F017A 2 XV-243 F017B 2 F-2 H-3 X X X 1 C 1 C 1 XFC I XFC X X 0 0 0 0 CV,LT Ycs CV,LT Ycs CV,LT Ycs CV,LT Ycs 15 RR 15 RR 14 RR 14 RR Closure test only.Closure test only.Closure test only.Closure test only.
'".'43F013A 243F013BXV-243F017A2XV-243F017B2F-2H-3XXX1C1C1XFCIXFCXX0000CV,LTYcsCV,LTYcsCV,LTYcsCV,LTYcs15RR15RR14RR14RRClosuretestonly.Closuretestonly.Closuretestonly.Closuretestonly.
REACTOR WATER CLEANUP M-2144 Sheet 1',;,',!'I;":i Valise';i?'.',":!
REACTORWATERCLEANUPM-2144Sheet1',;,',!'I;":i Valise';i?'.',":!
'..'"..'.Numbe'r',,'':-.:':.;":,:','.,'cA';.'-.,'::;::;.:'.:;-;:;B,'",",";:::,'::;."",:,C'.";::;;:;,':$
'..'"..'.Numbe'r',,'':-.:':.;":,:','.,'cA';.'-.,'::;::;.:'.:;-;:;B,'",",";:::,'::;."",:,C'.";::;;:;,':$
':D';?Cj?)?;4kI.;i':C!'Y'8:'Y.':;:;,Y:::"Y.:::Lc?C,,
': D';?Cj?)?;4k I.;i':C!'Y'8: 'Y.':;:;,Y:::"Y.:::Lc?C,, C ,o;;;Q:;I ,Retie'f c;"';;,'I;R'eqiies't",:,".R'eq!d""",.'":.
C,o;;;Q:;I
"!;:'Y," TeStl1lg.":c"',:.'::;':;:...-::;:.;'?A'ltetn'atiye'.:':::, Rema HV-244F001 1 C-2 X X 6 G M X 0 Q,MT, LT No HV-244F004 1 C-2 X 6 G M X 0 Q,MT, LT No O g tel t L''~P CONTROL ROD DRIVE M-2147 Sheet 1" fh.",'i;Testmg
,Retie'fc;"';;,'I;R'eqiies't",:,
".R'eq!d""",.'":.
"!;:'Y,"
TeStl1lg.":c"',:.'::;':;:...-::;:.;'?A'ltetn'atiye'.:':::,
RemaHV-244F001 1C-2XX6GMX0Q,MT,LTNoHV-244F004 1C-2X6GMX0Q,MT,LTNoOgtel tL''~P CONTROLRODDRIVEM-2147Sheet1"fh.",'i;Testmg
''"i..",,'-':'Altemative
''"i..",,'-':'Altemative
.:,,-,'.-';:''.,"Re'tttaiks.".;;,"
.:,,-,'.-';:''.,"Re'tttaiks.".;;,"':" A':::::: '..B,::;:.":',"..C;.i:;
':"A'::::::'..B,::;:.":',"..C;.i:;
',':"":9,:;:
',':"":9,:;:
XV-247F010A XV-247F010B XV-247F011A 2A-42A-52F-5XXGLGLGLA000Q,MTYesQ,MTYesQ,MTYes616161SeeReliefRequest.SeeReliefRequest.SeeReliefRequest.XV-247F011B 2F-6XGL0Q,MTYes61SeeReliefRequest.~Thereareatotalof185setsofthesevalves,oneforeachofthe185CRDHydraulic ControlUnits.OgIJI~IJIMhlOOO C'IUt~IC, CONTROLRODDRIVEM-2147Sheet2)rJA'alve,.Number3;A'S;.-.''QRclicfRequestRcq'd'.~;.Testing"',-.tItltcrnative
XV-247F010A XV-247F010B XV-247F011A 2 A-4 2 A-5 2 F-5 X X GL GL GL A 0 0 0 Q,MT Yes Q,MT Yes Q,MT Yes 61 61 61 See Relief Request.See Relief Request.See Relief Request.XV-247F011B 2 F-6 X GL 0 Q,MT Yes 61 See Relief Request.~There are a total of 185 sets of these valves, one for each of the 185 CRD Hydraulic Control Units.O g IJI~IJI M hl O O O C'I U t~I C, CONTROL ROD DRIVE M-2147 Sheet 2)r J A'alve,.Number 3;A'S;.-.''Q Rclicf Request Rcq'd'.~;.Testing"',-.tItltcrnative Rcntarka, A-B":;.,';:-'C
: Rcntarka, A-B":;.,';:-'C
*.:D', 247114>>247115*XV-247260 XV-24727*2471380 2 AS 2 D-8 2 DW 2 AW 2 D4 X X X X X 3/4 GL A GL A CV~C CV C e C e 0 CV 17 17 17 17 17 Scc Rclicf Rcqucst.Scc Rclicf Rcqu est.Scc Rclicf Request.Scc Rclicf Rcqu est.Scc Relief Request.Open test only.Closure test only.Open test only.Open test only.Closure test only.'here are a total of IBS sets of these valves, one for each of the IBS CRD Hydraulic Control Units.
*.:D',247114>>247115*XV-247260 XV-24727*
STANDBY LIQUID CONTROL M-2148 Valve Number 8S O g Relief Roqu cat Rcq'd*'esting Alternative Remarks A B C,D 248F004A 248F004B HV-248F006 248 F007 PSV-248F029A PS V-248 F029B 248F033A D-7 D-7 D-8 E-8 D-5 F-5 D.6 X X X X X X X X SC M X RV RV DT DT Q,MT, LT,CV CV,LT SRV SRV CV No No No No No 18 RR 19 RR Explosive Valve.Explosive Valve.Closure test with motor operator, open test during reactor vcsscl injection test.Closure test during leak test, open test during reactor vessel injection lest.
24713802AS2D-82DW2AW2D4XXXXX3/4GLAGLACV~CCVCeCe0CV1717171717SccRclicfRcqucst.SccRclicfRcquest.SccRclicfRequest.SccRclicfRcquest.SccReliefRequest.Opentestonly.Closuretestonly.Opentestonly.Opentestonly.Closuretestonly.'hereareatotalofIBSsetsofthesevalves,oneforeachoftheIBSCRDHydraulic ControlUnits.
STANDBY LIQUID CONTROL M-2148 (Continued)
STANDBYLIQUIDCONTROLM-2148ValveNumber8SOgReliefRoqucatRcq'd*'estingAlternative RemarksABC,D248F004A248F004BHV-248F006 248F007PSV-248F029A PSV-248F029B248F033AD-7D-7D-8E-8D-5F-5D.6XXXXXXXXSCMXRVRVDTDTQ,MT,LT,CVCV,LTSRVSRVCVNoNoNoNoNo18RR19RRExplosive Valve.Explosive Valve.Closuretestwithmotoroperator, opentestduringreactorvcssclinjection test.Closuretestduringleaktest,opentestduringreactorvesselinjection lest.
Valve Number O cl+(0 tg 8'4 g S O E~O Relief Request Rcq'd Testing Alternative Remarks A B'C D.248F033B 2 FW I'A C CV No REACTOR CORE ISOLATION COOLING M-2149 ,",'!;!,',:,'Nu'mbe'r,"".-':),.:',::;;Relief::.,';:.-:
STANDBYLIQUIDCONTROLM-2148(Continued)
ValveNumberOcl+(0tg8'4gSOE~OReliefRequestRcq'dTestingAlternative RemarksAB'CD.248F033B2FWI'ACCVNo REACTORCOREISOLATION COOLINGM-2149,",'!;!,',:,'Nu'mbe'r,
"".-':),.:',::;;Relief::.,';:.-:
,:;::Re'q)'ue?st';
,:;::Re'q)'ue?st';
;Req;d::;:::.'.
;Req;d::;:::.'.
Line 151: Line 120:
",'',;.";::
",'',;.";::
i;;Remarks.,:::;:.".,".'5.'..
i;;Remarks.,:::;:.".,".'5.'..
?249420E-5XXGLHLTNoHV-249F007 1C-3XXMX0Q,MT,LT20SeeReliefRequest.Leaktestinreversedirection.
?249420 E-5 X X GL H LT No HV-249F007 1 C-3 X X M X 0 Q,MT, LT 20 See Relief Request.Leak test in reverse direction.
HV-249F008 2C-3XXMX0Q,MT,LTNoHV-249F013 2E-5XMXQ,MT,LTNoFV-249F019 2F-3XGLMX0Q,MT,LT2038SeeReliefRequest.Leaktestinreversedirection.
HV-249F008 2 C-3 X X M X 0 Q,MT, LT No HV-249F013 2 E-5 X M X Q,MT, LT No FV-249F019 2 F-3 X GL M X 0 Q,MT, LT 20 38 See Relief Request.Leak test in reverse direction.
Rapidactingvalve.249F021F-7XCV,LTYes2165Closuretestonly.249F028G-5XCV,LTYes21Closuretestonly.HV-249F031 2H-2XGMXQ,MT,LTYes20SeeReliefRequest.Leaktestin,reversedirection.  
Rapid acting valve.249F021 F-7 X CV,LT Yes 21 65 Closure test only.249F028 G-5 X CV,LT Yes 21 Closure test only.HV-249F031 2 H-2 X G M X Q,MT, LT Yes 20 See Relief Request.Leak test in, reverse direction.  
(-,ilt REACTORCOREISOLATION COOLINGM-2149(Continued)
(-,i l t REACTOR CORE ISOLATION COOLING M-2149 (Continued)
ValveNumberRclicfRequestReq'dTestingAlternative RemarksABCD249F0402G-5X10CCV,LT21RRClosuretestonly.HV-249F059 HV-249F060 HV-249F062 G-32G3XX10GL000Q,MT,LTQ,MT,LTQ,MT,LTNoNo20SceRclicfRcqucst.Leaktestinreversedirection.
Valve Number Rclicf Request Req'd Testing Alternative Remarks A B C D 249 F040 2 G-5 X 10 C CV,LT 21 RR Closure test only.H V-249F059 HV-249F060 HV-249F062 G-3 2 G3 X X 10 GL 0 0 0 Q,MT, LT Q,MT, LT Q,MT, LT No No 20 Sce Rclicf Rcqucst.Leak test in reverse direction.
Leaktestinrcvcrscdirection.
Leak test in rcvcrsc direction.
249F063249F0642FA2F4XXCCVCCV2264RROpentestonly.Opentestonly.HV-249F084 2F-30Q,MT,LTYcsrSccRclicfRcquest.Leaktestinreversedirection.
249 F063 249 F064 2 FA 2 F4 X X C CV C CV 22 64 RR Open test only.Open test only.HV-249F084 2 F-3 0 Q,MT, LT Ycs r Scc Rclicf Rcqu est.Leak test in reverse direction.
3 REACTORCOREISOLATION COOLINGM-2149(Continued) 0Qg'.'.y'-/'~'hB..C';::,
3 REACTOR CORE ISOLATION COOLING M-2149 (Continued) 0 Q g'.'.y'-/'~'h B..C';::, D Valve", Number HV-249F088 X C-3 IJ D X I GL 0/*/A X Pe ,O'',+8 II Q,MT, LT.h=Relief Rctlu cat Rctl'd:-'-
DValve",NumberHV-249F088 XC-3IJDXIGL0/*/AXPe,O'',+8IIQ,MT,LT.h=ReliefRctlucatRctl'd:-'-
vt/*38 Testing Alternative'cc Rclicf RcIIucst.is//I Remarks Leak test in revcrsc direction.
vt/*38TestingAlternative'cc RclicfRcIIucst.
Rapid acting valve.  
is//IRemarksLeaktestinrevcrscdirection.
Rapidactingvalve.  


RESIDUALHEATREMOVALM-2151SheetI")i.';:''"'':,Vaiv'el::::":::?~?",',"",
RESIDUAL HEAT REMOVAL M-2151 Sheet I")i.';:''"'':,Vaiv'el::::":::?~?",',"","??'?;~'.v.'';.O:::,....v 4:.''..':::.'i':
"??'?;~'.v.'';.O:::,....
.'e<<";4"V/4 C??~X" NA;X;(".,y..', C;$;,C,;.Relief;;::;
v4:.''..':::.'i':
.'e<<";4"V/4C??~X"NA;X;(".,y..',C;$;,C,;.Relief;;::;
':;.R'equ'"e'st'-''.
':;.R'equ'"e'st'-''.
"::,:R'e'a'.ll,"=::
"::,:R'e'a'.ll,"=::
Line 174: Line 139:
:%.y.&A,','Alte'r'nativ?e':";:;.'.":
:%.y.&A,','Alte'r'nativ?e':";:;.'.":
~::,:;:Rem'a'iks",:.'V-2518$
~::,:;:Rem'a'iks",:.'V-2518$
4A2F-8X24GMX0Q,MT,LTYes20SeeReliefRequest.Leaktestinreversedirectton.HV-251F004C 2F-8GMX0Q,MT,LTYes20SeeReliefRequest.Leaktestinreversedirection.
4A 2 F-8 X 24 G M X 0 Q,MT, LT Yes 20 See Relief Request.Leak test in reverse direct ton.HV-251F004C 2 F-8 G M X 0 Q,MT, LT Yes 20 See Relief Request.Leak test in reverse direction.
HV-251F006A HV-251F006C HV-251F007A 2H-82G-72F-7XXXX2020GMXGMXGMX0Q,MT,LTQ,MTCQ,MTNoNoYes20SeeReliefRequest.Leaktestinreversedirection.
HV-251F006A HV-251F006C HV-251F007A 2 H-8 2 G-7 2 F-7 X X X X 20 20 G M X G M X G M X 0 Q,MT, LT Q,MT C Q,MT No No Yes 20 See Relief Request.Leak test in reverse direction.
HV-251F015A ID-7X24GMXQ,MT,LTYes2667CSPressureisolation valve.HV-251F016A 2B512GL:MXQ,MT,LTNoHV-251F017A HV-251F021A 2D-32B7XX12GLMXGMX0Q,MTCQ,MTNoNoMOOO RESIDUALHEATREMOVALM-2151Sheet1(Continued)
HV-251F015A I D-7 X 24 G M X Q,MT, LT Yes 26 67 CS Pressure isolation valve.HV-251F016A 2 B5 12 GL: M X Q,MT, LT No HV-251F017A HV-251F021A 2 D-3 2 B7 X X 12 GL M X G M X 0 Q,MT C Q,MT No No M O O O RESIDUAL HEAT REMOVAL M-2151 Sheet 1 (Continued)
.:;;'';:;:;:;,:Nu'mb'er",',."':,',",'.,.';'Relief
.:;;'';:;:;:;,:Nu'mb'er",',."':,',",'.,.';'Relief
"";:Rendu'e?st',".
"";:Rendu'e?st',".
::Req',d,':;:
:: Req',d,':;:
',,:::,:"''
',,:::,:"''
''":Tes'tiri'j'.;:':::i!:.':,"
''":Tes'tiri'j'.;:':::i!:.':,":,',:;::Alte'I'attv'e',::,':>.
:,',:;::Alte'I'attv'e',::,':>.
';;.Re'ma'rks;:,:":;:
';;.Re'ma'rks;:,:":;:
HV-251F022 HV-251F023
HV-251F022 HV-251F023
"'':'A':,!:,';:."::-,""B,'.":,;'::'C;'::
"'':'A':,!:,';:."::-,""B,'.":,;'::'C;'::
-:.;.:.';'..:.::.',:.";.;:;::;.
-:.;.:.';'..:.::.',:.";.;:;::;.
1B-8XIB7XX6X6GMQ,MT,LTQ,MT,LTYesYes2026672667CSCSLeaktestinreversedirection.
1 B-8 X I B7 X X 6 X 6 G M Q,MT, LT Q,MT, LT Yes Yes 20 26 67 26 67 CS CS Leak test in reverse direction.
HV-251F024A 2E-7HV-251F027A 2E-7HV-251F028A 2E-5XXX1818GLMGLMGMXCQMTCQ,MTQ,MT,LTNoNoNo251F031A251F031C251F046A251F046C2H-22G-32F-22F-3XXX2020CCVCCVCCVCCVNoNoYesYes6464SeeReliefRequest.SeeReliefRequest.Opentestonly.Opentestonly.CDC)CO FIl RESIDUALHEATREMOVALM-2151Sheet1(Continued)
HV-251F024A 2 E-7 HV-251F027A 2 E-7 HV-251F028A 2 E-5 X X X 18 18 GL M GL M G M X C QMT C Q,MT Q,MT, LT No No No 251F031A 251F031C 251F046A 251F046C 2 H-2 2 G-3 2 F-2 2 F-3 X X X 20 20 C CV C CV C CV C CV No No Yes Yes 64 64 See Relief Request.See Relief Request.Open test only.Open test only.CD C)CO F I l RESIDUAL HEAT REMOVAL M-2151 Sheet 1 (Continued)
::::c'NWA~.:M','",;:,'R'erie f:;.;:.i::Request
::::c'N WA~.:M','",;:,'R'erie f:;.;:.i::Request
.,''.:,Req'd"',:;"'."'Alte'mat tv'e";:-:";
.,''.:,Req'd"',:;"'."'Alte'mat tv'e";:-:";
::';;::Remarks''.:':
::';;::Remarks''.:':
HV-251F048A HV-251FOSOA G-1D-8XXX24GLMX0Q,MTNoCCVLTYes2667CSPressureisolation valve.251F090AHV-251F122A E-8XXXXGLA0CVQ,MT,LTYesYes24263867SeeReliefRequest.CSClosuretestonly.Pressureisolation valve.Rapidactingvalve.  
HV-251F048A HV-251FOSOA G-1 D-8 X X X 24 GL M X 0 Q,MT No C CV LT Yes 26 67 CS Pressure isolation valve.251F090A HV-251F122A E-8 X X X X GL A 0 CV Q,MT, LT Yes Yes 24 26 38 67 See Relief Request.CS Closure test only.Pressure isolation valve.Rapid acting valve.  


RESIDUALHEATREMOVALM-2151Sbc@t2ValveNurnbcf0COv0n~0nn0DeiSO00RclicfRcquest~Rcq'd-',"Testing.Altcfnativc RemarksABC'DHV-251F003A2HV-251FOI IA2HV-251F047A 2F-5H4XC-8XXX2020GMHXCLTNo0Q,MTNo0Q,MTNoDisabledPSV-25IFOSSAA-5XRVCLTNoSV-251F079A2XGLCQMTVcs38SccRclicfRcqucst.Rapidactingvavc.HV-251F103A 2PSV-25106AD3XF-3XIXIGLRVXCLTCLTNoNoLeaktestinfCVCfSCdirection.
RESIDUAL HEAT REMOVAL M-2151 Sbc@t 2 Valve Nurnbcf 0 CO v 0 n~0 n n 0 De iS O 0 0 Rclicf Rcqu est~Rcq'd-'," Testing.Altcfnativc Remarks A B C'D HV-251 F003A 2 HV-251FOI I A 2 HV-251F047A 2 F-5 H4 X C-8 X X X 20 20 G M H X C LT No 0 Q,MT No 0 Q,MT No Disabled PS V-25 I FOSSA A-5 X RV C LT No SV-251 F079A 2 X GL C Q MT Vcs 38 Scc Rclicf Rcqucst.Rapid acting vavc.HV-251F103A 2 PS V-25106A D3 X F-3 X I X I GL RV X C LT C LT No No Leak test in fCVCfSC direction.
~P7IJ4IJcOEDO
~P7 IJ 4 IJ cO ED O


RESIDUALHEATREMOVALM-2151Sheet3,"',:::.;';,VaIv'e''.".';,".",.':,"..;:,":&#xb9;iiiibcer:.':
RESIDUAL HEAT REMOVAL M-2151 Sheet 3 ,"',:::.;';,VaIv'e''.".';,".",.':,"..;:,":&#xb9;iiiibcer:.':
.'''."'':,
.'''."'':,'C:: Cd':,:,'.,'',.'.
'C::Cd':,:,'.,'',.'.
0.:;':,:.4::C.:::;:.;.C'.:
0.:;':,:.4::C.:::;:.;.C'.:
'$'"~':s%C.;:gC1c.a','l'Q:,":
'$'"~':s%C.;:g C1 c.a','l'Q:,":
;':ReItef."
;':ReItef."~;';Request:.
~;';Request:.
:;.,Re'q',d;,';;;
:;.,Re'q',d;,';;;
).a".'.,Testiiij",,:
).a".'.,Testiiij",,:
:":,::"Altcemactiv''e''em'aiks.:.
:":,::"Altcemactiv''e''em'aiks.:.
,C'.;:,:.';::;;.
, C'.;:,:.';::;;.
',HV-251F004B 2.F-3,,XMX0Q,MT,LTYes20SeeReliefRequest.Leaktestinreversedirection.
', HV-251F004B 2.F-3,, X M X 0 Q,MT, LT Yes 20 See Relief Request.Leak test in reverse direction.
HV-251F004D 2F-1XX24G0Q,MT,LTYes20SeeReliefRequest.Leaktestinreversedirection.
HV-251F004D 2 F-1 X X 24 G 0 Q,MT, LT Yes 20 See Relief Request.Leak test in reverse direction.
HV-251F006B 2G-3X.X20GCQ,MTNoHV-251F006D HV-251F007B 2H-22F-3XX20G6GMXMX0Q,MT,LTYesCQMTNo20SeeReliefRequest.Leaktestinreversedirection.
HV-251F006B 2 G-3 X.X 20 G C Q,MT No HV-251F006D HV-251F007B 2 H-2 2 F-3 X X 20 G 6 G M X M X 0 Q,MT, LT Yes C QMT No 20 See Relief Request.Leak test in reverse direction.
HV-251F008 HV-251F0091E-3X1D-1XXX20G20GMXMXQ,MT,LTQ,MT,LTYes23672367CSCSPressureisolation valve.Pressureisolation valve.  
HV-251F008 HV-251 F009 1 E-3 X 1 D-1 X X X 20 G 20 G M X M X Q,MT, LT Q,MT, LT Yes 23 67 23 67 CS CS Pressure isolation valve.Pressure isolation valve.  


RESIDUALHEATREMOVALM-2151Sheet3(Continued)
RESIDUAL HEAT REMOVAL M-2151 Sheet 3 (Continued)
.',:".";.:.''"":.;."::::;.:.,Valv'e:.'.";",:,:',.'-',.',:;;:;::;:,;;;:.:,;.:::;Nu'mb'er::.".
.',:".";.:.''"":.;."::::;.:.,Valv'e:.'.";",:,:',.'-',.',:;;:;::;:,;;;:.:,;.:::;Nu'mb'er::.".
":,':,ch?',',''R'elie'f;:.":..'::.R'e'qu'e's't
":,':, ch?',',''R'elie'f;:.":..'::.R'e'qu'e's't
':;:R'e'q'd
':;:R'e'q'd
:':::::i:,::..";":-Te'stinj-;i.":'.
:'::::: i:,::..";":-Te'stinj-;i.":'.
,:.;..;Alt'e'inative,'.-".,',
,:.;..;Alt'e'inative,'.-".,', ,",: Remar'It's',:.''';.
,",:Remar'It's',:.''';.
HV-251F015B 1 HV-251 F016B 2 HV-251F017B 2 HV-251F021B 2 HV-251 F024B 2 HV-251F027B 2 HV-251F028B 2 251F031B 251F031D C-3 A-5 C-7 A-3 F-3 E-3 C-6 G-8 H-8 X X X X X X X X X 12 GL 24 GL 12 G 18 GL 6 GL 18 G 20 C 20 C X X Q,MT, LT Q,MT, LT 0 Q,MT C Q,MT C Q,MT C Q,MT Q,MT, LT C CV C CV Yes No No No No No No No No 26 67 CS Pressure isolation valve.
HV-251F015B 1HV-251F016B2HV-251F017B 2HV-251F021B 2HV-251F024B2HV-251F027B 2HV-251F028B 2251F031B251F031DC-3A-5C-7A-3F-3E-3C-6G-8H-8XXXXXXXXX12GL24GL12G18GL6GL18G20C20CXXQ,MT,LTQ,MT,LT0Q,MTCQ,MTCQ,MTCQ,MTQ,MT,LTCCVCCVYesNoNoNoNoNoNoNoNo2667CSPressureisolation valve.
V I fi l 1 RESIDUAL HEAT REMOVAL M-2151 Sheet 3 (Continued)
VIfil1 RESIDUALHEATREMOVALM-2151Sheet3(Continued)
'''V ,:;.;.(::;:;:y,',.
'''V,:;.;.(::;:;:y,',.
,'z@lr",'..';:.''..'.Valv'e",'-.".'..,:',',''',"-".";: ,Relief:::-'::
,'z@lr",'..';:.''..'.Valv'e",'-.".'..,:',',''',"-".";:
,Relief:::-'::
:.'::;:;Rvequ'e'st.;:
:.'::;:;Rvequ'e'st.;:
';Req'd';:::.-'',";.'",'y'.((:;"'.
';Req'd';:::.-'',";.'",'y'.((:;"'.
:',;"'Testmg'i,':@
:',;"'Testmg'i,':@
".,".:Alternative.;':
".,".:Alternative.;':
':,'4;.'.".;.
':,'4;.'.".;.".;":'::Reiiia(rks,':,:,"::
".;":'::Reiiia(rks,':,:,"::
251F046B 251 F046D F-7 F-8 X 4 C 4 C C CV C CV See Relief Request.See Relief Request.Open test only.Open test only.HV-251 F048B HV-251F050B F-9 C-2 X X 24 GL 24 C M X 0 Q,MT C CV,LT No 26 67 CS Pressure isolation valve.251F090B B-6 2 C 0 CV See Relief Request..Closure test only.HV-251F122B C-2 1 GL A X Q,MT, LT 26 38 67 Pressure isolation valve.Rapid acting valve.
251F046B251F046DF-7F-8X4C4CCCVCCVSeeReliefRequest.SeeReliefRequest.Opentestonly.Opentestonly.HV-251F048BHV-251F050B F-9C-2XX24GL24CMX0Q,MTCCV,LTNo2667CSPressureisolation valve.251F090BB-62C0CVSeeReliefRequest..Closuretestonly.HV-251F122B C-21GLAXQ,MT,LT263867Pressureisolation valve.Rapidactingvalve.
RESIDUAL HEAT REMOVAL M-2151 Sheet 3 (Continued)
RESIDUALHEATREMOVALM-2151Sheet3(Continued)
Valve Number ol~I c5 Q n S=5 O 0 Pp D eR O 0 8'elief Rcqu est Rcj'd",-: Testing Alternative Remarks A B C D tJ C PS V-25 1 F 126 D-2 X X X I RV C LT No RESIDUAL HEAT REMOVAL M-2151 Sheet 4 Valve Number 0 0 0.Cl'c O O ,II e V)r O O 0 n C O n O C4 89 O g~O O$4 Relief Request Rcq'd Testing Alternative Remarks A B, C, D HV-251F003B F4 20 X 0 Q,MT No HV-251FOI I B 2 H-3 X 4 G H C LT No Disabled HV-~&I F047B PS V-251F055B 2 SV-251 F079B HV-25 1 F103B 2 C-2 G-5 C-7 X X 20 G 8 RV 1 GL I GL M X X 0 Q,MT No C LT No C LT C Q,MT Ycs 38 Scc Rclicl'cqu est.Rapid acting valve.Leak test in fevcfse direction.
ValveNumberol~Ic5QnS=5O0PpDeRO08'eliefRcquestRcj'd",-:TestingAlternative RemarksABCDtJCPSV-251F126D-2XXXIRVCLTNo RESIDUALHEATREMOVALM-2151Sheet4ValveNumber000.Cl'cOO,IIeV)rOO0nCOnOC489Og~OO$4ReliefRequestRcq'dTestingAlternative RemarksAB,C,DHV-251F003B F420X0Q,MTNoHV-251FOI IB2H-3X4GHCLTNoDisabledHV-~&IF047BPSV-251F055B 2SV-251F079BHV-251F103B2C-2G-5C-7XX20G8RV1GLIGLMXX0Q,MTNoCLTNoCLTCQ,MTYcs38SccRclicl'cqu est.Rapidactingvalve.Leaktestinfevcfsedirection.
PS V-25106B PS V-251F097 F-7 G-2 X X X I RV 4 RV C LT LT, SRV No'o  
PSV-25106BPSV-251F097 F-7G-2XXXIRV4RVCLTLT,SRVNo'o  


CORESPRAYM-2152:.iP:,:":;Valve";.','':;,.;.:.
CORE SPRAY M-2152:.iP:,:":;Valve";.','':;,.;.:.
'"'-"'"'':::
'"'-"'"'':::
Number'':::-'..:.
Number'':::-'..:.
:Relief,.:'';:;
:Relief,.:'';:;
:;:-:Re'q'u'est'-".':
:;:-:Re'q'u'est'-".':
Req,'6',:;i:'!:.,
Req,'6',:;i:'!:.,.:::.,;:":.".',;:.":;:Testin'g''.'"'-'::;:
.:::.,;:":.".',;:.":;:Testin'g''.'"'-'::;:
!;-.-'P.'':::.;.',:.::,:;:'A'Item>>ativ'e'",:;:::;:-;:Retnarks.:'.:.'4
!;-.-'P.'':::.;.',:.::,:;:'A'Item>>ativ'e'",
:;:::;:-;:Retnarks.:'.:.'4
".::.'"':-:,':.:",'.'::;,':B',".;."::;".,:.i;C;.';".;::.,""..';::D~
".::.'"':-:,':.:",'.'::;,':B',".;."::;".,:.i;C;.';".;::.,""..';::D~
HV-252FO01A 2H-316M0Q,MT,LTYes20SeeReliefRequest.Leaktestinreversedirection.
HV-252FO01A 2 H-3 16 M 0 Q,MT, LT Yes 20 See Relief Request.Leak test in reverse direction.
HV-252FO01B 2H-1X16GM0Q,MT,LTYes20SeeReliefRequest.Leaktestinreversedirection.
HV-252FO01B 2 H-1 X 16 G M 0 Q,MT, LT Yes 20 See Relief Request.Leak test in reverse direction.
252F003A252F003BE-5E-8XXX1212CVCVNoNo252F003C252F003DE-6E-91212CVCVNoNoHV-252F004A 2HV-252F004B 2HV-252FOOSA 1D4B4D-3XXX121212GMGMX00Q,MTQ,MTQ,MT,LTNoNo4567CSPressureisolation valve.
252F003A 252F003B E-5 E-8 X X X 12 12 CV CV No No 252F003C 252F003D E-6 E-9 12 12 CV CV No No HV-252F004A 2 HV-252F004B 2 HV-252FOOSA 1 D4 B4 D-3 X X X 12 12 12 G M G M X 0 0 Q,MT Q,MT Q,MT, LT No No 45 67 CS Pressure isolation valve.
IIII CORESPRAYM-2152(Continued)
I I I I CORE SPRAY M-2152 (Continued)
.:;:;:<":''",",,;.'VaIv'e'.
.:;:;:<":''",",,;.'VaIv'e'.
"-"..';,',:,:,'",;."::",i:
"-"..';,',:,:,'",;."::",i:
N<<umb'er"
N<<umb'er".".'-.',"?Yg r.'a?':~" c>%;:4MZ;W 0...:,:,?$
.".'-.',"?Yg r.'a?':~"c>%;:4MZ;W0...:,:,?$
%'C ,j:?p??'.,?:0, , Zv v(<<(A.C","Relief:,:;;,;
%'C,j:?p??'.,
?:0,,Zvv(<<(A.C","Relief:,:;;,;
,'etlUest~g
,'etlUest~g
",:Ri'j!d:";.:::"::
",: Ri'j!d:";.:::"::
hn&"-'Testlflg""'.
hn&"-'Testlflg""'.
:,Alt'em'ative
: ,Alt'em'ative
-::Retnaiks'-
-:: Retnaiks'-
:'-:HV-252FOOSB 1B-3X12GMXQ,MT,LTYes4567Pressureisolation valve.HV-252F006A 1D-3XX12CXCV,LTYes4567Pressureisolation valve.HV-252F006B 1B312CXCV,LTYes4567Pressureisolation valve.PSV-252F012A 2D-7XX1'ARVSRVNoPSV-252F012B HV-122F015A 2B-72E-31'ARV10GLMXSRVQ,MT,LTNoNoLeaktestinreversedirection.
:'-: HV-252FOOSB 1 B-3 X 12 G M X Q,MT, LT Yes 45 67 Pressure isolation valve.HV-252F006A 1 D-3 X X 12 C X CV,LT Yes 45 67 Pressure isolation valve.HV-252F006B 1 B3 12 C X CV,LT Yes 45 67 Pressure isolation valve.PS V-252F012A 2 D-7 X X 1'A RV SRV No PS V-252F012B HV-122F015A 2 B-7 2 E-3 1'A RV 10 GL M X SRV Q,MT, LT No No Leak test in reverse direction.
HV-252F015B 2E-3XX10GLMXQ,MT,LTNoLeaktestinreversedirection.
HV-252F015B 2 E-3 X X 10 GL M X Q,MT, LT No Leak test in reverse direction.
Og~a>(%JIC/0C)cOCO 44t'IP' CORESPRAYM-2152(Continued)
O g~a>(%JI C/0 C)cO CO 4 4 t'I P' CORE SPRAY M-2152 (Continued)
ValveNumberOlCCO~qOnI4OOQ6~O0,C+iOl4RclicfRcquestRcq'dTestingAlternative RemarksABCDCh252F029A252F029B252F030A252F030BHV-252F031A 2HV-252F031B 2PSV-252F032A2PSV-252F032B 2A-5F-3F-3G-4H-6XXXXXXXGMGMRVRVX000000CVCVCVCVQ,MT,LTQ,MT,LTrSRVSRVYcsYesNoNo242424242020SceRclicfRequest.SccRclicfRcquest.SceRclicfRcqucst.SccRclicfRcqucst.SccRclicfRcqucst.SccRclicfRcquest.Leaktestinrcvcrscdirection.
Valve Number O lC C O~q O nI 4 O O Q 6~O 0 ,C+i O l4 Rclicf Rcqu est Rcq'd Testing Alternative Remarks A B C D Ch 252 F029A 252 F029B 252F030A 252 F030B HV-252F031A 2 HV-252F031B 2 PS V-252 F032A 2 PSV-252F032B 2 A-5 F-3 F-3 G-4 H-6 X X X X X X X G M G M RV RV X 0 0 0 0 0 0 CV CV CV CV Q,MT, LT Q,MT, LT r SRV SRV Ycs Yes No No 24 24 24 24 20 20 Sce Rclicf Request.Scc Rclicf Rcqu est.Sce Rclicf Rcqucst.Scc Rclicf Rcqucst.Scc Rclicf Rcqucst.Scc Rclicf Rcqu est.Leak test in rcvcrsc direction.
Leaktestmreversedirection.
Leak test m reverse direction.
0 CORESPRAYM-2152(Continued)
0 CORE SPRAY M-2152 (Continued)
"-':"'Valve""
"-': "'Valve""-""',;:;.;:"::,<'".",,'.::Number";.'.,',.",," i Relief.::;:.i
-""',;:;.;:"::,<'".",,'.::Number";.'.,',.",,"
::;R'e'ques't,':, i;Req:,d;,<
iRelief.::;:.i
::;R'e'ques't,':,
i;Req:,d;,<
.;;";:,;",:,.TestIng'':;-:;";';:;.
.;;";:,;",:,.TestIng'':;-:;";';:;.
";"Alte'rn'ative';:;
";"Alte'rn'ative';:;
':;::Remaiks'','-,';".':
':;:: Remaiks'','-,';".':
".":!A!':':::iB;;;,:,':;:":..C,':::..;:::,:,::.:;::;:D':
".":!A!':':::iB;;;,:,':;:":..C,':::..;:::,:,::.:;::;:D':
252F036A252F036B252F036C252F036DHV-252F037A 1E-5E-8E-6E-9D-3XXXXXGLAXCVCVCVCVQ,MT,LTYesYesYesYes453867SeeReliefRequest.SeeReliefRequest.SeeReliefRequest.SeeReliefRequest.CSOpentestonly.Opentestonly.Opentestonly.Opentestonly.Pressureisolation valve.Rapidactingvalve.
252F036A 252F036B 252F036C 252F036D HV-252F037A 1 E-5 E-8 E-6 E-9 D-3 X X X X X GL A X CV CV CV CV Q,MT, LT Yes Yes Yes Yes 45 38 67 See Relief Request.See Relief Request.See Relief Request.See Relief Request.CS Open test only.Open test only.Open test only.Open test only.Pressure isolation valve.Rapid acting valve.
CORESPRAYM-2152(Continued)
CORE SPRAY M-2152 (Continued)
';"-;:,;-",'"::VaIv'e",:i:-,:.
';"-;:,;-",'"::VaIv'e",:i:-,:.
,,"A".',',",::.":"':.';
,,"A".',',",::.":"':.';
8,":::..'ji C~"',;:":!8;:.'':.?
8,":::..'ji C~"',;:":!8;:.'':.?
''t@"'':.
''t@"'':.':"C;<';:?:.:..;:., N.;, YA 4;.".;.:~';?':.,;;.
':"C;<';:?:.:..;:.,N.;,YA4;.".;.:~';?':.,;;.
",Relief:::,!';:.:
",Relief:::,!';:.:
:;ReqUest~
:;ReqUest~
'Req.'d:",',:?'C,'.?'?X.~:::..:.:::::.:,:Tisttn'g;:.:;::;-:;:;,
'Req.'d: ",',:?'C,'.?'?X.~:::..:.:::::.:,:Tisttn'g;:.:;::;-:;:;,::::::Alte'riia'ttve,".
::::::Alte'riia'ttve,".
g?,"y,',",M
g?,"y,',",M
,'":Rem'a'ik's',,:,:
,'": Rem'a'ik's',,:,:
HV-252F037B 1C-3XQ,MT,LTYes453867CSPressureisolation valve.Rapidactingvalve.Ogtel(CA 4'IP,I FUELPOOLCOOLING4,CLEANUPM-2153Sheet1ValveNumberOOgctOCI8~COnRclicf=RequestRcq'dk'estingAltcrnativc RemarksIJL2-53%7IA2-53471B3B43B-5ABC,.9XXXCCVCCVYcs13651365SccRclicfRcqucat.SccRclicfRcquest.Opentestonly.Opentestonly.CJnC/lCJCOCOCO HIGHPRESSURECOOLANTINJECTION M-2155ValveNumberj',-'sOOC4O0el0~&~I0C4XRelicf-RequestRcq'd';Testing,~Altcrnativc
HV-252F037B 1 C-3 X Q,MT, LT Yes 45 38 67 CS Pressure isolation valve.Rapid acting valve.O g tel (CA 4'I P, I FUEL POOL COOLING 4, CLEANUP M-2153 Sheet 1 Valve Number O O g ct O CI 8~C O n Rclicf=Request Rcq'd k'esting Altcrnativc Remarks IJ L 2-53%7IA 2-53471 B 3 B4 3 B-5 A B C,.9 X X X C CV C CV Ycs 13 65 13 65 Scc Rclicf Rcqu cat.Scc Rclicf Rcqu est.Open test only.Open test only.CJ n C/l CJ CO CO CO HIGH PRESSURE COOLANT INJECTION M-2155 Valve Number j',-'s O O C4 O 0 el 0~&~I 0 C4 X Relic f-Request Rcq'd';Testing,~Altcrnativc
,RemarksVlCl2-55%122-55%38HV-255F001 HV-255F002 2E-52E-52D-8B-3A.B.,-,.CDXX2CIGL10G10GHM0CVLTNoQ,MTNo.Q,MT,LT2420SceRclicfRequest.SccRclicfRcquest.Leaktestinreversedirection.
, Remarks Vl Cl 2-55%12 2-55%38 H V-255F001 H V-255F002 2 E-5 2 E-5 2 D-8 B-3 A.B.,-,.C D X X 2 C I GL 10 G 10 G H M 0 CV LT No Q,MT No.Q,MT, LT 24 20 Sce Rclicf Request.Scc Rclicf Rcqu est.Leak test in reverse direction.
HV-255F003 B-310GX0Q,MT,LTNoHV-255F004 255F005HV-255F006 HV-255F007 HV-255F008 B-82EW2E-52E-62D5XXXXX16G14C14G14G10GLXXX00Q,MTNoCVNoQ,MTYcsQ,MTNoQ,MTNo29Opentestonly.
HV-255F003 B-3 10 G X 0 Q,MT, LT No H V-255F004 255 F005 HV-255F006 H V-255F007 H V-255F008 B-8 2 EW 2 E-5 2 E-6 2 D5 X X X X X 16 G 14 C 14 G 14 G 10 GL X X X 0 0 Q,MT No CV No Q,MT Ycs Q,MT No Q,MT No 29 Open test only.
HIGHPRESSURECOOLANTI%ECTIONM-2155(Continued)
HIGH PRESSURE COOLANT I%ECTION M-2155 (Continued)
ValveNumberj'EOOQo6Ch0IcO"cdOIn0oSOOOOcdOK6EctlReliefRcquestRcq'dTestingAlternative RemarksABCDHV-255F012 F-3XGMXQ,MT,LTYcs20SccReliefRcquest.Leaktestinfcvcrscdirection.
Valve Number j'E O O Q o 6 Ch 0 IcO" cd O I n 0 o S O O O O cd O K 6 E ctl Relief Rcqu est Rcq'd Testing Alternative Remarks A B C D HV-255F012 F-3 X G M X Q,MT, LT Ycs 20 Scc Relief Rcqu est.Leak test in fcvcrsc direction.
Verifystrokeduringpumptest.255F019C-8X16CV32RRClosuretestonly.HV-255F042 255F045255F0462H2XH-3E-7XXX1616GMXQ,MT,LTCVCVgLTYcs2031652865SccRclicfRcqucst.SccRclicfRequest.SceRclicfRcqucst.Leaktestinfcvcfscdirection.
Verify stroke during pump test.255 F019 C-8 X 16 CV 32 RR Closure test only.HV-255F042 255 F045 255 F046 2 H2 X H-3 E-7 X X X 16 16 G M X Q,MT, LT CV CVgLT Ycs 20 31 65 28 65 Scc Rclicf Rcqucst.Scc Rclicf Request.Sce Rclicf Rcqucst.Leak test in fcvcfsc direction.
Opentestonly.Opentestonly.
Open test only.Open test only.
HIGHPRESSURECOOLANTIN/ECTION M-2155(Continued)
HIGH PRESSURE COOLANT IN/ECTION M-2155 (Continued)
SwValve'Numberg'."...0A4'SRclicfRequestReq'dTestingAlternative h"s255F049HV-255F066 2G-5G-3AB,.:C'','DX20C20G0CV,LTQ,MT,LT2S20SecReliefRcquest.SccRclicfRcqucst.Opentestonlyduringpumptest.Leaktestinreversedirection.
Sw Valve'Number g'."...0 A 4'S Rclicf Request Req'd Testing Alternative h" s 255 F049 H V-255F066 2 G-5 G-3 A B,.: C'','D X 20 C 20 G 0 CV,LT Q,MT, LT 2S 20 Sec Relief Rcqu est.Scc Rclicf Rcqucst.Open test only during pump test.Leak test in reverse direction.
HV-255F075 255F076255F077HV-255F079 2F-52F42F4F-3XXXX3G3C3C3G00Q,MT,LTCVCVNo3464346420RRSccRclicfRcquest.Opentestonly.Opentestonly.Leaktestinreversedirection.
HV-255F075 255F076 255 F077 HV-255F079 2 F-5 2 F4 2 F4 F-3 X X X X 3 G 3 C 3 C 3 G 0 0 Q,MT, LT CV CV No 34 64 34 64 20 RR Scc Rclicf Rcqu est.Open test only.Open test only.Leak test in reverse direction.
IJ4C/)S+8C)  
IJ 4 C/)S+8 C)  


HIGHPRESSURECOOLANTINJECTION M-2I55(Continued)
HIGH PRESSURE COOLANT INJECTION M-2I55 (Continued)
ValveNumbereRXgIIReliefRequestRcq'dTcatutg-Alternative.
Valve Number eR X g II Relief Request Rcq'd Tcatutg-Alternative.
RemarksABC9COIAHV-255F100 B-3XXIGLAXQ,MT,LT38SccRclicfRcclucst.
Remarks A B C 9 CO IA HV-255F100 B-3 X X I GL A X Q,MT, LT 38 Scc Rclicf Rcclucst.Rapid acting valve.CA CJ CD CD CD HPCI TURBINE-PUMP M-2156 Sheet 1 Valve Number~o O O 8 O o II E~o 8'Rclicf Request Rcq'd.Testing Alternative Remarks FV-25612 256F04S 256 F052 256 F057 B-7 G-5 G-5 A 8 C.'D X X 10 GL E/H X C Q,MT C CV C CV C CV No 53 65 65 Sce Rclicf Rcqu est.Scc Rclicf Rcqu est.Scc Rclicf Rcqucst.Test during HPCI pump test.Test during HPCI pump test, open test only.Test during HPCI pump test, close test only.Test during HPCI pump test, open test only.H V-256F059 PSE-256D003 E-3 B-5 X X 16 GL M X RD C QMT C DT No No Test during HPCI pump test.No testing required.V)IJ CO CO HPCI TURBINE-PUMP M-2156 Sheet 1 (Continued)
Rapidactingvalve.CACJCDCDCD HPCITURBINE-PUMPM-2156Sheet1ValveNumber~oOO8OoIIE~o8'RclicfRequestRcq'd.TestingAlternative RemarksFV-25612256F04S256F052256F057B-7G-5G-5A8C.'DXX10GLE/HXCQ,MTCCVCCVCCVNo536565SceRclicfRcquest.SccRclicfRcquest.SccRclicfRcqucst.TestduringHPCIpumptest.TestduringHPCIpumptest,opentestonly.TestduringHPCIpumptest,closetestonly.TestduringHPCIpumptest,opentestonly.HV-256F059 PSE-256D003 E-3B-5XX16GLMXRDCQMTCDTNoNoTestduringHPCIpumptest.Notestingrequired.
'alve Number O S 5.O l4 8S O g~0 g II Relief Request Rcq'd Testing Alternative A 8'D IJ IJI PSE-256D004 S h-5 X X 16 DT No No testing required.  
V)IJCOCO HPCITURBINE-PUMPM-2156Sheet1(Continued)
'alveNumberOS5.Ol48SOg~0gIIReliefRequestRcq'dTestingAlternative A8'DIJIJIPSE-256D004 Sh-5XX16DTNoNotestingrequired.  


CONTAINMENT ATMOSPHERE CONTROLM-2157SheetIOJSYalve'utnbcr',AnA...=B",C.>>,<<"D,Relief''Rcqucst
CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet I O J S Yalve'utnbcr', A n A...=B",C.>>,<<" D , Relief''Rcqucst
:Rcq'd.~i'=-Testing
: Rcq'd.~i'=-Testing
.,Alternative
., Alternative
,"Rcntarka
,"Rcntarka'c lJ C Ch HV-25703 HV-25704 PS V-25704A I 2 PS V-25704A2 2 PSV-25704B I 2 PS V-25704B2 2 PSV-25704CI 2 PS V-25704C2 2 PSV-25704DI 2 PS V-25704D2 2 PS V-25704E I E-3 X E-2 X F-4 F-4 F4 F4 F-4 F4 F-4 X X X X X X X X 18 B 18 B 24 RV 24 RV 24 RV 24 RV 24 RV 24 RV 24 RV 24 RV 24 RV A X X X X X X X Q,MT, LT Q,MT, LT C SRV C SRV C SRV C SRV C SRV C SRV C SRV C SRV C SRV No No No No No No No No No 37 37 Closure test only.Leak test in reverse direction.
'clJCChHV-25703HV-25704PSV-25704AI2PSV-25704A2 2PSV-25704B I2PSV-25704B2 2PSV-25704CI 2PSV-25704C2 2PSV-25704DI 2PSV-25704D2 2PSV-25704EIE-3XE-2XF-4F-4F4F4F-4F4F-4XXXXXXXX18B18B24RV24RV24RV24RV24RV24RV24RV24RV24RVAXXXXXXXQ,MT,LTQ,MT,LTCSRVCSRVCSRVCSRVCSRVCSRVCSRVCSRVCSRVNoNoNoNoNoNoNoNoNo3737Closuretestonly.Leaktestinreversedirection.
Closure test only.t>n (D M tJ CO C)CO  
Closuretestonly.t>n(DMtJCOC)CO  


CONTAINMENT ATMOSPHERE CONTROLM-2157Sheet1(Continued)
CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 1 (Continued)
YalycNumber-gCDc"j8SOE~0Relief.RequestRcq'd:Testing,Alternative RemarksAB'C.DPSV-25704E2 2HV-25705HV-25711HV-25713HV-25714HV-25721D-3A-3C-8X24RV2GL2GL24B24B6BAXXXSRVQ,MT,LTQ,MT,LTQ,MT,LTQ,MT,LTQ,MT,LTrNo37CS37CS37CS37CSClosuretestonly.Closuretestonly.Closuretcst only.Leaktestinreversedirection.
Yalyc Number-g C Dc"j 8S O E~0 Relief.Request Rcq'd: Testing , Alternative Remarks A B'C.D PS V-25704E2 2 HV-25705 HV-25711 HV-25713 HV-25714 HV-25721 D-3 A-3 C-8 X 24 RV 2 GL 2 GL 24 B 24 B 6 B A X X X SRV Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LTr No 37 CS 37 CS 37 CS 37 CS Closure test only.Closure test only.Closuretcst only.Leak test in reverse direction.
Closuretestonly.Closuretestonly.  
Closure test only.Closure test only.  


CONTAINMENT ATMOSPHERE CONTROLM-2157SheetI(Continued)
CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet I (Continued)
ValveNumberO000OIO8l49OgE~OslDvReliefRcqucstRcq'dTestingAltcfnattveHV-25722HV-25723HV-25724HV-25725C-5D-7E-5ABCDX24241818BAXBAXBAXBAXQ,MT,LTQ,MT,LTQ,MT,LTQ,MT,LTYcsYcs37CS37CS37CS37CSClosuretestonly,Leaktestinfcvcfscdirection.
Valve Number O 0 0 0 O I O 8 l4 9 O g E~O sl Dv Relief Rcqucst Rcq'd Testing Altcfnat tve HV-25722 HV-25723 HV-25724 HV-25725 C-5 D-7 E-5 A B C D X 24 24 18 18 B A X B A X B A X B A X Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT Ycs Ycs 37 CS 37 CS 37 CS 37 CS Closure test only, Leak test in fcvcfsc direction.
Closuretestonly.Closuretestonly.Closuretestonly.Leaktestinfcvcfscdirection.
Closure test only.Closure test only.Closure test only.Leak test in fcvcfsc direction.
SV-25734A G-2XXGLSXQ,L'd,MTYcs38,58SceReliefRcqucst.Rapidactingvalve.  
SV-25734A G-2 X X GL S X Q,L'd, MT Ycs 38, 58 Sce Relief Rcqucst.Rapid acting valve.  


CONTAINMENT ATMOSPHERE CONTROLM-2157Sheet1(Continued)
CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 1 (Continued)
.';-.:;Valve"'";;"
.';-.:;Valve"'";;":;:::;:::,'::,::,Numb e'r:.':,';,.:,:,'-'.', C":;" tA::g.;:"O.'.C',W.~;Relief,';,:.
:;:::;:::,'::,::,Numb e'r:.':,';,.:,:,'-'.',
C":;"tA::g.;:"O.'.C',W.~;Relief,';,:.
:Re'q'nest''
:Re'q'nest''
'.:,'Re'q'd'-,-'.:.
'.:,'Re'q'd'-,-'.:."g","','gTe'sttri::-';"","';.;:"'Alt'eiiiative',;;:
"g","','gTe'sttri::-';"",
:,"':-:""',Reiiiaiks:;,',":,:'V-25734B 2 E-6 X 1 GL S X Q,LT, MT 38, 58 See Relief Request.Rapid acting valve.SV-25736A SV-25736B 2 G-3 X 2 E-6 X X 1 GL 1 GL S X S X 0 Q,LT, MT Q,LT, MT 38, 58 38, 58 See Relief Request.See Relief Request.Rapid acting valve.Rapid acting valve.SV-25737 2 G-6 X 1 GL S X Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.SV-25738 2 G-6 X X 1 GL S X Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.  
"';.;:"'Alt'eiiiative',;;:
'C.~I~I.,j I 1 CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 1 (Continued)
:,"':-:""',Reiiiaiks:;,',":,:'V-25734B 2E-6X1GLSXQ,LT,MT38,58SeeReliefRequest.Rapidactingvalve.SV-25736A SV-25736B 2G-3X2E-6XX1GL1GLSXSX0Q,LT,MTQ,LT,MT38,5838,58SeeReliefRequest.SeeReliefRequest.Rapidactingvalve.Rapidactingvalve.SV-257372G-6X1GLSXQ,LT,MTYes38,58SeeReliefRequest.Rapidactingvalve.SV-257382G-6XX1GLSXQ,LT,MTYes38,58SeeReliefRequest.Rapidactingvalve.  
"'''-'<'""'"-" Val+e"""':-''""''.;::;;.;
'C.~I~I.,jI1 CONTAINMENT ATMOSPHERE CONTROLM-2157Sheet1(Continued)
Number"..'.',".;:,'';
"'''-'<'""'"-"
': 0&tv'.'.wi'A""':i;.".c.B+
Val+e"""':-''""
i!:,:";, C~..;.'.:Q i';..'.,'@.,XC;8:;,;., 8;.,:C;:6;:;
''.;::;;.;
::.c.gg?a (p g"".'.?',.')C;:.', 4'YMZ.,M%'.C::Relief:,.;:.':
Number"..
,";Request;":, i';RE!d,".,":;;, ,:r:.'..C ,.C%"..: ,'A'Iternattv'e-';.';
'.',".;:,'';
,:;,i:,"Re'mari s.",'SV-25740A 2 B4 X X GL S X 0 Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.SV-25740B SV-25742A 2 B5 2 B3 X GL S GL S 0 Q,LT, MT Q,LT, MT Yes 38, 58 38, 58 See Relief Request.See Relief Request.Rapid acting valve.Rapid acting valve.SV-25742B 2 B-6 X GL S X Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.SV-25750A 2 C4 X GL S X 0 Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.  
':0&tv'.'.wi'A""':i;.".c.B+
"~v r~,'Ci CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 1 (Continued) 9?''?X?:?.;"',',",h'....'.Cl:..?.:<;fy??.C%?.".c",.'
i!:,:";,C~..;.'.:Qi';..'.,'@.,XC;8:;,;.,8;.,:C;:6;:;
';Cl,.'.r?.,;: "'-''ll":-'?
::.c.gg?a(pg"".'.?',.')C;:.',4'YMZ.,M%'.
;;?:C%: ",%lgP,'.;.'t
C::Relief:,.;:.':
,";Request;":,
i';RE!d,".,":;;,
,:r:.'..C,.C%"..:,'A'Iternattv'e-';.';
,:;,i:,"Re'mari s.",'SV-25740A 2B4XXGLSX0Q,LT,MTYes38,58SeeReliefRequest.Rapidactingvalve.SV-25740B SV-25742A 2B52B3XGLSGLS0Q,LT,MTQ,LT,MTYes38,5838,58SeeReliefRequest.SeeReliefRequest.Rapidactingvalve.Rapidactingvalve.SV-25742B 2B-6XGLSXQ,LT,MTYes38,58SeeReliefRequest.Rapidactingvalve.SV-25750A 2C4XGLSX0Q,LT,MTYes38,58SeeReliefRequest.Rapidactingvalve.  
"~vr~,'Ci CONTAINMENT ATMOSPHERE CONTROLM-2157Sheet1(Continued) 9?''?X?:?.;"',',",h'....'.Cl:..?.:<;fy??.C%?.".c",.'
';Cl,.'.r?.,;:"'-''ll":-'?
;;?:C%:",%lgP,'.;.'t
.!ReIief:.;"."':,.,",'.;:Re'qu'e'st'::;
.!ReIief:.;"."':,.,",'.;:Re'qu'e'st'::;
".'Req!d':.'??:C':?y'.',,".,.y"
".'Req!d':.'??:C':?y'.',,".,.y"?gg%:.".~".g''yM'y:NANT(..:+:?%';'",'';i;::.
?gg%:.".~".g''yM'y:NANT(..:+:?%';'",'';i;::.
:Testing':.",:i~i','
:Testing':.",:i~i','
Alternativ'e,';:,:
Alternativ'e,';:,:
;'.';:::'",.':,Rem'arks.'';;::.';;
;'.';:::'",.':,Rem'arks.'';;::.';;
.".'A"'i::.'::"'::";:B';'.~":;;':::Ci:::,::,:i.:':.''-::,,'D.';.
.".'A"'i::.'::"'::";:B';'.~":;;':::Ci:::,::,:i.:':.''-::,,'D.';.
SV-25750B 2B-5XGLSXQ,LT,MTYes38,58SeeReliefRequest.Rapidactingvalve.SV-25752A 2C-3XXGLSX0Q,LT,MTYes38,58SeeReliefRequest.Rapidactingvalve.SV-25752B 2B-6XGLSQ,LT,MT38,58SeeReliefRequest.Rapidactingvalve.HV-257662H-5GMQ,MT,LTYes20SeeReliefRequest.Leaktestinreversedirection.
SV-25750B 2 B-5 X GL S X Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.SV-25752A 2 C-3 X X GL S X 0 Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.SV-25752B 2 B-6 X GL S Q,LT, MT 38, 58 See Relief Request.Rapid acting valve.HV-25766 2 H-5 G M Q,MT, LT Yes 20 See Relief Request.Leak test in reverse direction.
SV-257672C-5XGLSQ,LT,MT38,58SeeReliefRequest.Rapidactingvalve.HV-257682H-4XGMXQ,MT,LTNo
SV-25767 2 C-5 X GL S Q,LT, MT 38, 58 See Relief Request.Rapid acting valve.HV-25768 2 H-4 X G M X Q,MT, LT No
*!~r.
*!~r.
CONTAINMENT ATMOSPHERE CONTROLM-2157Sheet1(Continued)
CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 1 (Continued)
",-.',;;;;,':.'";:;:,Valve,:-',;;.""".'.,';".".',
",-.',;;;;,':.'";:;:,Valve,:-',;;.""".'.,';".".',-,,';:;,:;::Number'"-";;;
-,,';:;,:;::Number'"-";;;
'.WV W',"Relief'.",-".
'.WVW',"Relief'.",-".
:',Reqwu'est'.'Reqw'vd:::.':-
:',Reqwu'est'.'Reqw'vd:::.':-
:'<<v.:.'W.'.'.r
: '<<v.:.'W.'.'.r
'"-':',:Te'sjin'gv'::-
'"-':',:Te'sjin'gv'::-
':'Avl'teinative
':'Avl'teinative
;.'::::Rema'iks..:::.::::,
;.'::::Rema'iks..:::.::::, SV-25774A C-3 X 1 GL S X 0 Q,LT, MT 38, 58 See Relief Request.Rapid acting valve.SV-25774B D-6 X 1 GL S X Q,LT, MT 38, 58 See Relief Request.Rapid acting valve.SV-25776A SV-25776B SV-25780A C4 X D-5 X F-3 X X X 1 GL 1 GL 1 GL S X, S X S X 0 0 Q,LT, MT Q,LT, MT Q,LT, MT Yes Yes 38, 58 38, 58 38, 58 See Relief Request.See Relief Request.See Relief Request.Rapid acting valve.Rapid acting valve.Rapid acting valve.
SV-25774A C-3X1GLSX0Q,LT,MT38,58SeeReliefRequest.Rapidactingvalve.SV-25774B D-6X1GLSXQ,LT,MT38,58SeeReliefRequest.Rapidactingvalve.SV-25776A SV-25776B SV-25780A C4XD-5XF-3XXX1GL1GL1GLSX,SXSX00Q,LT,MTQ,LT,MTQ,LT,MTYesYes38,5838,5838,58SeeReliefRequest.SeeReliefRequest.SeeReliefRequest.Rapidactingvalve.Rapidactingvalve.Rapidactingvalve.
CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 1 (Continued)
CONTAINMENT ATMOSPHERE CONTROLM-2157Sheet1(Continued)
::!Relief~'Request".'':Reij'd-""';", i-'::::.-".:Remarks:.:'::;:," SV-25780B SV-25782A SV-25782B SV-25789 2 F-6 2 F-2 F-6 2 C4 X X X X X GL S GL S GL S GL S X X 0 Q,LT, MT Q,LT, MT Q,LT, MT Q,LT, MT Yes Yes Yes Yes 38, 58 38, 58 38, 58 38, 58 See Relief Request.See Relief Request.See Relief Request.See Relief Request.Rapid acting valve.Rapid acting valve.Rapid acting valve.Rapid acting valve.
::!Relief~'Request".'':Reij'd-""';",
t T~4 CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 5'\',".0':::":.'.
i-'::::.-".:Remarks:.:'::;:,"
0,:...;;;;.:;4'?;;";F%.O'',".i":-'-'.'.
SV-25780B SV-25782A SV-25782B SV-257892F-62F-2F-62C4XXXXXGLSGLSGLSGLSXX0Q,LT,MTQ,LT,MTQ,LT,MTQ,LT,MTYesYesYesYes38,5838,5838,5838,58SeeReliefRequest.SeeReliefRequest.SeeReliefRequest.SeeReliefRequest.Rapidactingvalve.Rapidactingvalve.Rapidactingvalve.Rapidactingvalve.
tT~4 CONTAINMENT ATMOSPHERE CONTROLM-2157Sheet5'\',".0':::":.'.
0,:...;;;
;.:;4'?;;";F%.O'',".i":-'-'.'.
B:-''ll:",';;C(i.":,'.:;-'.9
B:-''ll:",';;C(i.":,'.:;-'.9
;~'?j':I,car;i.'..
;~'?j': I , car;i.'..t p":.'".,'5?;al:".:,~;.'.;
tp":.'".,'5?;al:".:,~;.'.;
9;:n.,'.,";;:;:
9;:n.,'.,";;:;:
;:;::R':.
;:;::R':.'-'X.;::;'Relic'f.,':::"-:.;;:
'-'X.;::;'Relic'f.,':::"-:.;;:
.;:;;:Request:".,-:.
.;:;;:Request:".,-:.
.';,Rej!d:::,:,::;,'C.'::,',':
.';,Rej!d:::,:,::;,'C.'::,',':
~~"'Testmg'-".'-';:;:Aiteriiative',,,':
~~"'Testmg'-".'-';:;: Aiteriiative',,,':
;::",:"-::::Rem aikr;,"","
;::",:"-::::Rem aikr;,""," SV-257104 E-3 1 GL S Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.SV-257105 E-3 1 GL S X Q,MT, LT Yes 38, 58 See Relief Request.Rapid acting valve.SV-257106 F-3 X 1 GL S X Q,LT, MT 38, 58 See Relief Request.Rapid acting valve.SV-257107 X 1 GL S X Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.
SV-257104 E-31GLSQ,LT,MTYes38,58SeeReliefRequest.Rapidactingvalve.SV-257105 E-31GLSXQ,MT,LTYes38,58SeeReliefRequest.Rapidactingvalve.SV-257106 F-3X1GLSXQ,LT,MT38,58SeeReliefRequest.Rapidactingvalve.SV-257107 X1GLSXQ,LT,MTYes38,58SeeReliefRequest.Rapidactingvalve.
4~I CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 6:;::;;:.: '"",:Valv'e".,".'",'l
4~I CONTAINMENT ATMOSPHERE CONTROLM-2157Sheet6:;::;;:.:
'"",:Valv'e".,".'",'l
"'=:';,;&#xb9;'mh'ei.'..;::;::;;
"'=:';,;&#xb9;'mh'ei.'..;::;::;;
~p+vg'.Relief@~;"::.:R'equest";
~p+vg'.Relief@~;"::.:R'equest";
'Req!d',~N''
'Req!d',~N''
:.C.,",.:g:,;:;;:::'gestUlg;:;.,';
:.C.,",.: g:,;:;;:::'gestUlg;:;.,';
":"Alternative',".':,
":"Alternative',".':,:;.-.': ';Rem'aiks:-,'", SV-257100A 2 SV-257101A 2 SV-257102A 2 SV-257103A 2 B-3 X B-3 X C-3 X C-3 X X 1 GL 1 GL 1 GL 1 GL X X X X 0 0 0 0 Q,LT, MT Q,LT, MT Q,LT, MT Q,LT, MT Yes 38, 58 38, 58 38, 58 38, 58 See Relief Request.See Relief Request.Relief Request.See Relief Request.Rapid acting valve.Rapid acting valve.Rapid acting valve.Rapid acting valve.
:;.-.':';Rem'aiks:-,'",
0 N 8 ge l" CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 7 ,""'",".""':":"',Valve",:.''';,,'.'
SV-257100A 2SV-257101A 2SV-257102A 2SV-257103A 2B-3XB-3XC-3XC-3XX1GL1GL1GL1GLXXXX0000Q,LT,MTQ,LT,MTQ,LT,MTQ,LT,MTYes38,5838,5838,5838,58SeeReliefRequest.SeeReliefRequest.ReliefRequest.SeeReliefRequest.Rapidactingvalve.Rapidactingvalve.Rapidactingvalve.Rapidactingvalve.
g/: 'A";::,'-::i::.
0N8gel" CONTAINMENT ATMOSPHERE CONTROLM-2157Sheet7,""'",".""':":"',Valve",:.''';,,'.'
;:B;:;:;".,:.C;:::..'';.::::,':,:::,::,",9.';:;
g/:'A";::,'-::i::.
CJ I NM<" C'>':.,":.;.
;:B;:;:;".,:.C;:::..'';.::::,
.)/%':::0:".'Q X".,'::rP,'.x: '.ReqUest''-R'e'q':d,:;:;:
':,:::,::,",9.';:;
V(',: ';, V hV ,'::)): ',.a"""."Testtng
CJINM<"C'>':.,":.;.
.)/%':::0:".'QX".,'::rP,'.
x:'.ReqUest''-R'e'q':d,:;:;:
V(',:';,VhV,'::)):',.a"""."Testtng
":~"'':Aitemativ'e'.
":~"'':Aitemativ'e'.
'':-Rema'iks'",.'''-'.
'':-Rema'iks'",.'''-'.
SV-257100B SV-257101B SV-257102B B-3B-3C-3XX1GL1GL1GLSXSXSX000Q,LT,MTQ,LT,MTQ,LT,MTYes38,5838,5838,58SeeReliefRequest.SeeReliefRequest.SeeReliefRequest.LRapidactingvalve.Rapidactingvalve.Rapidactingvalve.SV-257103B C-3XX1GLSX0Q,LT,MT38,58SeeReliefRequest.Rapidactingvalve.
SV-257100B SV-257101B SV-257102B B-3 B-3 C-3 X X 1 GL 1 GL 1 GL S X S X S X 0 0 0 Q,LT, MT Q,LT, MT Q,LT, MT Yes 38, 58 38, 58 38, 58 See Relief Request.See Relief Request.See Relief Request.L Rapid acting valve.Rapid acting valve.Rapid acting valve.SV-257103B C-3 X X 1 GL S X 0 Q,LT, MT 38, 58 See Relief Request.Rapid acting valve.
g~t1h1'~I LIQUIDRADWASTECOLLECTION M-2161SheetIRelief::i'.:.'":,'e'qiies't:i Rej',d,'-':.
g~t 1 h 1'~I LIQUID RADWASTE COLLECTION M-2161 Sheet I Relief::i'.:.'":,'e'qiies't:i Rej',d,'-':.
HV-26108A1 HV-26108A2 2B-3X2B-5XXXGAGAXXQ,MT,LTQ,MT,LTNoNoHV-26116A1 2G-3XGAXQ,MT,LTNoHV-26116A2 2H-3XXGAQ,MT,LTNo REACTORBUILDINGCHILLEDWATERM-2187Sheet2V':,".-.:::,:;Vali):":,';,''::-"'.
HV-26108A1 HV-26108A2 2 B-3 X 2 B-5 X X X G A G A X X Q,MT, LT Q,MT, LT No No HV-26116A1 2 G-3 X G A X Q,MT, LT No HV-26116A2 2 H-3 X X G A Q,MT, LT No REACTOR BUILDING CHILLED WATER M-2187 Sheet 2 V':,".-.:::,:;Vali):":,';,''::-"'.
::;:;:,:,':;;,.;.Numb'e'x,:.":':,',&#x17d;,
::;:;:,:,':;;,.;.Numb'e'x,:.":':,',&#x17d;,'::'A'.:"::::,'::::.::::.B:::::::=':-::::.:C::::
'::'A'.:"::::,'::::.::::.B:::::::=':-::::.:C::::
"'4:D!::,:-'!."':;:::;:Relte'f,;:,:"':,''::
"'4:D!::,:-'!."
':;:::;:Relte'f,;:,:"':,''::
i",:Retlues't':'';Req',d',".;:.
i",:Retlues't':'';Req',d',".;:.
.xZCCxcP;;:;:Y:..:.:;.;Testmg;,'.":
.x ZCC xcP;;:;: Y:..:.:;.;Testmg;,'.":
"..''Arltrexiia'tKe';:::
"..''Arltrexiia'tKe';:::
.'';;;:;;:
.'';;;:;;:
r.r..'....
r.r..'....
"":,:''.-',Re''m'axks",:;
"":,:''.-',Re''m'axks",:;
HV-28781AI 2HV-28781A2 2HV-28781B I2HV-28781B2 2HV-28782A1 2HV-28782A2 2HV-28782B I2HV-28782B2 2HV-28791AI 2H-2G-2D-2C-2D-2C-2H-2G-2B-2XXXXXXXXXXXGAXGAXGAXGAXBAXBAXBAXBAXGAX000000000Q,MT,LTQ,MT,LTQ,MT,LTQ,MT,LTQ,MT,LTQ,MT,LTQ,MT,LTQ,MT,LTQ,MT,LTNoNoNoNoNoNoNoNoYes39CSOg
HV-28781AI 2 HV-28781A2 2 HV-28781B I 2 HV-28781B2 2 HV-28782A1 2 HV-28782A2 2 HV-28782B I 2 HV-28782B2 2 HV-28791AI 2 H-2 G-2 D-2 C-2 D-2 C-2 H-2 G-2 B-2 X X X X X X X X X X X G A X G A X G A X G A X B A X B A X B A X B A X G A X 0 0 0 0 0 0 0 0 0 Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT No No No No No No No No Yes 39 CS O g
'I1I~'C REACTORBUILDINGCHILLEDWATERM-2187Sheet2(Continued)
'I 1 I~'C REACTOR BUILDING CHILLED WATER M-2187 Sheet 2 (Continued)
M:-'ll:::::,:",::VaI'v'e,'.'.'-'.;-"'..',":.',';."::
M:-'ll:::::,:",::VaI'v'e,'.'.'-'.;-"'..',":.',';."::
';::Nuinbet".:.:.:,'.",':
';::Nuinbet".:.:.:,'.",':
C.:.::CC.':"'j:A':.;i',::.::i, Bi,:::.:'":.';C:."'-':,'"';:::".'I)
C.:.:: CC.': "'j: A':.;i',::.::i, Bi,:::.:'":.';C:."'-':,'"';:::".'I)
:'g::40',:5:,'8%ca?ai",4'',.41'.w':~;N~jN',"g'.;C7'',g;.Og.,:;:'-;R'elief,:.,'::::,;.
:'g::40',:5:,'8%ca?ai", 4'',.41'.w':~;N~j N'," g'.;C7'', g;.Og.,:;: '-;R'elief,:.,'::::,;.
;::.Request:.
;::.Request:.'::Req"d:;::,":;,'
'::Req"d:;::,":;,'
\'.;~<:~Testing':,:;:)~
\'.;~<:~Testing':,:;:)~
;-',A'Itetn'atiy'e,:".
;-',A'Itetn'atiy'e,:".
;:,";';Re'iiiaiks.'".':.'
;:,";';Re'iiiaiks.'".':.'
0ChHV-28791A2 2HV-28791B I2A-2XF-2XX3G3GAXAX00Q,MT,LTQ,MT,LTYesYes3939CSCSHV-28791B2 2E-2X3G0Q,MT,LTYes39CSHV-28792AI 2F-2XX3BAX0Q,MT,LTYes39CSHV-28792A2 2E-2X3BAX0Q,MT,LTYes39CSHV-28792BI 2B-2X3BAX0Q,MT,LTYes39CSHV-28792B2 2A-2XX3BAX0Q,MT,LTYes39CS
0 Ch HV-28791A2 2 HV-28791B I 2 A-2 X F-2 X X 3 G 3 G A X A X 0 0 Q,MT, LT Q,MT, LT Yes Yes 39 39 CS CS HV-28791B2 2 E-2 X 3 G 0 Q,MT, LT Yes 39 CS HV-28792AI 2 F-2 X X 3 B A X 0 Q,MT, LT Yes 39 CS HV-28792A2 2 E-2 X 3 B A X 0 Q,MT, LT Yes 39 CS HV-28792BI 2 B-2 X 3 B A X 0 Q,MT, LT Yes 39 CS HV-28792B2 2 A-2 X X 3 B A X 0 Q,MT, LT Yes 39 CS
,IIrIII TRAVERSING INCOREPROBE(TIP)(NoP&ID)';:.::,:;.:,"','.Valv'e
, II r I I I TRAVERSING INCORE PROBE (TIP)(No P&ID)';:.::,:;.:,"','.Valv'e
""'i"-"'-:""~'"'&#xb9;mber;
""'i"-"'-:""~'"'&#xb9;mber;
''':",::'%.'y?'8?:;:';::A".-::,:':,.:::-::,:
''': ",:: '%.'y?'8?:;: ';::A".-::,:':,.:::-::,:
B::.::::::,'.'.":..':..,C..'::."":.'"D;.:'.;
B::.::::::,'.'.":..':..,C..'::."":.'"D;.:'.;
y.'..:C.'y(?'%?y?':R'e'lief,,:,:.',"::
y.'..: C.'y (?'%?y?':R'e'lief,,:,:.',"::
;Re'q'uest.;:
;Re'q'uest.;:
."y::j'?Testmg:::yy.';i.'':"Alternative"';
."y::j'?Testmg:::yy.';i.'':"Alternative"';
."."."Reiiiarlts."',.";
."."." Reiiiarlts."',.";
TIPChanAManValve*TIPChanASquibValve**TIPChanBManValveTIPChanBSquibValveTIPChanCManValveTIPChanCSquibValveTIPChanDManValveTIPChanDSquibValveTIPChanEManValveSN/AXSN/ASN/AXSN/ASN/AXSN/ASN/AXSN/ASN/AXXXXXXXXX3/8BA3/8X3/8BA3/8X3/8BA3/8X3/8BA3/8X3/8BASXSXSXSXSXQ,MT,LT0DTQ,MT,LT0DTQ,MT,LT0DTQ,MT,LT0DTQ,MT,LTNoNoYesNoYesNo3838383838SeeReliefRequest.SeeReliefRequest.SeeReliefRequest.SeeReliefRequest.SeeReliefRequest.Rapidactingvlv.Rapidactingvlv.Rapidactingvlv.Rapidactingvlv.Rapidactingvlv.
TIP Chan A Man Valve*TIP Chan A Squib Valve**TIP Chan B Man Valve TIP Chan B Squib Valve TIP Chan C Man Valve TIP Chan C Squib Valve TIP Chan D Man Valve TIP Chan D Squib Valve TIP Chan E Man Valve S N/A X S N/A S N/A X S N/A S N/A X S N/A S N/A X S N/A S N/A X X X X X X X X X 3/8 BA 3/8 X 3/8 BA 3/8 X 3/8 BA 3/8 X 3/8 BA 3/8 X 3/8 BA S X S X S X S X S X Q,MT, LT 0 DT Q,MT, LT 0 DT Q,MT, LT 0 DT Q,MT, LT 0 DT Q,MT, LT No No Yes No Yes No 38 38 38 38 38 See Relief Request.See Relief Request.See Relief Request.See Relief Request.See Relief Request.Rapid acting vlv.Rapid acting vlv.Rapid acting vlv.Rapid acting vlv.Rapid acting vlv.
A TRAVERSING INCOREPROBE(TIP)(NoP&ID)(Continued)
A TRAVERSING INCORE PROBE (TIP)(No P&ID)(Continued)
'-".,i;'"'-::,":",''Numb'e'r'.",'.''-",';.
'-".,i;'"'-::,":",''Numb'e'r'.",'.''-",';.,p,'?-;'Relief:,::.
,p,'?-;'Relief:,::.
4:ReqU est: '::,Req.'d';-;.'
4:ReqUest:'::,Req.'d';-;.'
::.i.",:,''';:9'e'su'n''i::'.:::'."::i:
::.i.",:,''';:9'e'su'n''i::'.:::'."::i:
::i,"':Alte'm'a'tiye,:::.
::i,"':Alte'm'a'tiye,:::.
TIPChanESquibValveSN/AXX3/8X0DTNoTIPChannelmanual(Ball)isolation valve.TIPChannelSquib(explosive/shear) isolation valve.
TIP Chan E Squib Valve S N/A X X 3/8 X 0 DT No TIP Channel manual (Ball)isolation valve.TIP Channel Squib (explosive/shear) isolation valve.
ISI-T-200.0 2PT-1Rev.412/91 PARAJVIETER MEASUREDPumpNumberc'CPumpName'.9..IRemarks2P202A2P202B2P202C2P202D2P204and2P209ResidualHeatRemoval-A ResidualHeatRemoval-B ResidualHeatRemoval-C ResidualHeatRemoval-D HighPrcssureCoolantInjection Main&,BoosterExemptIWP-4400ExemptIWP-4400ExemptIWP-4400ExemptIWP-4400XXXXXXXXXXXXXXXXX4C5254555254555254555254554448525563Bypassloop,bearingsinmainflowpathlubricated bypumpedliquid.Bypassloop,bearingsinmainflowpathlubricated bypumpedliquid.Bypassloop,bearingsinmainflowpathlubricated bypumpedliquid.Bypassloop,bearingsinmainflowpathlubricated bypumpedliquid.Bypassloop,mainandboosterpumpsopcratcintandcm-mcasurements takenasoncpump.IJC)C)
ISI-T-200.0 2PT-1 Rev.4 12/91 PARAJVIETER MEASURED Pump Number c'C Pump Name'.9..I Remarks 2P202A 2P202B 2P202C 2P202D 2P204 and 2P209 Residual Heat Removal-A Residual Heat Removal-B Residual Heat Removal-C Residual Heat Removal-D High Prcssure Coolant Injection Main&, Booster Exempt IWP-4400 Exempt IWP-4400 Exempt IWP-4400 Exempt IWP-4400 X X X X X X X X X X X X X X X X X 4C 52 54 55 52 54 55 52 54 55 52 54 55 44 48 52 55 63 Bypass loop, bearings in main flow path lubricated by pumped liquid.Bypass loop, bearings in main flow path lubricated by pumped liquid.Bypass loop, bearings in main flow path lubricated by pumped liquid.Bypass loop, bearings in main flow path lubricated by pumped liquid.Bypass loop, main and booster pumps opcratc in tandcm-mcasurements taken as onc pump.IJ C)C)
PARAMETER MEASURED(Continued)
PARAMETER MEASURED (Continued)
PumpNumberPumpName~pC4gE~gmX=Remarks2P206A2P206B2P206C2P206D2P208ACoreSpray-A'CoreSpray-BCoreSpray-CCoreSpray-DStandbyLiquidControl-A ExemptlWP-4400ExemptlWP-4400ExemptlWP-4400ExemptIWP-4400ExemptIWP-4400XXXXXXXXXXXXSeeRclicfRequest43.XXaa525455525455525455525455434952Bypassloop,bearingsinmainflowpathlubricated bypumpedliquid.Bypassloop,bearingsinmainflowpathlubricated bypumpedliquid.Bypassloop,bearingsinmainflowpathlubricated bypumpedliquid.Bypassloop,bearingsinmainflowpathlubricated bypumpedliquid.Bypassloop.MlJC)ED PARAMETER MEASURED(Continued)
Pump Number Pump Name~p C4 g E~gm X=Remarks 2P206A 2P206B 2P206C 2P206D 2P208A Core Spray-A'Core Spray-B Core Spray-C Core Spray-D Standby Liquid Control-A Exempt lWP-4400 Exempt lWP-4400 Exempt lWP-4400 Exempt IWP-4400 Exempt IWP-4400 X X X X X X X X X X X X See Rclicf Request 43.X X aa 52 54 55 52 54 55 52 54 55 52 54 55 43 49 52 Bypass loop, bearings in main flow path lubricated by pumped liquid.Bypass loop, bearings in main flow path lubricated by pumped liquid.Bypass loop, bearings in main flow path lubricated by pumped liquid.Bypass loop, bearings in main flow path lubricated by pumped liquid.Bypass loop.M lJ C)ED PARAMETER MEASURED (Continued)
PumpNumberPumpNamc-ll]I:ORemarks2P208BStandbyLiquidControl-B ExemptIWP-4400SccRclicfRcqucst43.XXX434952Bypassloop.2PS06A2PS06BRHRService.Water-A(UnitI)RHRScrviccWater-B(UnitI)ExemptIWP-4400ExemptIWP-4400XXXXX52545254Bearingsinmainflowpathlubricated bypumpedliquid.Inletpressuredcrivcdfromspraypondlcvcl.Bearingsinmainflowpathlubricated bypumpedliquid.Inletprcssuredcrivcdfromspraypondlevel.SccRclicfRcqucst48.SceRclicfRcqucst54.SccRclicfRcqucst49.
Pump Number Pump Namc-ll]I:O Remarks 2P208B Standby Liquid Control-B Exempt IWP-4400 Scc Rclicf Rcqucst 43.X X X 43 49 52 Bypass loop.2PS06A 2PS06B RHR Service.Water-A (Unit I)RHR Scrvicc Water-B (Unit I)Exempt IWP-4400 Exempt IWP-4400 X X X X X 52 54 52 54 Bearings in main flow path lubricated by pumped liquid.Inlet pressure dcrivcd from spray pond lcvcl.Bearings in main flow path lubricated by pumped liquid.Inlet prcssure dcrivcd from spray pond level.Scc Rclicf Rcqucst 48.Sce Rclicf Rcqucst 54.Scc Rclicf Rcqucst 49.
ISI-T-200.0 2RRT-1Rev.412/91 ISI-T-200.0 RELIEFREUESTNUMBER1COLDSHUTDOWNTESTJUSTIFICATION System:PEcID:Valves:ReactorBuildingClosedCoolingWaterM-2113HV-21313HV-21314HV-21345HV-21346Category:
ISI-T-200.0 2RRT-1 Rev.4 12/91 ISI-T-200.0 RELIEF RE UEST NUMBER 1 COLD SHUTDOWN TEST JUSTIFICATION System: PEcID: Valves: Reactor Building Closed Cooling Water M-2113 HV-21313 HV-21314 HV-21345 HV-21346 Category: Class: Function: Containment Isolation Impractical Test Requirement:
Class:Function:
Exercise valves once per 92 days.Basis for Relief: These valves are in the coolin water su g pply and return lines for the reactor recirculation pump bearing and seal coolers.Cycling of these valves during power operation would interrupt this cooling water flow, possibly causing pump bearing damage or seal failure.Alternative Testing: Exercise valves during Cold Shutdowns (no more frequently than once per 92 days).2RR1-1 Rev.5 05/93 ISI-T-200.0 RELIEF RE ER 2 System: P&ID: Containment Instrument Gas M-2126 Valves: 2-26-070 2-26-072 2-26-074 2-26-152 2-26-154 2-26-164 Category: Class: A,C Function: Containment Isolation Impractical Test Requirement:
Containment Isolation Impractical TestRequirement:
Exercise valves once per 92 days.'asis for Relief: These check valves serve the containment isolation function inside containment and are not equipped with remote position indicators.
Exercisevalvesonceper92days.BasisforRelief:Thesevalvesareinthecoolinwatersugpplyandreturnlinesforthereactorrecirculation pumpbearingandsealcoolers.Cyclingofthesevalvesduringpoweroperation wouldinterrupt thiscoolingwaterflow,possiblycausingpumpbearingdamageorsealfailure.Alternative Testing:ExercisevalvesduringColdShutdowns (nomorefrequently thanonceper92days).2RR1-1Rev.505/93 ISI-T-200.0 RELIEFREER2System:P&ID:Containment Instrument GasM-2126Valves:2-26-0702-26-0722-26-0742-26-1522-26-1542-26-164Category:
Downstream of the valves (inside containment) there are no pressure measurement devices or other means of remotely verif'ying valve position.The only practical method of closure testing involves pressurizing the downstream side and measuring pressures with temporary instrumentation.
Class:A,CFunction:
With the inerted containment, such testing can only be performed during a major outage which requires containment purging.This testing, which requires significant effort in the installation and removal of temporary equipment in the high radiation area of the containment drywell, is already performed during Category A leak rate testing.Two valves, 2-26-152 and 2-26-154, serve a safety function on opening as well as their containment isolation function.The open test cannot be performed as there would be no positive indication (flow measurements) of function.Operation of the equipment serviced by these valves (ADS function of the safety/relief valves)will not verify their proper opening since the accumulators at the SRV operators provide capacity for several lifts.2RR2-1 Rev.4 12/91 ISI-T-200.0 RELIEF RE T ER 2 (Cont'd.)Performing continued lifts in an attempt to verify check valve opening will increase the potential for SRV leakage or failure to reseat, will impact proper maintenance of reactor pressure control, and has the potential for degradation of the ADS function.Alternative Testing: Valve closure is.demonstrated by completion of leak rate testing performed once per 24 months.Commencing with the first refueling outage, verification of the opening capability of valves 2-26-152 and 2-26-154 will also be performed at that time with an air pressure applied through the outboard test valves (2-26-021, 2-26-03 1), opening the inboard test valves (2-26-155, 2-26-153), and observing essentially unrestricted flow.I 2RR2-2 Rev.4 12/91  
Containment Isolation Impractical TestRequirement:
Exercisevalvesonceper92days.'asisforRelief:Thesecheckvalvesservethecontainment isolation functioninsidecontainment andarenotequippedwithremotepositionindicators.
Downstream ofthevalves(insidecontainment) therearenopressuremeasurement devicesorothermeansofremotelyverif'ying valveposition.
Theonlypractical methodofclosuretestinginvolvespressurizing thedownstream sideandmeasuring pressures withtemporary instrumentation.
Withtheinertedcontainment, suchtestingcanonlybeperformed duringamajoroutagewhichrequirescontainment purging.Thistesting,whichrequiressignificant effortintheinstallation andremovaloftemporary equipment inthehighradiation areaofthecontainment drywell,isalreadyperformed duringCategoryAleakratetesting.Twovalves,2-26-152and2-26-154, serveasafetyfunctiononopeningaswellastheircontainment isolation function.
Theopentestcannotbeperformed astherewouldbenopositiveindication (flowmeasurements) offunction.
Operation oftheequipment servicedbythesevalves(ADSfunctionofthesafety/relief valves)willnotverifytheirproperopeningsincetheaccumulators attheSRVoperators providecapacityforseverallifts.2RR2-1Rev.412/91 ISI-T-200.0 RELIEFRETER2(Cont'd.)
Performing continued liftsinanattempttoverifycheckvalveopeningwillincreasethepotential forSRVleakageorfailuretoreseat,willimpactpropermaintenance ofreactorpressurecontrol,andhasthepotential fordegradation oftheADSfunction.
Alternative Testing:Valveclosureis.demonstrated bycompletion ofleakratetestingperformed onceper24months.Commencing withthefirstrefueling outage,verification oftheopeningcapability ofvalves2-26-152and2-26-154willalsobeperformed atthattimewithanairpressureappliedthroughtheoutboardtestvalves(2-26-021, 2-26-031),openingtheinboardtestvalves(2-26-155, 2-26-153),
andobserving essentially unrestricted flow.I2RR2-2Rev.412/91  


ISI-T-200.0 RELIEFREUEST.NUMBER3COLDSHUTDOWNTESTJUSTIFICATION System:PEcID'alves:
ISI-T-200.0 RELIEF RE UEST.NUMBER 3 COLD SHUTDOWN TEST JUSTIFICATION System: PEcID'alves:
Containment Instrument GasM-2126SV-22651Category:
Containment Instrument Gas M-2126 SV-22651 Category: Class: Function: Containment Isolation Impractical Test Requirement:
Class:Function:
Exercise valve once per 92 days.Basis for Relief: Closing this valve interrupts instrument gas supply to several important valves inside containment such as the Safety/Relief Valves (non-ADS function)and the MSIVs.This could compromise the ability of the SRV's to operate in the relief mode which, while not an ECCS function, is important to safety.Loss of instrument gas could also cause the MSIVs to close, resulting in a severe reactor transient.
Containment Isolation Impractical TestRequirement:
Alternative Testing: Exercise valve during cold shutdowns (no more frequently than once per 92 days).2RR3-1 Rev.5 05/93  
Exercisevalveonceper92days.BasisforRelief:Closingthisvalveinterrupts instrument gassupplytoseveralimportant valvesinsidecontainment suchastheSafety/Relief Valves(non-ADSfunction) andtheMSIVs.Thiscouldcompromise theabilityoftheSRV'stooperateinthereliefmodewhich,whilenotanECCSfunction, isimportant tosafety.Lossofinstrument gascouldalsocausetheMSIVstoclose,resulting inaseverereactortransient.
~~k f ISI-T-200.0 RELIEF RE VEST NUMBER 4 COLD SHUTDOWN TEST JUSTIFICATION System: PAID: Valves: Containment Instrument Gas M-2126 SV-22654A SV-22654B Category: Class: Function: Containment Isolation Impractical Test Requirement:
Alternative Testing:Exercisevalveduringcoldshutdowns (nomorefrequently thanonceper92days).2RR3-1Rev.505/93  
Exercise valves once per 92 days.Basis for Relief: Closing these valves will interrupt instrument gas supply to the ADS solenoids of the Safety/Relief Valves, compromising their ability to provide the opening motive force for the ADS valves in support of the long-term cooling ECCS function.Alternative Testing: Exercise valves during cold shutdown (no more frequently than once per 92 days).2RR4-1 Rev.5 05/93 ISI-T-200.0 RELIEF RE UEST NUMBER 5 COLD SHUTDOWN TEST JUSTIFICATION System: P&ID: MSIV-Leakage Control M-2139'''"'"'""':i''::
~~kf ISI-T-200.0 RELIEFREVESTNUMBER4COLDSHUTDOWNTESTJUSTIFICATION System:PAID:Valves:Containment Instrument GasM-2126SV-22654A SV-22654B Category:
Class:Function:
Containment Isolation Impractical TestRequirement:
Exercisevalvesonceper92days.BasisforRelief:Closingthesevalveswillinterrupt instrument gassupplytotheADSsolenoids oftheSafety/Relief Valves,compromising theirabilitytoprovidetheopeningmotiveforcefortheADSvalvesinsupportofthelong-term coolingECCSfunction.
Alternative Testing:Exercisevalvesduringcoldshutdown(nomorefrequently thanonceper92days).2RR4-1Rev.505/93 ISI-T-200.0 RELIEFREUESTNUMBER5COLDSHUTDOWNTESTJUSTIFICATION System:P&ID:MSIV-Leakage ControlM-2139'''"'"'""':i''::
''':::::''"'"'ij"""'''"i(Valves":~'~jk~mimgii~''''h"'"'":"""""i"N
''':::::''"'"'ij"""'''"i(Valves":~'~jk~mimgii~''''h"'"'":"""""i"N
"''':':Catego~'iaaf 4'~HV-239F001 B,F,K,PHV-239F002 B,F,K,PFunction:
"''':': Catego~'iaaf 4'~HV-239F001 B, F, K, P HV-239F002 B, F, K, P Function: Containment Isolation; System Initiation Impractical Test Requirement:
Containment Isolation; SystemInitiation Impractical TestRequirement:
Exercise valves once per 92 days.Basis for Relief: The MSIV-LCS inboard bleed lines are directly connected to the main steam lines at the outboard MSIV.During power operations, these lines are pressurized with main steam up to the first isolation valve (HV-239F001 B,F,K,P).Double valve isolation is provided by HV-239F002 B,F,K,P.Opening any of these valves during power operations will leave only one barrier against the release of main steam to occupied plant areas through the system piping.Maintenance of double valve isolation is desired for personnel safety considerations and for prevention of inadvertent leakage paths from the main steam lines.Alternative Testing: Exercise during cold shutdowns (no more frequently than once per 92 days).2RR5-1 Rev.5 05/93 4 V ISI-T-200.0 RELIEF RE UEST NUMBER 6 COLD SHUTDOWN TEST JUSTIFICATION System: P&ID: MSIV-Leakage Control M-2139 Valves: HV-239F006
Exercisevalvesonceper92days.BasisforRelief:TheMSIV-LCSinboardbleedlinesaredirectlyconnected tothemainsteamlinesattheoutboardMSIV.Duringpoweroperations, theselinesarepressurized withmainsteamuptothefirstisolation valve(HV-239F001B,F,K,P).
/HV-239F007 HV-239F008 HV-239F009 Category: Class: Function: System Initiation Impractical Test Requirement:
Doublevalveisolation isprovidedbyHV-239F002 B,F,K,P.Openinganyofthesevalvesduringpoweroperations willleaveonlyonebarrieragainstthereleaseofmainsteamtooccupiedplantareasthroughthesystempiping.Maintenance ofdoublevalveisolation isdesiredforpersonnel safetyconsiderations andforprevention ofinadvertent leakagepathsfromthemainsteamlines.Alternative Testing:Exerciseduringcoldshutdowns (nomorefrequently thanonceper92days).2RR5-1Rev.505/93 4V ISI-T-200.0 RELIEFREUESTNUMBER6COLDSHUTDOWNTESTJUSTIFICATION System:P&ID:MSIV-Leakage ControlM-2139Valves:HV-239F006
Exercise valve once per 92 days.Basis for Relief: The MSIV-LCS outboard bleed and blowdown li nes are directly connected to the m'ain steam system at the steam line drain.During power operations these lines are pressurized with main steam up to the first isolation valve (HV-239F006, HV-239F008).
/HV-239F007 HV-239F008 HV-239F009 Category:
Double valve isolation is provided by HV-239F007 and HV-239F009.
Class:Function:
Opening any of these valves will leave only one barrier against the release of main steam to occupied plant areas through system piping.Maintenance of double valve isolation is desired for personnel safety considerations and for prevention of inadvertent
SystemInitiation Impractical TestRequirement:
~leakage paths from the main steam lines.Alternative Testing: Exercise during cold shutdowns (no more frequently than once per 92 days).2RR6-1 Rev.5 05/93 A''AO P~e3 i RELTEF RE T R7 ISI-T-200.0 System: P&ID: Valves: Nuclear Boiler M-2141 241F010 A,B Category: Class: A,C Function: Containment Isolation Impractical Test Requirement:
Exercisevalveonceper92days.BasisforRelief:TheMSIV-LCSoutboardbleedandblowdownlinesaredirectlyconnected tothem'ainsteamsystematthesteamlinedrain.Duringpoweroperations theselinesarepressurized withmainsteamuptothefirstisolation valve(HV-239F006, HV-239F008).
Exercise valves closed once per 92 days.Basis for Relief: These check valves remain open maintaining the flowpath to the vessel whenever the feedwater/condensate, HPCI or RCIC systems are providing makeup to the vessel or when Reactor Water Cleanup is returning flow to the vessel.Due to the necessity of maintaining this flowpath in virtually all modes of operation, closure testing is only practical during extended outages such as refuelings during which these systems are shutdown.Also, plant design does not provide a practical means of demonstrating closure other than by upstream pressurization performed during leak rate testing.This testing involves significant effort for installation of temporary equipment, and requires complete purging of the inerted reactor containment.
Doublevalveisolation isprovidedbyHV-239F007andHV-239F009.
Alternative Testing: Proper valve closure will be verified in by completion of leak rate testing performed once per 24 months.2RR7-1 Rev.4 12/91 R ISI-T-200.0 System: P&ID: Nuclear Boiler M-2141 Valves: PSV-24137 A,B,C,D,E,F,G,H,J,K,L,M,N,P,R,S PSV-241F037 A,B,C,D,E,F,G,H,J,K,L,M,N,P,R,S Category: Class: Function: SRV Discharge Pipe Vacuum Breaker Impractical Test Requirement:
Openinganyofthesevalveswillleaveonlyonebarrieragainstthereleaseofmainsteamtooccupiedplantareasthroughsystempiping.Maintenance ofdoublevalveisolation isdesiredforpersonnel safetyconsiderations andforprevention ofinadvertent
Setpoint test per PTC 25.3-1976.
~leakagepathsfromthemainsteamlines.Alternative Testing:Exerciseduringcoldshutdowns (nomorefrequently thanonceper92days).2RR6-1Rev.505/93 A''AOP~e3i RELTEFRETR7ISI-T-200.0 System:P&ID:Valves:NuclearBoilerM-2141241F010A,BCategory:
'Basis for Relief: The ASME performance test code does not provide the most practical method for testing these vacuum relief devices.Alternative Testing: Commencing with the first refueling outage, the setpoint will be checked once per refueling outage by pouring water into the valve inlet and measuring the height of water column necessary to activate the valve.2RR8-1 Rev.4 12/91 ISI-T-200.0 R LIE System'.P&ID: Valves: Category: Class: Function: General General General General General As applicable to specific valves.Impractical Test Requirement:
Class:A,CFunction:
Paragraphs IWV-3417(b) and IWV-3523 of Section XI require that when corrective action is required as a result of tests made during cold shutdown, the condition shall be corrected before startup.Basis for Relief: For those valves specified therein, the Limiting Conditions for Operation presently contained within the Susquehanna Steam Electric Station Technical Specifications provide the control by which valves and/or systems are declared inoperable.
Containment Isolation Impractical TestRequirement:
They also control entry into the various operational conditions.
Exercisevalvesclosedonceper92days.BasisforRelief:Thesecheckvalvesremainopenmaintaining theflowpathtothevesselwheneverthefeedwater/condensate, HPCIorRCICsystemsareproviding makeuptothevesselorwhenReactorWaterCleanupisreturning flowtothevessel.Duetothenecessity ofmaintaining thisflowpathinvirtually allmodesofoperation, closuretestingisonlypractical duringextendedoutagessuchasrefuelings duringwhichthesesystemsareshutdown.
Further controls are not necessary for"these valves.Valves which are not under the control of the Technical Specifications will be declared inoperable should they fail ISI testing.Alternative Testing: The requirements contained within Susquehanna SES Technical Specifications will control plant operations and testing with regard to out-of-service valves.For valves which are not addressed in the Technical Specifications, any failures will cause the affected valve(s)to be declared inoperable and corrective action to be initiated as appropriate.
Also,plantdesigndoesnotprovideapractical meansofdemonstrating closureotherthanbyupstreampressurization performed duringleakratetesting.Thistestinginvolvessignificant effortforinstallation oftemporary equipment, andrequirescompletepurgingoftheinertedreactorcontainment.
2RR9-1 Rev.4 12/91  
Alternative Testing:Propervalveclosurewillbeverifiedinbycompletion ofleakratetestingperformed onceper24months.2RR7-1Rev.412/91 RISI-T-200.0 System:P&ID:NuclearBoilerM-2141Valves:PSV-24137 A,B,C,D,E,F,G,H,J,K,L,M,N,P,R,S PSV-241F037 A,B,C,D,E,F,G,H,J,K,L,M,N,P,R,S Category:
Class:Function:
SRVDischarge PipeVacuumBreakerImpractical TestRequirement:
SetpointtestperPTC25.3-1976.
'BasisforRelief:TheASMEperformance testcodedoesnotprovidethemostpractical methodfortestingthesevacuumreliefdevices.Alternative Testing:Commencing withthefirstrefueling outage,thesetpointwillbecheckedonceperrefueling outagebypouringwaterintothevalveinletandmeasuring theheightofwatercolumnnecessary toactivatethevalve.2RR8-1Rev.412/91 ISI-T-200.0 RLIESystem'.P&ID:Valves:Category:
Class:Function:
GeneralGeneralGeneralGeneralGeneralAsapplicable tospecificvalves.Impractical TestRequirement:
Paragraphs IWV-3417(b) andIWV-3523ofSectionXIrequirethatwhencorrective actionisrequiredasaresultoftestsmadeduringcoldshutdown, thecondition shallbecorrected beforestartup.BasisforRelief:Forthosevalvesspecified therein,theLimitingConditions forOperation presently contained withintheSusquehanna SteamElectricStationTechnical Specifications providethecontrolbywhichvalvesand/orsystemsaredeclaredinoperable.
Theyalsocontrolentryintothevariousoperational conditions.
Furthercontrolsarenotnecessary for"thesevalves.ValveswhicharenotunderthecontroloftheTechnical Specifications willbedeclaredinoperable shouldtheyfailISItesting.Alternative Testing:Therequirements contained withinSusquehanna SESTechnical Specifications willcontrolplantoperations andtestingwithregardtoout-of-service valves.Forvalveswhicharenotaddressed intheTechnical Specifications, anyfailureswillcausetheaffectedvalve(s)tobedeclaredinoperable andcorrective actiontobeinitiated asappropriate.
2RR9-1Rev.412/91  


RELIEFREVESTNUMBER10ISI-T-200.0 System:P&ID:Valves:Category:
RELIEF RE VEST NUMBER 10 ISI-T-200.0 System: P&ID: Valves: Category: Nuclear Boiler I M-2141 PSV-241F013 G,J,K,L,M,N B,C Class: Function: ADS Valve, Code Safety/Relief Valve Impractical Test Requirement:
NuclearBoilerIM-2141PSV-241F013 G,J,K,L,M,N B,CClass:Function:
Exercise valve once per 92 days.Basis for Relief: The six safety relief valves assigned to the ADS system perform an essential safety function when operated by the pneumatic actuator with gas supplied through the ADS solenoid valves.Operation of these valves is not practical during power operation because this action will vent main steam to the suppression pool, inducing a transient condition and increasing the potentiality for an open failure of a safety relief valve.Also, no stroke timing is practical as these are pneumatic assisted SRVs.No direct position indication of the SRVs is provided.Although acoustic monitors attached to the valve discharge piping provide evidence of steam flow through each valve, which can be taken as indirect or secondary indication of valve position, no accurate stroke timing is possible.ADS valve stroke times could only be inferred very crudely from elapsed time between manual (non-ADS)actuation of each valve and acoustic monitor indication of steam flow or lack of steam flow in the valve discharge pipe line.Exercising during cold shutdown cannot be accomplished because of lack of steam flow (and attendant noise)provides no indirect or secondary indication of valve movement.Alternative Testing: The ADS valves will be exercised once per 18 months in accordance with Technical Specification 4.5.1.d.2.b, which provides manual opening of each ADS valve with reactor dome pressure greater than or equal to 100 psig and observing either control valve or bypass valve response or corresponding change in measured steam flow.No stroke timing can be done.2RR10-1 Rev.5 05/93  
ADSValve,CodeSafety/Relief ValveImpractical TestRequirement:
Exercisevalveonceper92days.BasisforRelief:ThesixsafetyreliefvalvesassignedtotheADSsystemperformanessential safetyfunctionwhenoperatedbythepneumatic actuatorwithgassuppliedthroughtheADSsolenoidvalves.Operation ofthesevalvesisnotpractical duringpoweroperation becausethisactionwillventmainsteamtothesuppression pool,inducingatransient condition andincreasing thepotentiality foranopenfailureofasafetyreliefvalve.Also,nostroketimingispractical asthesearepneumatic assistedSRVs.Nodirectpositionindication oftheSRVsisprovided.
Althoughacousticmonitorsattachedtothevalvedischarge pipingprovideevidenceofsteamflowthrougheachvalve,whichcanbetakenasindirectorsecondary indication ofvalveposition, noaccuratestroketimingispossible.
ADSvalvestroketimescouldonlybeinferredverycrudelyfromelapsedtimebetweenmanual(non-ADS) actuation ofeachvalveandacousticmonitorindication ofsteamfloworlackofsteamflowinthevalvedischarge pipeline.Exercising duringcoldshutdowncannotbeaccomplished becauseoflackofsteamflow(andattendant noise)providesnoindirectorsecondary indication ofvalvemovement.
Alternative Testing:TheADSvalveswillbeexercised onceper18monthsinaccordance withTechnical Specification 4.5.1.d.2.b, whichprovidesmanualopeningofeachADSvalvewithreactordomepressuregreaterthanorequalto100psigandobserving eithercontrolvalveorbypassvalveresponseorcorresponding changeinmeasuredsteamflow.Nostroketimingcanbedone.2RR10-1Rev.505/93  


ISI-T-200.0 Additionally, tomonitorforpossibledegradation ofeachADSSRV,actuatorlifttimeandactuatorliftdistancewillbemeasuredduringeachsafetyvalve/relief valvepressuresetpointtest,donetosatisfyparagraph IWV-3510requirements.
ISI-T-200.0 Additionally, to monitor for possible degradation of each ADS SRV, actuator lift time and actuator lift distance will be measured during each safety valve/relief valve pressure set point test, done to satisfy paragraph IWV-3510 requirements.
2RR10-2Rev.505/93 1<
2RR10-2 Rev.5 05/93 1<
ISI-T-200.0 RELIEFREUESTNUMBER11System:PAID:Valves:NuclearBoilerM-2141HV-241F022 A,B,C,DHV-241F028 A,B,C,DCategory:
ISI-T-200.0 RELIEF RE UEST NUMBER 11 System: PAID: Valves: Nuclear Boiler M-2141 HV-241F022 A,B,C,D HV-241F028 A,B,C,D Category: Class: Function: Containment Isolation Impractical Test Requirement:
Class:Function:
Exercise valves once per 92 days.Basis for Relief: During full power operation, it is impractical to full stroke cycle these valves, since the interruption in steam flow would induce a reactor pressure transient with increased probability of reactor scram, main steam line isolation and SRV actuation.
Containment Isolation Impractical TestRequirement:
Trending of valve stroke times is not necessary due to Technical Specification limits on minimum as well as maximum allowable stroke times with a tolerance of only 2 seconds between the 3 second minimum and the 5 second maximum.Alternative Testing: Full stroke testing will be performed in Operational Condition 1, 2, or 3 when power level is low enough to prevent the above mentioned transients (no more frequently than once per 92 days).No reduction from high power levels will be made specifically to accomplish this testing.No trending of valve stroke times will be done.2RR11-1 Rev.5 05/93 ISI-T-200.0 KR 12 System: P&ID: Valves: Category: Class: Nuclear Boiler M-2141 HV-241F032 A,B A, C (HV-241F032B only)Function: Containment isolation; HPCI flowpath (HV-241F032B only).Impractical Test Requirement:
Exercisevalvesonceper92days.BasisforRelief:Duringfullpoweroperation, itisimpractical tofullstrokecyclethesevalves,sincetheinterruption insteamflowwouldinduceareactorpressuretransient withincreased probability ofreactorscram,mainsteamlineisolation andSRVactuation.
Exercise valve once per 92 days.Basis for Relief: a.These check valves remain open maintaining the fiowpath to the vessel whenever the feedwater/
Trendingofvalvestroketimesisnotnecessary duetoTechnical Specification limitsonminimumaswellasmaximumallowable stroketimeswithatolerance ofonly2secondsbetweenthe3secondminimumandthe5secondmaximum.Alternative Testing:Fullstroketestingwillbeperformed inOperational Condition 1,2,or3whenpowerlevelislowenoughtopreventtheabovementioned transients (nomorefrequently thanonceper92days).Noreduction fromhighpowerlevelswillbemadespecifically toaccomplish thistesting.Notrendingofvalvestroketimeswillbedone.2RR11-1Rev.505/93 ISI-T-200.0 KR12System:P&ID:Valves:Category:
condensate systems are providing makeup to the vessel.Interruption of the feedwater fiowpath by motor operator closure of these valves can only be practically accomplished during cold shutdowns.
Class:NuclearBoilerM-2141HV-241F032 A,BA,C(HV-241F032B only)Function:
b.No practical means other than upstream pressurization similar to leak rate testing is available to demonstrate valve closure of HV-141F0328 as a check valve.Alternative Testing: a.Cycle valves shut using stop-check motor operators during cold shutdowns (no more frequent than once per 92 days).b.Closure testing of HV-241F032B as a check valve will be demonstrated by completion of leak rate testing to be performed once per 24 months.2RR12-1 Rev.4 12/91 ISI-T-200.0 RELIEF RE UEST NUMBER 13 System: PEcID: Valves: Category: Class: Function: Fuel Pool Cooling and Clean-Up M-2153 2-53-071 A,B Admit flow to fuel storage pool.Impractical Test Requirement:
Containment isolation; HPCIflowpath(HV-241F032B only).Impractical TestRequirement:
Exercise valves once per 92 days.Basis for Relief: In an alternative flowpath to the fuel storage pool, exercising of these valves utilizing flow can only be accomplished utilizing ESW or RHR water.Use of ESW would introduce"raw" water from the ESSW spray pond, undesirable for chemistry and fuel integrity considerations.
Exercisevalveonceper92days.BasisforRelief:a.Thesecheckvalvesremainopenmaintaining thefiowpathtothevesselwheneverthefeedwater/
While use of the RHR flowpath is possible, the difficulty of operating the RHR system in an abnormal lineup for supplying the fuel pool creates a dynamic control situation that is best minimized.
condensate systemsareproviding makeuptothevessel.Interruption ofthefeedwater fiowpathbymotoroperatorclosureofthesevalvescanonlybepractically accomplished duringcoldshutdowns.
Alternative Testing: Verify valve operability by a pneumatic open flow path test during periodic pressure test.A pneumatic open flow path test (SE-235-301) is performed once per Inspection Period (as specified by ASME Code Section XI paragraph IWD-2400).
b.Nopractical meansotherthanupstreampressurization similartoleakratetestingisavailable todemonstrate valveclosureofHV-141F0328 asacheckvalve.Alternative Testing:a.Cyclevalvesshutusingstop-check motoroperators duringcoldshutdowns (nomorefrequentthanonceper92days).b.ClosuretestingofHV-241F032B asacheckvalvewillbedemonstrated bycompletion ofleakratetestingtobeperformed onceper24months.2RR12-1Rev.412/91 ISI-T-200.0 RELIEFREUESTNUMBER13System:PEcID:Valves:Category:
2RR13-1 Rev.5 05/93 ISI-T-200.0 KR 14 System: P&ID: Valves: Category: Class: Reactor Recirculation M-2143 XV-243F017 A,B A,C Function: Containment Isolation Impractical Test Requirement:
Class:Function:
Exercise valves once per 92 days.Basis for Relief: Closure testing of these excess flow check valves involves depressurization of the CRD system side of the valves and verification that the valve will close and stop excess flow.Such actions require interruption of seal water to the recirculation pumps, which creates a potential for pump seal damage;disruption of CRD Hydraulic System flow;and installation of temporary equipment.
FuelPoolCoolingandClean-UpM-21532-53-071A,BAdmitflowtofuelstoragepool.Impractical TestRequirement:
Alternative Testing: Closure testing will be demonstrated by completion of leak rate testing to be performed once per 24 months.2RR14-1 Rev.4 12/91 RELIEF E ER 1 ISI-T-200.0 System: P&ID: Valves: Reactor Recirculation M-2143 243F013 A,B Category: Class: A,C Function: Containment Isolation Impractical Test Requirement:
Exercisevalvesonceper92days.BasisforRelief:Inanalternative flowpathtothefuelstoragepool,exercising ofthesevalvesutilizing flowcanonlybeaccomplished utilizing ESWorRHRwater.UseofESWwouldintroduce "raw"waterfromtheESSWspraypond,undesirable forchemistry andfuelintegrity considerations.
Exercise valves once per 92 days.Basis for Relief: These simple check valves serve as containment isolation valves inside containment.
WhileuseoftheRHRflowpathispossible, thedifficulty ofoperating theRHRsysteminanabnormallineupforsupplying thefuelpoolcreatesadynamiccontrolsituation thatisbestminimized.
The valves are not equipped with remote indication and there is no pressure indication downstream of the valves.For these valves, closure testing is only practical through pressurization downstream of the valve with the upstream piping vented, and verification of the absence of flow upstream.Interruption, of the CRD flow (seal purge)during Reactor Recirculation Pump operation to perform this testing could result in seal damage.This type of testing can only be performed during a period when the containment is accessible.
Alternative Testing:Verifyvalveoperability byapneumatic openflowpathtestduringperiodicpressuretest.Apneumatic openflowpathtest(SE-235-301) isperformed onceperInspection Period(asspecified byASMECodeSectionXIparagraph IWD-2400).
The deinerting of the containment will only be performed during major outages and the testing will be performed during Category A leak rate testing.Alternative Testing: Valve closure is demonstrated by completion of leak rate testing performed once per 24 months.2RR15-1 Rev.4 12/91 ISI-T-200.0 RELIEF RE VEST NUMBER 16 COLD SHUTDOWN TEST JUSTIFICATION System: PAID: Valves: Reactor Recirculation M-2143 HV-243F031 A,B Category: Class: Function: Reactor Recirculation Pump Discharge Isolation, LPCI flowpath.Impractical Test Requirement:
2RR13-1Rev.505/93 ISI-T-200.0 KR14System:P&ID:Valves:Category:
Exercise valves once per 92 days.Basis for Relief:.The recirculation pump discharge isolation valves are in the main flowpath of the reactor recirculation system which is necessary to maintain reactivity control of the reactor.Cycling of these valves during power operations would interrupt the driving core flow, possibly resulting in severe changes in core power level.Alternative Testing: Technical Specification 4.4.1.1.1 provides for and controls the exercising of these valves prior to exceeding 25%power during each startup.2RR16-1 Rev.5 05/93 ISI-T-200.0 RELIEF KR 17 System: P&ID: Control Rod Drive M-2147~V~lv gate~ry 247114-001 through 247114-185 247115-001 through 247115-185 XV-247126-001 through XV-247126-185 XV-247127-001 through XV-247127-185 247138-001 through 247138-185 C C B B C Class: Function: Control Rod Scram Impractical Test Requirement:
Class:ReactorRecirculation M-2143XV-243F017 A,BA,CFunction:
Exercise valves once per 92 days and measure stroke times.(per IWV-3411 and IWV-3521)it Basis for Relief: These valves, located on the hydraulic control units for the 185 control rod drives, perform the active safety function of rapidly inserting the control rods into the reactor core, upon receipt of a reactor scram signal from the reactor protection system.Exercising these valves quarterly during power operations could result in the rapid insertion of one or more control rods more frequently than desired.Where testing could result in the rapid insertion of control rods, thereby causing rapid reactivity transients and wear of the control rod drive mechanisms, the control rod scram test frequency identified in the Plant Technical Specifications will be utilized as the valve testing frequency.
Containment Isolation Impractical TestRequirement:
Normal control rod motion has been shown to be an indicator that the associated cooling water header check valve (247138-001 through-185)moves to its safety position (closed).Normal control rod motion may not occur if this check valve were to fail in the open position.An additional positive test of the closure of this valve can be provided by venting of the cooling water header during Primary Containment Integrated Leakage Testing, conducted per Technical Specification 4.6.1.2.Normal control rod motion does not serve as an indicator that any scram discharge header check valve (247114-001 through-185)moves to its 2RR17-1 Rev.4 12/91 ISI-T-200.0 RELIEF RE ER 17 (Cont'd.)safety position (open), however.Since this check valve is moved to its open position only by scram exhaust flow, a positive test of the opening of'the valve can only be provided by the periodic scram testing and control rod insertion timing specified by Technical Specification 4.1.3.2.Verification that any charging water header check valve (247511-001 through-185)moves to its safety position (closed), requires that the control rod drive pumps be stopped to depressurize the charging water header.This test cannot be performed during power operations because stopping the pumps would result in loss of cooling water to all control rod drive mechanisms and seal damage could result.This test cannot be performed during each cold shutdown because the control rod drive pumps supply seal water to the reactor recirculation pumps and one of the recirculation pumps might be kept running, thus continuing to need its seal water supply.The HCU accumulator pressure decay test, specified by Technical Specification 4.1.3.5.b.2, provides verification of the closure of its charging water header check valve.The scram inlet valves (XV-247126
Exercisevalvesonceper92days.BasisforRelief:Closuretestingoftheseexcessflowcheckvalvesinvolvesdepressurization oftheCRDsystemsideofthevalvesandverification thatthevalvewillcloseandstopexcessflow.Suchactionsrequireinterruption ofsealwatertotherecirculation pumps,whichcreatesapotential forpumpsealdamage;disruption ofCRDHydraulic Systemflow;andinstallation oftemporary equipment.
-001 through-185)and the scram exhaust valves (XV-247127-001 through-185)are air operated valves that full-stroke in milliseconds and are not equipped with position indication, thereby rendering measurement of their full-stroke times impractical.
Alternative Testing:Closuretestingwillbedemonstrated bycompletion ofleakratetestingtobeperformed onceper24months.2RR14-1Rev.412/91 RELIEFEER1ISI-T-200.0 System:P&ID:Valves:ReactorRecirculation M-2143243F013A,BCategory:
Verifying that the control rod associated with each pair of these valves meets the periodic scram testing rod insertion time limits, specified by Technical Specification 4.1.3.2, is an acceptable alternate method of detecting degradation of these valves.Since these measurements of control rod insertion times are subject to the conservative limitations of Technical Specification 4.1.3.3, and because these measurements cannot be meaningfully correlated with the full-stroke times of the scram inlet and exhaust valves, trending of these scrams time measurements in any manner comparable to that of valve stroke times is both impractical and unnecessary.
Class:A,CFunction:
These bases for relief from applicable code testing requirements for these individual control rod scram valves are intended to conform to those provided as guidance by NRC Generic Letter 89-04 (Position P7).2RR17-2 Rev.4 12/91 ISI-T-200.0 RELIEF RE T KR 17 (Cont'd.)'n: Pro r functioning of the scram discharge header check valves (247114-'-2 7126-XXX d of th xh al{XV-247127-XXX) will be verified by periodic scram testi d control rod insertion timing, with reactor pressure>psig, testing an con o conducted per Technical Specification 4.1.3.2 and Technical Specification a)For all control rods prior to thermal power exceeding 40%of rated power, following core alternations or after a reactor shutdown that is greater than 120 days.I b)For specifically affected individual control rods, following maintenance or modification to the control rod or control rod drive system, which could affect the scram insertion time of those specific control rods.c)For at least 10%of the control rods, on a rotating basis, at least once per 120 days of power operation.
Containment Isolation Impractical TestRequirement:
Proper closure of the charging water header check valves (247115-XXX) will be verified by the demonstration that each individual accumulator check valve maintains its associated accumulator pressure above the alarm f~10 minutes with no CRD pump operating, at least once per 18 months, conducted per Technical Specification 4.1.3.5...
Exercisevalvesonceper92days.BasisforRelief:Thesesimplecheckvalvesserveascontainment isolation valvesinsidecontainment.
Proper closure of the cooling water header check valves (247138-XXX) will be verified by venting of the cooling water header during Primary r 30 to 50 month Containment Integrated Leakage Testing, at least once per o m interval, conducted per Technical Specification 4.6.1.2.2RR17-3 Rev.4 12/91 ISI-T-200.0 System: PAID: Valves: Standby Liquid Control M-2148 HV-248F006.Category:
Thevalvesarenotequippedwithremoteindication andthereisnopressureindication downstream ofthevalves.Forthesevalves,closuretestingisonlypractical throughpressurization downstream ofthevalvewiththeupstreampipingvented,andverification oftheabsenceofflowupstream.
Class: A,C Function: Containment Isolation Impractical Test Requirement:
Interruption, oftheCRDflow(sealpurge)duringReactorRecirculation Pumpoperation toperformthistestingcouldresultinsealdamage.Thistypeoftestingcanonlybeperformed duringaperiodwhenthecontainment isaccessible.
Exercise valve once per 92 days.Basis for Relief: Alternative Testing: To verify proper opening of this stop-check valve, it is necessary to pass fluid through the valve.This action would result in an injection into t e reactor vessel and would require actuation of an explosive valve.Both actions are undesirable during power operations.
Thedeinerting ofthecontainment willonlybeperformed duringmajoroutagesandthetestingwillbeperformed duringCategoryAleakratetesting.Alternative Testing:Valveclosureisdemonstrated bycompletion ofleakratetestingperformed onceper24months.2RR15-1Rev.412/91 ISI-T-200.0 RELIEFREVESTNUMBER16COLDSHUTDOWNTESTJUSTIFICATION System:PAID:Valves:ReactorRecirculation M-2143HV-243F031 A,BCategory:
Closure testing as a motor-operated stop-check valve during power operations presents the danger of having the disc stick in the closed position, blocking the only SLC injection fiowpath, with no means of detecting the failure.The proper functioning of the Standby Liquid Control System injection fiowpath, including opening of HV-248F006, will be demonstrated once per 18 months in accordance with Technical Specification Section 4.1.5.d.Closure testing of the valve by motor operator will be performed just prior to the injection testing once per 18 months.2RR18-1 Rev.4 12/91  
Class:Function:
ReactorRecirculation PumpDischarge Isolation, LPCIflowpath.
Impractical TestRequirement:
Exercisevalvesonceper92days.BasisforRelief:.Therecirculation pumpdischarge isolation valvesareinthemainflowpathofthereactorrecirculation systemwhichisnecessary tomaintainreactivity controlofthereactor.Cyclingofthesevalvesduringpoweroperations wouldinterrupt thedrivingcoreflow,possiblyresulting inseverechangesincorepowerlevel.Alternative Testing:Technical Specification 4.4.1.1.1 providesforandcontrolstheexercising ofthesevalvespriortoexceeding 25%powerduringeachstartup.2RR16-1Rev.505/93 ISI-T-200.0 RELIEFKR17System:P&ID:ControlRodDriveM-2147~V~lvgate~ry247114-001 through247114-185 247115-001 through247115-185 XV-247126-001 throughXV-247126-185 XV-247127-001 throughXV-247127-185 247138-001 through247138-185 CCBBCClass:Function:
ControlRodScramImpractical TestRequirement:
Exercisevalvesonceper92daysandmeasurestroketimes.(perIWV-3411andIWV-3521) itBasisforRelief:Thesevalves,locatedonthehydraulic controlunitsforthe185controlroddrives,performtheactivesafetyfunctionofrapidlyinserting thecontrolrodsintothereactorcore,uponreceiptofareactorscramsignalfromthereactorprotection system.Exercising thesevalvesquarterly duringpoweroperations couldresultintherapidinsertion ofoneormorecontrolrodsmorefrequently thandesired.Wheretestingcouldresultintherapidinsertion ofcontrolrods,therebycausingrapidreactivity transients andwearofthecontrolroddrivemechanisms, thecontrolrodscramtestfrequency identified inthePlantTechnical Specifications willbeutilizedasthevalvetestingfrequency.
Normalcontrolrodmotionhasbeenshowntobeanindicator thattheassociated coolingwaterheadercheckvalve(247138-001through-185)movestoitssafetyposition(closed).
Normalcontrolrodmotionmaynotoccurifthischeckvalveweretofailintheopenposition.
Anadditional positivetestoftheclosureofthisvalvecanbeprovidedbyventingofthecoolingwaterheaderduringPrimaryContainment Integrated LeakageTesting,conducted perTechnical Specification 4.6.1.2.Normalcontrolrodmotiondoesnotserveasanindicator thatanyscramdischarge headercheckvalve(247114-001through-185)movestoits2RR17-1Rev.412/91 ISI-T-200.0 RELIEFREER17(Cont'd.)
safetyposition(open),however.Sincethischeckvalveismovedtoitsopenpositiononlybyscramexhaustflow,apositivetestoftheopeningof'thevalvecanonlybeprovidedbytheperiodicscramtestingandcontrolrodinsertion timingspecified byTechnical Specification 4.1.3.2.Verification thatanychargingwaterheadercheckvalve(247511-001through-185)movestoitssafetyposition(closed),
requiresthatthecontrolroddrivepumpsbestoppedtodepressurize thechargingwaterheader.Thistestcannotbeperformed duringpoweroperations becausestoppingthepumpswouldresultinlossofcoolingwatertoallcontrolroddrivemechanisms andsealdamagecouldresult.Thistestcannotbeperformed duringeachcoldshutdownbecausethecontrolroddrivepumpssupplysealwatertothereactorrecirculation pumpsandoneoftherecirculation pumpsmightbekeptrunning,thuscontinuing toneeditssealwatersupply.TheHCUaccumulator pressuredecaytest,specified byTechnical Specification 4.1.3.5.b.2, providesverification oftheclosureofitschargingwaterheadercheckvalve.Thescraminletvalves(XV-247126
-001through-185)andthescramexhaustvalves(XV-247127-001 through-185)areairoperatedvalvesthatfull-stroke inmilliseconds andarenotequippedwithpositionindication, therebyrendering measurement oftheirfull-stroke timesimpractical.
Verifying thatthecontrolrodassociated witheachpairofthesevalvesmeetstheperiodicscramtestingrodinsertion timelimits,specified byTechnical Specification 4.1.3.2,isanacceptable alternate methodofdetecting degradation ofthesevalves.Sincethesemeasurements ofcontrolrodinsertion timesaresubjecttotheconservative limitations ofTechnical Specification 4.1.3.3,andbecausethesemeasurements cannotbemeaningfully correlated withthefull-stroke timesofthescraminletandexhaustvalves,trendingofthesescramstimemeasurements inanymannercomparable tothatofvalvestroketimesisbothimpractical andunnecessary.
Thesebasesforrelieffromapplicable codetestingrequirements fortheseindividual controlrodscramvalvesareintendedtoconformtothoseprovidedasguidancebyNRCGenericLetter89-04(Position P7).2RR17-2Rev.412/91 ISI-T-200.0 RELIEFRETKR17(Cont'd.)
'n:Prorfunctioning ofthescramdischarge headercheckvalves(247114-'-27126-XXXdofthxhal{XV-247127-XXX) willbeverifiedbyperiodicscramtestidcontrolrodinsertion timing,withreactorpressure>psig,testinganconoconducted perTechnical Specification 4.1.3.2andTechnical Specification a)Forallcontrolrodspriortothermalpowerexceeding 40%ofratedpower,following corealternations orafterareactorshutdownthatisgreaterthan120days.Ib)Forspecifically affectedindividual controlrods,following maintenance ormodification tothecontrolrodorcontrolroddrivesystem,whichcouldaffectthescraminsertion timeofthosespecificcontrolrods.c)Foratleast10%ofthecontrolrods,onarotatingbasis,atleastonceper120daysofpoweroperation.
Properclosureofthechargingwaterheadercheckvalves(247115-XXX) willbeverifiedbythedemonstration thateachindividual accumulator checkvalvemaintains itsassociated accumulator pressureabovethealarmf~10minuteswithnoCRDpumpoperating, atleastonceper18months,conducted perTechnical Specification 4.1.3.5...
Properclosureofthecoolingwaterheadercheckvalves(247138-XXX) willbeverifiedbyventingofthecoolingwaterheaderduringPrimaryr30to50monthContainment Integrated LeakageTesting,atleastonceperominterval, conducted perTechnical Specification 4.6.1.2.2RR17-3Rev.412/91 ISI-T-200.0 System:PAID:Valves:StandbyLiquidControlM-2148HV-248F006
.Category:
Class:A,CFunction:
Containment Isolation Impractical TestRequirement:
Exercisevalveonceper92days.BasisforRelief:Alternative Testing:Toverifyproperopeningofthisstop-check valve,itisnecessary topassfluidthroughthevalve.Thisactionwouldresultinaninjection intotereactorvesselandwouldrequireactuation ofanexplosive valve.Bothactionsareundesirable duringpoweroperations.
Closuretestingasamotor-operated stop-check valveduringpoweroperations presentsthedangerofhavingthediscstickintheclosedposition, blockingtheonlySLCinjection
: fiowpath, withnomeansofdetecting thefailure.Theproperfunctioning oftheStandbyLiquidControlSysteminjection
: fiowpath, including openingofHV-248F006, willbedemonstrated onceper18monthsinaccordance withTechnical Specification Section4.1.5.d.Closuretestingofthevalvebymotoroperatorwillbeperformed justpriortotheinjection testingonceper18months.2RR18-1Rev.412/91  


ISI-T-200.0 RKLIKFRKKR1System:P&ID:Valves:StandbyLiquidControlM-2148248F007Category:
ISI-T-200.0 RKLIKF RK KR 1 System: P&ID: Valves: Standby Liquid Control M-2148 248F007 Category: Class: A,C Function: Containment Isolation Impractical Test Requirement:
Class:A,CFunction:
Exercise valve once per 92 days.Basis for Relief: To verify proper opening of this check valve, it is necessary to pass fluid through the valve.This action would result in an injection into the vessel and would require actuation of an explosive valve, both undesirable during power operations.
Containment Isolation Impractical TestRequirement:
Closure testing is only practical by pressurizing downstream of the valve (the upstream side being vented)and verifying absence of flow in the upstream side.This requires installation of temporary equipment and access to the containment which is inerted during power operation.
Exercisevalveonceper92days.BasisforRelief:Toverifyproperopeningofthischeckvalve,itisnecessary topassfluidthroughthevalve.Thisactionwouldresultinaninjection intothevesselandwouldrequireactuation ofanexplosive valve,bothundesirable duringpoweroperations.
Alternative Testing: The proper functioning of the Standby Liquid Control System injection fiowpath, including opening of 248F007, will be demonstrated once per 18 months in accordance with Technical Specification Section 4.1.5.d.Valve closure is demonstrated by completion of leak rate testing performed once per 24 months.See Relief Request Number 18.2RR19-1 Rev.4 12/91  
Closuretestingisonlypractical bypressurizing downstream ofthevalve(theupstreamsidebeingvented)andverifying absenceofflowintheupstreamside.Thisrequiresinstallation oftemporary equipment andaccesstothecontainment whichisinertedduringpoweroperation.
~!0' ISI-T-200.0 RELIEF RE T ER 20 RCIC RCIC RCIC RCIC RHR Core Spray Core Spray HPCI HPCI'PCI System-" P&ID''.M-2149 M-2149 M-2149 M-2149 M-2151.M-2151 M-2151 M-2152 M-2152 M-2155 M-2155 M-2155 Valve HV-249 F007 HV-249F031 HV-249 F059 HV-249F084
Alternative Testing:Theproperfunctioning oftheStandbyLiquidControlSysteminjection
'V-251F004A,B,C,D HV-251F007A,B HV-251F022 HV-252F001A,B HV-252F031A,B HV-255 F002 HV-255F012 HV-255 F042 Class HPCI HPCI Containment Atmosphere Control M-2155 M-2155 M-2157 HV-255 F066 HV-255F079 HV-25766 Category: Function: Containment Isolation Impractical Test Requirement:
: fiowpath, including openingof248F007,willbedemonstrated onceper18monthsinaccordance withTechnical Specification Section4.1.5.d.Valveclosureisdemonstrated bycompletion ofleakratetestingperformed onceper24months.SeeReliefRequestNumber18.2RR19-1Rev.412/91  
Leak test gate valve with pressure differential in same direction as safety function.Basis for Relief: These valves are configured such that there is no practical means of pressurizing in the direction of safety function (lack of proper isolation valves, test connections, etc.).2RR20-1 Rev.4 12/91 ISI-T-200.0 RELIEF RE UEST NUMBER 20 (Cont'd.)Pressurization in the direction of safety function would require actions such as pressurizing the containment (equivalent to an ILRT)or precisely controlling the entire RCS at the valve test pressure.10CFR50 Appendix J paragraph III.C.1 requires that the pressure be applied in the same direction as that when the valve would be required to perform its safety function, unless is can be determined that the results from the tests for a pressure applied in a different direction provide equivalent or more conservative results.The Susquehanna FSAR Section 6.2.6.3 provides confirmation that, for the subject valves, pressure applied in the opposite direction of accident pressure produces equivalent or more conservative results.Alternative Testing: Leak test each valve in the reverse direction.
~!0' ISI-T-200.0 RELIEFRETER20RCICRCICRCICRCICRHRCoreSprayCoreSprayHPCIHPCI'PCISystem-"P&ID''.M-2149M-2149M-2149M-2149M-2151.M-2151M-2151M-2152M-2152M-2155M-2155M-2155ValveHV-249F007HV-249F031 HV-249F059HV-249F084
Penetration will be subjected to test pressures in the correct direction during containment integrated leak rate tests.2RR20-2 Rev.5 05/93 0
'V-251F004A,B,C,D HV-251F007A,B HV-251F022 HV-252F001A,B HV-252F031A,B HV-255F002HV-255F012 HV-255F042ClassHPCIHPCIContainment Atmosphere ControlM-2155M-2155M-2157HV-255F066HV-255F079 HV-25766Category:
IS I-T-200.0 RELIEF RE UEST ER 21 System: PEcID: Valves: Reactor Core Isolation Cooling M-2149 249F028, 249F040, 249F021 Category: Class: A,C Function: Containment Isolation Impractical Test'Requirement:
Function:
Exercise valve once per 92 days.Basis for Relief: These check valves are not equipped with position indication and system design does not provide any practical method of verifying closure other than pressurization similar to leak rate testing.Such testing requires installation of temporary equipment which is impractical on a quarterly basis, and it would render the RCIC system inoperable during the testing period.While RCIC is not an ECCS system, it is important to safety and can provide an additional margin for prevention or mitigation of reactor transients.
Containment Isolation Impractical TestRequirement:
Normally, testing of this type is accomplished by required containment local leak rate testing in accordance with 10CFR50, Appendix J.More frequent performance represents an unnecessary burden on the licensee.Alternative Testing: Demonstrate closure by completion of leak rate testing performed once per 24 months.2RR21-1 Rev.4 12/91 IS I-T-200.0 RELIEF RE T KR 22 System: PAID: Valves: Category: Class: Reactor Core Isolation Cooling M-2149 249F063, 249F064 Function: Vacuum Breaker Impractical Test Requirement:
Leaktestgatevalvewithpressuredifferential insamedirection assafetyfunction.
Exercise valve once per 92 days.Basis for Relief: These vacuum breakers installed on the RCIC turbine exhaust line are not provided with position indication equipment nor is there pressure indication installed that would provide positive verification of valve operation.
BasisforRelief:Thesevalvesareconfigured suchthatthereisnopractical meansofpressurizing inthedirection ofsafetyfunction(lackofproperisolation valves,testconnections, etc.).2RR20-1Rev.412/91 ISI-T-200.0 RELIEFREUESTNUMBER20(Cont'd.)
A practical method of testing involves supplying low pressure air upstream of the valve and verifying that fiow can be detected downstrea'm of the valve.This test method involves installation of temporary equipment and is not practical except during major outages, and it would render the RCIC system inoperable during the testing period.While RCIC is not an ECCS system, it is important to safety and can provide an additional margin for prevention or mitigation of reactor transients.
Pressurization inthedirection ofsafetyfunctionwouldrequireactionssuchaspressurizing thecontainment (equivalent toanILRT)orprecisely controlling theentireRCSatthevalvetestpressure.
More frequent performance represents an unnecessary burden on the licensee.Alternative Testing: Commencing with the first refueling outage, verify opening once per 24 months in conjunction with leak rate testing.2RR22-1 Rev.4 12/91 RELIEF RE VEST NUMBER 23 ISI-T-200.0 COLD SHUTDOWN~JUSTIHCATION System: PEcID: Valves: Residual Heat Removal M-2151 Sh.2 HV-251F008, HV-251F009 Category: Class: Function: Containment Isolation (Shutdown Cooling)Impractical Test Requirement:
10CFR50AppendixJparagraph III.C.1requiresthatthepressurebeappliedinthesamedirection asthatwhenthevalvewouldberequiredtoperformitssafetyfunction, unlessiscanbedetermined thattheresultsfromthetestsforapressureappliedinadifferent direction provideequivalent ormoreconservative results.TheSusquehanna FSARSection6.2.6.3providesconfirmation that,forthesubjectvalves,pressureappliedintheoppositedirection ofaccidentpressureproducesequivalent ormoreconservative results.Alternative Testing:Leaktesteachvalveinthereversedirection.
Exercise valves once per 92 days.Basis for Relief: These normally closed isolation valves are only required to open when bringing the unit to a cold shutdown condition, providing the flowpath for the shutdown cooling mode of RHR.In accordance with guidance presented in IE Information Notice 84-74, draft R.G.901-4, and previous NRC concerns regarding intersystem LOCAs, cycling these valves every 92 days during power operation increases the probability of exposing the downstream low pressure piping to reactor coolant pressure (since only'ne valve would have to be ruptured or failed open to expose the low pressure system to reactor coolant pressure).
Penetration willbesubjected totestpressures inthecorrectdirection duringcontainment integrated leakratetests.2RR20-2Rev.505/93 0
During reactor operations above approximately 100 psig, interlocks inhibit cycling of these valves for the express purpose of protecting low pressure piping.Alternative Testing: Exercise valves during cold shutdown (no more frequently than once per 92 days).2RR23-1 Rev.5 05/93  
ISI-T-200.0RELIEFREUESTER21System:PEcID:Valves:ReactorCoreIsolation CoolingM-2149249F028,249F040,249F021Category:
Class:A,CFunction:
Containment Isolation Impractical Test'Requirement:
Exercisevalveonceper92days.BasisforRelief:Thesecheckvalvesarenotequippedwithpositionindication andsystemdesigndoesnotprovideanypractical methodofverifying closureotherthanpressurization similartoleakratetesting.Suchtestingrequiresinstallation oftemporary equipment whichisimpractical onaquarterly basis,anditwouldrendertheRCICsysteminoperable duringthetestingperiod.WhileRCICisnotanECCSsystem,itisimportant tosafetyandcanprovideanadditional marginforprevention ormitigation ofreactortransients.
: Normally, testingofthistypeisaccomplished byrequiredcontainment localleakratetestinginaccordance with10CFR50,AppendixJ.Morefrequentperformance represents anunnecessary burdenonthelicensee.
Alternative Testing:Demonstrate closurebycompletion ofleakratetestingperformed onceper24months.2RR21-1Rev.412/91 ISI-T-200.0RELIEFRETKR22System:PAID:Valves:Category:
Class:ReactorCoreIsolation CoolingM-2149249F063,249F064Function:
VacuumBreakerImpractical TestRequirement:
Exercisevalveonceper92days.BasisforRelief:Thesevacuumbreakersinstalled ontheRCICturbineexhaustlinearenotprovidedwithpositionindication equipment noristherepressureindication installed thatwouldprovidepositiveverification ofvalveoperation.
Apractical methodoftestinginvolvessupplying lowpressureairupstreamofthevalveandverifying thatfiowcanbedetecteddownstrea'm ofthevalve.Thistestmethodinvolvesinstallation oftemporary equipment andisnotpractical exceptduringmajoroutages,anditwouldrendertheRCICsysteminoperable duringthetestingperiod.WhileRCICisnotanECCSsystem,itisimportant tosafetyandcanprovideanadditional marginforprevention ormitigation ofreactortransients.
Morefrequentperformance represents anunnecessary burdenonthelicensee.
Alternative Testing:Commencing withthefirstrefueling outage,verifyopeningonceper24monthsinconjunction withleakratetesting.2RR22-1Rev.412/91 RELIEFREVESTNUMBER23ISI-T-200.0 COLDSHUTDOWN~JUSTIHCATION System:PEcID:Valves:ResidualHeatRemovalM-2151Sh.2HV-251F008, HV-251F009 Category:
Class:Function:
Containment Isolation (Shutdown Cooling)Impractical TestRequirement:
Exercisevalvesonceper92days.BasisforRelief:Thesenormallyclosedisolation valvesareonlyrequiredtoopenwhenbringingtheunittoacoldshutdowncondition, providing theflowpathfortheshutdowncoolingmodeofRHR.Inaccordance withguidancepresented inIEInformation Notice84-74,draftR.G.901-4,andpreviousNRCconcernsregarding intersystem LOCAs,cyclingthesevalvesevery92daysduringpoweroperation increases theprobability ofexposingthedownstream lowpressurepipingtoreactorcoolantpressure(sinceonly'nevalvewouldhavetoberupturedorfailedopentoexposethelowpressuresystemtoreactorcoolantpressure).
Duringreactoroperations aboveapproximately 100psig,interlocks inhibitcyclingofthesevalvesfortheexpresspurposeofprotecting lowpressurepiping.Alternative Testing:Exercisevalvesduringcoldshutdown(nomorefrequently thanonceper92days).2RR23-1Rev.505/93  
'
'
ISI-T-200.0RKI.IKFRKKR24SystemRHRCoreSprayCoreSprayCoreSprayCoreSprayHPCIP&IDM-2151M-2151M-2152M-2152M-2152M-2152M-2155M-2111M-2111ValveNumber251FO90A251FO90B252FO29A252FO29B252FO30A252FO30B255012211165A211165BClassCategory,CFunction:
IS I-T-200.0 RKI.IKF RK KR 24 System RHR Core Spray Core Spray Core Spray Core Spray HPCI P&ID M-2151 M-2151 M-2152 M-2152 M-2152 M-2152 M-2155 M-2111 M-2111 Valve Number 251FO90A 251FO90B 252FO29A 252FO29B 252FO30A 252FO30B 255012 211165 A 211165B Class Category ,C Function: Prevent reverse flow out through keepfill line Impractical Test Requirement:
PreventreverseflowoutthroughkeepfilllineImpractical TestRequirement:
Exercise valves to their closed positions once per 92 days (Per IWV-3521).
Exercisevalvestotheirclosedpositions onceper92days(PerIWV-3521).
Basis For Relief: These check valves, located in keepfill lines for the RHR, Core Spray, and HPCI Systems provide Condensate Transfer System water flow into their respective headers, while preventing flow of process water in the reverse direction, during operation of the respective ECCS System.In the RHR and HPCI Systems, test connections exist between the two tandem check valves existing in each line;while in the Core Spray System, a single test connection exists upstream of both check valves, which are located very close together.These configurations allow individual testing of the downstream check valve in the RHR and HPCI Systems, but support only dual testing of each pair of Core Spray System check valves in combination.
BasisForRelief:Thesecheckvalves,locatedinkeepfilllinesfortheRHR,CoreSpray,andHPCISystemsprovideCondensate TransferSystemwaterflowintotheirrespective headers,whilepreventing flowofprocesswaterinthereversedirection, duringoperation oftherespective ECCSSystem.IntheRHRandHPCISystems,testconnections existbetweenthetwotandemcheckvalvesexistingineachline;whileintheCoreSpraySystem,asingletestconnection existsupstreamofbothcheckvalves,whicharelocatedveryclosetogether.
Using these test connections in RHR, Core Spray, and HPCI to monitor essential restriction of reverse flow involves collecting radioactively contaminated seepage while the process system is pressurized, as during flow testing.This creates the potential for spills and spread of contamination.
Theseconfigurations allowindividual testingofthedownstream checkvalveintheRHRandHPCISystems,butsupportonlydualtestingofeachpairofCoreSpraySystemcheckvalvesincombination.
The increase in potential for water hammer in these systems due to isolation of keepfill lines during testing, the increase in personnel radiation exposure required to perform this testing during 2RR24-1 Rev.4 12/91 ISI-T-200.0 RELIEF RK KR 24 (Cont'd.)plant operation, and the increase in potential for contamination of personnel and equipment through this testing justify reduced frequency.
Usingthesetestconnections inRHR,CoreSpray,andHPCItomonitoressential restriction ofreverseflowinvolvescollecting radioactively contaminated seepagewhiletheprocesssystemispressurized, asduringflowtesting.Thiscreatesthepotential forspillsandspreadofcontamination.
The stainless steel construction of each check valve and the series configuration of each pair of check valves reduce the probability of failure to restrict reverse flow through any keepfill line.The relatively small size of each keepfill line minimizes the impact of any such failure.The combination of these mitigating factors warrant reduction in testing frequency.
Theincreaseinpotential forwaterhammerinthesesystemsduetoisolation ofkeepfilllinesduringtesting,theincreaseinpersonnel radiation exposurerequiredtoperformthistestingduring2RR24-1Rev.412/91 ISI-T-200.0 RELIEFRKKR24(Cont'd.)
The single check valves located in the keepfill lines for the ESW System provide Service Water System flow into their respective headers, while preventing flow of process water in the reverse direction, during operation of ESW System.Test connections upstream of each check valve support testing of its reverse flow individually.
plantoperation, andtheincreaseinpotential forcontamination ofpersonnel andequipment throughthistestingjustifyreducedfrequency.
Using these test connections in ESW to monitor essential restriction of reverse flow involves collecting raw service water seepage, which has the potential to chemically contaminate and degrade the operation of the plant Liquid Radwaste System.The stainless steel construction of each check valve reduces the probability of failure to restrict reverse flow through any keepfill line.The relatively small size of each keepfill line minimizes the impact of any such failure.The combination of these mitigating factors warrant reduction in testing frequency.
Thestainless steelconstruction ofeachcheckvalveandtheseriesconfiguration ofeachpairofcheckvalvesreducetheprobability offailuretorestrictreverseflowthroughanykeepfillline.Therelatively smallsizeofeachkeepfilllineminimizes theimpactofanysuchfailure.Thecombination ofthesemitigating factorswarrantreduction intestingfrequency.
Alternative Testing: Demonstrate closure of each check valve in the keepfill lines of the RHR and HPCI Systems by monitoring the essential restriction of its reverse flow, through its upstream test connection, once per refueling outage while the process system is pressurized, as during flow testing.Demonstrate closure of at least one of the two check valves in each pair in the keepfill lines of the Core Spray System by monitoring the essential restriction of their reverse flow, through their upstream test connections, once per refueling outage while the process system is pressurized, as during flow testing.Demonstrate closure of each check valve in the keepfill lines of the ESW System by monitoring the essential restriction of their reverse flow, through their upstream test connections, once per 18 months (+3 months)while the process system is pressurized, as during flow testing.2RR24-2 Rev.4 12/91 e
ThesinglecheckvalveslocatedinthekeepfilllinesfortheESWSystemprovideServiceWaterSystemflowintotheirrespective headers,whilepreventing flowofprocesswaterinthereversedirection, duringoperation ofESWSystem.Testconnections upstreamofeachcheckvalvesupporttestingofitsreverseflowindividually.
ISI-T-200.0 RELIEF RK Relief Request Deleted.This Page IntentionalLy Left Blank.2RR25-1 Rev.4 12/91  
Usingthesetestconnections inESWtomonitoressential restriction ofreverseflowinvolvescollecting rawservicewaterseepage,whichhasthepotential tochemically contaminate anddegradetheoperation oftheplantLiquidRadwasteSystem.Thestainless steelconstruction ofeachcheckvalvereducestheprobability offailuretorestrictreverseflowthroughanykeepfillline.Therelatively smallsizeofeachkeepfilllineminimizes theimpactofanysuchfailure.Thecombination ofthesemitigating factorswarrantreduction intestingfrequency.
'4'.pr ISI-T-200.0 RELIEF RE UEST NUMBER 26 COLD SHUTDOWN TEST JUSTIFICATION System: PAID: Residual Heat Removal M-2151 Sh.1 and Sh.2 Valve CategoO HV-251F015A HV-251F015B HV-251F022 HV-251F023 HV-251FOSOA HV-251F050B HV-251F122A HV-251F122B A A A A A,C A,C A A Class: Function: Containment Isolation Impractical Test Requirement:
Alternative Testing:Demonstrate closureofeachcheckvalveinthekeepfilllinesoftheRHRandHPCISystemsbymonitoring theessential restriction ofitsreverseflow,throughitsupstreamtestconnection, onceperrefueling outagewhiletheprocesssystemispressurized, asduringflowtesting.Demonstrate closureofatleastoneofthetwocheckvalvesineachpairinthekeepfilllinesoftheCoreSpraySystembymonitoring theessential restriction oftheirreverseflow,throughtheirupstreamtestconnections, onceperrefueling outagewhiletheprocesssystemispressurized, asduringflowtesting.Demonstrate closureofeachcheckvalveinthekeepfilllinesoftheESWSystembymonitoring theessential restriction oftheirreverseflow,throughtheirupstreamtestconnections, onceper18months(+3months)whiletheprocesssystemispressurized, asduringflowtesting.2RR24-2Rev.412/91 e
Exercise valves once per 92 days.Basis for Relief: These normally closed isolation valves serve as the pressure isolation between RHR system piping and reactor coolant pressure.In accordance with guidance presented in IE Information Notice 84-74, draft R.G.901-4, and previous NRC concerns regarding intersystem LOCAs, cycling these valves every 92 days during power operation increases the probability of exposing the downstream low pressure piping to reactor coolant pressure (since only one valve would have to~be ruptured or stuck open to expose the low pressure system to reactor coolant pressure).
ISI-T-200.0 RELIEFRKReliefRequestDeleted.ThisPageIntentionalLy LeftBlank.2RR25-1Rev.412/91  
Maintenance history on these valves has shown that excessive cycling at pressure will reduce the leak tightness of the valves.In addition, failure of these valves during testing to positively re-seat could cause loss of RHR system function.Alternative Testing: Exercise valves during cold shutdowns (no more frequently than once per 92 days).2RR26-1 Rev.5 05/93 0 J ISI-T-200.0 RELIEF RE ER 27 This Page IntentionaLly Left Blank.2RR27-1 Rev.4 12/91  
'4'.pr ISI-T-200.0 RELIEFREUESTNUMBER26COLDSHUTDOWNTESTJUSTIFICATION System:PAID:ResidualHeatRemovalM-2151Sh.1andSh.2ValveCategoOHV-251F015A HV-251F015B HV-251F022 HV-251F023 HV-251FOSOA HV-251F050B HV-251F122A HV-251F122B AAAAA,CA,CAAClass:Function:
Containment Isolation Impractical TestRequirement:
Exercisevalvesonceper92days.BasisforRelief:Thesenormallyclosedisolation valvesserveasthepressureisolation betweenRHRsystempipingandreactorcoolantpressure.
Inaccordance withguidancepresented inIEInformation Notice84-74,draftR.G.901-4,andpreviousNRCconcernsregarding intersystem LOCAs,cyclingthesevalvesevery92daysduringpoweroperation increases theprobability ofexposingthedownstream lowpressurepipingtoreactorcoolantpressure(sinceonlyonevalvewouldhaveto~berupturedorstuckopentoexposethelowpressuresystemtoreactorcoolantpressure).
Maintenance historyonthesevalveshasshownthatexcessive cyclingatpressurewillreducetheleaktightness ofthevalves.Inaddition, failureofthesevalvesduringtestingtopositively re-seatcouldcauselossofRHRsystemfunction.
Alternative Testing:Exercisevalvesduringcoldshutdowns (nomorefrequently thanonceper92days).2RR26-1Rev.505/93 0J ISI-T-200.0 RELIEFREER27ThisPageIntentionaLly LeftBlank.2RR27-1Rev.412/91  


ISI-T-200.0 RELIEFREER2System:P&ID:Valves:HighPressureCoolantInjection M-2155255F049,255F046Category:
ISI-T-200.0 RELIEF RE ER 2 System: P&ID: Valves: High Pressure Coolant Injection M-2155 255F049, 255F046 Category: Class: A,C Function: Containment Isolation Impractical Test Requirement:
Class:A,CFunction:
Exercise valve closed once per 92 days.Basis for Relief: This valve is not equipped with position indication.
Containment Isolation Impractical TestRequirement:
Its configuration with an open discharge into the suppression pool prevents usage of reverse flow to demonstrate closure.No practical method exists to perform closure testing other than the downstream pressurization of leak rate testing.Such testing requires installation of temporary equipment and closure of valves which renders the system inoperable.
Exercisevalveclosedonceper92days.BasisforRelief:Thisvalveisnotequippedwithpositionindication.
Alternative Testing: Demonstrate closure once per 24 months by completion of leak rate testing.2RR28-'1 Rev.4 12/91 ISI-T-200.0 RELIEF RE VEST NUMBER 29 COLD SHUTDOWN TEST JUSTIFICATION System: P8cID: Valve: Category: High Pressure Coolant Injection M-2155 HV-255 F006 Class: Function: Containment Isolation, HPCI Injection Impractical Test Requirement:
Itsconfiguration withanopendischarge intothesuppression poolpreventsusageofreverseflowtodemonstrate closure.Nopractical methodexiststoperformclosuretestingotherthanthedownstream pressurization ofleakratetesting.Suchtestingrequiresinstallation oftemporary equipment andclosureofvalveswhichrendersthesysteminoperable.
Exercise valve once per 92 days.Basis for Relief: This valve is in the HPCI injection flowpath.The interlocks on this valve prevent its being open unless the Steam Admission and Turbine Stop Valves are open.This is only possible during pump flow testing.Cycling this valve during normal plant operation or HPCI testing may lead to HPCI injection into the vessel.This would affect reactor operations and introduce a thermal transient in the vessel nozzle.Alternative Testing: Exercise valve during cold shutdowns (no more frequently than once per 92 days).2RR29-1 Rev.5 05/93 I l 0 a, ISI-T-200.0 RELIEF RE UEST NUMBER 30 System: PAID: General General Valves: All valves specified as tested on a cold shutdown or refueling frequency.
Alternative Testing:Demonstrate closureonceper24monthsbycompletion ofleakratetesting.2RR28-'1Rev.412/91 ISI-T-200.0 RELIEFREVESTNUMBER29COLDSHUTDOWNTESTJUSTIFICATION System:P8cID:Valve:Category:
Category: Class: Function: As applicable As applicable As applicable Impractical Test Requirement:
HighPressureCoolantInjection M-2155HV-255F006Class:Function:
Paragraph IWV-3417(a) of Section XI requires that should an unacceptable increase in stroke time be observed, the valve test frequency shall be increased to once per month until corrective action is taken.Basis for Relief: Valves are tested on a cold shutdown or refueling frequency because there is a defined basis for exemption from quarterly testing frequency during power operation (e.g., the plant is put into an unsafe condition, system design does not permit testing).This same reasoning would, therefore, provide the basis for exemption from the monthly testing as well.Alternative Testing: The testing frequency will remain unchanged.
Containment Isolation, HPCIInjection Impractical TestRequirement:
The requirements contained in the Susquehanna Steam-Electric Station Technical Specifications will control plant operations with regard to out-of-service valves.Each valve exhibiting such an increase in its stroke time will have its acceptability for continued operation evaluated by a review of the tendencies and historical ranges of its stroke time measurements.
Exercisevalveonceper92days.BasisforRelief:ThisvalveisintheHPCIinjection flowpath.
2RR30-1 Rev.5 05/93 i
Theinterlocks onthisvalvepreventitsbeingopenunlesstheSteamAdmission andTurbineStopValvesareopen.Thisisonlypossibleduringpumpflowtesting.Cyclingthisvalveduringnormalplantoperation orHPCItestingmayleadtoHPCIinjection intothevessel.Thiswouldaffectreactoroperations andintroduce athermaltransient inthevesselnozzle.Alternative Testing:Exercisevalveduringcoldshutdowns (nomorefrequently thanonceper92days).2RR29-1Rev.505/93  
ISI-T-200.0 RELIEF RE KR 1 System: P&ID: Valves: High Pressure Coolant Injection M-2155 255 F045 Category: Class: Function: Backflow Prevention Impractical Test Requirement:
: Il0a, ISI-T-200.0 RELIEFREUESTNUMBER30System:PAID:GeneralGeneralValves:Allvalvesspecified astestedonacoldshutdownorrefueling frequency.
Exercise valve once per 92 days.Basis for Relief: To verify proper opening of this valve, it is necessary to initiate HPCI flow while taking suction from the suppression pool.Since the water quality in the suppression pool is not maintained at reactor coolant standards, it is not advisable to initiate this flow at any time during normal operations.
Category:
The resulting contamination of the HPCI system from such flow testing would affect the condensate storage tank purity and ultimately affect the chemistry control of the reactor coolant system.There exists no other practical method of verifying proper valve operation.
Class:Function:
Asapplicable Asapplicable Asapplicable Impractical TestRequirement:
Paragraph IWV-3417(a) ofSectionXIrequiresthatshouldanunacceptable increaseinstroketimebeobserved, thevalvetestfrequency shallbeincreased tooncepermonthuntilcorrective actionistaken.BasisforRelief:Valvesaretestedonacoldshutdownorrefueling frequency becausethereisadefinedbasisforexemption fromquarterly testingfrequency duringpoweroperation (e.g.,theplantisputintoanunsafecondition, systemdesigndoesnotpermittesting).
Thissamereasoning would,therefore, providethebasisforexemption fromthemonthlytestingaswell.Alternative Testing:Thetestingfrequency willremainunchanged.
Therequirements contained intheSusquehanna Steam-Electric StationTechnical Specifications willcontrolplantoperations withregardtoout-of-servicevalves.Eachvalveexhibiting suchanincreaseinitsstroketimewillhaveitsacceptability forcontinued operation evaluated byareviewofthetendencies andhistorical rangesofitsstroketimemeasurements.
2RR30-1Rev.505/93 i
ISI-T-200.0 RELIEFREKR1System:P&ID:Valves:HighPressureCoolantInjection M-2155255F045Category:
Class:Function:
BackflowPrevention Impractical TestRequirement:
Exercisevalveonceper92days.BasisforRelief:Toverifyproperopeningofthisvalve,itisnecessary toinitiateHPCIflowwhiletakingsuctionfromthesuppression pool.Sincethewaterqualityinthesuppression poolisnotmaintained atreactorcoolantstandards, itisnotadvisable toinitiatethisflowatanytimeduringnormaloperations.
Theresulting contamination oftheHPCIsystemfromsuchflowtestingwouldaffectthecondensate storagetankpurityandultimately affectthechemistry controlofthereactorcoolantsystem.Thereexistsnootherpractical methodofverifying propervalveoperation.
Alternative.
Alternative.
Testing:Verifyoperability byinspection duringvalvedisassembly.
Testing: Verify operability by inspection during valve disassembly.
Thevalvewillbedisassembled atleastonceeveryotherrefueling outageonanalternating basis.2RR31-1Rev.412/91  
The valve will be disassembled at least once every other refueling outage on an alternating basis.2RR31-1 Rev.4 12/91  
~iI ISI-T-200.0 RKLIKFRKTSystem.P&ID:Valves:HighPressureCoolantInjection M-2155255F019Category:
~i I ISI-T-200.0 RKLIKF RK T System.P&ID: Valves: High Pressure Coolant Injection M-2155 255F019 Category: Class: Function: Backflow Prevention Impractical Test Requirement:
Class:Function:
Exercise valve closed once per 92 days.Basis for Relief: This check valve in the HPCI pump suction line is not installed in a configuration permitting positive verification of valve closure.As stated in Relief Request Number 31, alignment of the HPCI pump to the suppression pool is not desirable.
BackflowPrevention Impractical TestRequirement:
Attempting to verify closure during leak rate testing of 255F045 will not provide positive verification, since there is no appropriate pressure instrumentation provided on the CST side of 255F019, and level changes in the CST would not be readily detected due to the large tank volume.Alternative Testing: Verify operability by inspection during valve disassembly.
Exercisevalveclosedonceper92days.BasisforRelief:ThischeckvalveintheHPCIpumpsuctionlineisnotinstalled inaconfiguration permitting positiveverification ofvalveclosure.AsstatedinReliefRequestNumber31,alignment oftheHPCIpumptothesuppression poolisnotdesirable.
The valve will be disassembled at least once every other refueling outage on an alternating basis.2RR32-1 Rev.4 12/91 ISI-T-200.0 RELIEF RE UEST NUMBER 33'ystem: Various P&ID: M-2139 M-2141 M-2142 M-2143 M-2144 M-2149 M-2151 M-2152 M-2155 Valves: Various (listed in Susquehanna SES Technical Specification Table 3.6.3-1)Category: Class: Function: Containment Isolation Impractical Test Requirement:
Attempting toverifyclosureduringleakratetestingof255F045willnotprovidepositiveverification, sincethereisnoappropriate pressureinstrumentation providedontheCSTsideof255F019,andlevelchangesintheCSTwouldnotbereadilydetectedduetothelargetankvolume.Alternative Testing:Verifyoperability byinspection duringvalvedisassembly.
Exercise valve once per 92 days per IWV-3520.Basis for Relief: Excess flow check valves are installed on instrument lines penetrating containment in accordance with Regulatory Guide 1.11.As such, the lines are sized and/or orificed such that off-site doses will be substantially below 10CFR100 limits in the event of a rupture.Therefore, individual leak rate testing of these valves is not required for conformance with 10CFR50, Appendix J requirements.
Thevalvewillbedisassembled atleastonceeveryotherrefueling outageonanalternating basis.2RR32-1Rev.412/91 ISI-T-200.0 RELIEFREUESTNUMBER33'ystem:VariousP&ID:M-2139M-2141M-2142M-2143M-2144M-2149M-2151M-2152M-2155Valves:Various(listedinSusquehanna SESTechnical Specification Table3.6.3-1)Category:
Functional testing of valves to verify closure can be accomplished by the process of venting the instrument side of the valve while the process side is under pressure.Such testing is required by Technical Specification 4.6.3.4 at least once per 18 months.Testing on a more frequency basis is not feasible for several reasons.Instruments serviced by these valves frequently have interlock or actuation functions that would be interfered with should testing be attempted during plant operation.
Class:Function:
Also, process liquid will be contaminated to some degree, requiring special measures to collect fiow from the vented instrument side.Alternative Testing: Functional testing with verification that flow is checked will be performed at least once per 18 months per Technical Specification 4.6.3.4.2RR33-1 Rev.5 05/93 r~4 t ISI-T-200.
Containment Isolation Impractical TestRequirement:
0 RELIEF RE T ER 34 System: PScID: Valves: High Pressure Coolant Injection M-2155 255F076, 255F077 Category: Class: Function: Vacuum Breaker, Impractical Test Requirement:
Exercisevalveonceper92daysperIWV-3520.
Exercise valve once per 92 days.Basis for Relief: These vacuum breakers installed on the HPCI turbine exhaust line are not provided with position indication equipment nor is there pressure indication installed that would provide positive verification of valve operation.
BasisforRelief:Excessflowcheckvalvesareinstalled oninstrument linespenetrating containment inaccordance withRegulatory Guide1.11.Assuch,thelinesaresizedand/ororificedsuchthatoff-sitedoseswillbesubstantially below10CFR100limitsintheeventofarupture.Therefore, individual leakratetestingofthesevalvesisnotrequiredforconformance with10CFR50,AppendixJrequirements.
A practical method of testing involves supplying low pressure air upstream of the valves and verifying that flow can be detected downstream of the valve.This test method.involves installation of temporary equipment and is not practical except during major outages.Its implementation would also require temporary removal of the HPCI System from service.Alternative Testing: Commencing with the first refueling outage, verify opening once per 24 months in conjunction with leak rate testing.2RR34-1.Rev.4 12!91  
Functional testingofvalvestoverifyclosurecanbeaccomplished bytheprocessofventingtheinstrument sideofthevalvewhiletheprocesssideisunderpressure.
'I L I l I I ISI-T-200.0 RKLIKF RK KR System: P8cID: Valves: General General All containment isolation valves.Category: 'lass: Function: As applicable to specific valves.Primary Containment Isolation Impractical Test Requirement:
SuchtestingisrequiredbyTechnical Specification 4.6.3.4atleastonceper18months.Testingonamorefrequency basisisnotfeasibleforseveralreasons.Instruments servicedbythesevalvesfrequently haveinterlock oractuation functions thatwouldbeinterfered withshouldtestingbeattempted duringplantoperation.
Additional corrective actions specified for valves 6 inches and larger, that exhibit increases in leakage rate, per IWV-3427(b).Basis for Relief: Containment leakage rate testing is governed by 10CFR50 Appendix and Susquehanna SES Technical Specification 3/4.6.1.2.
Also,processliquidwillbecontaminated tosomedegree,requiring specialmeasurestocollectfiowfromtheventedinstrument side.Alternative Testing:Functional testingwithverification thatflowischeckedwillbeperformed atleastonceper18monthsperTechnical Specification 4.6.3.4.2RR33-1Rev.505/93 r~4t ISI-T-200.
Compliance with these requirements is described in FSAR Section 6.2.6 and in FSAR Tables 6.2-19 through 6.2-22.The additional corrective actions specified by ASME code Section XI, paragraph IWV-3427(b) are not generally effective.
0RELIEFRETER34System:PScID:Valves:HighPressureCoolantInjection M-2155255F076,255F077Category:
Their usefulness does not justify the burden of complying with this requirement.
Class:Function:
This basis for relief from all requirements imposed by IWV-3427(b) is intended to comply with that provided as guidance by NRC Generic Letter 89-04 (Position&#xb9;10).Alternative Testing: Primary Containment isolation valve leak testing (with the exception of identified pressure isolation function)will be performed in accordance with FSAR Section 6.2.6 and FSAR Tables 6.2-19 through 6.2-22.Evaluation of containment isolation valve leak test results will be conducted in accordance with the requirements of 10CFR50 Appendix J and Susquehanna SES Technical Specification 3/4.6.1.2.
VacuumBreaker,Impractical TestRequirement:
~ge rate measurements shall be compared with previous measurements and with the permissible valve leakage rates specified by the Superintendent of Plant for Susquehanna SES.2RR35-1 Rev.4 12/91  
Exercisevalveonceper92days.BasisforRelief:Thesevacuumbreakersinstalled ontheHPCIturbineexhaustlinearenotprovidedwithpositionindication equipment noristherepressureindication installed thatwouldprovidepositiveverification ofvalveoperation.
Apractical methodoftestinginvolvessupplying lowpressureairupstreamofthevalvesandverifying thatflowcanbedetecteddownstream ofthevalve.Thistestmethod.involvesinstallation oftemporary equipment andisnotpractical exceptduringmajoroutages.Itsimplementation wouldalsorequiretemporary removaloftheHPCISystemfromservice.Alternative Testing:Commencing withthefirstrefueling outage,verifyopeningonceper24monthsinconjunction withleakratetesting.2RR34-1.Rev.412!91  
'ILIlII ISI-T-200.0 RKLIKFRKKRSystem:P8cID:Valves:GeneralGeneralAllcontainment isolation valves.Category:
'lass:Function:
Asapplicable tospecificvalves.PrimaryContainment Isolation Impractical TestRequirement:
Additional corrective actionsspecified forvalves6inchesandlarger,thatexhibitincreases inleakagerate,perIWV-3427(b).BasisforRelief:Containment leakageratetestingisgovernedby10CFR50AppendixandSusquehanna SESTechnical Specification 3/4.6.1.2.
Compliance withtheserequirements isdescribed inFSARSection6.2.6andinFSARTables6.2-19through6.2-22.Theadditional corrective actionsspecified byASMEcodeSectionXI,paragraph IWV-3427(b) arenotgenerally effective.
Theirusefulness doesnotjustifytheburdenofcomplying withthisrequirement.
Thisbasisforrelieffromallrequirements imposedbyIWV-3427(b) isintendedtocomplywiththatprovidedasguidancebyNRCGenericLetter89-04(Position
&#xb9;10).Alternative Testing:PrimaryContainment isolation valveleaktesting(withtheexception ofidentified pressureisolation function) willbeperformed inaccordance withFSARSection6.2.6andFSARTables6.2-19through6.2-22.Evaluation ofcontainment isolation valveleaktestresultswillbeconducted inaccordance withtherequirements of10CFR50AppendixJandSusquehanna SESTechnical Specification 3/4.6.1.2.
~geratemeasurements shallbecomparedwithpreviousmeasurements andwiththepermissible valveleakageratesspecified bytheSuperintendent ofPlantforSusquehanna SES.2RR35-1Rev.412/91  


ISI-T-200.0 RELIEFREThtsPageIntentionally LeftBlank.2RR36-1Rev.412/91  
ISI-T-200.0 RELIEF RE Thts Page Intentionally Left Blank.2RR36-1 Rev.4 12/91  


RELIEFREUESTNUMBER37COLDSHUTDOWNTEiSTJUSTIFICATION ISI-T-200.0 System:P&ID:Valves:HV-25703HV-25704HV-25705HV-25711HV-25713HV-25714HV-25721HV-25722Containment Atmosphere ControlM-2157Slit.1HV-25723HV-25724HV-25725Category:
RELIEF RE UEST NUMBER 37 COLD SHUTDOWN TEiST JUSTIFICATION ISI-T-200.0 System: P&ID: Valves: HV-25703 HV-25704 HV-25705 HV-25711 HV-25713 HV-25714 HV-25721 HV-25722 Containment Atmosphere Control M-2157 Slit.1 HV-25723 HV-25724 HV-25725 Category: Class: Function: Containment Isolation Impractical Test Requirement:
Class:Function:
Exercise valve once per 92 days.Basis for Relief: These normally closed containment isolation valves on the containment purge inlet and exhaust lines are not opened during power operations except during startup for inerting purposes and during shutdown procedure to de-inert.It is not good practice to cycle a normally closed containment isolation valve, as this increases the possibility of failure in the open position.Technical Specification 3.6.1.8 controls and limits the amount of time these valves can be open in a one-year'period.Alternative Testing: Exercise valves at cold shutdown (no more frequently than once per 92 days).2RR37-1 Rev.5 05/93 N l',4'p ISI-T-200.0 RELIEF RE UEST NUMBER'3S System: P8cID: Valves: Category: Class: Various Various Those designated"Rapid-Acting" in the REMARKS column.Aor B 1 or 2 Function: Various (sample, containment isolation, etc.)Impractical Test Requirement:
Containment Isolation Impractical TestRequirement:
Trend valve stroke times per IWV-3417(a).
Exercisevalveonceper92days.BasisforRelief:Thesenormallyclosedcontainment isolation valvesonthecontainment purgeinletandexhaustlinesarenotopenedduringpoweroperations exceptduringstartupforinertingpurposesandduringshutdownprocedure tode-inert.
Basis for Relief: The listed valves, designated as"rapid acting valves," have stroke times (~2 seconds)of such short duration that comparison of measurements with previous data for specified percentage increases is not indicative of degrading valve performance.
Itisnotgoodpracticetocycleanormallyclosedcontainment isolation valve,asthisincreases thepossibility offailureintheopenposition.
With measurement of stroke times to the nearest second per IWV-3413(b), a very small increase in stroke time will result in an extremely large percentage change.Verification that valves meet a'specified maximum stroke time of short duration provides adequate assurance of operability.
Technical Specification 3.6.1.8controlsandlimitstheamountoftimethesevalvescanbeopeninaone-year'period.Alternative Testing:Exercisevalvesatcoldshutdown(nomorefrequently thanonceper92days).2RR37-1Rev.505/93 Nl',4'p ISI-T-200.0 RELIEFREUESTNUMBER'3SSystem:P8cID:Valves:Category:
This basis for relief from the code required corrective actions is intended to conform to the guidance provided by NRC Generic Letter 89-04 (Position&#xb9;6).Alternative Testing: Measured stroke time less than the limit stroke time of 2 seconds will be verified for each of these valves when exercise tested.2RR38-1 Rev.5 05/93 ISI-T-200.0 RELIEF RE VEST NUMBER 39 COLD SHUTDOWN~>>JUSTIFICATION System: P8cID: Reactor Building Chilled Water M-2187 Sh.2 Valves: HV-28791A1 HV-28791A2 HV-28791B1 HV-28791B2 HV-28792A1 HV-28792A2 HV-28792B1 HV-28792B2 Category: Class: Function: Containment Isolation Impractical Test Requirement:
Class:VariousVariousThosedesignated "Rapid-Acting" intheREMARKScolumn.AorB1or2Function:
Exercise valves once per 92 days.Basis for Relief: These containment isolation valves are located in the Reactor Building Chilled Water supply and return lines serving the Reactor Recirculation pump motor coolers.The closure of these valves during power operation will interrupt cooling water flow to the Reactor Recirculation motor coolers, which creates the possibility of overheating and damage.Alternative Testing: Exercise valves during cold shutdowns (no more frequently than once per 92 days).2RR39-1 Rev.5 05/93  
Various(sample,containment isolation, etc.)Impractical TestRequirement:
'I V ISI-T-200.0 RELIEF RE VEST NUMBER 40 This Page Intentionally Left Blank.2RR40-1 Rev.4-12/91  
TrendvalvestroketimesperIWV-3417(a).
BasisforRelief:Thelistedvalves,designated as"rapidactingvalves,"havestroketimes(~2seconds)ofsuchshortdurationthatcomparison ofmeasurements withpreviousdataforspecified percentage increases isnotindicative ofdegrading valveperformance.
Withmeasurement ofstroketimestothenearestsecondperIWV-3413(b),
averysmallincreaseinstroketimewillresultinanextremely largepercentage change.Verification thatvalvesmeeta'specified maximumstroketimeofshortdurationprovidesadequateassurance ofoperability.
Thisbasisforrelieffromthecoderequiredcorrective actionsisintendedtoconformtotheguidanceprovidedbyNRCGenericLetter89-04(Position
&#xb9;6).Alternative Testing:Measuredstroketimelessthanthelimitstroketimeof2secondswillbeverifiedforeachofthesevalveswhenexercisetested.2RR38-1Rev.505/93 ISI-T-200.0 RELIEFREVESTNUMBER39COLDSHUTDOWN~>>JUSTIFICATION System:P8cID:ReactorBuildingChilledWaterM-2187Sh.2Valves:HV-28791A1 HV-28791A2 HV-28791B1 HV-28791B2 HV-28792A1 HV-28792A2 HV-28792B1 HV-28792B2 Category:
Class:Function:
Containment Isolation Impractical TestRequirement:
Exercisevalvesonceper92days.BasisforRelief:Thesecontainment isolation valvesarelocatedintheReactorBuildingChilledWatersupplyandreturnlinesservingtheReactorRecirculation pumpmotorcoolers.Theclosureofthesevalvesduringpoweroperation willinterrupt coolingwaterflowtotheReactorRecirculation motorcoolers,whichcreatesthepossibility ofoverheating anddamage.Alternative Testing:Exercisevalvesduringcoldshutdowns (nomorefrequently thanonceper92days).2RR39-1Rev.505/93  
'IV ISI-T-200.0 RELIEFREVESTNUMBER40ThisPageIntentionally LeftBlank.2RR40-1Rev.4-12/91  
~'
~'
ISI-T-200.0 RELIEFRETER41System:P&ID:Valves:Category:
ISI-T-200.0 RELIEF RE T ER 41 System: P&ID: Valves: Category: Class: Function: General General All Fail-Safe Valves As applicable As applicable As applicable Impractical Test Requirement:
Class:Function:
Paragraph IWV-3415, Section XI Basis for Relief: Valves which have a"fail-safe" requirement at Susquehanna Steam Electric Station will normally be cycled once every 92 days', unless otherwise relieved.This test will accomplish the intent of the"fail-safe" test because normal valve movement is achieved by means of interrupting motive force to the valve.Alternative Testing: No additional testing of"fail-safe" provisions will be done because normal valve testing will achieve the same results.2RR41-1 Rev.4 12/91 ISI-T-200.0 RELIEF RE T ER 42 System: P8cID: Valves: Category: Class: Function: General General All pressure relief valves.As applicable As applicable System Overpressure Protection Impractical Test Requirement:
GeneralGeneralAllFail-Safe ValvesAsapplicable Asapplicable Asapplicable Impractical TestRequirement:
Paragraph IWV-3100, all valves shall be pressure tested after installation and prior to service.Basis for Relief: Pressure relief valves used at Susquehanna SES have been purchased in accordance with specifications which require performance testing at the manufacturer's shop.Records of these tests are part of the Quality Assurance records.In addition, a technical procedure requires inspection of the sealing mechanism as part of the preoperational/acceptance test program.Alternative Testing: No additional testing beyond that which was performed as part of the purchase and installation will be performed.
Paragraph IWV-3415, SectionXIBasisforRelief:Valveswhichhavea"fail-safe" requirement atSusquehanna SteamElectricStationwillnormallybecycledonceevery92days',unlessotherwise relieved.
The records will remain part of either the purchase or preoperational records and not part of the ISI files.2RR42-1 Rev.4 12/91 0
Thistestwillaccomplish theintentofthe"fail-safe"testbecausenormalvalvemovementisachievedbymeansofinterrupting motiveforcetothevalve.Alternative Testing:Noadditional testingof"fail-safe" provisions willbedonebecausenormalvalvetestingwillachievethesameresults.2RR41-1Rev.412/91 ISI-T-200.0 RELIEFRETER42System:P8cID:Valves:Category:
ISI-T-200.0 RELIEF RK T System: P&ID: Pumps: Class: Standby Liquid Control M-2148 2P208 A,B Function: Standby Liquid Control Pumps Impractical Test Requirement:
Class:Function:
Measure inlet pressure prior to and during pump test and measure pump delta-p during pump test.Basis for Relief: System configuration does not provide a pressure indicator on the pump suctions.It is possible to determine suction pressure by calculation from tank level (elevation difference) when the pumps are in normal alignment to the SLC Storage Tank.However, when pump testing is being performed, the tank is valved out and the suctions are aligned to a demineralized water header.While some estimation of the pressure in this alignment is available by the setting of the pressure control valve on the demineralized water header, no direct pressure indication is available.
GeneralGeneralAllpressurereliefvalves.Asapplicable Asapplicable SystemOverpressure Protection Impractical TestRequirement:
Since the SLC pumps are positive displacement type pumps, suction pressure will not affect developed discharge pressure.Alternative Testing: Do not measure inlet pressure prior to or during pump tests.Utilize pump discharge pressure reading in lieu of Pump delta-p reading.2RR43-1 Rev.4 12/91  
Paragraph IWV-3100, allvalvesshallbepressuretestedafterinstallation andpriortoservice.BasisforRelief:PressurereliefvalvesusedatSusquehanna SEShavebeenpurchased inaccordance withspecifications whichrequireperformance testingatthemanufacturer's shop.RecordsofthesetestsarepartoftheQualityAssurance records.Inaddition, atechnical procedure requiresinspection ofthesealingmechanism aspartofthepreoperational/acceptance testprogram.Alternative Testing:Noadditional testingbeyondthatwhichwasperformed aspartofthepurchaseandinstallation willbeperformed.
Therecordswillremainpartofeitherthepurchaseorpreoperational recordsandnotpartoftheISIfiles.2RR42-1Rev.412/91 0
ISI-T-200.0 RELIEFRKTSystem:P&ID:Pumps:Class:StandbyLiquidControlM-21482P208A,BFunction:
StandbyLiquidControlPumpsImpractical TestRequirement:
Measureinletpressurepriortoandduringpumptestandmeasurepumpdelta-pduringpumptest.BasisforRelief:Systemconfiguration doesnotprovideapressureindicator onthepumpsuctions.
Itispossibletodetermine suctionpressurebycalculation fromtanklevel(elevation difference) whenthepumpsareinnormalalignment totheSLCStorageTank.However,whenpumptestingisbeingperformed, thetankisvalvedoutandthesuctionsarealignedtoademineralized waterheader.Whilesomeestimation ofthepressureinthisalignment isavailable bythesettingofthepressurecontrolvalveonthedemineralized waterheader,nodirectpressureindication isavailable.
SincetheSLCpumpsarepositivedisplacement typepumps,suctionpressurewillnotaffectdeveloped discharge pressure.
Alternative Testing:Donotmeasureinletpressurepriortoorduringpumptests.Utilizepumpdischarge pressurereadinginlieuofPumpdelta-preading.2RR43-1Rev.412/91  


ISI-T-200.0 RELIEFRETSystem:P&ID:Pumps:Class:HighPressureCoolantInjection M-21562P204,2P209Function; HPCIMainandBoosterPumpsImpractical TestRequirement:
ISI-T-200.0 RELIEF RE T System: P&ID: Pumps: Class: High Pressure Coolant Injection M-2156 2P204, 2P209 Function;HPCI Main and Booster Pumps Impractical Test Requirement:
Ifnottestedduringplantshutdown, thepumpshallbetestedwithinoneweekaftertheplantisreturnedtonormaloperation.
If not tested during plant shutdown, the pump shall be tested within one week after the plant is returned to normal operation.
BasisforRelief:TherequiredsteamsupplypressureforHPCIsurveillance flowverification testingisspecified intheTechnical Specifications.
Basis for Relief: The required steam supply pressure for HPCI surveillance flow verification testing is specified in the Technical Specifications.
Thispressuremaynotbeattainedwithintheaboveprescribed timeinterval.
This pressure may not be attained within the above prescribed time interval.Alternative Testing: Perform HPCI flow verification test in accordance with quarterly schedule.After a shutdown which has exceeded the quarterly limit, recommence quarterly schedule in accordance with Technical Specification 4.5.1.b.3.
Alternative Testing:PerformHPCIflowverification testinaccordance withquarterly schedule.
2RR44-1 Rev.4 12/91 RELIEF RE UEST NUMBER 45 ISI-T-200.0 COLD SHUTDOWN TEST JUSTIFICATION System: PA,ID: Core Spray M-2152 Valves Cate~os HV-252FOOSA HV-252FOOSB HV-252F006A HV-252F006B HV-252F037A HV-252F037B A A A,C A,C A A Class: Function: Containment Isolation Impractical Test Requirement:
Afterashutdownwhichhasexceededthequarterly limit,recommence quarterly scheduleinaccordance withTechnical Specification 4.5.1.b.3.
Exercise valves once per 92 days.Basis for Relief: These normally closed Isolation valves serve as the pressure isolation between CS system piping and reactor vessel pressure.In accordance with guidance presented in IE Information Notice 84-74, draft R.G.901-4, and previous NRC concerns regarding intersystem LOCAs, cycling these valves every 92 days during power operation increases the probability of exposing the downstream low pressure piping to reactor coolant pressure (since only one valve would have to be ruptured or failed open to expose the low pressure system to reactor coolant pressure).
2RR44-1Rev.412/91 RELIEFREUESTNUMBER45ISI-T-200.0 COLDSHUTDOWNTESTJUSTIFICATION System:PA,ID:CoreSprayM-2152ValvesCate~osHV-252FOOSA HV-252FOOSB HV-252F006A HV-252F006B HV-252F037A HV-252F037B AAA,CA,CAAClass:Function:
In addition, failure of these valves after testing to positively reseat could cause loss of Core Spray system function.Alternative Testing: Exercise valves during cold shutdown (no more frequently than once per 92 days).2RR45-1 Rev.5 05/93  
Containment Isolation Impractical TestRequirement:
Exercisevalvesonceper92days.BasisforRelief:ThesenormallyclosedIsolation valvesserveasthepressureisolation betweenCSsystempipingandreactorvesselpressure.
Inaccordance withguidancepresented inIEInformation Notice84-74,draftR.G.901-4,andpreviousNRCconcernsregarding intersystem LOCAs,cyclingthesevalvesevery92daysduringpoweroperation increases theprobability ofexposingthedownstream lowpressurepipingtoreactorcoolantpressure(sinceonlyonevalvewouldhavetoberupturedorfailedopentoexposethelowpressuresystemtoreactorcoolantpressure).
Inaddition, failureofthesevalvesaftertestingtopositively reseatcouldcauselossofCoreSpraysystemfunction.
Alternative Testing:Exercisevalvesduringcoldshutdown(nomorefrequently thanonceper92days).2RR45-1Rev.505/93  


ISI-T-200.0 RELIEFREVESTNUMBER4System:P&ID:Valves/Pumps:
ISI-T-200.0 RELIEF RE VEST NUMBER 4 System: P&ID: Valves/Pumps:
Category:
Category: Class: Function: General General General As applicable As applicable As applicable Impractical Test Requirement:
Class:Function:
Test equipment in accordance with Section XI frequency requirements.
GeneralGeneralGeneralAsapplicable Asapplicable Asapplicable Impractical TestRequirement:
Basis for Relief: With one loop out-of-service in a system, it is not desirable to test the redundant loop per ISI requirements as such testing may increase the chance of failure in a condition where backup equipment is not available.
Testequipment inaccordance withSectionXIfrequency requirements.
Also, these situations will be governed by the Susquehanna Steam Electric Station Technical Specifications.
BasisforRelief:Withoneloopout-of-service inasystem,itisnotdesirable totesttheredundant loopperISIrequirements assuchtestingmayincreasethechanceoffailureinacondition wherebackupequipment isnotavailable.
Alternative Testing: Testing will be suspended on equipment in operable loop when there is a redundant loop out-of-service.
Also,thesesituations willbegovernedbytheSusquehanna SteamElectricStationTechnical Specifications.
2RR46-1 Rev.4 12/91 ISI-T-200.0 REI IEF RE T ER 47 This Page Intentionally Left Blank.2RR47-1 Rev.4 12/91 I~.
Alternative Testing:Testingwillbesuspended onequipment inoperableloopwhenthereisaredundant loopout-of-service.
ISI-T-200.0 RELIEF RE UEST NUMBER 48 System: PAID: Pumps: Class: High Pressure Coolant Injection M-2156 2P204, 2P209 Function: HPCI main and booster pumps Impractical Test Requirement:
2RR46-1Rev.412/91 ISI-T-200.0 REIIEFRETER47ThisPageIntentionally LeftBlank.2RR47-1Rev.412/91 I~.
Paragraph IWP-3100, bearing temperature measurement.
ISI-T-200.0 RELIEFREUESTNUMBER48System:PAID:Pumps:Class:HighPressureCoolantInjection M-21562P204,2P209Function:
Basis for Relief: These pumps are driven by a steam turbine which exhausts steam into the suppression pool.Extended run times necessary to achieve stabilized bearing temperatures could heat the suppression pool water to a temperature exceeding the Technical Specification limit of 105'F.Alternative Testing: Eliminate bearing temperature measurement.
HPCImainandboosterpumpsImpractical TestRequirement:
Vibration measurements will.give adequate information concerning potential bearing temperature problems.2RR48-1 Rev.5 05/93 0
Paragraph IWP-3100, bearingtemperature measurement.
ISI-T-200.0 RELIEF RE UEST NUMBER 49 System: P8cID: Pumps: Class: Function: Standby Liquid Control M-2148 2P208 A,B Injection of sodium pentaborate into Rx vessel.Impractical Test Requirement:
BasisforRelief:Thesepumpsaredrivenbyasteamturbinewhichexhaustssteamintothesuppression pool.Extendedruntimesnecessary toachievestabilized bearingtemperatures couldheatthesuppression poolwatertoatemperature exceeding theTechnical Specification limitof105'F.Alternative Testing:Eliminate bearingtemperature measurement.
Paragraph IWP-3100, bearing temperature measurement Basis for Relief: One characteristic of positive displacement pumps is that there is essentially no lag time between starting the pumps and reaching equilibrium conditions.
Vibration measurements will.giveadequateinformation concerning potential bearingtemperature problems.
The pump bearings are located in a motor gearbox and no direct measurement of gearbox oil temperature is possible.The gearbox casing is not a reproducible measurement point.I Alternative Testing: Vibration measurements will give information concerning potential bearing problems.The pump flow rate will be measured and changes in pump flow rate provide an early indication of degradation in pump performance.
2RR48-1Rev.505/93 0
2RR49-1 Rev.5 05/93 l I 0 ISI-T-200.0 RELIEF RE ER 50 This Page Intentionally Left Blank.2RRSO-1 Rev.4 12/91  
ISI-T-200.0 RELIEFREUESTNUMBER49System:P8cID:Pumps:Class:Function:
StandbyLiquidControlM-21482P208A,BInjection ofsodiumpentaborate intoRxvessel.Impractical TestRequirement:
Paragraph IWP-3100, bearingtemperature measurement BasisforRelief:Onecharacteristic ofpositivedisplacement pumpsisthatthereisessentially nolagtimebetweenstartingthepumpsandreachingequilibrium conditions.
Thepumpbearingsarelocatedinamotorgearboxandnodirectmeasurement ofgearboxoiltemperature ispossible.
Thegearboxcasingisnotareproducible measurement point.IAlternative Testing:Vibration measurements willgiveinformation concerning potential bearingproblems.
Thepumpflowratewillbemeasuredandchangesinpumpflowrateprovideanearlyindication ofdegradation inpumpperformance.
2RR49-1Rev.505/93 lI0 ISI-T-200.0 RELIEFREER50ThisPageIntentionally LeftBlank.2RRSO-1Rev.412/91  


ISI-T-200.0 RELIEFRETER1ThisPageIntentionally LeftBlank.2RR51-1Rev.412/91  
ISI-T-200.0 RELIEF RE T ER 1 This Page Intentionally Left Blank.2RR51-1 Rev.4 12/91  
'(
'(
ISI-T-200.0 RELIEFRETR2System:P&ID:RHR,CoreSpray,ESW,RHRSW,HPCI,SBLCVariousPumps:Class:AllinabovesystemsVariousFunction:
ISI-T-200.0 RELIEF RE T R 2 System: P&ID: RHR, Core Spray, ESW, RHRSW, HPCI, SBLC Various Pumps: Class: All in above systems Various Function: Process flow for above systems Impractical Test Requirement:
ProcessflowforabovesystemsImpractical TestRequirement:
Section XI, Paragraph IWP-3210, Allowable Ranges of Inservice Test Quantities Basis for Relief: Ranges of acceptable instrument accuracies, as established by ASME Section XI paragraph IWP-4110 and Table IWP-4110-1 allow up to 6%error in pump pressure and fiow readings due to acceptable instrument accuracy of 6%(2%of full scale range times full scale range 3 times reference value).In contrast, the acceptable pump pressure and flow values required to result from pump tests, as established by ASME Section XI paragraph IWP-3100 and Table IWP-3100-2, are limited to a range extending only 2%above the corresponding reference value and only 6%flow or 7%pressure below the reference value.Alternative Testing: Actual instrument accuracies shall be applied to indicated values of pump flow and pressure.The values of pump flow and pressure, so corrected for the effects of instrument accuracy, shall be compared to the allowable ranges for the corresponding test quantities, from Table IWP-3100-2, for determination of acceptability.
SectionXI,Paragraph IWP-3210, Allowable RangesofInservice TestQuantities BasisforRelief:Rangesofacceptable instrument accuracies, asestablished byASMESectionXIparagraph IWP-4110andTableIWP-4110-1 allowupto6%errorinpumppressureandfiowreadingsduetoacceptable instrument accuracyof6%(2%offullscalerangetimesfullscalerange3timesreference value).Incontrast, theacceptable pumppressureandflowvaluesrequiredtoresultfrompumptests,asestablished byASMESectionXIparagraph IWP-3100andTableIWP-3100-2, arelimitedtoarangeextending only2%abovethecorresponding reference valueandonly6%flowor7%pressurebelowthereference value.Alternative Testing:Actualinstrument accuracies shallbeappliedtoindicated valuesofpumpflowandpressure.
Instrument accuracies for use in these corrections shall be determined, as needed, by calibration of the flow and/or pressure instruments utilized for the pump test.Actual instrument accuracies for use in these corrections shall conform to the acceptable instrument accuracies established for flow instruments and for pressure instruments by Table IWP-4110-1.
Thevaluesofpumpflowandpressure, socorrected fortheeffectsofinstrument
2RR52-1 Rev.4 12/91  
: accuracy, shallbecomparedtotheallowable rangesforthecorresponding testquantities, fromTableIWP-3100-2, fordetermination ofacceptability.
Instrument accuracies foruseinthesecorrections shallbedetermined, asneeded,bycalibration oftheflowand/orpressureinstruments utilizedforthepumptest.Actualinstrument accuracies foruseinthesecorrections shallconformtotheacceptable instrument accuracies established forflowinstruments andforpressureinstruments byTableIWP-4110-1.
2RR52-1Rev.412/91  


ISI-T-200.0 RELIEFREUESTNUMBER53System:HPCIP&IDValves:M-2156FV-25612Category:
ISI-T-200.0 RELIEF RE UEST NUMBER 53 System: HPCI P&ID Valves: M-2156 FV-25612 Category: B Class: Function: Opens to admit steam to HPCI turbine, closes to isolate steam in the event of a turbine trip.Impractical Test Requirements:
BClass:Function:
Stroke time valves when exercised, once per 92 days.Basis for Relief: The HPCI Turbine Stop Valve, FV-25612, has a design closure stroke time of 0.5 seconds.This rapid closure is accomplished by spring force.As a rapid-acting valve, closure of this valve cannot be timed accurately nor trended from test-to-test.
OpenstoadmitsteamtoHPCIturbine,closestoisolatesteamintheeventofaturbinetrip.Impractical TestRequirements:
In contrast, opening is accomplished hydraulically, by oil pressure working against spring force.Opening takes a much longer time than closing, but the length of time can vary greatly, depending on HPCI lube oil flow and pressure variations.
Stroketimevalveswhenexercised, onceper92days.BasisforRelief:TheHPCITurbineStopValve,FV-25612, hasadesignclosurestroketimeof0.5seconds.Thisrapidclosureisaccomplished byspringforce.Asarapid-acting valve,closureofthisvalvecannotbetimedaccurately nortrendedfromtest-to-test.
The turbine stop valve has no independent manual control, but rather is controlled only by HPCI turbine oil pressure.Repetitious starts and stops of the HPCI turbine and its lube oil pumps to support attempts to precisely time"stop valve movement are detrimental to the machine.The turbine stop valve is a skid-mounted component of the HPCI turbine, and structurally integrated with the turbine.Alternative Testing: Valve will be tested functionally.
Incontrast, openingisaccomplished hydraulically, byoilpressureworkingagainstspringforce.Openingtakesamuchlongertimethanclosing,butthelengthoftimecanvarygreatly,depending onHPCIlubeoilflowandpressurevariations.
each time the HPCI turbine is tested (quarterly).
Theturbinestopvalvehasnoindependent manualcontrol,butratheriscontrolled onlybyHPCIturbineoilpressure.
No stroke timing or trending will be performed.
Repetitious startsandstopsoftheHPCIturbineanditslubeoilpumpstosupportattemptstoprecisely time"stopvalvemovementaredetrimental tothemachine.Theturbinestopvalveisaskid-mounted component oftheHPCIturbine,andstructurally integrated withtheturbine.Alternative Testing:Valvewillbetestedfunctionally.
In addition, response time testing for the HPCI system will be performed in accordance with Technical Specifications once per 18 months.2RR53-1 Rev.5 05/93 1 J I ISI-T-200.0 REI IEP RE UEST NUMBER 54 System: PAID: Pumps: Class: RHR, Core Spray, ESW, RHRSW Various All in above systems Various Function: Process flow for above systems Impractical Test Requirement:
eachtimetheHPCIturbineistested(quarterly).
Paragraph IWP-3100, bearing temperature and lubricant level or pressure measurement, during test.Basis for Relief: The bearings for the pumps listed above are lubricated by the flowing fluid and therefore require no verification of adequate lubrication.
Nostroketimingortrendingwillbeperformed.
Similarly, the bearing temperatures cannot be accurately measured due to the flowing fluid.Alternative Testing: None;component vibration readings will serve as indications of pump mechanical condition.
Inaddition, responsetimetestingfortheHPCIsystemwillbeperformed inaccordance withTechnical Specifications onceper18months.2RR53-1Rev.505/93 1JI ISI-T-200.0 REIIEPREUESTNUMBER54System:PAID:Pumps:Class:RHR,CoreSpray,ESW,RHRSWVariousAllinabovesystemsVariousFunction:
2RR54-1 Rev.5 05/93 0'
ProcessflowforabovesystemsImpractical TestRequirement:
ISI-T-200.0 RELIEF RE T ER 55 System: P&ID'umps:
Paragraph IWP-3100, bearingtemperature andlubricant levelorpressuremeasurement, duringtest.BasisforRelief:Thebearingsforthepumpslistedabovearelubricated bytheflowingfluidandtherefore requirenoverification ofadequatelubrication.
Class: Function: RHR, Core Spray, HPCI Various All in above systems Various Process suction pressure for above systems Impractical Test Requirement:
Similarly, thebearingtemperatures cannotbeaccurately measuredduetotheflowingfluid.Alternative Testing:None;component vibration readingswillserveasindications ofpumpmechanical condition.
Section XI Paragraph IWP-4120, required range of test instruments Basis for Relief: it Full scale ranges of test instruments, as established by ASME Code Section XI paragraph IWP-4120, are limited to three times the reference value or less.In contrast, the four RHR System Pumps 2P202A/B/C/D have suction pressure reference values as low as 5 PSIG, but have suction pressure'ages, PI-2R002A/B/C/D permanently installed with full scale ranges 0-200 PSIG.Similarly, the four Core Spray System Pumps 2P206A/B/C/D have suction pressure reference values as low as 7 PSIG, but have suction pressure gages PI-2R001A/B/C/D permanently installed with full scale ranges 0-60 PSIG.Similarly, HPCI System Pump 2P204 has a suction pressure reference value of 18 PSIG, but has suction pressure gauge PI-1R606 permanently installed with a full scale range of 0-85 PSIG.These permanent plant instruments require the full scale ranges for which they have been designed and installed to be able to cover the full spectrum of operating conditions and configurations of their respective systems.These permanent plant instruments have greater reliability than temporary or permanent test instruments would have.The permanent plant instruments used for these tests have had the accuracy of their calibration specially enhanced at the nominal values of the test parameters; their accuracy within the range of test values is adequate for test purposes.The use of the permanent plant instruments for ISI pump testing ensures that pump suction pressures 2RR55-1 Rev.4 12/91  
2RR54-1Rev.505/93 0'
ISI-T-200.0 RELIEFRETER55System:P&ID'umps:
Class:Function:
RHR,CoreSpray,HPCIVariousAllinabovesystemsVariousProcesssuctionpressureforabovesystemsImpractical TestRequirement:
SectionXIParagraph IWP-4120, requiredrangeoftestinstruments BasisforRelief:itFullscalerangesoftestinstruments, asestablished byASMECodeSectionXIparagraph IWP-4120, arelimitedtothreetimesthereference valueorless.Incontrast, thefourRHRSystemPumps2P202A/B/C/D havesuctionpressurereference valuesaslowas5PSIG,buthavesuctionpressure'ages,PI-2R002A/B/C/D permanently installed withfullscaleranges0-200PSIG.Similarly, thefourCoreSpraySystemPumps2P206A/B/C/D havesuctionpressurereference valuesaslowas7PSIG,buthavesuctionpressuregagesPI-2R001A/B/C/D permanently installed withfullscaleranges0-60PSIG.Similarly, HPCISystemPump2P204hasasuctionpressurereference valueof18PSIG,buthassuctionpressuregaugePI-1R606permanently installed withafullscalerangeof0-85PSIG.Thesepermanent plantinstruments requirethefullscalerangesforwhichtheyhavebeendesignedandinstalled tobeabletocoverthefullspectrumofoperating conditions andconfigurations oftheirrespective systems.Thesepermanent plantinstruments havegreaterreliability thantemporary orpermanent testinstruments wouldhave.Thepermanent plantinstruments usedforthesetestshavehadtheaccuracyoftheircalibration specially enhancedatthenominalvaluesofthetestparameters; theiraccuracywithintherangeoftestvaluesisadequatefortestpurposes.
Theuseofthepermanent plantinstruments forISIpumptestingensuresthatpumpsuctionpressures 2RR55-1Rev.412/91  


TMJMBKR(Continued)
T MJMBKR (Continued)
ISI-T-200.0 arebeingmeasuredinthesamewayastheywouldifthepumpwereoperatedtofulfillitsdesignsafetyfunction.
ISI-T-200.0 are being measured in the same way as they would if the pump were operated to fulfill its design safety function.Repeated temporary installation and removal of suction pressure gages is impractical due to high potential for damage to the gages through the transport and work processes.
Repeatedtemporary installation andremovalofsuctionpressuregagesisimpractical duetohighpotential fordamagetothegagesthroughthetransport andworkprocesses.
Alternate Testing: Utilize permanent plant pump suction pressure instruments for ISI pump test suction pressure measurements in RHR, Core Spray, and HPCI Systems.2RR55-2 Rev.4 12/91  
Alternate Testing:Utilizepermanent plantpumpsuctionpressureinstruments forISIpumptestsuctionpressuremeasurements inRHR,CoreSpray,andHPCISystems.2RR55-2Rev.412/91  


ISI-T-200.0 RELIEFREER6ThisPageIntentionally LeftBlank.2RR56-1Rev.412/91  
ISI-T-200.0 RELIEF RE ER 6 This Page Intentionally Left Blank.2RR56-1 Rev.4 12/91  


ISI-T-200.0 RELIEFREYThisPageIntentionally LeftBlank.2RR57-1Rev.412/91  
ISI-T-200.0 RELIEF RE Y This Page Intentionally Left Blank.2RR57-1 Rev.4 12/91  
's.0 RELIEFRKUKSTNUlVfBER58(Continued)
's.0 RELIEF RK UKST NUlVfBER 58 (Continued)
ISI-T-200.0 RELIEFRKTKRSystemP&IDValveCategoryChssFunctionCIGCIGCIGCIGCIGCIGCIGCIGCIGCIGCACCACCACCACM-2126SV-22605M-2126SV-22643M-2126SV-22644M-2126SV-22648M-2126SV-22649M-2126SV-22651M-2126SV-22654A M-2126SV-22654B M-2126SV-22661M-2126SV-22671M-2157SV-25734A M-2157SV-25734B M-2157SV-25736A M-2157SV-25736B AContainment Isolation Instrument GasStorageInstrument GasStorageInstrument GasStorageInstrument GasStorageContainment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation CACM-2157SV-25737Containment Isolation CACCACCACCACCACM-2157SV-25738M-2157SV-25740A M-2157SV-25740B M-2157SV-25742A M-2157SV-25742B Containment Isolation Containment Isolation Containment Isolation Containment Isolation 2Containment Isolation CACM-2157SV-25750B CACM-2157SV-25750A Containment Isolation Containment Isolation CACM-2157SV-25752A Containment Isolation CACM-2157SV-25767CAC~M-2157SV-25752B Containment Isolation Containment Isolation 2RR58-IRev.412/91  
ISI-T-200.0 RELIEF RK T KR System P&ID Valve Category Chss Function CIG CIG CIG CIG CIG CIG CIG CIG CIG CIG CAC CAC CAC CAC M-2126 SV-22605 M-2126 SV-22643 M-2126 SV-22644 M-2126 SV-22648 M-2126 SV-22649 M-2126 SV-22651 M-2126 SV-22654A M-2126 SV-22654B M-2126 SV-22661 M-2126 SV-22671 M-2157 SV-25734A M-2157 SV-25734B M-2157 SV-25736A M-2157 SV-25736B A Containment Isolation Instrument Gas Storage Instrument Gas Storage Instrument Gas Storage Instrument Gas Storage Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation CAC M-2157 SV-25737 Containment Isolation CAC CAC CAC CAC CAC M-2157 SV-25738 M-2157 SV-25740A M-2157 SV-25740B M-2157 SV-25742A M-2157 SV-25742B Containment Isolation Containment Isolation Containment Isolation Containment Isolation 2 Containment Isolation CAC M-2157 SV-25750B CAC M-2157 SV-25750A Containment Isolation Containment Isolation CAC M-2157 SV-25752A Containment Isolation CAC M-2157 SV-25767 CAC~M-2157 SV-25752B Containment Isolation Containment Isolation 2RR58-I Rev.4 12/91  
>1~ip,'E0 RELIEFRETNUMBER(Cont'd.)
>1~i p,'E 0 RELIEF RE T NUMBER (Cont'd.)ISI-T-200.0 System CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC P&ID M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 Valve SV-25774A SV-25774B SV-25776A SV-25776B SV-25780A SV-25780B SV-25782A SV-25782B SV-25789 SV-257100A SV-257100B SV-257101A SV-257101B SV-257102A S V-257102B SV-257103A SV-257103B SV-257104 SV-257105 SV-257106 SV-257107 Category Chss Function Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isoaltion Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Impractical Test Requirement:
ISI-T-200.0 SystemCACCACCACCACCACCACCACCACCACCACCACCACCACCACCACCACCACCACCACCACCACP&IDM-2157M-2157M-2157M-2157M-2157M-2157M-2157M-2157M-2157M-2157M-2157M-2157M-2157M-2157M-2157M-2157M-2157M-2157M-2157M-2157M-2157ValveSV-25774A SV-25774B SV-25776A SV-25776B SV-25780A SV-25780B SV-25782A SV-25782B SV-25789SV-257100A SV-257100B SV-257101A SV-257101B SV-257102A SV-257102B SV-257103A SV-257103B SV-257104 SV-257105 SV-257106 SV-257107 CategoryChssFunctionContainment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isoaltion Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Impractical TestRequirement:
Valves with Remote Position Indicators shall be observed at least once every 2 years to verify that valve operation is accurately indicated.
ValveswithRemotePositionIndicators shallbeobservedatleastonceevery2yearstoverifythatvalveoperation isaccurately indicated.
Basis For Relief: The subject solenoid valves, all of which are manufactured by the Target Rock Corporation, all are constructed in a manner that precludes local verification of valve operation by direct observation.
BasisForRelief:Thesubjectsolenoidvalves,allofwhicharemanufactured bytheTargetRockCorporation, allareconstructed inamannerthatprecludes localverification ofvalveoperation bydirectobservation.
All movements and positions of valve parts are obscured by the valve structure within which they travel and 2RR58-2 Rev.4 12/91 h,p 1 I 1 I l 0 RELIEF RE T NVMBER (Cont'd.)ISI-T-200.
Allmovements andpositions ofvalvepartsareobscuredbythevalvestructure withinwhichtheytraveland2RR58-2Rev.412/91 h,p1I1Il0 RELIEFRETNVMBER(Cont'd.)
0 within which they are sealed.A method for indirect observation of valve movement, utilizing ferritic steel objects (steel shot)moved along the surface of each valve's indicating tube by the permanent magnet attached to the valve stem inside, was devised, used for 18 months, and subsequently abandoned because its employment necessitated partial disassembly of the solenoid valve for the test.This disassembly and reassembly, consisting of removal and reinstallation of the reed switch housing assembly, or cover, has been found to cause damage to the wiring and its connections to the reed switches.Alternative Testing;Confirmation of coincident valve movement and remote indication is accomplished by listening to the valve with a stethoscope, for the audible signal of the valve disk arriving at a new position.Accuracy of remote indication of valve operation is essentially verified for these solenoid valves at least once every 2 years by the combination of containment isolation valve leak testing (LLRT)(or instrument gas storage leakdown testing)with accomplishment of General Operating Procedures (GO-200-002) for plant startup and heatup.These activities are completed at least once each refueling shutdown, as follows:.Sy'tem Valve Refueling:;,:.Shutdown'"', Testing":;:.,Pro'cedure',:Verified-Valve~"':='osition ,y Startup;.'-Procedure(s)'
ISI-T-200.
C.Verified Valve-Position'IG CIG CIG CIG CIG CIG CIG CIG CIG CIG SV-22605 SE-259467 SV-22643 TP-225407 SV-22644 TP-225407 SV-22648 TP-225409 SV-22649 TP-225-009 SV-22651 SE-259437 SV-22654A SE-259446 SV-22654B SE-259438 SV-22661 SE-259-069 SV-22671 SE-259490 Closed OP-225401/GO-200402 Open OP-225401/GO-200-002 Closed OP-225-001/GO-200402 Open OP-225401/GO-200-002 Closed OP-225401/GO-200-002 Closed OP-225-001/GO-200-002 Closed OP-225-001/GO-200-002 Closed OP-225401/GO-200402 Closed OP-225401/GO-200402 Closed OP-225401/GO-200402 Open Open Open Open Open Open Open Open Open Open 2RR58-3 Rev.4 12/91 l 0 RELIEF RE T ER 58 (Cont'd.)ISI-T-200.0 System Valve Refueling; Shutdown Testing Procedure Verified Valve Position Startup Procedure(s)
0withinwhichtheyaresealed.Amethodforindirectobservation ofvalvemovement, utilizing ferriticsteelobjects(steelshot)movedalongthesurfaceofeachvalve'sindicating tubebythepermanent magnetattachedtothevalvesteminside,wasdevised,usedfor18months,andsubsequently abandoned becauseitsemployment necessitated partialdisassembly ofthesolenoidvalveforthetest.Thisdisassembly andreassembly, consisting ofremovalandreinstallation ofthereedswitchhousingassembly, orcover,hasbeenfoundtocausedamagetothewiringanditsconnections tothereedswitches.
Verified Valve Position 0 CAC SV-25734A SE-259419 CAC SV-25734B SE-259420 CAC SV-25736A SE-259-019 CAC SV-25736B SE-259-020 CAC SV-25737 SE-259-103 CAC SV-25738 SE-259-103 CAC SV-25740A SE-259419 CAC SV-25740B SE-259-020 CAC SV-25742A SE-259419 CAC SV-25742B SE-259420 CAC SV-25750A SE-259419 CAC SV-25750B SE-259420 CAC SV-25752A SE-259419 CAC SV-25752B SE-259420 CAC SV-25767 SE-259-102 CAC SV-25774A SE-259419 CAC SV-25774B SE-259420 CAC SV-25776A SE-259419 CAC SV-25776B SE-259420 CAC SV-25780A SE-259419 CAC SV-25780B SE-259420 CAC SV-25782A SE-259419 CAC SV-25782B SE-259420 CAC SV-25789 SE-259-102 CAC SV-257100A SE-259419 Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed OP-273401/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200-002 OP-273401/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200-002 OP-273401/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200402 OP-273-001/GO-200402 OP-273401/GO-200402 OP-273401/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200-002 OP-273-001/GO-200-002 OP-273-001/GO-200-002 Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open 2RR58-4 Rev.4 12/91 I (
Alternative Testing;Confirmation ofcoincident valvemovementandremoteindication isaccomplished bylistening tothevalvewithastethoscope, fortheaudiblesignalofthevalvediskarrivingatanewposition.
RELIEF RE T ER (Cont'd.)ISI-T-200.0 System Valve" Refueling.
Accuracyofremoteindication ofvalveoperation isessentially verifiedforthesesolenoidvalvesatleastonceevery2yearsbythecombination ofcontainment isolation valveleaktesting(LLRT)(orinstrument gasstorageleakdowntesting)withaccomplishment ofGeneralOperating Procedures (GO-200-002) forplantstartupandheatup.Theseactivities arecompleted atleastonceeachrefueling
''Shutdown Testing;.Procedure.
: shutdown, asfollows:.Sy'temValveRefueling
." ,Verified'alve:-
:;,:.Shutdown'"
Position..Startup.Procedure(s)
',Testing":;:.,Pro'cedure',
Verified Valve Position CAC SV-257100B SE-259420 CAC SV-257.101A SE-259419 CAC SV-257101B SE-259-020 CAC SV-257102A SE-259419 CAC SU-257102B SE-259420 CAC SV-257103A SE-259419 CAC SV-257103B SE-259-020 CAC SV-257104 SE-259419 CAC SV-257105 SE-259-019 CAC SV-257106 SE-259419 CAC SV-257107 SE-259-019 Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed OP-273401/GO-200402 OP-273-001/GO-200402 OP-273401/GO-200402 OP-273-001/GO-200402 OP-273-001/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200-002
:Verified
'OP-273-001/GO-200402 Open Open Open Open Open Open Open Open Open Open Open 2RR58-5 Rev.4 12/91  
-Valve~"':='osition
,yStartup;.'-Procedure(s)'
C.Verified Valve-Position'IG CIGCIGCIGCIGCIGCIGCIGCIGCIGSV-22605SE-259467 SV-22643TP-225407 SV-22644TP-225407 SV-22648TP-225409 SV-22649TP-225-009 SV-22651SE-259437 SV-22654A SE-259446 SV-22654B SE-259438 SV-22661SE-259-069 SV-22671SE-259490 ClosedOP-225401/GO-200402 OpenOP-225401/GO-200-002 ClosedOP-225-001/GO-200402 OpenOP-225401/GO-200-002 ClosedOP-225401/GO-200-002 ClosedOP-225-001/GO-200-002 ClosedOP-225-001/GO-200-002 ClosedOP-225401/GO-200402 ClosedOP-225401/GO-200402 ClosedOP-225401/GO-200402 OpenOpenOpenOpenOpenOpenOpenOpenOpenOpen2RR58-3Rev.412/91 l0 RELIEFRETER58(Cont'd.)
ISI-T-200.0 SystemValveRefueling; ShutdownTestingProcedure VerifiedValvePositionStartupProcedure(s)
VerifiedValvePosition0CACSV-25734A SE-259419 CACSV-25734B SE-259420 CACSV-25736A SE-259-019 CACSV-25736B SE-259-020 CACSV-25737SE-259-103 CACSV-25738SE-259-103 CACSV-25740A SE-259419 CACSV-25740B SE-259-020 CACSV-25742A SE-259419 CACSV-25742B SE-259420 CACSV-25750A SE-259419 CACSV-25750B SE-259420 CACSV-25752A SE-259419 CACSV-25752B SE-259420 CACSV-25767SE-259-102 CACSV-25774A SE-259419 CACSV-25774B SE-259420 CACSV-25776A SE-259419 CACSV-25776B SE-259420 CACSV-25780A SE-259419 CACSV-25780B SE-259420 CACSV-25782A SE-259419 CACSV-25782B SE-259420 CACSV-25789SE-259-102 CACSV-257100A SE-259419 ClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedOP-273401/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200-002 OP-273401/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200-002 OP-273401/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200402 OP-273-001/GO-200402 OP-273401/GO-200402 OP-273401/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200-002 OP-273-001/GO-200-002 OP-273-001/GO-200-002 OpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpen2RR58-4Rev.412/91 I(
RELIEFRETER(Cont'd.)
ISI-T-200.0 SystemValve"Refueling.
''ShutdownTesting;.Procedure.
.",Verified'alve:-
Position.
.Startup.Procedure(s)
VerifiedValvePositionCACSV-257100B SE-259420 CACSV-257.101A SE-259419 CACSV-257101B SE-259-020 CACSV-257102A SE-259419 CACSU-257102B SE-259420 CACSV-257103A SE-259419 CACSV-257103B SE-259-020 CACSV-257104 SE-259419 CACSV-257105 SE-259-019 CACSV-257106 SE-259419 CACSV-257107 SE-259-019 ClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedClosedOP-273401/GO-200402 OP-273-001/GO-200402 OP-273401/GO-200402 OP-273-001/GO-200402 OP-273-001/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200-002
'OP-273-001/GO-200402 OpenOpenOpenOpenOpenOpenOpenOpenOpenOpenOpen2RR58-5Rev.412/91  


ISI-T-200.0 RELIEFREUESTNUMBER59RELIEFREQUESTDELETEDThisPageIntentionally LeftBlank.2RR59-1Rev.505/93  
ISI-T-200.0 RELIEF RE UEST NUMBER 59 RELIEF REQUEST DELETED This Page Intentionally Left Blank.2RR59-1 Rev.5 05/93  
\0 RELIEFREUESTNUMBER60(Continued)
\0 RELIEF RE UEST NUMBER 60 (Continued)
ISI-T-200.0 RELIEFREUESTNUMBER605~)Sgstem,:-.'..:.':
ISI-T-200.0 RELIEF RE UEST NUMBER 60 5~)Sgstem,:-.'..:.':
MSIVMSIVMSIVMSIVMSIVMSIVMSIVMSIVM-2141M-2141M-2141M-2141M-2141M-2141M-2141M-2141g:':,.':gVaIi'e.NNumb'ir",
MSIV MSIV MSIV MSIV MSIV MSIV MSIV MSIV M-2141 M-2141 M-2141 M-2141 M-2141 M-2141 M-2141 M-2141 g:':,.':gVaIi'e.NNumb'ir",..;;.'41FO24A 241FO24B 241FO24C 241FO24D.241FO29A 241FO29B 241FO29C 241FO29D"%l;:;,YC;:CIass'!lg'j.::'.',Cat'egos,'.,,',;'unction:
..;;.'41FO24A 241FO24B241FO24C241FO24D.241FO29A241FO29B241FO29C241FO29D"%l;:;,YC;:CIass'!
Prevent reverse flow out through MSIV accumulator inlet (air)line.Impractical Test Requirement:
lg'j.::'.',Cat'egos,'.,,',;'unction:
Exercise valves to their closed positions once per 92 days (per IWP-3521).
PreventreverseflowoutthroughMSIVaccumulator inlet(air)line.Impractical TestRequirement:
Basis For Relief: These check valves, located in MSIV accumulator inlet(air) lines provide Containment Instrument Gas System and Instrument Air System gas flow into their respective MSIV accumulators, while , preventing flow of gas stored in the MSIV accumulator in the reverse direction, during closure of their respective MSIV's at the onset of a LOCA.Plant configuration and exclusion of personnel from the purged drywell during operation preclude completion of closure exercise testing throughout the period of each plant operating cycle.Any exercise testing of these check valves requires or causes closure of the associated MSIVs, rendering it impractical except during refueling outages.The design basis of these check valves for the inboard MSIVs is established by PP&L Calculations M-MSS-025 and M-MSS-028, from which testing appropriate to their safety function is derived.E Exercise testing of these check valves requires both access to each MSIV accumulator and that the MSIV associated with each check valve tested remain closed throughout the test to prevent unplanned actuations of Engineered Safety Features.As the primary containment is not opened and entered during every cold shutdown and as plant configuration does not always support MSIV closure 2RR60-1 Rev.5 05/93  
Exercisevalvestotheirclosedpositions onceper92days(perIWP-3521).
'Cs*I 0 RELIEF RE UEST NUMBER 60 (Continued)
BasisForRelief:Thesecheckvalves,locatedinMSIVaccumulator inlet(air) linesprovideContainment Instrument GasSystemandInstrument AirSystemgasflowintotheirrespective MSIVaccumulators, while,preventing flowofgasstoredintheMSIVaccumulator inthereversedirection, duringclosureoftheirrespective MSIV'sattheonsetofaLOCA.Plantconfiguration andexclusion ofpersonnel fromthepurgeddrywellduringoperation precludecompletion ofclosureexercisetestingthroughout theperiodofeachplantoperating cycle.Anyexercisetestingofthesecheckvalvesrequiresorcausesclosureoftheassociated MSIVs,rendering itimpractical exceptduringrefueling outages.ThedesignbasisofthesecheckvalvesfortheinboardMSIVsisestablished byPP&LCalculations M-MSS-025 andM-MSS-028, fromwhichtestingappropriate totheirsafetyfunctionisderived.EExercisetestingofthesecheckvalvesrequiresbothaccesstoeachMSIVaccumulator andthattheMSIVassociated witheachcheckvalvetestedremainclosedthroughout thetesttopreventunplanned actuations ofEngineered SafetyFeatures.
ISI-T-200.0 while primary containment entry is in progress, exercise testing of these check valves is not practical at every cold shutdown, and can be performed safely and reliably only during each refueling outage.A1ternative Testing: Demonstrate closure of each MSIV accumulator check valve by monitoring the essential restriction of its reverse flow of gas, through measurement of the rate of decay of pressure in its respective MSIV accumulator (downstream of the check valve under test)once per refueling outage.This MSIV accumulator pressure decay test provides verification of the closure of the inlet check valve.2RR60-2 Rev.5 05/93 P I'r Y' ISI-T-200.0 RELIEF RE UEST NUMBER 61 System: PAID: Valves: Control Rod Drive Hydraulic M-2147 XV-247FO10A, XV-247FO11A XV-247F010B, XV-247F011B Class: Function: CRD Scram Discharge Volume venting and draining Impractical Test Requirement:
Astheprimarycontainment isnotopenedandenteredduringeverycoldshutdownandasplantconfiguration doesnotalwayssupportMSIVclosure2RR60-1Rev.505/93  
'Cs*I0 RELIEFREUESTNUMBER60(Continued)
ISI-T-200.0 whileprimarycontainment entryisinprogress, exercisetestingofthesecheckvalvesisnotpractical ateverycoldshutdown, andcanbeperformed safelyandreliablyonlyduringeachrefueling outage.A1ternative Testing:Demonstrate closureofeachMSIVaccumulator checkvalvebymonitoring theessential restriction ofitsreverseflowofgas,throughmeasurement oftherateofdecayofpressureinitsrespective MSIVaccumulator (downstream ofthecheckvalveundertest)onceperrefueling outage.ThisMSIVaccumulator pressuredecaytestprovidesverification oftheclosureoftheinletcheckvalve.2RR60-2Rev.505/93 PI'rY' ISI-T-200.0 RELIEFREUESTNUMBER61System:PAID:Valves:ControlRodDriveHydraulic M-2147XV-247FO10A, XV-247FO11A XV-247F010B, XV-247F011B Class:Function:
CRDScramDischarge VolumeventinganddrainingImpractical TestRequirement:
Paragraph IWV-3417(a)
Paragraph IWV-3417(a)
Corrective Action,increasing testfrequency tomonthlywheneverstroketimeincreases by)25%(whenover10seconds)orby)50%(whenunder10seconds)~BasisForRelief:Theseglobevalvesareairoperatedandhavecomparatively complexactuation logicschemessequencing theirstartandstoptimes.P&IDM-2147Notes&#xb9;21Sc22establish additional restraints, whicharesatisfied administratively, uponthestroketimesandsequencing ofthesevalves.Thepneumatic actuators ofthesevalveshavetheirexhaustairflowsmeteredbyneedlevalves.Theiractuation rateisextremely sensitive totheslightest changesinthepositions oftheneedlesintheseneedlevalves,ascausedbyreadjustment, byphysicalshock,orbythermalchange.Byreadjustment oftheexhaustneedlevalveposition, thesevalvesaremaintained incompliance withthestroketimeandsequencing limitations ofthePAID,which,althoughdissimilar fromthoseofArticleIWV-3000, provideamorerelevantbasisforverifying theoperational readiness oftheseparticular valves.Stroketimemeasurement oftheseAOVsisprimarily ameasureofthebalanceoftheirentireactuating airsupply/exhaust network;itisnotareliablemeasureofthephysicalcondition ofthevalveundertest.Positionchangeofthecommonneedlevalvesintheactuating airexhaustlineshasbeentheprimary,dominant, andonlysignificant causeofchangesinstroketimesoftheseAOVs.Measurements ofthestroketimesoftheseAOVsareindicative mainlyofneedlevalveposition; andnotoftheAOVphysicalcondition.
Corrective Action, increasing test frequency to monthly whenever stroke time increases by)25%(when over 10 seconds)or by)50%(when under 10 seconds)~Basis For Relief: These globe valves are air operated and have comparatively complex actuation logic schemes sequencing their start and stop times.P&ID M-2147 Notes&#xb9;21 Sc 22 establish additional restraints, which are satisfied administratively, upon the stroke times and sequencing of these valves.The pneumatic actuators of these valves have their exhaust airflows metered by needle valves.Their actuation rate is extremely sensitive to the slightest changes in the positions of the needles in these needle valves, as caused by readjustment, by physical shock, or by thermal change.By readjustment of the exhaust needle valve position, these valves are maintained in compliance with the stroke time and sequencing limitations of the PAID, which, although dissimilar from those of Article IWV-3000, provide a more relevant basis for verifying the operational readiness of these particular valves.Stroke time measurement of these AOVs is primarily a measure of the balance of their entire actuating air supply/exhaust network;it is not a reliable measure of the physical condition of the valve under test.Position change of the common needle valves in the actuating air exhaust lines has been the primary, dominant, and only significant cause of changes in stroke times of these AOVs.Measurements of the stroke times of these AOVs are indicative mainly of needle valve position;and not of the AOV physical condition.
Mechanical failureofanyofthesevalveswouldcausealargeanddefinitive increaseinitsstroketime,causingittoexceedits30secondLimitStrokeTimeandplantTechnical Specification 4.1.3.1.4.a.1 limit.2RR61-1Rev.505/93 I~~
Mechanical failure of any of these valves would cause a large and definitive increase in its stroke time, causing it to exceed its 30 second Limit Stroke Time and plant Technical Specification 4.1.3.1.4.a.1 limit.2RR61-1 Rev.5 05/93 I~~
RELIEFREUESTNUMBER61(Continued)
RELIEF RE UEST NUMBER 61 (Continued)
ISI-T-200.0 Thesevalvesarelocatedinaradiologically contaminated areaoftheplant.Theyhavenoremotepositionindication usablefortesting;andtheyhavenoindividual controlmechanism (onlytwocommonpushbuttons):
ISI-T-200.0 These valves are located in a radiologically contaminated area of the plant.They have no remote position indication usable for testing;and they have no individual control mechanism (only two common pushbuttons):
Consequently, exercisetestingofthevalvesrequiressimultaneous entryoftheirradiologically contaminated areabyfourobservers.
Consequently, exercise testing of the valves requires simultaneous entry of their radiologically contaminated area by four observers.
Uponthecommonactuation ofallfourvalves,simultaneous directobservation (accompanied bystopwatch timing)ismadeofthevalvestemsofallfourAOVsduringtheirclosurestrokes.Thiscrudetestingmethodofsimultaneous directobservation ofvalvestemmotiondoesnotproducestroketimingresultsaccurate, enoughtojustifyanyconcernover25%(or50%)ratesofvariation inindividual stroketimemeasurements.
Upon the common actuation of all four valves, simultaneous direct observation (accompanied by stopwatch timing)is made of the valve stems of all four AOVs during their closure strokes.This crude testing method of simultaneous direct observation of valve stem motion does not produce stroke timing results accurate, enough to justify any concern over 25%(or 50%)rates of variation in individual stroke time measurements.
Alternative Testing:Exercisetestingofthefourvalvesistobeperformed quarterly, perIWV-3410requirements, exceptthattheIWV-3417(a) stroketimeincreaselimitations (of25%above10secondsand50%below10seconds)willnotbeapplied.Notrendingofvalvestroketimeswillbedone.2RR61-2Rev.505/93  
Alternative Testing: Exercise testing of the four valves is to be performed quarterly, per IWV-3410 requirements, except that the IWV-3417(a) stroke time increase limitations (of 25%above 10 seconds and 50%below 10 seconds)will not be applied.No trending of valve stroke times will be done.2RR61-2 Rev.5 05/93  
~,ft,1 ISI-T-200.0 RELIEFREUESTNUMBER62RELIEFREQUESTDELETEDThisPageIntentionally LeftBlank.2RR62-1Rev.505/93  
~, f t, 1 ISI-T-200.0 RELIEF RE UEST NUMBER 62 RELI EF REQU EST DELETED This Page Intentionally Left Blank.2RR62-1 Rev.5 05/93  


ISI-T-200.0 RELIEFREUESTNUMBER63System:P&ID:,Pumps:Class:HighPressureCoolantInjection M-21562P204and2P209(combination)
ISI-T-200.0 RELIEF RE UEST NUMBER 63 System: P&ID: , Pumps: Class: High Pressure Coolant Injection M-2156 2P204 and 2P209 (combination)
Impractical TestRequirement:
Impractical Test Requirement:
Paragraph IWP-3500(a) requiresforthedurationofthetesttobeatleast5minutes,withthepumprununderconditions asstableasthesystempermits.BasisForRelief:Thesepumpsaredrivenbyasteamturbinewhichexhaustssteamintothesuppression pool,heatingittowarditsTechnical Specification limitof105'F.Thisisaseverelimitation ontestduration.
Paragraph IWP-3500(a) requires for the duration of the test to be at least 5 minutes, with the pump run under conditions as stable as the system permits.Basis For Relief: These pumps are driven by a steam turbine which exhausts steam into the suppression pool, heating it toward its Technical Specification limit of 105'F.This is a severe limitation on test duration.Increasing suppression pool temperature toward its 105'F limit, while within limits, does reduce plant safety margin in the event of an accident occurring during or after a test.Frequent test repetition is not desirable due to the strong transient nature of a HPCI quick start.Such quick starts are recommended by INPO and have been adopted as PP&L's test method.Pump speed is not directly controllable, but can only be achieved through coordinated manipulation of the pump flow controller and the test system throttling valve.Test results are extremely sensitive to variations in pump speed;from all sources.These factors make this test uniquely time-dependent.
Increasing suppression pooltemperature towardits105'Flimit,whilewithinlimits,doesreduceplantsafetymarginintheeventofanaccidentoccurring duringorafteratest.Frequenttestrepetition isnotdesirable duetothestrongtransient natureofaHPCIquickstart.Suchquickstartsarerecommended byINPOandhavebeenadoptedasPP&L'stestmethod.Pumpspeedisnotdirectlycontrollable, butcanonlybeachievedthroughcoordinated manipulation ofthepumpflowcontroller andthetestsystemthrottling valve.Testresultsareextremely sensitive tovariations inpumpspeed;fromallsources.Thesefactorsmakethistestuniquelytime-dependent.
I Furthermore, the HPCI Pump quarterly surveillance test procedure is structured to first demonstrate satisfaction of Technical Specification 4.5.1.b.3 by running the pump at its rated flow rate and discharge pressure conditions, which create essentially the same test conditions as those for inservice testing.This prior technical specification test performance has the effect of providing several minutes of pump warmup time at rated conditions before the inservice test.Alternative Testing: The pumps shall be run for at least one minute under conditions as stable as the system permits.At the end of this time at least one measurement or observation of each of the quantities specified shall be made and recorded.2RR63-1 Rev.5 05/93 1 1~.I I ISI-T-200.0 RELIEF RE T ER 64 System ESW ESW ESW ESW P&ID M-2111 211132 M-2111 211133 M-2111 211134 M-2111 211135 Valve Category Class Function ESG&Load Center Rooms cooling ESG&Load Center Rooms cooling ESG&Load Center Rooms cooling ESG&Load Center Rooms cooling RCIC RCIC LPCS HPCI HPCI M-2149 249 F063 M-2149 249 F064 M-2151 251FO46 A/B/C/D M-2152 252FO36 A/B/C/D M-2155 255FO76 M-2155 255 F077 Turbine exh steam line vac brkr Turbine exh steam line vac brkr RHR pump minimum flow line CS pump minimum flow line Turbine exh steam line vac brkr Turbine exh steam line vac brkr Impractical Test Requirement:
IFurthermore, theHPCIPumpquarterly surveillance testprocedure isstructured tofirstdemonstrate satisfaction ofTechnical Specification 4.5.1.b.3 byrunningthepumpatitsratedflowrateanddischarge pressureconditions, whichcreateessentially thesametestconditions asthoseforinservice testing.Thispriortechnical specification testperformance hastheeffectofproviding severalminutesofpumpwarmuptimeatratedconditions beforetheinservice test.Alternative Testing:Thepumpsshallberunforatleastoneminuteunderconditions asstableasthesystempermits.Attheendofthistimeatleastonemeasurement orobservation ofeachofthequantities specified shallbemadeandrecorded.
NRC Generic Letter 89-04 Position 1 requirement that, during opening exercise testing, a check valve's"full-stroke" to the open position be verified by passage of"maximum required accident condition flow" through the check valve;and ASME Code Section XI Paragraph IWV-3521 requirement that check valves be tested every 3 months.Basis For Relief: In recognition that establishing design accident flow through these valves for testing could result in degradation or damage to major plant equipment, NRC Generic'Letter 89-04 Position 2 establishes that disassembly and inspection of these check valves may be used as a positive means of determining that a valve's disk will"full-stroke" open..., as permitted by ASME Code Section XI Paragraph IWV-3522.If possible, partial valve stroking quarterly or during cold shutdowns or after reassembly must be performed, additionally.
2RR63-1Rev.505/93 11~.II ISI-T-200.0 RELIEFRETER64SystemESWESWESWESWP&IDM-2111211132M-2111211133M-2111211134M-2111211135ValveCategoryClassFunctionESG&LoadCenterRoomscoolingESG&LoadCenterRoomscoolingESG&LoadCenterRoomscoolingESG&LoadCenterRoomscoolingRCICRCICLPCSHPCIHPCIM-2149249F063M-2149249F064M-2151251FO46A/B/C/DM-2152252FO36A/B/C/DM-2155255FO76M-2155255F077TurbineexhsteamlinevacbrkrTurbineexhsteamlinevacbrkrRHRpumpminimumflowlineCSpumpminimumflowlineTurbineexhsteamlinevacbrkrTurbineexhsteamlinevacbrkrImpractical TestRequirement:
Due to the scope of these inspections, the personnel hazards involved, and system operating restrictions, NRC Generic Letter 89-04 Position 2 establishes that valve disassembly and 2RR64-1 Rev.4 12/91 e'q I 0't 4~l I'l'n RELIEF RE UEST NUMBER 64 (Cont'd.)ISI-T-200.0 inspection may be performed during reactor refueling outages.As it is burdensome to disassemble and inspect all of the subject valves each refueling outage, NRC Generic Letter 89-04 Position 2 establishes that a sample inspection plan for groups of up to four identical valves in similar applications may be employed, within~the NRC guidelines specified within Position 2.Alternative Testing: Perform partial valve stroke exercise testing at quarterly testing frequency, at cold shutdown testing frequency, or at other frequency, as specified in separate Relief Requests, specific to each check valve.Establish and employ a sample disassembly and , inspection plan for groups of up to four identical valves in similar applications.
NRCGenericLetter89-04Position1requirement that,duringopeningexercisetesting,acheckvalve's"full-stroke" totheopenpositionbeverifiedbypassageof"maximumrequiredaccidentcondition flow"throughthecheckvalve;andASMECodeSectionXIParagraph IWV-3521requirement thatcheckvalvesbetestedevery3months.BasisForRelief:Inrecognition thatestablishing designaccidentflowthroughthesevalvesfortestingcouldresultindegradation ordamagetomajorplantequipment, NRCGeneric'Letter 89-04Position2establishes thatdisassembly andinspection ofthesecheckvalvesmaybeusedasapositivemeansofdetermining thatavalve'sdiskwill"full-stroke" open...,aspermitted byASMECodeSectionXIParagraph IWV-3522.
Disassemble, inspect, verify structural soundness of internal components, and manually exercise the disk through its full stroke for one different valve in each group at each successive refueling outage (or 18 month+3 month period for common plant valves and ESW valves), until the entire group has been inspected.
Ifpossible, partialvalvestrokingquarterly orduringcoldshutdowns orafterreassembly mustbeperformed, additionally.
As an alternative to inspection, optionally perform full valve stroke exercise testing, utilizing a non-intrusive diagnostic test system, employing externally generated magnetic flux monitoring, acoustic emission monitoring and/or ultrasonic techniques, on the same schedule;i.e., diagnostic test one different valve in each group at each successive refueling outage (or 18 month+3 month period for common plant valves), until the entire group has been'iagnostic-tested or inspected.
Duetothescopeoftheseinspections, thepersonnel hazardsinvolved, andsystemoperating restrictions, NRCGenericLetter89-04Position2establishes thatvalvedisassembly and2RR64-1Rev.412/91 e'qI0't4~lI'l'n RELIEFREUESTNUMBER64(Cont'd.)
2RR64-2 Rev.5 05/93 y~4'I 1 k 4'IN Q g d ISI-T-200.0 RELIEF RE UEST NUMBER 65 O'',System':"'.:.::,-:P&lo.~
ISI-T-200.0 inspection maybeperformed duringreactorrefueling outages.Asitisburdensome todisassemble andinspectallofthesubjectvalveseachrefueling outage,NRCGenericLetter89-04Position2establishes thatasampleinspection planforgroupsofuptofouridentical valvesinsimilarapplications maybeemployed, within~theNRCguidelines specified withinPosition2.Alternative Testing:Performpartialvalvestrokeexercisetestingatquarterly testingfrequency, atcoldshutdowntestingfrequency, oratotherfrequency, asspecified inseparateReliefRequests, specifictoeachcheckvalve.Establish andemployasampledisassembly and,inspection planforgroupsofuptofouridentical valvesinsimilarapplications.
RCIC M-2149 FPC&C M-2153 HPCI M-2155 HPCI M-2155 HPCI M-2156 HPCI M-2156~':.i.".:,,;:i,:.'::.";;',Vil'v,e;,:'.;:.:';:::;,':;:..:':,'"'',',,",'';'::,:;,i;::
Disassemble, inspect,verifystructural soundness ofinternalcomponents, andmanuallyexercisethediskthroughitsfullstrokeforonedifferent valveineachgroupateachsuccessive refueling outage(or18month+3monthperiodforcommonplantvalvesandESWvalves),untiltheentiregrouphasbeeninspected.
Asanalternative toinspection, optionally performfullvalvestrokeexercisetesting,utilizing anon-intrusive diagnostic testsystem,employing externally generated magneticfluxmonitoring, acousticemissionmonitoring and/orultrasonic techniques, onthesameschedule; i.e.,diagnostic testonedifferent valveineachgroupateachsuccessive refueling outage(or18month+3monthperiodforcommonplantvalves),untiltheentiregrouphasbeen'iagnostic-tested orinspected.
2RR64-2Rev.505/93 y~4'I1k4'INQgd ISI-T-200.0 RELIEFREUESTNUMBER65O'',System':"'.:.::,-:P&lo.~
RCICM-2149FPC&CM-2153HPCIM-2155HPCIM-2155HPCIM-2156HPCIM-2156~':.i.".:,,;:i,:.'::.";;',Vil'v,e;,:'.;:.:';:::;,':;:..:':,'"'',',,",'';'::,:;,i;::
.':::;:::;.:':;,Cate'jo'ry",.:',::::;;
.':::;:::;.:':;,Cate'jo'ry",.:',::::;;
249F021253071A/B,255F045255F046256F048256F057Clas's':;::
249F021 253071 A/B , 255 F045 255F046 256F048 256F057 Clas's':;::
2RCICpumpminimumflowlineFPC&Cisolation fromESWsystem2HPCIsupppoolsuctionline2HPCIpumpminimumfiowlineHPCIlubeoilcoolerreturnline2HPCIlubeoiloutletlineImpractical TestRequirement:
2 RCIC pump minimum flow line FPC&C isolation from ESW system 2 HPCI supp pool suction line 2 HPCI pump minimum fiow line HPCI lube oil cooler return line 2 HPCI lube oil outlet line Impractical Test Requirement:
NRCGenericLetter89-04Position1requirement that,duringopeningexercisetesting,acheckvalve's"full-stroke" totheopenpositionbeverifiedbypassageof"maximumrequiredaccidentcondition flow"throughthecheckvalve;andASMECodeSectionXIParagraph IWV-3521requirement thatcheckvalvesbetestedevery3months.BasisForRelief:,Inrecognition thatestablishing designaccidentflowthroughthesevalvesfortestingcouldresultindegradation ordamagetomajorplantequipment, NRCGenericLetter89-04Position2establishes thatdisassembly andinspection ofthesecheckvalvesmaybeusedasapositivemeansofdetermining thatavalve'sdiskwill"full-stroke" open...,aspermitted byASMECodeSectionXIParagraph IWV-3522.
NRC Generic Letter 89-04 Position 1 requirement that, during opening exercise testing, a check valve's"full-stroke" to the open position be verified by passage of"maximum required accident condition flow" through the check valve;and ASME Code Section XI Paragraph IWV-3521 requirement that check valves be tested every 3 months.Basis For Relief:, In recognition that establishing design accident flow through these valves for testing could result in degradation or damage to major plant equipment, NRC Generic Letter 89-04 Position 2 establishes that disassembly and inspection of these check valves may be used as a positive means of determining that a valve's disk will"full-stroke" open..., as permitted by ASME Code Section XI Paragraph IWV-3522.If possible, partial valve stroking quarterly or during cold shutdowns or after reassembly must be performed, additionally.
Ifpossible, partialvalvestrokingquarterly orduringcoldshutdowns orafterreassembly mustbeperformed, additionally.
Due to the scope of these inspections, the personnel hazards involved, and system operating restrictions, NRC Generic Letter 89-04 Position 2 establishes that valve disassembly and inspection may be performed during reactor refueling outages.As it is burdensome to disassemble and inspect all of the subject valves each refueling outage, NRC Generic Letter 89-04 Position 2 establishes that a sample inspection plan for groups of up to four identical valves in similar applications may be employed, within the NRC guidelines specified 2RR65-1 Rev.4 12I91 p I 0 RELIEF RE VEST NUMBER 65 (Cont'd.)ISI-T-200.0 within Position 2.As the population of identical valves, among those listed above, is extremely small," groups of up to four identical valves in similar applications in both units will be created for sampling.Alternative Testing: Perform partial valve stroke exercise testing at quarterly testing frequency, at cold shutdown testing frequency, or at other frequency, as specified in separate Relief Requests, specific to each check valve.Establish and employ a sample disassembly and inspection plan for groups of up to four identical valves, shared among both units, in similar applications.
Duetothescopeoftheseinspections, thepersonnel hazardsinvolved, andsystemoperating restrictions, NRCGenericLetter89-04Position2establishes thatvalvedisassembly andinspection maybeperformed duringreactorrefueling outages.Asitisburdensome todisassemble andinspectallofthesubjectvalveseachrefueling outage,NRCGenericLetter89-04Position2establishes thatasampleinspection planforgroupsofuptofouridentical valvesinsimilarapplications maybeemployed, withintheNRCguidelines specified 2RR65-1Rev.412I91 pI0 RELIEFREVESTNUMBER65(Cont'd.)
Disassemble, inspect, verify structural soundness of internal components, and manually exercise the disk through its full stroke for one different valve in each group at every"pair" of refueling outages, alternating between the two units, until the entire group has been inspected.
ISI-T-200.0 withinPosition2.Asthepopulation ofidentical valves,amongthoselistedabove,isextremely small,"groupsofuptofouridentical valvesinsimilarapplications inbothunitswillbecreatedforsampling.
The Fuel Pool Cooling and Cleanup check valves, not normally tested during refueling outages, are tested on a 72 month frequency for each valve.As an alternative to inspection, optionally perform full valve stroke exercise testing, utilizing a non-intrusive diagnostic test system, employing externally generated magnetic flux monitoring, acoustic emission monitoring and/or ultrasonic techniques, on the same schedule;i.e., diagnostic test one different valve in each group at every"pair" of refueling outages, alternating between the two units, until the entire group has been diagnostic-tested or inspected.
Alternative Testing:Performpartialvalvestrokeexercisetestingatquarterly testingfrequency, atcoldshutdowntestingfrequency, oratotherfrequency, asspecified inseparateReliefRequests, specifictoeachcheckvalve.Establish andemployasampledisassembly andinspection planforgroupsofuptofouridentical valves,sharedamongbothunits,insimilarapplications.
2RR65-2 Rev.4 12/91 I'I*'I't~I~~I*II~'I~J~'\~
Disassemble, inspect,verifystructural soundness ofinternalcomponents, andmanuallyexercisethediskthroughitsfullstrokeforonedifferent valveineachgroupatevery"pair"ofrefueling outages,alternating betweenthetwounits,untiltheentiregrouphasbeeninspected.
ISI-T-200.0 RELIEF RE VEST NUMBER 66 System: P&ID: Valves: Category: Class: Function: Containment Instrument Gas M-2126 226018 and 226029 Provide Actuating Gas to Automatic Depressurization Feature of Main Steam Relief Valves.Impractical Test Requirement:
TheFuelPoolCoolingandCleanupcheckvalves,notnormallytestedduringrefueling outages,aretestedona72monthfrequency foreachvalve.Asanalternative toinspection, optionally performfullvalvestrokeexercisetesting,utilizing anon-intrusive diagnostic testsystem,employing externally generated magneticfluxmonitoring, acousticemissionmonitoring and/orultrasonic techniques, onthesameschedule; i.e.,diagnostic testonedifferent valveineachgroupatevery"pair"ofrefueling outages,alternating betweenthetwounits,untiltheentiregrouphasbeendiagnostic-tested orinspected.
Basis For Relief: Exercise valves once per 92 days (per IWV-3521).
2RR65-2Rev.412/91 I'I*'I't~I~~I*II~'I~J~'\~
Closure of the subject valves for exercise testing interrupts instrument gas supply to the ADS solenoids of the Safety/Relief Valves, compromising their ability to provide the opening motive force for the ADS valves, in support of the" long-term cooling ECCS function.Due to the configuration of the CIG System, depressurization and venting of sufficient pipe lines to permit closure exercise testing of these valves further interrupts instrument gas supply to several important valves inside containment, such as the Safety/Relief Valves (non-ADS relief function)and the MSIV'S.This could compromise the ability of the SRV's to operate in the relief mode which, while not an ECCS function, is important to safety.Loss of instrument gas supply could also cause the MSIV's to close, resulting in a severe reactor transient if operating; or in an undesirable ESF actuation, if shut down.Loss of instrument gas supply could also cause isolation of the drywell cooling lines, resulting in a drywell temperature excursion.
ISI-T-200.0 RELIEFREVESTNUMBER66System:P&ID:Valves:Category:
Testing of these check valves at every cold shutdown is not practical because it requires isolation of a line feeding 25 air operated primary containment isolation valves.Isolation of this line at any time other than at a refueling outage creates the danger of unplanned actuations of Engineered Safety Features.Additionally, 4 of these 25 air operated containment isolation valves isolate drywell cooling lines.2RR66-1 Rev.5 05/93  
Class:Function:
~4 r su I l I N~J~4 E~y A~P'I P I JC l' ISI-T-200.0 Unplanned isolation of dry well cooling during cold shutdown could cause a containment temperature transient that could exceed the design maximum temperature of the drywell.Only during refueling outages are provisions made for temporary additional cooling of the drywell.Alternative Testing: Demonstrate closure of each check valve by monitoring the essential restriction of its reverse airflow, through the test connection downstream of the opposite division check valve, once per refueling outage.2RR66-2 Rev.5 05/93  
Containment Instrument GasM-2126226018and226029ProvideActuating GastoAutomatic Depressurization FeatureofMainSteamReliefValves.Impractical TestRequirement:
,s, II)c p II=I~4 I h i I f~r M d J 1 n~~P II ISI-T-200.0 RELIEF RE UEST NUMBER 67.;:I..;.:-.''i::,::System'::.",:.::p:,'.'":,",,''.i,:!,::,"':,'P&lO:,;,;
BasisForRelief:Exercisevalvesonceper92days(perIWV-3521).
Closureofthesubjectvalvesforexercisetestinginterrupts instrument gassupplytotheADSsolenoids oftheSafety/Relief Valves,compromising theirabilitytoprovidetheopeningmotiveforcefortheADSvalves,insupportofthe"long-term coolingECCSfunction.
Duetotheconfiguration oftheCIGSystem,depressurization andventingofsufficient pipelinestopermitclosureexercisetestingofthesevalvesfurtherinterrupts instrument gassupplytoseveralimportant valvesinsidecontainment, suchastheSafety/Relief Valves(non-ADSrelieffunction) andtheMSIV'S.Thiscouldcompromise theabilityoftheSRV'stooperateinthereliefmodewhich,whilenotanECCSfunction, isimportant tosafety.Lossofinstrument gassupplycouldalsocausetheMSIV'stoclose,resulting inaseverereactortransient ifoperating; orinanundesirable ESFactuation, ifshutdown.Lossofinstrument gassupplycouldalsocauseisolation ofthedrywellcoolinglines,resulting inadrywelltemperature excursion.
Testingofthesecheckvalvesateverycoldshutdownisnotpractical becauseitrequiresisolation ofalinefeeding25airoperatedprimarycontainment isolation valves.Isolation ofthislineatanytimeotherthanatarefueling outagecreatesthedangerofunplanned actuations ofEngineered SafetyFeatures.
Additionally, 4ofthese25airoperatedcontainment isolation valvesisolatedrywellcoolinglines.2RR66-1Rev.505/93  
~4rsuIlIN~J~4E~yA~P'IPIJCl' ISI-T-200.0 Unplanned isolation ofdrywellcoolingduringcoldshutdowncouldcauseacontainment temperature transient thatcouldexceedthedesignmaximumtemperature ofthedrywell.Onlyduringrefueling outagesareprovisions madefortemporary additional coolingofthedrywell.Alternative Testing:Demonstrate closureofeachcheckvalvebymonitoring theessential restriction ofitsreverseairflow,throughthetestconnection downstream oftheoppositedivisioncheckvalve,onceperrefueling outage.2RR66-2Rev.505/93  
,s,II)cpII=I~4IhiIf~rMdJ1n~~PII ISI-T-200.0 RELIEFREUESTNUMBER67.;:I..;.:-.''i::,::System'::.",:.::p:,'.'":,",,''.i,:!,::,"':,'P&lO:,;,;
:':-::::::::::::
:':-::::::::::::
:.'<%Vali'es::::
:.'<%Vali'es::::
4::':'"::::":
4::':'"::::":
'"':>'Categoiy'"'':::::::
'"':>'Categoiy'"'':::::::
Clasi'HRRHRRHRRHRCoreSprayCoreSprayCoreSprayM-2151M-2151M-2151M-2151M-2151M-2151M-2151M-2152M-2152,M-2152HV-251F008 HV-251F009 HV-251F015A/B HV-251F022 HV-251F023 HV-251FOSOA/B HV-251F122A/B HV-252F005A/B HV-252F006A/B HV-252F037A/B AAFunction:
Clasi'HR RHR RHR RHR Core Spray Core Spray Core Spray M-2151 M-2151 M-2151 M-2151 M-2151 M-2151 M-2151 M-2152 M-2152, M-2152 HV-251F008 HV-251F009 HV-251F015A/B HV-251F022 HV-251F023 HV-251FOSOA/B HV-251F122A/B HV-252F005A/B HV-252F006A/B HV-252F037A/B A A Function: F Impractical Test Requirement:
FImpractical TestRequirement:
Pressure Isolation of reactor coolant system pressure from each attached low pressure system.'dditional corrective actions specified for valves 6 inches and larger, that exhibit increases in leakage rate, per IWV-3427(b).
PressureIsolation ofreactorcoolantsystempressurefromeachattachedlowpressuresystem.'dditional corrective actionsspecified forvalves6inchesandlarger,thatexhibitincreases inleakagerate,perIWV-3427(b).
Basis For Relief: Alternative Testing: Leakage rate testing is governed by Susquehanna SES Technical Specification 3.4.3.2.Compliance with these requirements is described in Technical Specification 4.4.3.2.The additional corrective actions specified by ASME Code Section XI, paragraph IWV-3427(b) are not generally effective.
BasisForRelief:Alternative Testing:LeakageratetestingisgovernedbySusquehanna SESTechnical Specification 3.4.3.2.Compliance withtheserequirements isdescribed inTechnical Specification 4.4.3.2.Theadditional corrective actionsspecified byASMECodeSectionXI,paragraph IWV-3427(b) arenotgenerally effective.
Their usefulness does not justify the burden of complying with this requirement.
Theirusefulness doesnotjustifytheburdenofcomplying withthisrequirement.
Their adherence could require a shutdown of the plant during an 18 month operating cycle for the accompishment of the additional leakage tests.II Pressure isolation valve testing will be performed in accordance with Technical Specification 4.4.3.2.Evaluation of pressure isolation valve leak test results will be conducted in accordance with the requirements of Technical Specification 3.4.3.2.,Leakage rate measurements shall be compared with previous measurements and with the permissible valve leakage rates specified by Technical Specification 3.4.3.2.2RR67-1 Rev.5 05/93 e~I~~IV I~~e~, I~I~"~'~'~.4".,'4"~I'I v I~~I fd I'4 ,)~,~4))~-4 I~e I IC ISI-T-200.0 RELIEF RE UEST NUMBER 68 System: P&ID: Valve: Category: Class: Function: General General General General General As applicable to specific valves.Impractical Test Requirement:
Theiradherence couldrequireashutdownoftheplantduringan18monthoperating cyclefortheaccompishment oftheadditional leakagetests.IIPressureisolation valvetestingwillbeperformed inaccordance withTechnical Specification 4.4.3.2.Evaluation ofpressureisolation valveleaktestresultswillbeconducted inaccordance withtherequirements ofTechnical Specification 3.4.3.2.,Leakage ratemeasurements shallbecomparedwithpreviousmeasurements andwiththepermissible valveleakageratesspecified byTechnical Specification 3.4.3.2.2RR67-1Rev.505/93 e~I~~IVI~~e~,I~I~"~'~'~.4".,'4"~I'IvI~~IfdI'4,)~,~4))~-4I~eIIC ISI-T-200.0 RELIEFREUESTNUMBER68System:P&ID:Valve:Category:
Paragraph IWV-3412 requires that valves that cannot be exercised during plant operation be specifically identified by the Owner and be full stroke exercised during cold shutdowns.
Class:Function:
Basis For Relief: By omission of any exceptions, the paragraph IWV-3412 statement implies that all valves not exercised during normal plant operation must be exercised at every cold shutdown, meeting the 3 month test interval qualification.
GeneralGeneralGeneralGeneralGeneralAsapplicable tospecificvalves.Impractical TestRequirement:
In rare cases where it may be advantageous to resume operation immediately after reaching cold shutdown, plant duration in the cold shutdown condition may not permit exercise testing of all valves designated for test.In such cases, maintaining the plant in a cold shutdown status solely to exercise test additional valves would not justify the burden of complying'with this requirement.
Paragraph IWV-3412requiresthatvalvesthatcannotbeexercised duringplantoperation bespecifically identified bytheOwnerandbefullstrokeexercised duringcoldshutdowns.
Alternative Testing: Exercise testing of cold shutdown frequency valves shall commence no later than 48 hours after the plant enters Cold Shutdown (Operational Condition 4)from Power Operation, except during refueling outages.Valves identified for cold shutdown test frequency are subject to testing if they have not been tested in the previous 92 days.Testing shall continue until all subject valves are tested or the plant begins startup.Testing at subsequent cold shutdowns will commence with those valves having the longest interval, greater than 92 days, since previous tests.2RR68-1 Rev.5 05/93}}
BasisForRelief:Byomissionofanyexceptions, theparagraph IWV-3412statement impliesthatallvalvesnotexercised duringnormalplantoperation mustbeexercised ateverycoldshutdown, meetingthe3monthtestintervalqualification.
Inrarecaseswhereitmaybeadvantageous toresumeoperation immediately afterreachingcoldshutdown, plantdurationinthecoldshutdowncondition maynotpermitexercisetestingofallvalvesdesignated fortest.Insuchcases,maintaining theplantinacoldshutdownstatussolelytoexercisetestadditional valveswouldnotjustifytheburdenofcomplying
'withthisrequirement.
Alternative Testing:Exercisetestingofcoldshutdownfrequency valvesshallcommencenolaterthan48hoursaftertheplantentersColdShutdown(Operational Condition 4)fromPowerOperation, exceptduringrefueling outages.Valvesidentified forcoldshutdowntestfrequency aresubjecttotestingiftheyhavenotbeentestedintheprevious92days.Testingshallcontinueuntilallsubjectvalvesaretestedortheplantbeginsstartup.Testingatsubsequent coldshutdowns willcommencewiththosevalveshavingthelongestinterval, greaterthan92days,sinceprevioustests.2RR68-1Rev.505/93}}

Revision as of 19:54, 7 July 2018

Rev 5 to ISI-T-200.0, ISI Program Plan for Pump & Valve Operational Testing.
ML17157C390
Person / Time
Site: Susquehanna  
Issue date: 05/31/1993
From:
PENNSYLVANIA POWER & LIGHT CO.
To:
Shared Package
ML17157C389 List:
References
GL-89-04, GL-89-4, ISI-T-200.0, NUDOCS 9307020026
Download: ML17157C390 (275)


Text

ISI-T-200.0 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 2 INSERVICE INSPECTION PROGRAM PI.AN'!PUMP AND VALVE OPERATIONAL TESTING Compliance with NRC Generic Letter 89-04 Responses to NRC Comments'i':,;::::;.':-,"'.:Pr'ep'ar'etI':b'j:>.':::::.:'.':.':;'.':

Signatures on File Signatures on File'.,;.',,,pprov'ed:bj,;~>'<5:::':::::::::

Date'.!': 9307020026 930623 PDR ADOCK 05000387 G PDR 2T-1 Rev.5 05j98 it O'1 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 2 PUMP AND VALVE INSERVICE INSPECTION TESTING PROGRAM TITLE: Page 2T-1 DESCRIPTION:

Page 2D-1 Page 2D-2 LEGENDS: Page 2LV-1 Page 2LV-2 Page 2LP-1 VALVE TABLES: Page 2VT-1 Page 2VT-2 Page 2VT-3 Page 2VT-4 Page 2VT-5 Page 2VT-6 Page 2VT-7 Page 2VT-8 Page 2VT-9 Page 2VT-10 Page 2VT-11 Page 2VT-12 Page 2VT-13 Page 2VT-14:,:j>>::,":;.:',";

'::Reiisioii':::::."-;::'::'::
'":.;:::;:::-'::,,",3::>Dated::'::::.':i::;:;';;::~;;.".," 05/93 05/93 05/93 12/91 05/93 12/91 12/91 12/91 12/91 12/91 12/91 05/93 05/93 12/91 12/91 12/91 12/91 12/91 12/91 12/91 LEP-1 05/93

~%'I, ISI-T-200.0 Page 2VT-43 Page 2VT-44 Page 2VT-45 Page 2VT-46 Page 2VT-47 Page 2VT-48 Page 2VT-49 Page 2VT-50 Page 2VT-51 Page 2VT-52 Page 2VT-53 Page 2VT-54 Page 2VT-55 Page 2VT-56 Page 2VT-57 Page 2VT-58 Page 2VT-59 Page 2VT-60 Page 2VT-61 Page 2VT-62 Page 2VT-63 Page 2VT-64 Page 2VT-65 Page 2VT-66 Page 2VT-67 Page 2VT-68 Page 2VT-69 Page 2VT-70 LEP-3 5 12/91 05/93 05/93 12/91 05/93 05/93 12/91 12/91 12/91 12/91 12/91 12/91 12/91 12/91 12/91 12/91 05/93 05/93 05/93 05/93 05/93 05/93 05/93 05/93 05/93 05/93 05/93 05/93 05/93 ISI-T-200.0 Page 2VT-71-PUMP TABLES: Page 2PT-1 Page 2PT-2 Page 2PT-3 Page 2PT-4 RELIEF REQUESTS: Page 2RRT-1 Page 2RR1-1 Page 2RR2-1 Page 2RR2-2 Page 2RR3-1 Page 2RR4-1 Page 2RR5-1 Page 2RR6-1:,:;','.'::.',::.::":;:

Revisioii";.";:j",.':;;":;,:"::,':::i:;:::.'"i'::

';j.",:9ate'I,'::,;';:';:'!;:,j:

05/93 12/91 12/91 12/91 12/91 12/91 05/93 12/91 12/91 05/93 05/93 05/93 05/93 Page 2RR7-1 Page 2RRS-1 Page 2RR9-1 Page 2RR10-1 Page 2RR10-2 Page 2RR11-1 Page 2RR12-1 Page 2RR13-1 Page 2RR14-1 Page 2RR15-1 Page 2RR16-1 Page 2RR17-1 Page 2RR17-2 LEP-4 4 12/91 12/91 12/91 05/93 05/93 05/93 12/91 05/93 12/91 12/91 05/93 12/91 12/91 05/93 ISI-T-200.0 Page 2RR17-3 Page 2RR18-1 Page 2RR19-1 Page 2RR20-1 Page 2RR20-2 Page 2RR21-1 Page 2RR22-1 Page 2RR23-1 Page 2RR24-1 Page 2RR24-2 Page 2RR25-1 Page 2RR26-1 Page 2RR27-1 Page 2RR28-1 Page 2RR29-1 Page 2RR30-1 Page 2RR31-1 Page 2RR32-1 Page 2RR33-1 Page 2RR34-1 Page 2RR35-1 Page 2RR36-1 Page 2RR37-1 Page 2RR38-1 Page 2RR39-1 Page 2RR40-1 Page 2RR41-1 Page 2RR42-1 LEP-5 5 5 12/91 12/91 12/91 12/91 05/93 12/91 12/91 05/93 12/91 12/91 12/91 05/93 12/91 12/91 05/93 05/93 12/91 12/91 05/93 12/91 12/91 12/91 05/93 05/93 05/93 12/91 12/91 12/91 05/93

~v ISI-T-200.0 Page 2RR43-1 Page 2RR44-1 Page 2RR45-1 Page 2RR46-1 Page 2RR47-1 Page 2RR48-1 Page 2RR49-1 Page 2RR50-1 Page 2RR51-1 Page 2RR52-1 Page 2RR53-1 Page 2RR54-1 Page 2RR55-1 Page 2RR55-2 Page 2RR56-1 Page 2RR57-1 Page 2RR58-1 Page 2RR58-2 Page 2RR58-3 Page 2RR584 Page 2RR58-5 Page 2RR59-1 Page 2RR60-1 Page 2RR60-2 Page 2RR61-1 Page 2RR61-2 Page 2RR62-1 Page 2RR63-1:;:.':.:;:,";.:;:..;':::

Rem)vari':, i:;:~:: i 4 LEP-6::;:::;:.','::::.:'I::

9ated::,::i.;'i.:.;'i!:::::;;.':;:.

12/91 12/91 05/93 12/91 12/91 05/93 05/93 12/91 12/91 12/91 05/93 05/93 12/91 12/91 12/91 12/91 12/91 12/91 12/91 12/91 12/91 05/93 05/93 05/93 05/93 05/03 05/93 05/93 05/93 ISI-T-200.0 Page 2RR64-1 Page 2RR64-2 Page 2RR65-1 Page 2RR65-2 Page 2RR66-1 Page 2RR66-2 Page 2RR67-1 Page 2RR68-1 5 12/91 05/93 12/91 05/93 05/93 05/93 05/93 05/93 LEP-7, 05/93 ISI-T-200.0 SUSQUEHANNA STEAM ELECTRIC STATION UNIT 2 PUMP AND VALVE INSERVICE INSPECTION TESTING PROGRAM The pump and valve ISI testing program at the Susquehanna SES Unit 2 will be conducted in accordance with the 1980 Edition of Section XI of the ASME Boiler and Pressure Vessel Code incorporating through the Winter 1981 Addenda.Specific exceptions from these requirements are included here as Relief Requests.The inservice portion of the program commences at the receipt of the Operating License.Requirements for specific components commence concurrent with Technical Specification operability requirements.

For valves so equipped, remote position indicators will be utilized to demonstrate valve operability.

Proper functioning of these position indicators will be demonstrated at least once every 24 months.Safety valve and relief valve pressure setpoint testing will be conducted using test procedures which incorporate the testing methods of Section 4.09 of ANSI/ASME PTC 25.3-1976.

PTC 25.3 Section 0, Section 1, Section 2, Section 3 paragraphs 3.06, 3.07, 3.10, and Section 4 paragraphs 4.01, 4.02 (4.023 only)and 4.09 pertain to the safety/relief valve pressure setpoint testing required by IWV-3512, in varying degrees, and will be complied with, accordingly.

PTC 25.3 Section 3 paragraphs 3.01, 3.02, 3.03, 3.05, 3.08, 3.09, Section 4 paragraphs 4.02 (4.021-4.022 and 4.024-4.029), 4.03, 4.04, 4.05, 4.06, 4.07, 4.08, Section 5 and Section 6 all pertain to more complex safety/relief valve capacity testing, (normally performed by valve manufacturers) rather than pressure setpoints tests, and will be disregarded due to their inapplicability to pressure setpoint testing.The provisions of Paragraph IWV-3511 shall begin at the receipt of the operating license.Thermal relief devices are excluded from the program.With the exception of valves providing a high pressure to low pressure boundary (pressure isolation function), valve leakage rate testing and acceptance criteria will be based on 10CFR50 Appendix J requirements as discussed in FSAR Subsection 6.2.6 and Susquehanna SES Technical Specification 3/4.6.1.2.

Pressure isolation function testing is discussed below.Excess flow check valves are installed on instrument lines penetrating containment in accordance with Regulatory Guide 1.11.As such, the lines are sized and/or orificed such that off-site doses will be substantially below 10CFR100 limits in the event of a rupture.Therefore, individual leak rate testing of these valves is not required for conformance with 10CFR50, Appendix J requirements.

Functional testing of valves to verify closure can be accomplished by the process of venting the instrument side of the valve while the process side is under pressure.Such testing is required by Technical Specification 4.6.3.4 at least once per 18 months.Testing on a more frequent basis is not feasible for several reasons.Instruments serviced by these valves frequently have interlock or actuation functions that would be interfered with should testing be performed during plant operation.

Also, process liquid will be contaminated to some degree, requiring 2D-1 Rev.5 05/93

/P~1k ISI-T-200.0 special measures to collect flow from the vented instrument side.Functional testing with verification that flow is checked will be performed at least once per 18 months per Technical Specification 4.6.3 via SI-299-220 through 234.A listing of excess flow check valves can be found in Technical Specification Table 3.6.3-1.Relief Request 33 pertains to excess flow check valve testing.Check valves whose safety function is to open will be full-stroke tested.Since disc position is'ot always observable, verification of the safety analysis design flowrate through the valve is considered an adequate demonstration of the full-stroke requirement.

This convention is in agreement with NRC Generic Letter 89-04, Position 1.Limit stroke times for power operated valves are provided and controlled in a general plant procedure in accordance with the NRC guidance provided by"Minutes of the Public Meetings on Generic Letter 89-04" (NRC Response to Question 38).Where devices monitoring appropriate parameters exist, permanently installed instrumentation will be used during pump performance testing.Both permanent plant instrumentation and measuring and test equipment will be maintained by the Instrumentation and Controls Section in accordance with their administrative procedures.

For those requirements of the Code which are impractical to test, Relief Requests have been included in this program.These Relief Requests provide the impractical test requirement, basis for relief and the proposed alternative testing.Also included as Relief Request are our Cold Shutdown Test Justifications and are so indicated.

2D-2 Rev.5 05/93 ISI-T-200.0 LE F R VALVE TABL Valve Number: Unique system designated valve identification HV-hand switch-operated valve SV-solenoid-operated valve PSV-pressure safety/relief valve XV-excess flow check valve FV-flow control valve PSE-rupture disks 5SME Class: ASME.Code Classes 1, 2, and 3 S-non-code valve which performs a safety-related function P&ID Coordinates:

Location of valve on P&ID drawing Section XI Valve Category: A-valves with specified maximum leakage rate B-valves with no specified maximum leakage rate C-self-actuating (check, relief valves)D-actuated by energy source capable of only one operation (rupture disks, explosive valves)Active: Valves required to change position to accomplish specified safety function Passive: Valves not required to change position to accomplish specified safety function Size: Nominal valve size in inches Valve Type: C-Check valve B-Butterfly valve G-Gate valve GL-Globe valve RV-Pressure relief valve XFC-Excess Flow Check valve RD-Rupture Disk BA-Ball valve X-Shear (explosive valve)SC-Stop Check valve 2LV-1 Rev.4 12/91

ISI-T-200.0 Actuator Type: M-Motor A-Air S-Solenoid H-Hand (manual)--None (self-actuated)

E/H-Electro-hydraulic Remote Position Indicator:

X-valve is equipped with an RPI (RPI)--valve is not equipped with an RPI Normal Position: C-closed 0-open Test Requirements:

Q-quarterly exercise test MT-stroke time measurement concurrent with quarterly exercise test LT.-leakage rate test once per 24 months CV-quarterly check valve exercise test SRV-safety/relief valve lift setpoint test in accordance with ASME PTC 25.3-1976, Section 4.09 (testing schedule per Table IWV-3510-1)

DT-category D test requirement Relief Request: Yes/No and number(s)of applicable relief request(s)

Testing Alternative:

CS-Testing shall commence no later than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after the plant enters Cold Shutdown (Operational Condition 4)from Power Operation.

Valves in this category are subject to testing if they have not been tested in the previous 92 days.Testing shall continue until all subject valves are tested or the plant begins startup.Testing at subsequent cold shutdowns will commence with those valves having the longest interval (if greater than 92 days)since previous tests.This definition applies to all relief requests with cold shutdown alternative testing.Relief Request 68 pertains to the definition of this code.RR-every 18 or 24 months as specified in relief request See relief request-specific guidance in individual relief request Remarks: Notes on any special methods of testing.If identified as a pressure isolation valve, additional leak rate testing will be performed (water as test medium)at 1000+10 psig with an acceptance criterion of 1 gpm.Valve testing configurations will be similar to that utilized for containment local leak rate testing.2LV-2 Rev.5*05/93 ISI-T-200.0 RP T BL Pump Number: Pump Name: ASME Class: Unique designated pump identification number Commonly recognized pump name ASME Code Classes 1, 2, and 3 S-non-code pump which performs a'safety-related function Parameters Measured: Required test measurements in accordance with Section XI, Subsection IWP X-Parameter will be required to be measured Specific code exemptions listed Test Frequency:

Scheduled test implementation frequency Relief Request Number: Reference to individual relief requests from code requirements Remarks: Notes on methods of testing.2LP-1 Rev.4 12/91 ISI-T-200.0 2VT-1 Rev.4 12/91 SERVICE WATER M-2109 Sheet 2 Valve Number O 0 0 0 Xg 8 g o g e V))S 5 O B~5 0 l4 O'ZJ 0 S4 O X 6 6'F Rclicf Request Rcq*'d Testing Altcmativc Remarks A B C D HV-20943A2 3 HV-20943B2 3 C-8 E-8 X X B B 0 0 Q,MT Q,MT No No SERVICE WATER M-2110 Valve Number O 0 0 Q S 5 O 0 8S O g~O C4 Rclicf Rcqucst Rcq'd TcstIng Alternative A B C D HV-21024A1 3 B-5 HV-21024A2 3 A-5 X X X 10 B 10 B X C Q,MT C QMT No No HV-21024B1 3 C-5 X 10 B X C Q,MT No HV-21024B2 3 C-5 X 10 B X C QMT

EMERGENCY SERVICE WATER M-2111 SIleet I Valve Number o 8$O g Rclicf Request R~'d Testulg Alternative Rcmarke HV-21143A HV-21143B 3 B-2 3 h4 A B C D X X B A X B A X Q,MT No Q,MT No H V-21144A HV-21144B 2-11-132 2-11-133 2-11-134 2-11-135 2-11-165A 3 GC 3 E-7 3 F4 3 G-4 3 E-7 3 E-7 3 FP X X X X X X X X X X B M X B M X 0 Q,MT Ycs Q,MT Ycs CV CV CV CV CV 59 59 59 64 59 64 59 64 59 64 24 RR RR Sec Rclicf Request Open test only Open test only Open test only Open test only Closure test only 0

EMERGENCY SERVICE WATER M-2111 Sheet I (Continued)

Valve Number 8 P s.89 O g E~C O C4~5 Rclicf.Request Rcq'd Tcsttng Altcrnatwc Rcm arly A B C D 2-1 I-165B 3 D4 X 0 CV Ycs 24 Scc Rclicf Rcqu est Closure test only Ch I&Ct C)C)

RHR SERVICE WATER M-2112-.',"'=;"':$

Valv'e:,i;:.;""::::;;.';;";-':-::.;:::'Nu'mbe't'"";i'"',-';:-';

'?"?'?'.::,:.W?:~?N x?.c'."y,','C;,,:gp:,", g, t/I:.;g'.,p':c.?x'::C':?::Q?C/',?~~~.',: Relief/-,",,.'";Requ'est'::

iR'e'q'd:"i:":"?

'O?:?;M):?8&" Cc,:@4': k',;~+),.g?.-.':":;Te'stin j;:;":.'>!':Alt'e'mative'.,',: 4?7:::;".:.Rem'arks':,'::

.,';;:;%g(:%:.;',:.2-12401 2-12403 HV-21210A HV-21210B PSV-21212A PS V-21212B HV-21215A HV-21215B HV-212F073A HV-212F073B 3 C-2 3 G-2 3 C-5 3 G-5 3 B7 3 F-7 3 C-7 3 G-7 3 A-5 3 E-5 X X X X X X X X X 20 20 20 20 20 20 B B RV RV B B X X X C CV C CV C QMT C'MT C SRV C SRV C QMT C Q,MT C Q,MT C Q,MT No No No No No No No No No No HV-212F074A S A-5 X X GL=A 0 Q MT Yes 38 See Relief Request Rapid acting vlv.

P A V'C 5 r, C 4 RHR SERVICE WATER M-2112 (Continued)

-';"'-",:.Valve'i:";-.',".:.'."::

';:"::Numbel,.::, HV-212F074B HV-212F075A HV-212F075B S E-5 2 A-5 2 E-5::: 'A'::,::g,"3!i".':,:,',Cj".'~":-:;::"D,'

X X I GL A 6 G M 6 G M X X m~x;m r,~";:.q<<j""'8:>F')":(a:p;K%~,.x 0 Q,MT C Q,MT C Q,MT.R'elief;,;:.

-"Req'ue<<si,:

,'Req',d:;;Yes No No 38.';,'-'Tes'tin j':;;:;,;:";A1teiiiative,,';."., See Relief Request ,""-Reiiiarks,:.

Rapid acting vlv.O g M O O O J 4 REACTOR BUILDING CLOSED COOLING WATER M-2113 Vaivc Number j 8 O 8 O C4 8S O g~'O H 0 l4 Rclicf ducat R~'d Testing Altcraativc Rcmarka A B C D HV-21313 HV-21314 H V-21345 HV-21346 2 C-I 2 C-3 2 C-I 2 C-3 X X 4 G 4 G 4 G 4 G X 0 0 0 Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT CS CONTAINMENT INSTRUMENT GAS M-2126 Sheet I Valve"-,"." Number O.-;Q 4 0'Rclicf, Request Rej'd,;g Testing.-Altcrnatiyc Reins rks 2-26-018 2-26429 2-26-O72 2-26474 2-26-152 2-26-154 2-26-164 2 AW 2 C-5 2 E-8 2 C-8 A-8 X X X X X 0 0 CV CV CV,LT Ycs CV,LT Ycs CV,LT Ycs CV,LT Ycs CV,LT Ycs RR RR RR RR Closure test only.Closure test only.Closure test only, verify operation during leak test.Closure test only, verify operation during leak test.Verify operation during leak test.Verify operation during leak test.Closure test only, verify operation during leak test.PS V-22643 SV-22643 B-6 3 B4 X X RV GL S SRV Q,MT No 38 58 Scc Relief Rcqu est.Rapid acting valve.

CONTAINMENT INSTRUMENT GAS M-2126 Shcct I (Continued)

.Valve: "" Number,'A B','v~;S"5 4'~rl.~O"'g>r>w ,'" g'~,:~8,':~%~~i'p Rclicf Request R~'d.0 4'P Testing-Altcrnatiyc,Remarks h7 C)SV-22644 PS V-22648 SV-22648 SV-22649 SV-22651 SV-22654A 2 A4 3 C-5 3 C4 2 C4 2 E-7 2 A-8 X X X X X X X GL S RV GL S GL S GL S GL S X X X 0 0 0 Q,MT SRV Q,MT Q,MT Q,MT, LT Q,MT, LT No 38 58 38 58 38 58 3 38 58 4 38 58 Scc Rclicf Request.Scc Rclicf Rcqu est.Scc Rclicf Rcqucst.Rapid acting valve.Rapid acting valve.Rapid acting valve.Rapid acting valve.Rapid acting valve.

CONTAINMENT INSTRUMENT GAS M-2126 Shcct I (Continued)

Valve Number O O l4 89 O g it~Rclicf Rcqucst Rcq'd,-Testing Altcrnativc Rema res SV-22654B A B C 9 2 C-7 X X GL X 0 Q,MT, LT 4 38 58 Rapid acting valve.SV-22661 2 F-7 X X GL X 0 Q,MT, LT 38 58 Scc Rclicf Rcqucst.Rapid acting valve.SV-22671 2 G-7 X GL Q,MT, LT 38 58 Scc Rclicf Rcqucst.Rapid acting valve.tJ n (IJ O O CO CONTAINMENT INSTRUMENT GAS M-2126 Shcct 2 Valve Number'E 0 0 A 4~e 0 O 8'S S O E~~l-~cc~O O De 0$Rclicf Request Rcq'd Testing Alternative Rema rlts A B C-D HV-22603 SV-22605 D-9 D-9 X X GL'X GL S 0 0 Q,MT, LT Q,MT, LT No 38 58 Sce Rclicf Request.Rapid acting valve.

MSIV LEAKAGE CONTROL SYSTEM M-2139 Valve Number I 0 n C4 O O g 6~V P4 e-a O O F Rclicf Request Rcq'd., Testing tcmatiye C Rema rki A B C D HV-239F001B 1 HV-239F001F 1 D-3 G-3 X X 2 G 2 G X Q,MT,LT Ycs Q,MT,LT Ycs Rcduccd Pressure Leak Test.Rcduccd Prcssure Leak Test.HV-239F001K 1 G-3 X X 2 G X Q,MT,LT Ycs Rcduccd Prcssure Leak Test.HV-239FOOI P 1 H-3 X 2 G X Q,MT,LT Ycs Reduced Pressure Leak Test.H V-239F002B HV-239F002F 2 HV-239F002K 2 HV-239F002P 2 E-3 G-3 G-3 H-3 X X X 2 G 2 G 2 G 2 G X X X Q,MT Q,MT Q,MT Q,MT CS CA IJ CO C)<<9 MSIV LEAKAGE CONTROL SYSTEM M-2139 (Continued)

Valve Number O le 0 O 8S O E-c ff O f O'CS~O 0 P fff Relief Request~Tcating , Rcq'd k Alternative Remarks A B C D'V-239F003B H V-239F003F H V-239F003K HV-239F003P HV-239F006 HV-239F007 HV-239F008 H V-239F009 2 E-5 2 G-3 2 G-3 2 H3 2 D-8 2 E-8 2 D-8 2 D-8 X X X X X X X M X G M X G M X G M X G M X G M X G M X G M X C QMT C Q,MT C Q,MT C QMT C QMT C Q,MT C QMT C Q,MT No No No No CS NUCLEAR BOILER M-2141 Sheet I Valve.Number 8 O De g-,8S O 6~c48 C O~I 0 De Rclicf Rcqu cat Rcq'd Testing Alternative Remarks A B.C-'PS V-24137A PS V-24137B PS V-24137C PS V-24137D PS V-24137E PS V-24137F PS V-24137G PS V-24137H PS V-24137J HA HQ H-4 HQ H-4 H-4 H-4 H4 X X X X X X.X X X X X X X RV RV RV RV RV RV RV RV RV C SRV C SRV C SRV C SRV C SRV C SRV C SRV C SRV r C SRV Ycs Sce Rclicf Rcqucst.Sce Rclicf Rcqucst.Sce Relief Rcqucst.Sce Relief Rcqucst.Sce Rclicf Rcqu est.Sce Rclicf Rcqucst.Scc Rclicf Request.Sce Rclicf Request.Scc Rclicf Rcqucst.

NUCLEAR BOILER M-2141 Sheet 1 (Continued)

Valve Number O 0 0 a 4 le O e O O O O E~ss P8'Rclicf Request Rcq'd Testing Alternative Remarks A B C D IJ Ch PS V-24137K PS V-24137L PS V-24137M PS V-24137N PSV-24137P X X X X X RV RV RV RV RV C SRV C SRV C SRV C SRV C SRV Scc Rclicf Rcqu est.Sec Rclicf Rcqucst.Sce Rclicf Rcqucst.Scc Rclicf Rcqu est.Scc Rclicf Request.PS V-24137R PSV-24137S PSV-241F013A 1 C4 X X X X RV RV RV C SRV C S+C SRV No Sce Rclicf Request.Scc Rclicf Rcqu est.I IJ 4 I7I IJ es NUCLEAR BOILER M-2141 Sheet I (Continued)

Valve Number O O-C4 O 0 E~V eR O$4 Vt Relief Request Rcq'd Testing Alternative Rcmarirs PS V-241F013B I PSV-24 1 F013C I PS V-24 1 F013 D I PS V-241F013E I A B C, D X X X X RV RV RV RV C SRV C SRV C SRV C SRV No No No No PSV-241 F013 F I PSV-241F013G I X X RV RV A C SRV No C SRV Q Ycs 10 ADS Valve.PS V-'241 F013H I RV C SRV No PSV-241F013J I RV A C SRV Q Ycs 10 RR ADS Valve.PS V-241F013K I PS V-241F013L I CA X X X RV A RV A SRV,Q (C SRVQ Ycs 10 10 RR ADS Valve.ADS Valve.

NUCLEAR BOILER M-2141 Shcct 1 (Continued)

Valvc-'Number;'O A B C;,, D'II" , n'" ctI nt'l;i It, nt n V Relief Request Rcq'd',.'esting

'Alt ctnative Remarks IJ 00 PSV-241F013M PS V-241F013N CA 1 CA X X X RV A RV A SRV,Q Ycs SRV,Q Ycs 10 IO RR ADS Valve.ADS Valve.PS V-241F013P PS V-241F013R PSV-241F013S HV-241F016 H V-241F019 1 C4 1 C4 1 C-4 1 E4 E-6 X X X X X X RV RV RV G M X G M X 0 0 SRVSRV SRV Q,MT, LT Q,MT, LT No No No No No HV-241F020 2 E-7 X GL M X 0 QgT No NUCLEAR BOILER M-2141 Sheet I (Continued)

Valve Number A B C D 5 o o lg O E~"'oR F F 8 Relief Rcqucst Rcq'd Testing gtcrnativc o Remarks HV-241F022A HV-241F022B H V-241F022C I C-5 X I C-5 X I C-5 X X 26 26 26 GL A GL A GL A 0 0 0 Q,MT, LT Q,MT, LT Q,MT, LT Yes Scc Rclicf Request.Scc Rclicf Request.Scc Relief Rcqu cat.Rcduecd prcssure leak test in rcvcf5c direction.

Rcduccd PfC55UIC leak test in Icvcrsc direction.

Rcduccd prc55ufc leak test in fCVCfsC direction.

NUCLEAR BOILER M-2141 Sheet 1 (Continued)

C/gA?(S,r Valve Number".'x C.1 A B C-;-D..'Relief: '-Rcqucsi Rcq'd: 'h ,,, Testing.'Altcrnativc IJ lJ o HV-241F022D 241 F024A 241F024B 241F024C 241F024D HV-241F02&A A-5 3 A-5 A-5 A-5 X X X X 26 GL 1 C 1 C I C I C 26 GL A X 0 0 0 0 0 Q,MT, LT CV CV CV CV Q,MT, LT Scc Rclicf Rcqucst.Scc Rclicf Rcqucst.Rcduccd pressure leak test in reverse direction.

Closure test only.Closure test only.Closure test only.Closure test only.Reduced pressure leak test.I IJ o I IJ CO C)O NUCLEAR BOILER M-2141 Sheet I (Continued)

Valve Number O".=;cl 0 O O x O E~~o c4~O 8.'elief~Request Rcq'd..Testing Alternative Remarks HV-241F028B HV-241F028C HV-241F028D A--" B.'C;-.D.1 C-7 X 1 C-7 X 1 C-7 X X 26 26 26 GL A GL A GL A X 0 0 0 Q,MT, LT Q,MT, LT Q,MT, LT Sce Rclicf Rcqu est.Scc Rclicf Rcqucst.Sce Rclicf Rcqu cat.Rcduccd prcssure leak teat.Rcduccd prcssure leak test.Rcduccd prcssure leak test.241F029A 241 F029B 241 F029C 241 F029D 2 A-7 2 A-7 2 A-7 2 A-7 X X X X 0 CV 0 CV 0 dv 0 CV Ycs Ycs RR Closure test only.Closure test only.Closure test only.Closure test only.

NUCLEAR BOILER M-2141 Sheet 1 (Continued)

Valve Number C O~o 0$4 o O E~O-oN 6 g 6 F 8 Relief Rcqucst Rcq'd Teatmg , Qtoernatiye Remarks.A 8 C D IJ IJ IJ PS V-241F037A 3 PSV-241F037B 3 PS V-241 F037C 3 PS V-241 F037D 3 PS V-241F037E 3 PSV-241F037F 3 PS V-241 F037G 3 PSV-241F037H 3 X X X X X X'X X RV RV RV RV RV RV RV RV C SRV C SRV C SRV C SRV C SRV C SRV SRV f C SRV Ycs Ycs Ycs Scc Rclicf Request.Scc Rclicf Request.Sec Rclicf Rcqu cat.Scc Relief Rcqucst.Scc Rclicf Rcqucst.Scc Rclicf Request.Scc Relief Rcqu cat.Scc Relief Request.

NUCLEAR BOILER M-2141 Shcct 1 (Continued)

Valve Number C O\+De O'o g g~O~O$4 oI O Rclicf Rcqucst Req'd Testing Alternative PSV-241F037J PS V-241 F037K PS V-241F037L 3 G4 3 G4 3 GR A B, C 9 X X 6 RV 6 RV 6 RV SRV SRV SRV Scc Rclicf Rcqucst.Scc Rclicf Request.Scc Rclicf Rcqu est.PS V-241 F037M PS V-241F037N PS V-241F037P PS V-241 F037R PSV-241F037S 3 G4 3 G4 G-4 3 G4 3 GP X X X X X X 6 RV 6 RV 6 RV 6 RV 6 RV SRV SRV SRV SRV SRV Scc Rclicf Rcqucst.Scc Rclicf Rcqucst.Scc Rclicf Request.Scc Rclicf Rcqucst.Scc Rclicf Request.

NUCLEAR BOILER M-2141 Sheet 2 Valve Number Cll 0 O n O I BS O g~c4 8 O'a nI IN Relief Rcqucst Rcq'd Testing Alternative A B-C,D 241%17 241%18 H V-24107B H V-'24182A HV-24182B 241 F010A 2 F-3 X 2 F-3 X E-3 C-2 X 2 E-2 X 1 C4 X X X X 24 24 GL GL H H 0 0 LT LT CV Q,MT, LT Q,MT, LT CV,LT No No No No No Sce Rclicf Request.Open check only.Closure check only.241F010B H V-241F032A HV-241F032B 1 E4 X 2 C-2 X 2 E-2 X 24 24 24 SC SC M X 0 0 0 CV,LT Q,MT, LT Q,CV, MT,LT Scc Relief Rcqu est.12 CS 12 CS Closure test only.Closure test only.

REACTOR RECIRCULATION M-2143 S!lect I.y (h~-""" Valve"'-~h Number h~A',-B;,."'C.9 Y(l'.Ch,'Y, h'0 h hh h Y;C ,'..\+'Rclicf'-Rcq'nest'cq'd'-YL j Y ,Testing Alternative Y'cmarits HV-243 F019 1 B4 X 3/4 GL A X Q,MT, LT 38 Scc Rclicf Rcqucst.Rapid acting valve.IJ&HV-243 F020 HV-243 F031A HV-243F031B HV-243F032A HV-243F032B 1 B4 X I F-8 I F-8 1 F-8 I F-8 X X X X 1 GL 28 G 28 G 4 G 4 G A X M X M X M X M X Q,MT, LT 0 QMT O Q,MT O Q,MT 0 Q,MT No No 38 16 CS 16 CS Sce Rclicf Request.Rapid acting valve.

REACTOR RECIRCULATION M-2143 SIlcct 2 Valve.,'.,:-Numbcr-.=,'.'.

O.trt~(,rh'h'R'A.B"..C,.D o 8,t O l4 O"?Rciicf'-'olucst Rcq'd I-,",...Testing;AltcrnatiYc v,i,X, , i-Rcrnarirs

'".'43F013A 243F013B XV-243 F017A 2 XV-243 F017B 2 F-2 H-3 X X X 1 C 1 C 1 XFC I XFC X X 0 0 0 0 CV,LT Ycs CV,LT Ycs CV,LT Ycs CV,LT Ycs 15 RR 15 RR 14 RR 14 RR Closure test only.Closure test only.Closure test only.Closure test only.

REACTOR WATER CLEANUP M-2144 Sheet 1',;,',!'I;":i Valise';i?'.',":!

'..'"..'.Numbe'r',,:-.:':.;":,:','.,'cA';.'-.,'::;::;.:'.:;-;:;B,'",",";:::,'::;."",:,C'.";::;;:;,':$

': D';?Cj?)?;4k I.;i':C!'Y'8: 'Y.':;:;,Y:::"Y.:::Lc?C,, C ,o;;;Q:;I ,Retie'f c;"';;,'I;R'eqiies't",:,".R'eq!d""",.'":.

"!;:'Y," TeStl1lg.":c"',:.'::;':;:...-::;:.;'?A'ltetn'atiye'.:':::, Rema HV-244F001 1 C-2 X X 6 G M X 0 Q,MT, LT No HV-244F004 1 C-2 X 6 G M X 0 Q,MT, LT No O g tel t L~P CONTROL ROD DRIVE M-2147 Sheet 1" fh.",'i;Testmg

"i..",,'-':'Altemative

.:,,-,'.-';:.,"Re'tttaiks.".;;,"':" A':::::: '..B,::;:.":',"..C;.i:;

',':"":9,:;:

XV-247F010A XV-247F010B XV-247F011A 2 A-4 2 A-5 2 F-5 X X GL GL GL A 0 0 0 Q,MT Yes Q,MT Yes Q,MT Yes 61 61 61 See Relief Request.See Relief Request.See Relief Request.XV-247F011B 2 F-6 X GL 0 Q,MT Yes 61 See Relief Request.~There are a total of 185 sets of these valves, one for each of the 185 CRD Hydraulic Control Units.O g IJI~IJI M hl O O O C'I U t~I C, CONTROL ROD DRIVE M-2147 Sheet 2)r J A'alve,.Number 3;A'S;.-.Q Rclicf Request Rcq'd'.~;.Testing"',-.tItltcrnative Rcntarka, A-B":;.,';:-'C

  • .:D', 247114>>247115*XV-247260 XV-24727*2471380 2 AS 2 D-8 2 DW 2 AW 2 D4 X X X X X 3/4 GL A GL A CV~C CV C e C e 0 CV 17 17 17 17 17 Scc Rclicf Rcqucst.Scc Rclicf Rcqu est.Scc Rclicf Request.Scc Rclicf Rcqu est.Scc Relief Request.Open test only.Closure test only.Open test only.Open test only.Closure test only.'here are a total of IBS sets of these valves, one for each of the IBS CRD Hydraulic Control Units.

STANDBY LIQUID CONTROL M-2148 Valve Number 8S O g Relief Roqu cat Rcq'd*'esting Alternative Remarks A B C,D 248F004A 248F004B HV-248F006 248 F007 PSV-248F029A PS V-248 F029B 248F033A D-7 D-7 D-8 E-8 D-5 F-5 D.6 X X X X X X X X SC M X RV RV DT DT Q,MT, LT,CV CV,LT SRV SRV CV No No No No No 18 RR 19 RR Explosive Valve.Explosive Valve.Closure test with motor operator, open test during reactor vcsscl injection test.Closure test during leak test, open test during reactor vessel injection lest.

STANDBY LIQUID CONTROL M-2148 (Continued)

Valve Number O cl+(0 tg 8'4 g S O E~O Relief Request Rcq'd Testing Alternative Remarks A B'C D.248F033B 2 FW I'A C CV No REACTOR CORE ISOLATION COOLING M-2149 ,",'!;!,',:,'Nu'mbe'r,"".-':),.:',::;;Relief::.,';:.-:

,:;::Re'q)'ue?st';

Req;d
:;:::.'.

':":.:";.-'"-,.,T)esttn'g:,;:,."-',,",$

,Alterna)tive';

",,;.";::

i;;Remarks.,:::;:.".,".'5.'..

?249420 E-5 X X GL H LT No HV-249F007 1 C-3 X X M X 0 Q,MT, LT 20 See Relief Request.Leak test in reverse direction.

HV-249F008 2 C-3 X X M X 0 Q,MT, LT No HV-249F013 2 E-5 X M X Q,MT, LT No FV-249F019 2 F-3 X GL M X 0 Q,MT, LT 20 38 See Relief Request.Leak test in reverse direction.

Rapid acting valve.249F021 F-7 X CV,LT Yes 21 65 Closure test only.249F028 G-5 X CV,LT Yes 21 Closure test only.HV-249F031 2 H-2 X G M X Q,MT, LT Yes 20 See Relief Request.Leak test in, reverse direction.

(-,i l t REACTOR CORE ISOLATION COOLING M-2149 (Continued)

Valve Number Rclicf Request Req'd Testing Alternative Remarks A B C D 249 F040 2 G-5 X 10 C CV,LT 21 RR Closure test only.H V-249F059 HV-249F060 HV-249F062 G-3 2 G3 X X 10 GL 0 0 0 Q,MT, LT Q,MT, LT Q,MT, LT No No 20 Sce Rclicf Rcqucst.Leak test in reverse direction.

Leak test in rcvcrsc direction.

249 F063 249 F064 2 FA 2 F4 X X C CV C CV 22 64 RR Open test only.Open test only.HV-249F084 2 F-3 0 Q,MT, LT Ycs r Scc Rclicf Rcqu est.Leak test in reverse direction.

3 REACTOR CORE ISOLATION COOLING M-2149 (Continued) 0 Q g'.'.y'-/'~'h B..C';::, D Valve", Number HV-249F088 X C-3 IJ D X I GL 0/*/A X Pe ,O,+8 II Q,MT, LT.h=Relief Rctlu cat Rctl'd:-'-

vt/*38 Testing Alternative'cc Rclicf RcIIucst.is//I Remarks Leak test in revcrsc direction.

Rapid acting valve.

RESIDUAL HEAT REMOVAL M-2151 Sheet I")i.';:":,Vaiv'el::::":::?~?",',"","??'?;~'.v.;.O:::,....v 4:...':::.'i':

.'e<<";4"V/4 C??~X" NA;X;(".,y..', C;$;,C,;.Relief;;::;

':;.R'equ'"e'st'-.

"::,:R'e'a'.ll,"=::

"+;Very'4'.",q+(.'~

':,':..."¹p'.:

%.y.&A,','Alte'r'nativ?e':";:;.'.":

~::,:;:Rem'a'iks",:.'V-2518$

4A 2 F-8 X 24 G M X 0 Q,MT, LT Yes 20 See Relief Request.Leak test in reverse direct ton.HV-251F004C 2 F-8 G M X 0 Q,MT, LT Yes 20 See Relief Request.Leak test in reverse direction.

HV-251F006A HV-251F006C HV-251F007A 2 H-8 2 G-7 2 F-7 X X X X 20 20 G M X G M X G M X 0 Q,MT, LT Q,MT C Q,MT No No Yes 20 See Relief Request.Leak test in reverse direction.

HV-251F015A I D-7 X 24 G M X Q,MT, LT Yes 26 67 CS Pressure isolation valve.HV-251F016A 2 B5 12 GL: M X Q,MT, LT No HV-251F017A HV-251F021A 2 D-3 2 B7 X X 12 GL M X G M X 0 Q,MT C Q,MT No No M O O O RESIDUAL HEAT REMOVAL M-2151 Sheet 1 (Continued)

.:;;;:;:;:;,:Nu'mb'er",',."':,',",'.,.';'Relief

"";:Rendu'e?st',".

Req',d,':;:

',,:::,:"

":Tes'tiri'j'.;:':::i!:.':,":,',:;::Alte'I'attv'e',::,':>.

';;.Re'ma'rks;:,:":;:

HV-251F022 HV-251F023

":'A':,!:,';:."::-,""B,'.":,;'::'C;'::

-:.;.:.';'..:.::.',:.";.;:;::;.

1 B-8 X I B7 X X 6 X 6 G M Q,MT, LT Q,MT, LT Yes Yes 20 26 67 26 67 CS CS Leak test in reverse direction.

HV-251F024A 2 E-7 HV-251F027A 2 E-7 HV-251F028A 2 E-5 X X X 18 18 GL M GL M G M X C QMT C Q,MT Q,MT, LT No No No 251F031A 251F031C 251F046A 251F046C 2 H-2 2 G-3 2 F-2 2 F-3 X X X 20 20 C CV C CV C CV C CV No No Yes Yes 64 64 See Relief Request.See Relief Request.Open test only.Open test only.CD C)CO F I l RESIDUAL HEAT REMOVAL M-2151 Sheet 1 (Continued)

c'N WA~.:M','",;:,'R'erie f:;.;:.i::Request

.,.:,Req'd"',:;"'."'Alte'mat tv'e";:-:";

';;::Remarks.:':

HV-251F048A HV-251FOSOA G-1 D-8 X X X 24 GL M X 0 Q,MT No C CV LT Yes 26 67 CS Pressure isolation valve.251F090A HV-251F122A E-8 X X X X GL A 0 CV Q,MT, LT Yes Yes 24 26 38 67 See Relief Request.CS Closure test only.Pressure isolation valve.Rapid acting valve.

RESIDUAL HEAT REMOVAL M-2151 Sbc@t 2 Valve Nurnbcf 0 CO v 0 n~0 n n 0 De iS O 0 0 Rclicf Rcqu est~Rcq'd-'," Testing.Altcfnativc Remarks A B C'D HV-251 F003A 2 HV-251FOI I A 2 HV-251F047A 2 F-5 H4 X C-8 X X X 20 20 G M H X C LT No 0 Q,MT No 0 Q,MT No Disabled PS V-25 I FOSSA A-5 X RV C LT No SV-251 F079A 2 X GL C Q MT Vcs 38 Scc Rclicf Rcqucst.Rapid acting vavc.HV-251F103A 2 PS V-25106A D3 X F-3 X I X I GL RV X C LT C LT No No Leak test in fCVCfSC direction.

~P7 IJ 4 IJ cO ED O

RESIDUAL HEAT REMOVAL M-2151 Sheet 3 ,"',:::.;';,VaIv'e.".';,".",.':,"..;:,":¹iiiibcer:.':

..":,'C:: Cd':,:,'.,,.'.

0.:;':,:.4::C.:::;:.;.C'.:

'$'"~':s%C.;:g C1 c.a','l'Q:,":

'
ReItef."~;';Request:.
.,Re'q',d;,';;;

).a".'.,Testiiij",,:

":,::"Altcemactiveem'aiks.:.

, C'.;:,:.';::;;.

', HV-251F004B 2.F-3,, X M X 0 Q,MT, LT Yes 20 See Relief Request.Leak test in reverse direction.

HV-251F004D 2 F-1 X X 24 G 0 Q,MT, LT Yes 20 See Relief Request.Leak test in reverse direction.

HV-251F006B 2 G-3 X.X 20 G C Q,MT No HV-251F006D HV-251F007B 2 H-2 2 F-3 X X 20 G 6 G M X M X 0 Q,MT, LT Yes C QMT No 20 See Relief Request.Leak test in reverse direction.

HV-251F008 HV-251 F009 1 E-3 X 1 D-1 X X X 20 G 20 G M X M X Q,MT, LT Q,MT, LT Yes 23 67 23 67 CS CS Pressure isolation valve.Pressure isolation valve.

RESIDUAL HEAT REMOVAL M-2151 Sheet 3 (Continued)

.',:".";.:."":.;."::::;.:.,Valv'e:.'.";",:,:',.'-',.',:;;:;::;:,;;;:.:,;.:::;Nu'mb'er::.".

":,':, ch?',',R'elie'f;:.":..'::.R'e'qu'e's't

':;:R'e'q'd

'::::: i:,::..";":-Te'stinj-;i.":'.

,:.;..;Alt'e'inative,'.-".,', ,",: Remar'It's',:.;.

HV-251F015B 1 HV-251 F016B 2 HV-251F017B 2 HV-251F021B 2 HV-251 F024B 2 HV-251F027B 2 HV-251F028B 2 251F031B 251F031D C-3 A-5 C-7 A-3 F-3 E-3 C-6 G-8 H-8 X X X X X X X X X 12 GL 24 GL 12 G 18 GL 6 GL 18 G 20 C 20 C X X Q,MT, LT Q,MT, LT 0 Q,MT C Q,MT C Q,MT C Q,MT Q,MT, LT C CV C CV Yes No No No No No No No No 26 67 CS Pressure isolation valve.

V I fi l 1 RESIDUAL HEAT REMOVAL M-2151 Sheet 3 (Continued)

V ,:;.;.(::;:;:y,',.

,'z@lr",'..';:...'.Valv'e",'-.".'..,:',',',"-".";: ,Relief:::-'::

.'::;:;Rvequ'e'st.;:

';Req'd';:::.-,";.'",'y'.((:;"'.

',;"'Testmg'i,':@

".,".:Alternative.;':

':,'4;.'.".;.".;":'::Reiiia(rks,':,:,"::

251F046B 251 F046D F-7 F-8 X 4 C 4 C C CV C CV See Relief Request.See Relief Request.Open test only.Open test only.HV-251 F048B HV-251F050B F-9 C-2 X X 24 GL 24 C M X 0 Q,MT C CV,LT No 26 67 CS Pressure isolation valve.251F090B B-6 2 C 0 CV See Relief Request..Closure test only.HV-251F122B C-2 1 GL A X Q,MT, LT 26 38 67 Pressure isolation valve.Rapid acting valve.

RESIDUAL HEAT REMOVAL M-2151 Sheet 3 (Continued)

Valve Number ol~I c5 Q n S=5 O 0 Pp D eR O 0 8'elief Rcqu est Rcj'd",-: Testing Alternative Remarks A B C D tJ C PS V-25 1 F 126 D-2 X X X I RV C LT No RESIDUAL HEAT REMOVAL M-2151 Sheet 4 Valve Number 0 0 0.Cl'c O O ,II e V)r O O 0 n C O n O C4 89 O g~O O$4 Relief Request Rcq'd Testing Alternative Remarks A B, C, D HV-251F003B F4 20 X 0 Q,MT No HV-251FOI I B 2 H-3 X 4 G H C LT No Disabled HV-~&I F047B PS V-251F055B 2 SV-251 F079B HV-25 1 F103B 2 C-2 G-5 C-7 X X 20 G 8 RV 1 GL I GL M X X 0 Q,MT No C LT No C LT C Q,MT Ycs 38 Scc Rclicl'cqu est.Rapid acting valve.Leak test in fevcfse direction.

PS V-25106B PS V-251F097 F-7 G-2 X X X I RV 4 RV C LT LT, SRV No'o

CORE SPRAY M-2152:.iP:,:":;Valve";.',:;,.;.:.

'"'-"'":::

Number:::-'..:.

Relief,.:;:;
-
Re'q'u'est'-".':

Req,'6',:;i:'!:.,.:::.,;:":.".',;:.":;:Testin'g.'"'-'::;:

!;-.-'P.:::.;.',:.::,:;:'A'Item>>ativ'e'",:;:::;:-;:Retnarks.:'.:.'4

".::.'"':-:,':.:",'.'::;,':B',".;."::;".,:.i;C;.';".;::.,""..';::D~

HV-252FO01A 2 H-3 16 M 0 Q,MT, LT Yes 20 See Relief Request.Leak test in reverse direction.

HV-252FO01B 2 H-1 X 16 G M 0 Q,MT, LT Yes 20 See Relief Request.Leak test in reverse direction.

252F003A 252F003B E-5 E-8 X X X 12 12 CV CV No No 252F003C 252F003D E-6 E-9 12 12 CV CV No No HV-252F004A 2 HV-252F004B 2 HV-252FOOSA 1 D4 B4 D-3 X X X 12 12 12 G M G M X 0 0 Q,MT Q,MT Q,MT, LT No No 45 67 CS Pressure isolation valve.

I I I I CORE SPRAY M-2152 (Continued)

.:;:;:<":",",,;.'VaIv'e'.

"-"..';,',:,:,'",;."::",i:

N<<umb'er".".'-.',"?Yg r.'a?':~" c>%;:4MZ;W 0...:,:,?$

%'C ,j:?p??'.,?:0, , Zv v(<<(A.C","Relief:,:;;,;

,'etlUest~g

",: Ri'j!d:";.:::"::

hn&"-'Testlflg""'.

,Alt'em'ative

-:: Retnaiks'-

'-: HV-252FOOSB 1 B-3 X 12 G M X Q,MT, LT Yes 45 67 Pressure isolation valve.HV-252F006A 1 D-3 X X 12 C X CV,LT Yes 45 67 Pressure isolation valve.HV-252F006B 1 B3 12 C X CV,LT Yes 45 67 Pressure isolation valve.PS V-252F012A 2 D-7 X X 1'A RV SRV No PS V-252F012B HV-122F015A 2 B-7 2 E-3 1'A RV 10 GL M X SRV Q,MT, LT No No Leak test in reverse direction.

HV-252F015B 2 E-3 X X 10 GL M X Q,MT, LT No Leak test in reverse direction.

O g~a>(%JI C/0 C)cO CO 4 4 t'I P' CORE SPRAY M-2152 (Continued)

Valve Number O lC C O~q O nI 4 O O Q 6~O 0 ,C+i O l4 Rclicf Rcqu est Rcq'd Testing Alternative Remarks A B C D Ch 252 F029A 252 F029B 252F030A 252 F030B HV-252F031A 2 HV-252F031B 2 PS V-252 F032A 2 PSV-252F032B 2 A-5 F-3 F-3 G-4 H-6 X X X X X X X G M G M RV RV X 0 0 0 0 0 0 CV CV CV CV Q,MT, LT Q,MT, LT r SRV SRV Ycs Yes No No 24 24 24 24 20 20 Sce Rclicf Request.Scc Rclicf Rcqu est.Sce Rclicf Rcqucst.Scc Rclicf Rcqucst.Scc Rclicf Rcqucst.Scc Rclicf Rcqu est.Leak test in rcvcrsc direction.

Leak test m reverse direction.

0 CORE SPRAY M-2152 (Continued)

"-': "'Valve""-""',;:;.;:"::,<'".",,'.::Number";.'.,',.",," i Relief.::;:.i

R'e'ques't,'
, i;Req:,d;,<

.;;";:,;",:,.TestIng:;-:;";';:;.

";"Alte'rn'ative';:;

':;:: Remaiks,'-,';".':

".":!A!':':::iB;;;,:,':;:":..C,':::..;:::,:,::.:;::;:D':

252F036A 252F036B 252F036C 252F036D HV-252F037A 1 E-5 E-8 E-6 E-9 D-3 X X X X X GL A X CV CV CV CV Q,MT, LT Yes Yes Yes Yes 45 38 67 See Relief Request.See Relief Request.See Relief Request.See Relief Request.CS Open test only.Open test only.Open test only.Open test only.Pressure isolation valve.Rapid acting valve.

CORE SPRAY M-2152 (Continued)

';"-;:,;-",'"::VaIv'e",:i:-,:.

,,"A".',',",::.":"':.';

8,":::..'ji C~"',;:":!8;:.:.?

t@":.':"C;<';:?:.:..;:., N.;, YA 4;.".;.:~';?':.,;;.

",Relief:::,!';:.:

ReqUest~

'Req.'d: ",',:?'C,'.?'?X.~:::..:.:::::.:,:Tisttn'g;:.:;::;-:;:;,::::::Alte'riia'ttve,".

g?,"y,',",M

,'": Rem'a'ik's',,:,:

HV-252F037B 1 C-3 X Q,MT, LT Yes 45 38 67 CS Pressure isolation valve.Rapid acting valve.O g tel (CA 4'I P, I FUEL POOL COOLING 4, CLEANUP M-2153 Sheet 1 Valve Number O O g ct O CI 8~C O n Rclicf=Request Rcq'd k'esting Altcrnativc Remarks IJ L 2-53%7IA 2-53471 B 3 B4 3 B-5 A B C,.9 X X X C CV C CV Ycs 13 65 13 65 Scc Rclicf Rcqu cat.Scc Rclicf Rcqu est.Open test only.Open test only.CJ n C/l CJ CO CO CO HIGH PRESSURE COOLANT INJECTION M-2155 Valve Number j',-'s O O C4 O 0 el 0~&~I 0 C4 X Relic f-Request Rcq'd';Testing,~Altcrnativc

, Remarks Vl Cl 2-55%12 2-55%38 H V-255F001 H V-255F002 2 E-5 2 E-5 2 D-8 B-3 A.B.,-,.C D X X 2 C I GL 10 G 10 G H M 0 CV LT No Q,MT No.Q,MT, LT 24 20 Sce Rclicf Request.Scc Rclicf Rcqu est.Leak test in reverse direction.

HV-255F003 B-3 10 G X 0 Q,MT, LT No H V-255F004 255 F005 HV-255F006 H V-255F007 H V-255F008 B-8 2 EW 2 E-5 2 E-6 2 D5 X X X X X 16 G 14 C 14 G 14 G 10 GL X X X 0 0 Q,MT No CV No Q,MT Ycs Q,MT No Q,MT No 29 Open test only.

HIGH PRESSURE COOLANT I%ECTION M-2155 (Continued)

Valve Number j'E O O Q o 6 Ch 0 IcO" cd O I n 0 o S O O O O cd O K 6 E ctl Relief Rcqu est Rcq'd Testing Alternative Remarks A B C D HV-255F012 F-3 X G M X Q,MT, LT Ycs 20 Scc Relief Rcqu est.Leak test in fcvcrsc direction.

Verify stroke during pump test.255 F019 C-8 X 16 CV 32 RR Closure test only.HV-255F042 255 F045 255 F046 2 H2 X H-3 E-7 X X X 16 16 G M X Q,MT, LT CV CVgLT Ycs 20 31 65 28 65 Scc Rclicf Rcqucst.Scc Rclicf Request.Sce Rclicf Rcqucst.Leak test in fcvcfsc direction.

Open test only.Open test only.

HIGH PRESSURE COOLANT IN/ECTION M-2155 (Continued)

Sw Valve'Number g'."...0 A 4'S Rclicf Request Req'd Testing Alternative h" s 255 F049 H V-255F066 2 G-5 G-3 A B,.: C,'D X 20 C 20 G 0 CV,LT Q,MT, LT 2S 20 Sec Relief Rcqu est.Scc Rclicf Rcqucst.Open test only during pump test.Leak test in reverse direction.

HV-255F075 255F076 255 F077 HV-255F079 2 F-5 2 F4 2 F4 F-3 X X X X 3 G 3 C 3 C 3 G 0 0 Q,MT, LT CV CV No 34 64 34 64 20 RR Scc Rclicf Rcqu est.Open test only.Open test only.Leak test in reverse direction.

IJ 4 C/)S+8 C)

HIGH PRESSURE COOLANT INJECTION M-2I55 (Continued)

Valve Number eR X g II Relief Request Rcq'd Tcatutg-Alternative.

Remarks A B C 9 CO IA HV-255F100 B-3 X X I GL A X Q,MT, LT 38 Scc Rclicf Rcclucst.Rapid acting valve.CA CJ CD CD CD HPCI TURBINE-PUMP M-2156 Sheet 1 Valve Number~o O O 8 O o II E~o 8'Rclicf Request Rcq'd.Testing Alternative Remarks FV-25612 256F04S 256 F052 256 F057 B-7 G-5 G-5 A 8 C.'D X X 10 GL E/H X C Q,MT C CV C CV C CV No 53 65 65 Sce Rclicf Rcqu est.Scc Rclicf Rcqu est.Scc Rclicf Rcqucst.Test during HPCI pump test.Test during HPCI pump test, open test only.Test during HPCI pump test, close test only.Test during HPCI pump test, open test only.H V-256F059 PSE-256D003 E-3 B-5 X X 16 GL M X RD C QMT C DT No No Test during HPCI pump test.No testing required.V)IJ CO CO HPCI TURBINE-PUMP M-2156 Sheet 1 (Continued)

'alve Number O S 5.O l4 8S O g~0 g II Relief Request Rcq'd Testing Alternative A 8'D IJ IJI PSE-256D004 S h-5 X X 16 DT No No testing required.

CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet I O J S Yalve'utnbcr', A n A...=B",C.>>,<<" D , ReliefRcqucst

Rcq'd.~i'=-Testing

., Alternative

,"Rcntarka'c lJ C Ch HV-25703 HV-25704 PS V-25704A I 2 PS V-25704A2 2 PSV-25704B I 2 PS V-25704B2 2 PSV-25704CI 2 PS V-25704C2 2 PSV-25704DI 2 PS V-25704D2 2 PS V-25704E I E-3 X E-2 X F-4 F-4 F4 F4 F-4 F4 F-4 X X X X X X X X 18 B 18 B 24 RV 24 RV 24 RV 24 RV 24 RV 24 RV 24 RV 24 RV 24 RV A X X X X X X X Q,MT, LT Q,MT, LT C SRV C SRV C SRV C SRV C SRV C SRV C SRV C SRV C SRV No No No No No No No No No 37 37 Closure test only.Leak test in reverse direction.

Closure test only.t>n (D M tJ CO C)CO

CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 1 (Continued)

Yalyc Number-g C Dc"j 8S O E~0 Relief.Request Rcq'd: Testing , Alternative Remarks A B'C.D PS V-25704E2 2 HV-25705 HV-25711 HV-25713 HV-25714 HV-25721 D-3 A-3 C-8 X 24 RV 2 GL 2 GL 24 B 24 B 6 B A X X X SRV Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LTr No 37 CS 37 CS 37 CS 37 CS Closure test only.Closure test only.Closuretcst only.Leak test in reverse direction.

Closure test only.Closure test only.

CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet I (Continued)

Valve Number O 0 0 0 O I O 8 l4 9 O g E~O sl Dv Relief Rcqucst Rcq'd Testing Altcfnat tve HV-25722 HV-25723 HV-25724 HV-25725 C-5 D-7 E-5 A B C D X 24 24 18 18 B A X B A X B A X B A X Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT Ycs Ycs 37 CS 37 CS 37 CS 37 CS Closure test only, Leak test in fcvcfsc direction.

Closure test only.Closure test only.Closure test only.Leak test in fcvcfsc direction.

SV-25734A G-2 X X GL S X Q,L'd, MT Ycs 38, 58 Sce Relief Rcqucst.Rapid acting valve.

CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 1 (Continued)

.';-.:;Valve"'";;":;:::;:::,'::,::,Numb e'r:.':,';,.:,:,'-'.', C":;" tA::g.;:"O.'.C',W.~;Relief,';,:.

Re'q'nest

'.:,'Re'q'd'-,-'.:."g","','gTe'sttri::-';"","';.;:"'Alt'eiiiative',;;:

,"':-:""',Reiiiaiks:;,',":,:'V-25734B 2 E-6 X 1 GL S X Q,LT, MT 38, 58 See Relief Request.Rapid acting valve.SV-25736A SV-25736B 2 G-3 X 2 E-6 X X 1 GL 1 GL S X S X 0 Q,LT, MT Q,LT, MT 38, 58 38, 58 See Relief Request.See Relief Request.Rapid acting valve.Rapid acting valve.SV-25737 2 G-6 X 1 GL S X Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.SV-25738 2 G-6 X X 1 GL S X Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.

'C.~I~I.,j I 1 CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 1 (Continued)

"-'<'""'"-" Val+e"""':-"".;::;;.;

Number"..'.',".;:,;

': 0&tv'.'.wi'A""':i;.".c.B+

i!:,:";, C~..;.'.:Q i';..'.,'@.,XC;8:;,;., 8;.,:C;:6;:;

.c.gg?a (p g"".'.?',.')C;:.', 4'YMZ.,M%'.C::Relief:,.;:.':

,";Request;":, i';RE!d,".,":;;, ,:r:.'..C ,.C%"..: ,'A'Iternattv'e-';.';

,:;,i:,"Re'mari s.",'SV-25740A 2 B4 X X GL S X 0 Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.SV-25740B SV-25742A 2 B5 2 B3 X GL S GL S 0 Q,LT, MT Q,LT, MT Yes 38, 58 38, 58 See Relief Request.See Relief Request.Rapid acting valve.Rapid acting valve.SV-25742B 2 B-6 X GL S X Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.SV-25750A 2 C4 X GL S X 0 Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.

"~v r~,'Ci CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 1 (Continued) 9??X?:?.;"',',",h'....'.Cl:..?.:<;fy??.C%?.".c",.'

';Cl,.'.r?.,;: "'-ll":-'?

?
C%
",%lgP,'.;.'t

.!ReIief:.;"."':,.,",'.;:Re'qu'e'st'::;

".'Req!d':.'??:C':?y'.',,".,.y"?gg%:.".~".gyM'y:NANT(..:+:?%';'",;i;::.

Testing':.",:i~i','

Alternativ'e,';:,:

'.';
::'",.':,Rem'arks.;;::.';;

.".'A"'i::.'::"'::";:B';'.~":;;':::Ci:::,::,:i.:':.-::,,'D.';.

SV-25750B 2 B-5 X GL S X Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.SV-25752A 2 C-3 X X GL S X 0 Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.SV-25752B 2 B-6 X GL S Q,LT, MT 38, 58 See Relief Request.Rapid acting valve.HV-25766 2 H-5 G M Q,MT, LT Yes 20 See Relief Request.Leak test in reverse direction.

SV-25767 2 C-5 X GL S Q,LT, MT 38, 58 See Relief Request.Rapid acting valve.HV-25768 2 H-4 X G M X Q,MT, LT No

  • !~r.

CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 1 (Continued)

",-.',;;;;,':.'";:;:,Valve,:-',;;.""".'.,';".".',-,,';:;,:;::Number'"-";;;

'.WV W',"Relief'.",-".

',Reqwu'est'.'Reqw'vd:::.':-
'<<v.:.'W.'.'.r

'"-':',:Te'sjin'gv'::-

':'Avl'teinative

.'
:::Rema'iks..:::.::::, SV-25774A C-3 X 1 GL S X 0 Q,LT, MT 38, 58 See Relief Request.Rapid acting valve.SV-25774B D-6 X 1 GL S X Q,LT, MT 38, 58 See Relief Request.Rapid acting valve.SV-25776A SV-25776B SV-25780A C4 X D-5 X F-3 X X X 1 GL 1 GL 1 GL S X, S X S X 0 0 Q,LT, MT Q,LT, MT Q,LT, MT Yes Yes 38, 58 38, 58 38, 58 See Relief Request.See Relief Request.See Relief Request.Rapid acting valve.Rapid acting valve.Rapid acting valve.

CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 1 (Continued)

!Relief~'Request".:Reij'd-""';", i-'::::.-".:Remarks:.:'::;:," SV-25780B SV-25782A SV-25782B SV-25789 2 F-6 2 F-2 F-6 2 C4 X X X X X GL S GL S GL S GL S X X 0 Q,LT, MT Q,LT, MT Q,LT, MT Q,LT, MT Yes Yes Yes Yes 38, 58 38, 58 38, 58 38, 58 See Relief Request.See Relief Request.See Relief Request.See Relief Request.Rapid acting valve.Rapid acting valve.Rapid acting valve.Rapid acting valve.

t T~4 CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 5'\',".0':::":.'.

0,:...;;;;.:;4'?;;";F%.O,".i":-'-'.'.

B:-ll:",';;C(i.":,'.:;-'.9

~'?j'
I , car;i.'..t p":.'".,'5?;al:".:,~;.'.;

9;:n.,'.,";;:;:

R'
.'-'X.;
:;'Relic'f.,':::"-:.;;:

.;:;;:Request:".,-:.

.';,Rej!d:::,:,::;,'C.'::,',':

~~"'Testmg'-".'-';:;: Aiteriiative',,,':

",
"-::::Rem aikr;,""," SV-257104 E-3 1 GL S Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.SV-257105 E-3 1 GL S X Q,MT, LT Yes 38, 58 See Relief Request.Rapid acting valve.SV-257106 F-3 X 1 GL S X Q,LT, MT 38, 58 See Relief Request.Rapid acting valve.SV-257107 X 1 GL S X Q,LT, MT Yes 38, 58 See Relief Request.Rapid acting valve.

4~I CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 6:;::;;:.: '"",:Valv'e".,".'",'l

"'=:';,;¹'mh'ei.'..;::;::;;

~p+vg'.Relief@~;"::.:R'equest";

'Req!d',~N

.C.,",.: g:,;:;;:::'gestUlg;:;.,';

":"Alternative',".':,:;.-.': ';Rem'aiks:-,'", SV-257100A 2 SV-257101A 2 SV-257102A 2 SV-257103A 2 B-3 X B-3 X C-3 X C-3 X X 1 GL 1 GL 1 GL 1 GL X X X X 0 0 0 0 Q,LT, MT Q,LT, MT Q,LT, MT Q,LT, MT Yes 38, 58 38, 58 38, 58 38, 58 See Relief Request.See Relief Request.Relief Request.See Relief Request.Rapid acting valve.Rapid acting valve.Rapid acting valve.Rapid acting valve.

0 N 8 ge l" CONTAINMENT ATMOSPHERE CONTROL M-2157 Sheet 7 ,""'",".""':":"',Valve",:.;,,'.'

g/: 'A";::,'-::i::.

B;
;:;".,:.C;:::..;.::::,':,:::,::,",9.';:;

CJ I NM<" C'>':.,":.;.

.)/%':::0:".'Q X".,'::rP,'.x: '.ReqUest-R'e'q':d,:;:;:

V(',: ';, V hV ,'::)): ',.a"""."Testtng

":~":Aitemativ'e'.

:-Rema'iks'",.'-'.

SV-257100B SV-257101B SV-257102B B-3 B-3 C-3 X X 1 GL 1 GL 1 GL S X S X S X 0 0 0 Q,LT, MT Q,LT, MT Q,LT, MT Yes 38, 58 38, 58 38, 58 See Relief Request.See Relief Request.See Relief Request.L Rapid acting valve.Rapid acting valve.Rapid acting valve.SV-257103B C-3 X X 1 GL S X 0 Q,LT, MT 38, 58 See Relief Request.Rapid acting valve.

g~t 1 h 1'~I LIQUID RADWASTE COLLECTION M-2161 Sheet I Relief::i'.:.'":,'e'qiies't:i Rej',d,'-':.

HV-26108A1 HV-26108A2 2 B-3 X 2 B-5 X X X G A G A X X Q,MT, LT Q,MT, LT No No HV-26116A1 2 G-3 X G A X Q,MT, LT No HV-26116A2 2 H-3 X X G A Q,MT, LT No REACTOR BUILDING CHILLED WATER M-2187 Sheet 2 V':,".-.:::,:;Vali):":,';,::-"'.

,
,'
;;,.;.Numb'e'x,:.":':,',Ž,'::'A'.:"::::,'::::.::::.B:::::::=':-::::.:C::::

"'4:D!::,:-'!."':;:::;:Relte'f,;:,:"':,::

i",:Retlues't':;Req',d',".;:.

.x ZCC xcP;;:;: Y:..:.:;.;Testmg;,'.":

"..Arltrexiia'tKe';:::

.;;;:;;:

r.r..'....

"":,:.-',Rem'axks",:;

HV-28781AI 2 HV-28781A2 2 HV-28781B I 2 HV-28781B2 2 HV-28782A1 2 HV-28782A2 2 HV-28782B I 2 HV-28782B2 2 HV-28791AI 2 H-2 G-2 D-2 C-2 D-2 C-2 H-2 G-2 B-2 X X X X X X X X X X X G A X G A X G A X G A X B A X B A X B A X B A X G A X 0 0 0 0 0 0 0 0 0 Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT Q,MT, LT No No No No No No No No Yes 39 CS O g

'I 1 I~'C REACTOR BUILDING CHILLED WATER M-2187 Sheet 2 (Continued)

M:-'ll:::::,:",::VaI'v'e,'.'.'-'.;-"'..',":.',';."::

';::Nuinbet".:.:.:,'.",':

C.:.:: CC.': "'j: A':.;i',::.::i, Bi,:::.:'":.';C:."'-':,'"';:::".'I)

'g::40',:5:,'8%ca?ai", 4,.41'.w':~;N~j N'," g'.;C7, g;.Og.,:;: '-;R'elief,:.,'::::,;.
.Request
.'::Req"d:;::,":;,'

\'.;~<:~Testing':,:;:)~

-',A'Itetn'atiy'e,
".
,";';Re'iiiaiks.'".'
.'

0 Ch HV-28791A2 2 HV-28791B I 2 A-2 X F-2 X X 3 G 3 G A X A X 0 0 Q,MT, LT Q,MT, LT Yes Yes 39 39 CS CS HV-28791B2 2 E-2 X 3 G 0 Q,MT, LT Yes 39 CS HV-28792AI 2 F-2 X X 3 B A X 0 Q,MT, LT Yes 39 CS HV-28792A2 2 E-2 X 3 B A X 0 Q,MT, LT Yes 39 CS HV-28792BI 2 B-2 X 3 B A X 0 Q,MT, LT Yes 39 CS HV-28792B2 2 A-2 X X 3 B A X 0 Q,MT, LT Yes 39 CS

, II r I I I TRAVERSING INCORE PROBE (TIP)(No P&ID)';:.::,:;.:,"','.Valv'e

""'i"-"'-:""~'"'¹mber;

: ",:: '%.'y?'8?:;: ';::A".-::,:':,.:::-::,:

B::.::::::,'.'.":..':..,C..'::."":.'"D;.:'.;

y.'..: C.'y (?'%?y?':R'e'lief,,:,:.',"::

Re'q'uest.;

."y::j'?Testmg:::yy.';i.:"Alternative"';

."."." Reiiiarlts."',.";

TIP Chan A Man Valve*TIP Chan A Squib Valve**TIP Chan B Man Valve TIP Chan B Squib Valve TIP Chan C Man Valve TIP Chan C Squib Valve TIP Chan D Man Valve TIP Chan D Squib Valve TIP Chan E Man Valve S N/A X S N/A S N/A X S N/A S N/A X S N/A S N/A X S N/A S N/A X X X X X X X X X 3/8 BA 3/8 X 3/8 BA 3/8 X 3/8 BA 3/8 X 3/8 BA 3/8 X 3/8 BA S X S X S X S X S X Q,MT, LT 0 DT Q,MT, LT 0 DT Q,MT, LT 0 DT Q,MT, LT 0 DT Q,MT, LT No No Yes No Yes No 38 38 38 38 38 See Relief Request.See Relief Request.See Relief Request.See Relief Request.See Relief Request.Rapid acting vlv.Rapid acting vlv.Rapid acting vlv.Rapid acting vlv.Rapid acting vlv.

A TRAVERSING INCORE PROBE (TIP)(No P&ID)(Continued)

'-".,i;'"'-::,":",Numb'e'r'.",'.-",';.,p,'?-;'Relief:,::.

4:ReqU est: '::,Req.'d';-;.'

.i.",:,';:9'e'su'ni::'.:::'."::i:
i,"':Alte'm'a'tiye,:::.

TIP Chan E Squib Valve S N/A X X 3/8 X 0 DT No TIP Channel manual (Ball)isolation valve.TIP Channel Squib (explosive/shear) isolation valve.

ISI-T-200.0 2PT-1 Rev.4 12/91 PARAJVIETER MEASURED Pump Number c'C Pump Name'.9..I Remarks 2P202A 2P202B 2P202C 2P202D 2P204 and 2P209 Residual Heat Removal-A Residual Heat Removal-B Residual Heat Removal-C Residual Heat Removal-D High Prcssure Coolant Injection Main&, Booster Exempt IWP-4400 Exempt IWP-4400 Exempt IWP-4400 Exempt IWP-4400 X X X X X X X X X X X X X X X X X 4C 52 54 55 52 54 55 52 54 55 52 54 55 44 48 52 55 63 Bypass loop, bearings in main flow path lubricated by pumped liquid.Bypass loop, bearings in main flow path lubricated by pumped liquid.Bypass loop, bearings in main flow path lubricated by pumped liquid.Bypass loop, bearings in main flow path lubricated by pumped liquid.Bypass loop, main and booster pumps opcratc in tandcm-mcasurements taken as onc pump.IJ C)C)

PARAMETER MEASURED (Continued)

Pump Number Pump Name~p C4 g E~gm X=Remarks 2P206A 2P206B 2P206C 2P206D 2P208A Core Spray-A'Core Spray-B Core Spray-C Core Spray-D Standby Liquid Control-A Exempt lWP-4400 Exempt lWP-4400 Exempt lWP-4400 Exempt IWP-4400 Exempt IWP-4400 X X X X X X X X X X X X See Rclicf Request 43.X X aa 52 54 55 52 54 55 52 54 55 52 54 55 43 49 52 Bypass loop, bearings in main flow path lubricated by pumped liquid.Bypass loop, bearings in main flow path lubricated by pumped liquid.Bypass loop, bearings in main flow path lubricated by pumped liquid.Bypass loop, bearings in main flow path lubricated by pumped liquid.Bypass loop.M lJ C)ED PARAMETER MEASURED (Continued)

Pump Number Pump Namc-ll]I:O Remarks 2P208B Standby Liquid Control-B Exempt IWP-4400 Scc Rclicf Rcqucst 43.X X X 43 49 52 Bypass loop.2PS06A 2PS06B RHR Service.Water-A (Unit I)RHR Scrvicc Water-B (Unit I)Exempt IWP-4400 Exempt IWP-4400 X X X X X 52 54 52 54 Bearings in main flow path lubricated by pumped liquid.Inlet pressure dcrivcd from spray pond lcvcl.Bearings in main flow path lubricated by pumped liquid.Inlet prcssure dcrivcd from spray pond level.Scc Rclicf Rcqucst 48.Sce Rclicf Rcqucst 54.Scc Rclicf Rcqucst 49.

ISI-T-200.0 2RRT-1 Rev.4 12/91 ISI-T-200.0 RELIEF RE UEST NUMBER 1 COLD SHUTDOWN TEST JUSTIFICATION System: PEcID: Valves: Reactor Building Closed Cooling Water M-2113 HV-21313 HV-21314 HV-21345 HV-21346 Category: Class: Function: Containment Isolation Impractical Test Requirement:

Exercise valves once per 92 days.Basis for Relief: These valves are in the coolin water su g pply and return lines for the reactor recirculation pump bearing and seal coolers.Cycling of these valves during power operation would interrupt this cooling water flow, possibly causing pump bearing damage or seal failure.Alternative Testing: Exercise valves during Cold Shutdowns (no more frequently than once per 92 days).2RR1-1 Rev.5 05/93 ISI-T-200.0 RELIEF RE ER 2 System: P&ID: Containment Instrument Gas M-2126 Valves: 2-26-070 2-26-072 2-26-074 2-26-152 2-26-154 2-26-164 Category: Class: A,C Function: Containment Isolation Impractical Test Requirement:

Exercise valves once per 92 days.'asis for Relief: These check valves serve the containment isolation function inside containment and are not equipped with remote position indicators.

Downstream of the valves (inside containment) there are no pressure measurement devices or other means of remotely verif'ying valve position.The only practical method of closure testing involves pressurizing the downstream side and measuring pressures with temporary instrumentation.

With the inerted containment, such testing can only be performed during a major outage which requires containment purging.This testing, which requires significant effort in the installation and removal of temporary equipment in the high radiation area of the containment drywell, is already performed during Category A leak rate testing.Two valves, 2-26-152 and 2-26-154, serve a safety function on opening as well as their containment isolation function.The open test cannot be performed as there would be no positive indication (flow measurements) of function.Operation of the equipment serviced by these valves (ADS function of the safety/relief valves)will not verify their proper opening since the accumulators at the SRV operators provide capacity for several lifts.2RR2-1 Rev.4 12/91 ISI-T-200.0 RELIEF RE T ER 2 (Cont'd.)Performing continued lifts in an attempt to verify check valve opening will increase the potential for SRV leakage or failure to reseat, will impact proper maintenance of reactor pressure control, and has the potential for degradation of the ADS function.Alternative Testing: Valve closure is.demonstrated by completion of leak rate testing performed once per 24 months.Commencing with the first refueling outage, verification of the opening capability of valves 2-26-152 and 2-26-154 will also be performed at that time with an air pressure applied through the outboard test valves (2-26-021, 2-26-03 1), opening the inboard test valves (2-26-155, 2-26-153), and observing essentially unrestricted flow.I 2RR2-2 Rev.4 12/91

ISI-T-200.0 RELIEF RE UEST.NUMBER 3 COLD SHUTDOWN TEST JUSTIFICATION System: PEcID'alves:

Containment Instrument Gas M-2126 SV-22651 Category: Class: Function: Containment Isolation Impractical Test Requirement:

Exercise valve once per 92 days.Basis for Relief: Closing this valve interrupts instrument gas supply to several important valves inside containment such as the Safety/Relief Valves (non-ADS function)and the MSIVs.This could compromise the ability of the SRV's to operate in the relief mode which, while not an ECCS function, is important to safety.Loss of instrument gas could also cause the MSIVs to close, resulting in a severe reactor transient.

Alternative Testing: Exercise valve during cold shutdowns (no more frequently than once per 92 days).2RR3-1 Rev.5 05/93

~~k f ISI-T-200.0 RELIEF RE VEST NUMBER 4 COLD SHUTDOWN TEST JUSTIFICATION System: PAID: Valves: Containment Instrument Gas M-2126 SV-22654A SV-22654B Category: Class: Function: Containment Isolation Impractical Test Requirement:

Exercise valves once per 92 days.Basis for Relief: Closing these valves will interrupt instrument gas supply to the ADS solenoids of the Safety/Relief Valves, compromising their ability to provide the opening motive force for the ADS valves in support of the long-term cooling ECCS function.Alternative Testing: Exercise valves during cold shutdown (no more frequently than once per 92 days).2RR4-1 Rev.5 05/93 ISI-T-200.0 RELIEF RE UEST NUMBER 5 COLD SHUTDOWN TEST JUSTIFICATION System: P&ID: MSIV-Leakage Control M-2139'"'"'""':i::

':::::"'"'ij""""i(Valves":~'~jk~mimgii~'h"'"'":"""""i"N

":': Catego~'iaaf 4'~HV-239F001 B, F, K, P HV-239F002 B, F, K, P Function: Containment Isolation; System Initiation Impractical Test Requirement:

Exercise valves once per 92 days.Basis for Relief: The MSIV-LCS inboard bleed lines are directly connected to the main steam lines at the outboard MSIV.During power operations, these lines are pressurized with main steam up to the first isolation valve (HV-239F001 B,F,K,P).Double valve isolation is provided by HV-239F002 B,F,K,P.Opening any of these valves during power operations will leave only one barrier against the release of main steam to occupied plant areas through the system piping.Maintenance of double valve isolation is desired for personnel safety considerations and for prevention of inadvertent leakage paths from the main steam lines.Alternative Testing: Exercise during cold shutdowns (no more frequently than once per 92 days).2RR5-1 Rev.5 05/93 4 V ISI-T-200.0 RELIEF RE UEST NUMBER 6 COLD SHUTDOWN TEST JUSTIFICATION System: P&ID: MSIV-Leakage Control M-2139 Valves: HV-239F006

/HV-239F007 HV-239F008 HV-239F009 Category: Class: Function: System Initiation Impractical Test Requirement:

Exercise valve once per 92 days.Basis for Relief: The MSIV-LCS outboard bleed and blowdown li nes are directly connected to the m'ain steam system at the steam line drain.During power operations these lines are pressurized with main steam up to the first isolation valve (HV-239F006, HV-239F008).

Double valve isolation is provided by HV-239F007 and HV-239F009.

Opening any of these valves will leave only one barrier against the release of main steam to occupied plant areas through system piping.Maintenance of double valve isolation is desired for personnel safety considerations and for prevention of inadvertent

~leakage paths from the main steam lines.Alternative Testing: Exercise during cold shutdowns (no more frequently than once per 92 days).2RR6-1 Rev.5 05/93 AAO P~e3 i RELTEF RE T R7 ISI-T-200.0 System: P&ID: Valves: Nuclear Boiler M-2141 241F010 A,B Category: Class: A,C Function: Containment Isolation Impractical Test Requirement:

Exercise valves closed once per 92 days.Basis for Relief: These check valves remain open maintaining the flowpath to the vessel whenever the feedwater/condensate, HPCI or RCIC systems are providing makeup to the vessel or when Reactor Water Cleanup is returning flow to the vessel.Due to the necessity of maintaining this flowpath in virtually all modes of operation, closure testing is only practical during extended outages such as refuelings during which these systems are shutdown.Also, plant design does not provide a practical means of demonstrating closure other than by upstream pressurization performed during leak rate testing.This testing involves significant effort for installation of temporary equipment, and requires complete purging of the inerted reactor containment.

Alternative Testing: Proper valve closure will be verified in by completion of leak rate testing performed once per 24 months.2RR7-1 Rev.4 12/91 R ISI-T-200.0 System: P&ID: Nuclear Boiler M-2141 Valves: PSV-24137 A,B,C,D,E,F,G,H,J,K,L,M,N,P,R,S PSV-241F037 A,B,C,D,E,F,G,H,J,K,L,M,N,P,R,S Category: Class: Function: SRV Discharge Pipe Vacuum Breaker Impractical Test Requirement:

Setpoint test per PTC 25.3-1976.

'Basis for Relief: The ASME performance test code does not provide the most practical method for testing these vacuum relief devices.Alternative Testing: Commencing with the first refueling outage, the setpoint will be checked once per refueling outage by pouring water into the valve inlet and measuring the height of water column necessary to activate the valve.2RR8-1 Rev.4 12/91 ISI-T-200.0 R LIE System'.P&ID: Valves: Category: Class: Function: General General General General General As applicable to specific valves.Impractical Test Requirement:

Paragraphs IWV-3417(b) and IWV-3523 of Section XI require that when corrective action is required as a result of tests made during cold shutdown, the condition shall be corrected before startup.Basis for Relief: For those valves specified therein, the Limiting Conditions for Operation presently contained within the Susquehanna Steam Electric Station Technical Specifications provide the control by which valves and/or systems are declared inoperable.

They also control entry into the various operational conditions.

Further controls are not necessary for"these valves.Valves which are not under the control of the Technical Specifications will be declared inoperable should they fail ISI testing.Alternative Testing: The requirements contained within Susquehanna SES Technical Specifications will control plant operations and testing with regard to out-of-service valves.For valves which are not addressed in the Technical Specifications, any failures will cause the affected valve(s)to be declared inoperable and corrective action to be initiated as appropriate.

2RR9-1 Rev.4 12/91

RELIEF RE VEST NUMBER 10 ISI-T-200.0 System: P&ID: Valves: Category: Nuclear Boiler I M-2141 PSV-241F013 G,J,K,L,M,N B,C Class: Function: ADS Valve, Code Safety/Relief Valve Impractical Test Requirement:

Exercise valve once per 92 days.Basis for Relief: The six safety relief valves assigned to the ADS system perform an essential safety function when operated by the pneumatic actuator with gas supplied through the ADS solenoid valves.Operation of these valves is not practical during power operation because this action will vent main steam to the suppression pool, inducing a transient condition and increasing the potentiality for an open failure of a safety relief valve.Also, no stroke timing is practical as these are pneumatic assisted SRVs.No direct position indication of the SRVs is provided.Although acoustic monitors attached to the valve discharge piping provide evidence of steam flow through each valve, which can be taken as indirect or secondary indication of valve position, no accurate stroke timing is possible.ADS valve stroke times could only be inferred very crudely from elapsed time between manual (non-ADS)actuation of each valve and acoustic monitor indication of steam flow or lack of steam flow in the valve discharge pipe line.Exercising during cold shutdown cannot be accomplished because of lack of steam flow (and attendant noise)provides no indirect or secondary indication of valve movement.Alternative Testing: The ADS valves will be exercised once per 18 months in accordance with Technical Specification 4.5.1.d.2.b, which provides manual opening of each ADS valve with reactor dome pressure greater than or equal to 100 psig and observing either control valve or bypass valve response or corresponding change in measured steam flow.No stroke timing can be done.2RR10-1 Rev.5 05/93

ISI-T-200.0 Additionally, to monitor for possible degradation of each ADS SRV, actuator lift time and actuator lift distance will be measured during each safety valve/relief valve pressure set point test, done to satisfy paragraph IWV-3510 requirements.

2RR10-2 Rev.5 05/93 1<

ISI-T-200.0 RELIEF RE UEST NUMBER 11 System: PAID: Valves: Nuclear Boiler M-2141 HV-241F022 A,B,C,D HV-241F028 A,B,C,D Category: Class: Function: Containment Isolation Impractical Test Requirement:

Exercise valves once per 92 days.Basis for Relief: During full power operation, it is impractical to full stroke cycle these valves, since the interruption in steam flow would induce a reactor pressure transient with increased probability of reactor scram, main steam line isolation and SRV actuation.

Trending of valve stroke times is not necessary due to Technical Specification limits on minimum as well as maximum allowable stroke times with a tolerance of only 2 seconds between the 3 second minimum and the 5 second maximum.Alternative Testing: Full stroke testing will be performed in Operational Condition 1, 2, or 3 when power level is low enough to prevent the above mentioned transients (no more frequently than once per 92 days).No reduction from high power levels will be made specifically to accomplish this testing.No trending of valve stroke times will be done.2RR11-1 Rev.5 05/93 ISI-T-200.0 KR 12 System: P&ID: Valves: Category: Class: Nuclear Boiler M-2141 HV-241F032 A,B A, C (HV-241F032B only)Function: Containment isolation; HPCI flowpath (HV-241F032B only).Impractical Test Requirement:

Exercise valve once per 92 days.Basis for Relief: a.These check valves remain open maintaining the fiowpath to the vessel whenever the feedwater/

condensate systems are providing makeup to the vessel.Interruption of the feedwater fiowpath by motor operator closure of these valves can only be practically accomplished during cold shutdowns.

b.No practical means other than upstream pressurization similar to leak rate testing is available to demonstrate valve closure of HV-141F0328 as a check valve.Alternative Testing: a.Cycle valves shut using stop-check motor operators during cold shutdowns (no more frequent than once per 92 days).b.Closure testing of HV-241F032B as a check valve will be demonstrated by completion of leak rate testing to be performed once per 24 months.2RR12-1 Rev.4 12/91 ISI-T-200.0 RELIEF RE UEST NUMBER 13 System: PEcID: Valves: Category: Class: Function: Fuel Pool Cooling and Clean-Up M-2153 2-53-071 A,B Admit flow to fuel storage pool.Impractical Test Requirement:

Exercise valves once per 92 days.Basis for Relief: In an alternative flowpath to the fuel storage pool, exercising of these valves utilizing flow can only be accomplished utilizing ESW or RHR water.Use of ESW would introduce"raw" water from the ESSW spray pond, undesirable for chemistry and fuel integrity considerations.

While use of the RHR flowpath is possible, the difficulty of operating the RHR system in an abnormal lineup for supplying the fuel pool creates a dynamic control situation that is best minimized.

Alternative Testing: Verify valve operability by a pneumatic open flow path test during periodic pressure test.A pneumatic open flow path test (SE-235-301) is performed once per Inspection Period (as specified by ASME Code Section XI paragraph IWD-2400).

2RR13-1 Rev.5 05/93 ISI-T-200.0 KR 14 System: P&ID: Valves: Category: Class: Reactor Recirculation M-2143 XV-243F017 A,B A,C Function: Containment Isolation Impractical Test Requirement:

Exercise valves once per 92 days.Basis for Relief: Closure testing of these excess flow check valves involves depressurization of the CRD system side of the valves and verification that the valve will close and stop excess flow.Such actions require interruption of seal water to the recirculation pumps, which creates a potential for pump seal damage;disruption of CRD Hydraulic System flow;and installation of temporary equipment.

Alternative Testing: Closure testing will be demonstrated by completion of leak rate testing to be performed once per 24 months.2RR14-1 Rev.4 12/91 RELIEF E ER 1 ISI-T-200.0 System: P&ID: Valves: Reactor Recirculation M-2143 243F013 A,B Category: Class: A,C Function: Containment Isolation Impractical Test Requirement:

Exercise valves once per 92 days.Basis for Relief: These simple check valves serve as containment isolation valves inside containment.

The valves are not equipped with remote indication and there is no pressure indication downstream of the valves.For these valves, closure testing is only practical through pressurization downstream of the valve with the upstream piping vented, and verification of the absence of flow upstream.Interruption, of the CRD flow (seal purge)during Reactor Recirculation Pump operation to perform this testing could result in seal damage.This type of testing can only be performed during a period when the containment is accessible.

The deinerting of the containment will only be performed during major outages and the testing will be performed during Category A leak rate testing.Alternative Testing: Valve closure is demonstrated by completion of leak rate testing performed once per 24 months.2RR15-1 Rev.4 12/91 ISI-T-200.0 RELIEF RE VEST NUMBER 16 COLD SHUTDOWN TEST JUSTIFICATION System: PAID: Valves: Reactor Recirculation M-2143 HV-243F031 A,B Category: Class: Function: Reactor Recirculation Pump Discharge Isolation, LPCI flowpath.Impractical Test Requirement:

Exercise valves once per 92 days.Basis for Relief:.The recirculation pump discharge isolation valves are in the main flowpath of the reactor recirculation system which is necessary to maintain reactivity control of the reactor.Cycling of these valves during power operations would interrupt the driving core flow, possibly resulting in severe changes in core power level.Alternative Testing: Technical Specification 4.4.1.1.1 provides for and controls the exercising of these valves prior to exceeding 25%power during each startup.2RR16-1 Rev.5 05/93 ISI-T-200.0 RELIEF KR 17 System: P&ID: Control Rod Drive M-2147~V~lv gate~ry 247114-001 through 247114-185 247115-001 through 247115-185 XV-247126-001 through XV-247126-185 XV-247127-001 through XV-247127-185 247138-001 through 247138-185 C C B B C Class: Function: Control Rod Scram Impractical Test Requirement:

Exercise valves once per 92 days and measure stroke times.(per IWV-3411 and IWV-3521)it Basis for Relief: These valves, located on the hydraulic control units for the 185 control rod drives, perform the active safety function of rapidly inserting the control rods into the reactor core, upon receipt of a reactor scram signal from the reactor protection system.Exercising these valves quarterly during power operations could result in the rapid insertion of one or more control rods more frequently than desired.Where testing could result in the rapid insertion of control rods, thereby causing rapid reactivity transients and wear of the control rod drive mechanisms, the control rod scram test frequency identified in the Plant Technical Specifications will be utilized as the valve testing frequency.

Normal control rod motion has been shown to be an indicator that the associated cooling water header check valve (247138-001 through-185)moves to its safety position (closed).Normal control rod motion may not occur if this check valve were to fail in the open position.An additional positive test of the closure of this valve can be provided by venting of the cooling water header during Primary Containment Integrated Leakage Testing, conducted per Technical Specification 4.6.1.2.Normal control rod motion does not serve as an indicator that any scram discharge header check valve (247114-001 through-185)moves to its 2RR17-1 Rev.4 12/91 ISI-T-200.0 RELIEF RE ER 17 (Cont'd.)safety position (open), however.Since this check valve is moved to its open position only by scram exhaust flow, a positive test of the opening of'the valve can only be provided by the periodic scram testing and control rod insertion timing specified by Technical Specification 4.1.3.2.Verification that any charging water header check valve (247511-001 through-185)moves to its safety position (closed), requires that the control rod drive pumps be stopped to depressurize the charging water header.This test cannot be performed during power operations because stopping the pumps would result in loss of cooling water to all control rod drive mechanisms and seal damage could result.This test cannot be performed during each cold shutdown because the control rod drive pumps supply seal water to the reactor recirculation pumps and one of the recirculation pumps might be kept running, thus continuing to need its seal water supply.The HCU accumulator pressure decay test, specified by Technical Specification 4.1.3.5.b.2, provides verification of the closure of its charging water header check valve.The scram inlet valves (XV-247126

-001 through-185)and the scram exhaust valves (XV-247127-001 through-185)are air operated valves that full-stroke in milliseconds and are not equipped with position indication, thereby rendering measurement of their full-stroke times impractical.

Verifying that the control rod associated with each pair of these valves meets the periodic scram testing rod insertion time limits, specified by Technical Specification 4.1.3.2, is an acceptable alternate method of detecting degradation of these valves.Since these measurements of control rod insertion times are subject to the conservative limitations of Technical Specification 4.1.3.3, and because these measurements cannot be meaningfully correlated with the full-stroke times of the scram inlet and exhaust valves, trending of these scrams time measurements in any manner comparable to that of valve stroke times is both impractical and unnecessary.

These bases for relief from applicable code testing requirements for these individual control rod scram valves are intended to conform to those provided as guidance by NRC Generic Letter 89-04 (Position P7).2RR17-2 Rev.4 12/91 ISI-T-200.0 RELIEF RE T KR 17 (Cont'd.)'n: Pro r functioning of the scram discharge header check valves (247114-'-2 7126-XXX d of th xh al{XV-247127-XXX) will be verified by periodic scram testi d control rod insertion timing, with reactor pressure>psig, testing an con o conducted per Technical Specification 4.1.3.2 and Technical Specification a)For all control rods prior to thermal power exceeding 40%of rated power, following core alternations or after a reactor shutdown that is greater than 120 days.I b)For specifically affected individual control rods, following maintenance or modification to the control rod or control rod drive system, which could affect the scram insertion time of those specific control rods.c)For at least 10%of the control rods, on a rotating basis, at least once per 120 days of power operation.

Proper closure of the charging water header check valves (247115-XXX) will be verified by the demonstration that each individual accumulator check valve maintains its associated accumulator pressure above the alarm f~10 minutes with no CRD pump operating, at least once per 18 months, conducted per Technical Specification 4.1.3.5...

Proper closure of the cooling water header check valves (247138-XXX) will be verified by venting of the cooling water header during Primary r 30 to 50 month Containment Integrated Leakage Testing, at least once per o m interval, conducted per Technical Specification 4.6.1.2.2RR17-3 Rev.4 12/91 ISI-T-200.0 System: PAID: Valves: Standby Liquid Control M-2148 HV-248F006.Category:

Class: A,C Function: Containment Isolation Impractical Test Requirement:

Exercise valve once per 92 days.Basis for Relief: Alternative Testing: To verify proper opening of this stop-check valve, it is necessary to pass fluid through the valve.This action would result in an injection into t e reactor vessel and would require actuation of an explosive valve.Both actions are undesirable during power operations.

Closure testing as a motor-operated stop-check valve during power operations presents the danger of having the disc stick in the closed position, blocking the only SLC injection fiowpath, with no means of detecting the failure.The proper functioning of the Standby Liquid Control System injection fiowpath, including opening of HV-248F006, will be demonstrated once per 18 months in accordance with Technical Specification Section 4.1.5.d.Closure testing of the valve by motor operator will be performed just prior to the injection testing once per 18 months.2RR18-1 Rev.4 12/91

ISI-T-200.0 RKLIKF RK KR 1 System: P&ID: Valves: Standby Liquid Control M-2148 248F007 Category: Class: A,C Function: Containment Isolation Impractical Test Requirement:

Exercise valve once per 92 days.Basis for Relief: To verify proper opening of this check valve, it is necessary to pass fluid through the valve.This action would result in an injection into the vessel and would require actuation of an explosive valve, both undesirable during power operations.

Closure testing is only practical by pressurizing downstream of the valve (the upstream side being vented)and verifying absence of flow in the upstream side.This requires installation of temporary equipment and access to the containment which is inerted during power operation.

Alternative Testing: The proper functioning of the Standby Liquid Control System injection fiowpath, including opening of 248F007, will be demonstrated once per 18 months in accordance with Technical Specification Section 4.1.5.d.Valve closure is demonstrated by completion of leak rate testing performed once per 24 months.See Relief Request Number 18.2RR19-1 Rev.4 12/91

~!0' ISI-T-200.0 RELIEF RE T ER 20 RCIC RCIC RCIC RCIC RHR Core Spray Core Spray HPCI HPCI'PCI System-" P&ID.M-2149 M-2149 M-2149 M-2149 M-2151.M-2151 M-2151 M-2152 M-2152 M-2155 M-2155 M-2155 Valve HV-249 F007 HV-249F031 HV-249 F059 HV-249F084

'V-251F004A,B,C,D HV-251F007A,B HV-251F022 HV-252F001A,B HV-252F031A,B HV-255 F002 HV-255F012 HV-255 F042 Class HPCI HPCI Containment Atmosphere Control M-2155 M-2155 M-2157 HV-255 F066 HV-255F079 HV-25766 Category: Function: Containment Isolation Impractical Test Requirement:

Leak test gate valve with pressure differential in same direction as safety function.Basis for Relief: These valves are configured such that there is no practical means of pressurizing in the direction of safety function (lack of proper isolation valves, test connections, etc.).2RR20-1 Rev.4 12/91 ISI-T-200.0 RELIEF RE UEST NUMBER 20 (Cont'd.)Pressurization in the direction of safety function would require actions such as pressurizing the containment (equivalent to an ILRT)or precisely controlling the entire RCS at the valve test pressure.10CFR50 Appendix J paragraph III.C.1 requires that the pressure be applied in the same direction as that when the valve would be required to perform its safety function, unless is can be determined that the results from the tests for a pressure applied in a different direction provide equivalent or more conservative results.The Susquehanna FSAR Section 6.2.6.3 provides confirmation that, for the subject valves, pressure applied in the opposite direction of accident pressure produces equivalent or more conservative results.Alternative Testing: Leak test each valve in the reverse direction.

Penetration will be subjected to test pressures in the correct direction during containment integrated leak rate tests.2RR20-2 Rev.5 05/93 0

IS I-T-200.0 RELIEF RE UEST ER 21 System: PEcID: Valves: Reactor Core Isolation Cooling M-2149 249F028, 249F040, 249F021 Category: Class: A,C Function: Containment Isolation Impractical Test'Requirement:

Exercise valve once per 92 days.Basis for Relief: These check valves are not equipped with position indication and system design does not provide any practical method of verifying closure other than pressurization similar to leak rate testing.Such testing requires installation of temporary equipment which is impractical on a quarterly basis, and it would render the RCIC system inoperable during the testing period.While RCIC is not an ECCS system, it is important to safety and can provide an additional margin for prevention or mitigation of reactor transients.

Normally, testing of this type is accomplished by required containment local leak rate testing in accordance with 10CFR50, Appendix J.More frequent performance represents an unnecessary burden on the licensee.Alternative Testing: Demonstrate closure by completion of leak rate testing performed once per 24 months.2RR21-1 Rev.4 12/91 IS I-T-200.0 RELIEF RE T KR 22 System: PAID: Valves: Category: Class: Reactor Core Isolation Cooling M-2149 249F063, 249F064 Function: Vacuum Breaker Impractical Test Requirement:

Exercise valve once per 92 days.Basis for Relief: These vacuum breakers installed on the RCIC turbine exhaust line are not provided with position indication equipment nor is there pressure indication installed that would provide positive verification of valve operation.

A practical method of testing involves supplying low pressure air upstream of the valve and verifying that fiow can be detected downstrea'm of the valve.This test method involves installation of temporary equipment and is not practical except during major outages, and it would render the RCIC system inoperable during the testing period.While RCIC is not an ECCS system, it is important to safety and can provide an additional margin for prevention or mitigation of reactor transients.

More frequent performance represents an unnecessary burden on the licensee.Alternative Testing: Commencing with the first refueling outage, verify opening once per 24 months in conjunction with leak rate testing.2RR22-1 Rev.4 12/91 RELIEF RE VEST NUMBER 23 ISI-T-200.0 COLD SHUTDOWN~JUSTIHCATION System: PEcID: Valves: Residual Heat Removal M-2151 Sh.2 HV-251F008, HV-251F009 Category: Class: Function: Containment Isolation (Shutdown Cooling)Impractical Test Requirement:

Exercise valves once per 92 days.Basis for Relief: These normally closed isolation valves are only required to open when bringing the unit to a cold shutdown condition, providing the flowpath for the shutdown cooling mode of RHR.In accordance with guidance presented in IE Information Notice 84-74, draft R.G.901-4, and previous NRC concerns regarding intersystem LOCAs, cycling these valves every 92 days during power operation increases the probability of exposing the downstream low pressure piping to reactor coolant pressure (since only'ne valve would have to be ruptured or failed open to expose the low pressure system to reactor coolant pressure).

During reactor operations above approximately 100 psig, interlocks inhibit cycling of these valves for the express purpose of protecting low pressure piping.Alternative Testing: Exercise valves during cold shutdown (no more frequently than once per 92 days).2RR23-1 Rev.5 05/93

'

IS I-T-200.0 RKI.IKF RK KR 24 System RHR Core Spray Core Spray Core Spray Core Spray HPCI P&ID M-2151 M-2151 M-2152 M-2152 M-2152 M-2152 M-2155 M-2111 M-2111 Valve Number 251FO90A 251FO90B 252FO29A 252FO29B 252FO30A 252FO30B 255012 211165 A 211165B Class Category ,C Function: Prevent reverse flow out through keepfill line Impractical Test Requirement:

Exercise valves to their closed positions once per 92 days (Per IWV-3521).

Basis For Relief: These check valves, located in keepfill lines for the RHR, Core Spray, and HPCI Systems provide Condensate Transfer System water flow into their respective headers, while preventing flow of process water in the reverse direction, during operation of the respective ECCS System.In the RHR and HPCI Systems, test connections exist between the two tandem check valves existing in each line;while in the Core Spray System, a single test connection exists upstream of both check valves, which are located very close together.These configurations allow individual testing of the downstream check valve in the RHR and HPCI Systems, but support only dual testing of each pair of Core Spray System check valves in combination.

Using these test connections in RHR, Core Spray, and HPCI to monitor essential restriction of reverse flow involves collecting radioactively contaminated seepage while the process system is pressurized, as during flow testing.This creates the potential for spills and spread of contamination.

The increase in potential for water hammer in these systems due to isolation of keepfill lines during testing, the increase in personnel radiation exposure required to perform this testing during 2RR24-1 Rev.4 12/91 ISI-T-200.0 RELIEF RK KR 24 (Cont'd.)plant operation, and the increase in potential for contamination of personnel and equipment through this testing justify reduced frequency.

The stainless steel construction of each check valve and the series configuration of each pair of check valves reduce the probability of failure to restrict reverse flow through any keepfill line.The relatively small size of each keepfill line minimizes the impact of any such failure.The combination of these mitigating factors warrant reduction in testing frequency.

The single check valves located in the keepfill lines for the ESW System provide Service Water System flow into their respective headers, while preventing flow of process water in the reverse direction, during operation of ESW System.Test connections upstream of each check valve support testing of its reverse flow individually.

Using these test connections in ESW to monitor essential restriction of reverse flow involves collecting raw service water seepage, which has the potential to chemically contaminate and degrade the operation of the plant Liquid Radwaste System.The stainless steel construction of each check valve reduces the probability of failure to restrict reverse flow through any keepfill line.The relatively small size of each keepfill line minimizes the impact of any such failure.The combination of these mitigating factors warrant reduction in testing frequency.

Alternative Testing: Demonstrate closure of each check valve in the keepfill lines of the RHR and HPCI Systems by monitoring the essential restriction of its reverse flow, through its upstream test connection, once per refueling outage while the process system is pressurized, as during flow testing.Demonstrate closure of at least one of the two check valves in each pair in the keepfill lines of the Core Spray System by monitoring the essential restriction of their reverse flow, through their upstream test connections, once per refueling outage while the process system is pressurized, as during flow testing.Demonstrate closure of each check valve in the keepfill lines of the ESW System by monitoring the essential restriction of their reverse flow, through their upstream test connections, once per 18 months (+3 months)while the process system is pressurized, as during flow testing.2RR24-2 Rev.4 12/91 e

ISI-T-200.0 RELIEF RK Relief Request Deleted.This Page IntentionalLy Left Blank.2RR25-1 Rev.4 12/91

'4'.pr ISI-T-200.0 RELIEF RE UEST NUMBER 26 COLD SHUTDOWN TEST JUSTIFICATION System: PAID: Residual Heat Removal M-2151 Sh.1 and Sh.2 Valve CategoO HV-251F015A HV-251F015B HV-251F022 HV-251F023 HV-251FOSOA HV-251F050B HV-251F122A HV-251F122B A A A A A,C A,C A A Class: Function: Containment Isolation Impractical Test Requirement:

Exercise valves once per 92 days.Basis for Relief: These normally closed isolation valves serve as the pressure isolation between RHR system piping and reactor coolant pressure.In accordance with guidance presented in IE Information Notice 84-74, draft R.G.901-4, and previous NRC concerns regarding intersystem LOCAs, cycling these valves every 92 days during power operation increases the probability of exposing the downstream low pressure piping to reactor coolant pressure (since only one valve would have to~be ruptured or stuck open to expose the low pressure system to reactor coolant pressure).

Maintenance history on these valves has shown that excessive cycling at pressure will reduce the leak tightness of the valves.In addition, failure of these valves during testing to positively re-seat could cause loss of RHR system function.Alternative Testing: Exercise valves during cold shutdowns (no more frequently than once per 92 days).2RR26-1 Rev.5 05/93 0 J ISI-T-200.0 RELIEF RE ER 27 This Page IntentionaLly Left Blank.2RR27-1 Rev.4 12/91

ISI-T-200.0 RELIEF RE ER 2 System: P&ID: Valves: High Pressure Coolant Injection M-2155 255F049, 255F046 Category: Class: A,C Function: Containment Isolation Impractical Test Requirement:

Exercise valve closed once per 92 days.Basis for Relief: This valve is not equipped with position indication.

Its configuration with an open discharge into the suppression pool prevents usage of reverse flow to demonstrate closure.No practical method exists to perform closure testing other than the downstream pressurization of leak rate testing.Such testing requires installation of temporary equipment and closure of valves which renders the system inoperable.

Alternative Testing: Demonstrate closure once per 24 months by completion of leak rate testing.2RR28-'1 Rev.4 12/91 ISI-T-200.0 RELIEF RE VEST NUMBER 29 COLD SHUTDOWN TEST JUSTIFICATION System: P8cID: Valve: Category: High Pressure Coolant Injection M-2155 HV-255 F006 Class: Function: Containment Isolation, HPCI Injection Impractical Test Requirement:

Exercise valve once per 92 days.Basis for Relief: This valve is in the HPCI injection flowpath.The interlocks on this valve prevent its being open unless the Steam Admission and Turbine Stop Valves are open.This is only possible during pump flow testing.Cycling this valve during normal plant operation or HPCI testing may lead to HPCI injection into the vessel.This would affect reactor operations and introduce a thermal transient in the vessel nozzle.Alternative Testing: Exercise valve during cold shutdowns (no more frequently than once per 92 days).2RR29-1 Rev.5 05/93 I l 0 a, ISI-T-200.0 RELIEF RE UEST NUMBER 30 System: PAID: General General Valves: All valves specified as tested on a cold shutdown or refueling frequency.

Category: Class: Function: As applicable As applicable As applicable Impractical Test Requirement:

Paragraph IWV-3417(a) of Section XI requires that should an unacceptable increase in stroke time be observed, the valve test frequency shall be increased to once per month until corrective action is taken.Basis for Relief: Valves are tested on a cold shutdown or refueling frequency because there is a defined basis for exemption from quarterly testing frequency during power operation (e.g., the plant is put into an unsafe condition, system design does not permit testing).This same reasoning would, therefore, provide the basis for exemption from the monthly testing as well.Alternative Testing: The testing frequency will remain unchanged.

The requirements contained in the Susquehanna Steam-Electric Station Technical Specifications will control plant operations with regard to out-of-service valves.Each valve exhibiting such an increase in its stroke time will have its acceptability for continued operation evaluated by a review of the tendencies and historical ranges of its stroke time measurements.

2RR30-1 Rev.5 05/93 i

ISI-T-200.0 RELIEF RE KR 1 System: P&ID: Valves: High Pressure Coolant Injection M-2155 255 F045 Category: Class: Function: Backflow Prevention Impractical Test Requirement:

Exercise valve once per 92 days.Basis for Relief: To verify proper opening of this valve, it is necessary to initiate HPCI flow while taking suction from the suppression pool.Since the water quality in the suppression pool is not maintained at reactor coolant standards, it is not advisable to initiate this flow at any time during normal operations.

The resulting contamination of the HPCI system from such flow testing would affect the condensate storage tank purity and ultimately affect the chemistry control of the reactor coolant system.There exists no other practical method of verifying proper valve operation.

Alternative.

Testing: Verify operability by inspection during valve disassembly.

The valve will be disassembled at least once every other refueling outage on an alternating basis.2RR31-1 Rev.4 12/91

~i I ISI-T-200.0 RKLIKF RK T System.P&ID: Valves: High Pressure Coolant Injection M-2155 255F019 Category: Class: Function: Backflow Prevention Impractical Test Requirement:

Exercise valve closed once per 92 days.Basis for Relief: This check valve in the HPCI pump suction line is not installed in a configuration permitting positive verification of valve closure.As stated in Relief Request Number 31, alignment of the HPCI pump to the suppression pool is not desirable.

Attempting to verify closure during leak rate testing of 255F045 will not provide positive verification, since there is no appropriate pressure instrumentation provided on the CST side of 255F019, and level changes in the CST would not be readily detected due to the large tank volume.Alternative Testing: Verify operability by inspection during valve disassembly.

The valve will be disassembled at least once every other refueling outage on an alternating basis.2RR32-1 Rev.4 12/91 ISI-T-200.0 RELIEF RE UEST NUMBER 33'ystem: Various P&ID: M-2139 M-2141 M-2142 M-2143 M-2144 M-2149 M-2151 M-2152 M-2155 Valves: Various (listed in Susquehanna SES Technical Specification Table 3.6.3-1)Category: Class: Function: Containment Isolation Impractical Test Requirement:

Exercise valve once per 92 days per IWV-3520.Basis for Relief: Excess flow check valves are installed on instrument lines penetrating containment in accordance with Regulatory Guide 1.11.As such, the lines are sized and/or orificed such that off-site doses will be substantially below 10CFR100 limits in the event of a rupture.Therefore, individual leak rate testing of these valves is not required for conformance with 10CFR50, Appendix J requirements.

Functional testing of valves to verify closure can be accomplished by the process of venting the instrument side of the valve while the process side is under pressure.Such testing is required by Technical Specification 4.6.3.4 at least once per 18 months.Testing on a more frequency basis is not feasible for several reasons.Instruments serviced by these valves frequently have interlock or actuation functions that would be interfered with should testing be attempted during plant operation.

Also, process liquid will be contaminated to some degree, requiring special measures to collect fiow from the vented instrument side.Alternative Testing: Functional testing with verification that flow is checked will be performed at least once per 18 months per Technical Specification 4.6.3.4.2RR33-1 Rev.5 05/93 r~4 t ISI-T-200.

0 RELIEF RE T ER 34 System: PScID: Valves: High Pressure Coolant Injection M-2155 255F076, 255F077 Category: Class: Function: Vacuum Breaker, Impractical Test Requirement:

Exercise valve once per 92 days.Basis for Relief: These vacuum breakers installed on the HPCI turbine exhaust line are not provided with position indication equipment nor is there pressure indication installed that would provide positive verification of valve operation.

A practical method of testing involves supplying low pressure air upstream of the valves and verifying that flow can be detected downstream of the valve.This test method.involves installation of temporary equipment and is not practical except during major outages.Its implementation would also require temporary removal of the HPCI System from service.Alternative Testing: Commencing with the first refueling outage, verify opening once per 24 months in conjunction with leak rate testing.2RR34-1.Rev.4 12!91

'I L I l I I ISI-T-200.0 RKLIKF RK KR System: P8cID: Valves: General General All containment isolation valves.Category: 'lass: Function: As applicable to specific valves.Primary Containment Isolation Impractical Test Requirement:

Additional corrective actions specified for valves 6 inches and larger, that exhibit increases in leakage rate, per IWV-3427(b).Basis for Relief: Containment leakage rate testing is governed by 10CFR50 Appendix and Susquehanna SES Technical Specification 3/4.6.1.2.

Compliance with these requirements is described in FSAR Section 6.2.6 and in FSAR Tables 6.2-19 through 6.2-22.The additional corrective actions specified by ASME code Section XI, paragraph IWV-3427(b) are not generally effective.

Their usefulness does not justify the burden of complying with this requirement.

This basis for relief from all requirements imposed by IWV-3427(b) is intended to comply with that provided as guidance by NRC Generic Letter 89-04 (Position¹10).Alternative Testing: Primary Containment isolation valve leak testing (with the exception of identified pressure isolation function)will be performed in accordance with FSAR Section 6.2.6 and FSAR Tables 6.2-19 through 6.2-22.Evaluation of containment isolation valve leak test results will be conducted in accordance with the requirements of 10CFR50 Appendix J and Susquehanna SES Technical Specification 3/4.6.1.2.

~ge rate measurements shall be compared with previous measurements and with the permissible valve leakage rates specified by the Superintendent of Plant for Susquehanna SES.2RR35-1 Rev.4 12/91

ISI-T-200.0 RELIEF RE Thts Page Intentionally Left Blank.2RR36-1 Rev.4 12/91

RELIEF RE UEST NUMBER 37 COLD SHUTDOWN TEiST JUSTIFICATION ISI-T-200.0 System: P&ID: Valves: HV-25703 HV-25704 HV-25705 HV-25711 HV-25713 HV-25714 HV-25721 HV-25722 Containment Atmosphere Control M-2157 Slit.1 HV-25723 HV-25724 HV-25725 Category: Class: Function: Containment Isolation Impractical Test Requirement:

Exercise valve once per 92 days.Basis for Relief: These normally closed containment isolation valves on the containment purge inlet and exhaust lines are not opened during power operations except during startup for inerting purposes and during shutdown procedure to de-inert.It is not good practice to cycle a normally closed containment isolation valve, as this increases the possibility of failure in the open position.Technical Specification 3.6.1.8 controls and limits the amount of time these valves can be open in a one-year'period.Alternative Testing: Exercise valves at cold shutdown (no more frequently than once per 92 days).2RR37-1 Rev.5 05/93 N l',4'p ISI-T-200.0 RELIEF RE UEST NUMBER'3S System: P8cID: Valves: Category: Class: Various Various Those designated"Rapid-Acting" in the REMARKS column.Aor B 1 or 2 Function: Various (sample, containment isolation, etc.)Impractical Test Requirement:

Trend valve stroke times per IWV-3417(a).

Basis for Relief: The listed valves, designated as"rapid acting valves," have stroke times (~2 seconds)of such short duration that comparison of measurements with previous data for specified percentage increases is not indicative of degrading valve performance.

With measurement of stroke times to the nearest second per IWV-3413(b), a very small increase in stroke time will result in an extremely large percentage change.Verification that valves meet a'specified maximum stroke time of short duration provides adequate assurance of operability.

This basis for relief from the code required corrective actions is intended to conform to the guidance provided by NRC Generic Letter 89-04 (Position¹6).Alternative Testing: Measured stroke time less than the limit stroke time of 2 seconds will be verified for each of these valves when exercise tested.2RR38-1 Rev.5 05/93 ISI-T-200.0 RELIEF RE VEST NUMBER 39 COLD SHUTDOWN~>>JUSTIFICATION System: P8cID: Reactor Building Chilled Water M-2187 Sh.2 Valves: HV-28791A1 HV-28791A2 HV-28791B1 HV-28791B2 HV-28792A1 HV-28792A2 HV-28792B1 HV-28792B2 Category: Class: Function: Containment Isolation Impractical Test Requirement:

Exercise valves once per 92 days.Basis for Relief: These containment isolation valves are located in the Reactor Building Chilled Water supply and return lines serving the Reactor Recirculation pump motor coolers.The closure of these valves during power operation will interrupt cooling water flow to the Reactor Recirculation motor coolers, which creates the possibility of overheating and damage.Alternative Testing: Exercise valves during cold shutdowns (no more frequently than once per 92 days).2RR39-1 Rev.5 05/93

'I V ISI-T-200.0 RELIEF RE VEST NUMBER 40 This Page Intentionally Left Blank.2RR40-1 Rev.4-12/91

~'

ISI-T-200.0 RELIEF RE T ER 41 System: P&ID: Valves: Category: Class: Function: General General All Fail-Safe Valves As applicable As applicable As applicable Impractical Test Requirement:

Paragraph IWV-3415,Section XI Basis for Relief: Valves which have a"fail-safe" requirement at Susquehanna Steam Electric Station will normally be cycled once every 92 days', unless otherwise relieved.This test will accomplish the intent of the"fail-safe" test because normal valve movement is achieved by means of interrupting motive force to the valve.Alternative Testing: No additional testing of"fail-safe" provisions will be done because normal valve testing will achieve the same results.2RR41-1 Rev.4 12/91 ISI-T-200.0 RELIEF RE T ER 42 System: P8cID: Valves: Category: Class: Function: General General All pressure relief valves.As applicable As applicable System Overpressure Protection Impractical Test Requirement:

Paragraph IWV-3100, all valves shall be pressure tested after installation and prior to service.Basis for Relief: Pressure relief valves used at Susquehanna SES have been purchased in accordance with specifications which require performance testing at the manufacturer's shop.Records of these tests are part of the Quality Assurance records.In addition, a technical procedure requires inspection of the sealing mechanism as part of the preoperational/acceptance test program.Alternative Testing: No additional testing beyond that which was performed as part of the purchase and installation will be performed.

The records will remain part of either the purchase or preoperational records and not part of the ISI files.2RR42-1 Rev.4 12/91 0

ISI-T-200.0 RELIEF RK T System: P&ID: Pumps: Class: Standby Liquid Control M-2148 2P208 A,B Function: Standby Liquid Control Pumps Impractical Test Requirement:

Measure inlet pressure prior to and during pump test and measure pump delta-p during pump test.Basis for Relief: System configuration does not provide a pressure indicator on the pump suctions.It is possible to determine suction pressure by calculation from tank level (elevation difference) when the pumps are in normal alignment to the SLC Storage Tank.However, when pump testing is being performed, the tank is valved out and the suctions are aligned to a demineralized water header.While some estimation of the pressure in this alignment is available by the setting of the pressure control valve on the demineralized water header, no direct pressure indication is available.

Since the SLC pumps are positive displacement type pumps, suction pressure will not affect developed discharge pressure.Alternative Testing: Do not measure inlet pressure prior to or during pump tests.Utilize pump discharge pressure reading in lieu of Pump delta-p reading.2RR43-1 Rev.4 12/91

ISI-T-200.0 RELIEF RE T System: P&ID: Pumps: Class: High Pressure Coolant Injection M-2156 2P204, 2P209 Function;HPCI Main and Booster Pumps Impractical Test Requirement:

If not tested during plant shutdown, the pump shall be tested within one week after the plant is returned to normal operation.

Basis for Relief: The required steam supply pressure for HPCI surveillance flow verification testing is specified in the Technical Specifications.

This pressure may not be attained within the above prescribed time interval.Alternative Testing: Perform HPCI flow verification test in accordance with quarterly schedule.After a shutdown which has exceeded the quarterly limit, recommence quarterly schedule in accordance with Technical Specification 4.5.1.b.3.

2RR44-1 Rev.4 12/91 RELIEF RE UEST NUMBER 45 ISI-T-200.0 COLD SHUTDOWN TEST JUSTIFICATION System: PA,ID: Core Spray M-2152 Valves Cate~os HV-252FOOSA HV-252FOOSB HV-252F006A HV-252F006B HV-252F037A HV-252F037B A A A,C A,C A A Class: Function: Containment Isolation Impractical Test Requirement:

Exercise valves once per 92 days.Basis for Relief: These normally closed Isolation valves serve as the pressure isolation between CS system piping and reactor vessel pressure.In accordance with guidance presented in IE Information Notice 84-74, draft R.G.901-4, and previous NRC concerns regarding intersystem LOCAs, cycling these valves every 92 days during power operation increases the probability of exposing the downstream low pressure piping to reactor coolant pressure (since only one valve would have to be ruptured or failed open to expose the low pressure system to reactor coolant pressure).

In addition, failure of these valves after testing to positively reseat could cause loss of Core Spray system function.Alternative Testing: Exercise valves during cold shutdown (no more frequently than once per 92 days).2RR45-1 Rev.5 05/93

ISI-T-200.0 RELIEF RE VEST NUMBER 4 System: P&ID: Valves/Pumps:

Category: Class: Function: General General General As applicable As applicable As applicable Impractical Test Requirement:

Test equipment in accordance with Section XI frequency requirements.

Basis for Relief: With one loop out-of-service in a system, it is not desirable to test the redundant loop per ISI requirements as such testing may increase the chance of failure in a condition where backup equipment is not available.

Also, these situations will be governed by the Susquehanna Steam Electric Station Technical Specifications.

Alternative Testing: Testing will be suspended on equipment in operable loop when there is a redundant loop out-of-service.

2RR46-1 Rev.4 12/91 ISI-T-200.0 REI IEF RE T ER 47 This Page Intentionally Left Blank.2RR47-1 Rev.4 12/91 I~.

ISI-T-200.0 RELIEF RE UEST NUMBER 48 System: PAID: Pumps: Class: High Pressure Coolant Injection M-2156 2P204, 2P209 Function: HPCI main and booster pumps Impractical Test Requirement:

Paragraph IWP-3100, bearing temperature measurement.

Basis for Relief: These pumps are driven by a steam turbine which exhausts steam into the suppression pool.Extended run times necessary to achieve stabilized bearing temperatures could heat the suppression pool water to a temperature exceeding the Technical Specification limit of 105'F.Alternative Testing: Eliminate bearing temperature measurement.

Vibration measurements will.give adequate information concerning potential bearing temperature problems.2RR48-1 Rev.5 05/93 0

ISI-T-200.0 RELIEF RE UEST NUMBER 49 System: P8cID: Pumps: Class: Function: Standby Liquid Control M-2148 2P208 A,B Injection of sodium pentaborate into Rx vessel.Impractical Test Requirement:

Paragraph IWP-3100, bearing temperature measurement Basis for Relief: One characteristic of positive displacement pumps is that there is essentially no lag time between starting the pumps and reaching equilibrium conditions.

The pump bearings are located in a motor gearbox and no direct measurement of gearbox oil temperature is possible.The gearbox casing is not a reproducible measurement point.I Alternative Testing: Vibration measurements will give information concerning potential bearing problems.The pump flow rate will be measured and changes in pump flow rate provide an early indication of degradation in pump performance.

2RR49-1 Rev.5 05/93 l I 0 ISI-T-200.0 RELIEF RE ER 50 This Page Intentionally Left Blank.2RRSO-1 Rev.4 12/91

ISI-T-200.0 RELIEF RE T ER 1 This Page Intentionally Left Blank.2RR51-1 Rev.4 12/91

'(

ISI-T-200.0 RELIEF RE T R 2 System: P&ID: RHR, Core Spray, ESW, RHRSW, HPCI, SBLC Various Pumps: Class: All in above systems Various Function: Process flow for above systems Impractical Test Requirement:

Section XI, Paragraph IWP-3210, Allowable Ranges of Inservice Test Quantities Basis for Relief: Ranges of acceptable instrument accuracies, as established by ASME Section XI paragraph IWP-4110 and Table IWP-4110-1 allow up to 6%error in pump pressure and fiow readings due to acceptable instrument accuracy of 6%(2%of full scale range times full scale range 3 times reference value).In contrast, the acceptable pump pressure and flow values required to result from pump tests, as established by ASME Section XI paragraph IWP-3100 and Table IWP-3100-2, are limited to a range extending only 2%above the corresponding reference value and only 6%flow or 7%pressure below the reference value.Alternative Testing: Actual instrument accuracies shall be applied to indicated values of pump flow and pressure.The values of pump flow and pressure, so corrected for the effects of instrument accuracy, shall be compared to the allowable ranges for the corresponding test quantities, from Table IWP-3100-2, for determination of acceptability.

Instrument accuracies for use in these corrections shall be determined, as needed, by calibration of the flow and/or pressure instruments utilized for the pump test.Actual instrument accuracies for use in these corrections shall conform to the acceptable instrument accuracies established for flow instruments and for pressure instruments by Table IWP-4110-1.

2RR52-1 Rev.4 12/91

ISI-T-200.0 RELIEF RE UEST NUMBER 53 System: HPCI P&ID Valves: M-2156 FV-25612 Category: B Class: Function: Opens to admit steam to HPCI turbine, closes to isolate steam in the event of a turbine trip.Impractical Test Requirements:

Stroke time valves when exercised, once per 92 days.Basis for Relief: The HPCI Turbine Stop Valve, FV-25612, has a design closure stroke time of 0.5 seconds.This rapid closure is accomplished by spring force.As a rapid-acting valve, closure of this valve cannot be timed accurately nor trended from test-to-test.

In contrast, opening is accomplished hydraulically, by oil pressure working against spring force.Opening takes a much longer time than closing, but the length of time can vary greatly, depending on HPCI lube oil flow and pressure variations.

The turbine stop valve has no independent manual control, but rather is controlled only by HPCI turbine oil pressure.Repetitious starts and stops of the HPCI turbine and its lube oil pumps to support attempts to precisely time"stop valve movement are detrimental to the machine.The turbine stop valve is a skid-mounted component of the HPCI turbine, and structurally integrated with the turbine.Alternative Testing: Valve will be tested functionally.

each time the HPCI turbine is tested (quarterly).

No stroke timing or trending will be performed.

In addition, response time testing for the HPCI system will be performed in accordance with Technical Specifications once per 18 months.2RR53-1 Rev.5 05/93 1 J I ISI-T-200.0 REI IEP RE UEST NUMBER 54 System: PAID: Pumps: Class: RHR, Core Spray, ESW, RHRSW Various All in above systems Various Function: Process flow for above systems Impractical Test Requirement:

Paragraph IWP-3100, bearing temperature and lubricant level or pressure measurement, during test.Basis for Relief: The bearings for the pumps listed above are lubricated by the flowing fluid and therefore require no verification of adequate lubrication.

Similarly, the bearing temperatures cannot be accurately measured due to the flowing fluid.Alternative Testing: None;component vibration readings will serve as indications of pump mechanical condition.

2RR54-1 Rev.5 05/93 0'

ISI-T-200.0 RELIEF RE T ER 55 System: P&ID'umps:

Class: Function: RHR, Core Spray, HPCI Various All in above systems Various Process suction pressure for above systems Impractical Test Requirement:

Section XI Paragraph IWP-4120, required range of test instruments Basis for Relief: it Full scale ranges of test instruments, as established by ASME Code Section XI paragraph IWP-4120, are limited to three times the reference value or less.In contrast, the four RHR System Pumps 2P202A/B/C/D have suction pressure reference values as low as 5 PSIG, but have suction pressure'ages, PI-2R002A/B/C/D permanently installed with full scale ranges 0-200 PSIG.Similarly, the four Core Spray System Pumps 2P206A/B/C/D have suction pressure reference values as low as 7 PSIG, but have suction pressure gages PI-2R001A/B/C/D permanently installed with full scale ranges 0-60 PSIG.Similarly, HPCI System Pump 2P204 has a suction pressure reference value of 18 PSIG, but has suction pressure gauge PI-1R606 permanently installed with a full scale range of 0-85 PSIG.These permanent plant instruments require the full scale ranges for which they have been designed and installed to be able to cover the full spectrum of operating conditions and configurations of their respective systems.These permanent plant instruments have greater reliability than temporary or permanent test instruments would have.The permanent plant instruments used for these tests have had the accuracy of their calibration specially enhanced at the nominal values of the test parameters; their accuracy within the range of test values is adequate for test purposes.The use of the permanent plant instruments for ISI pump testing ensures that pump suction pressures 2RR55-1 Rev.4 12/91

T MJMBKR (Continued)

ISI-T-200.0 are being measured in the same way as they would if the pump were operated to fulfill its design safety function.Repeated temporary installation and removal of suction pressure gages is impractical due to high potential for damage to the gages through the transport and work processes.

Alternate Testing: Utilize permanent plant pump suction pressure instruments for ISI pump test suction pressure measurements in RHR, Core Spray, and HPCI Systems.2RR55-2 Rev.4 12/91

ISI-T-200.0 RELIEF RE ER 6 This Page Intentionally Left Blank.2RR56-1 Rev.4 12/91

ISI-T-200.0 RELIEF RE Y This Page Intentionally Left Blank.2RR57-1 Rev.4 12/91

's.0 RELIEF RK UKST NUlVfBER 58 (Continued)

ISI-T-200.0 RELIEF RK T KR System P&ID Valve Category Chss Function CIG CIG CIG CIG CIG CIG CIG CIG CIG CIG CAC CAC CAC CAC M-2126 SV-22605 M-2126 SV-22643 M-2126 SV-22644 M-2126 SV-22648 M-2126 SV-22649 M-2126 SV-22651 M-2126 SV-22654A M-2126 SV-22654B M-2126 SV-22661 M-2126 SV-22671 M-2157 SV-25734A M-2157 SV-25734B M-2157 SV-25736A M-2157 SV-25736B A Containment Isolation Instrument Gas Storage Instrument Gas Storage Instrument Gas Storage Instrument Gas Storage Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation CAC M-2157 SV-25737 Containment Isolation CAC CAC CAC CAC CAC M-2157 SV-25738 M-2157 SV-25740A M-2157 SV-25740B M-2157 SV-25742A M-2157 SV-25742B Containment Isolation Containment Isolation Containment Isolation Containment Isolation 2 Containment Isolation CAC M-2157 SV-25750B CAC M-2157 SV-25750A Containment Isolation Containment Isolation CAC M-2157 SV-25752A Containment Isolation CAC M-2157 SV-25767 CAC~M-2157 SV-25752B Containment Isolation Containment Isolation 2RR58-I Rev.4 12/91

>1~i p,'E 0 RELIEF RE T NUMBER (Cont'd.)ISI-T-200.0 System CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC CAC P&ID M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 M-2157 Valve SV-25774A SV-25774B SV-25776A SV-25776B SV-25780A SV-25780B SV-25782A SV-25782B SV-25789 SV-257100A SV-257100B SV-257101A SV-257101B SV-257102A S V-257102B SV-257103A SV-257103B SV-257104 SV-257105 SV-257106 SV-257107 Category Chss Function Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isoaltion Containment Isolation Containment Isolation Containment Isolation Containment Isolation Containment Isolation Impractical Test Requirement:

Valves with Remote Position Indicators shall be observed at least once every 2 years to verify that valve operation is accurately indicated.

Basis For Relief: The subject solenoid valves, all of which are manufactured by the Target Rock Corporation, all are constructed in a manner that precludes local verification of valve operation by direct observation.

All movements and positions of valve parts are obscured by the valve structure within which they travel and 2RR58-2 Rev.4 12/91 h,p 1 I 1 I l 0 RELIEF RE T NVMBER (Cont'd.)ISI-T-200.

0 within which they are sealed.A method for indirect observation of valve movement, utilizing ferritic steel objects (steel shot)moved along the surface of each valve's indicating tube by the permanent magnet attached to the valve stem inside, was devised, used for 18 months, and subsequently abandoned because its employment necessitated partial disassembly of the solenoid valve for the test.This disassembly and reassembly, consisting of removal and reinstallation of the reed switch housing assembly, or cover, has been found to cause damage to the wiring and its connections to the reed switches.Alternative Testing;Confirmation of coincident valve movement and remote indication is accomplished by listening to the valve with a stethoscope, for the audible signal of the valve disk arriving at a new position.Accuracy of remote indication of valve operation is essentially verified for these solenoid valves at least once every 2 years by the combination of containment isolation valve leak testing (LLRT)(or instrument gas storage leakdown testing)with accomplishment of General Operating Procedures (GO-200-002) for plant startup and heatup.These activities are completed at least once each refueling shutdown, as follows:.Sy'tem Valve Refueling:;,:.Shutdown'"', Testing":;:.,Pro'cedure',:Verified-Valve~"':='osition ,y Startup;.'-Procedure(s)'

C.Verified Valve-Position'IG CIG CIG CIG CIG CIG CIG CIG CIG CIG SV-22605 SE-259467 SV-22643 TP-225407 SV-22644 TP-225407 SV-22648 TP-225409 SV-22649 TP-225-009 SV-22651 SE-259437 SV-22654A SE-259446 SV-22654B SE-259438 SV-22661 SE-259-069 SV-22671 SE-259490 Closed OP-225401/GO-200402 Open OP-225401/GO-200-002 Closed OP-225-001/GO-200402 Open OP-225401/GO-200-002 Closed OP-225401/GO-200-002 Closed OP-225-001/GO-200-002 Closed OP-225-001/GO-200-002 Closed OP-225401/GO-200402 Closed OP-225401/GO-200402 Closed OP-225401/GO-200402 Open Open Open Open Open Open Open Open Open Open 2RR58-3 Rev.4 12/91 l 0 RELIEF RE T ER 58 (Cont'd.)ISI-T-200.0 System Valve Refueling; Shutdown Testing Procedure Verified Valve Position Startup Procedure(s)

Verified Valve Position 0 CAC SV-25734A SE-259419 CAC SV-25734B SE-259420 CAC SV-25736A SE-259-019 CAC SV-25736B SE-259-020 CAC SV-25737 SE-259-103 CAC SV-25738 SE-259-103 CAC SV-25740A SE-259419 CAC SV-25740B SE-259-020 CAC SV-25742A SE-259419 CAC SV-25742B SE-259420 CAC SV-25750A SE-259419 CAC SV-25750B SE-259420 CAC SV-25752A SE-259419 CAC SV-25752B SE-259420 CAC SV-25767 SE-259-102 CAC SV-25774A SE-259419 CAC SV-25774B SE-259420 CAC SV-25776A SE-259419 CAC SV-25776B SE-259420 CAC SV-25780A SE-259419 CAC SV-25780B SE-259420 CAC SV-25782A SE-259419 CAC SV-25782B SE-259420 CAC SV-25789 SE-259-102 CAC SV-257100A SE-259419 Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed OP-273401/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200-002 OP-273401/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200-002 OP-273401/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200402 OP-273-001/GO-200402 OP-273401/GO-200402 OP-273401/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200-002 OP-273-001/GO-200-002 OP-273-001/GO-200-002 Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open Open 2RR58-4 Rev.4 12/91 I (

RELIEF RE T ER (Cont'd.)ISI-T-200.0 System Valve" Refueling.

Shutdown Testing;.Procedure.

." ,Verified'alve:-

Position..Startup.Procedure(s)

Verified Valve Position CAC SV-257100B SE-259420 CAC SV-257.101A SE-259419 CAC SV-257101B SE-259-020 CAC SV-257102A SE-259419 CAC SU-257102B SE-259420 CAC SV-257103A SE-259419 CAC SV-257103B SE-259-020 CAC SV-257104 SE-259419 CAC SV-257105 SE-259-019 CAC SV-257106 SE-259419 CAC SV-257107 SE-259-019 Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed Closed OP-273401/GO-200402 OP-273-001/GO-200402 OP-273401/GO-200402 OP-273-001/GO-200402 OP-273-001/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200402 OP-273401/GO-200-002 OP-273401/GO-200402 OP-273401/GO-200-002

'OP-273-001/GO-200402 Open Open Open Open Open Open Open Open Open Open Open 2RR58-5 Rev.4 12/91

ISI-T-200.0 RELIEF RE UEST NUMBER 59 RELIEF REQUEST DELETED This Page Intentionally Left Blank.2RR59-1 Rev.5 05/93

\0 RELIEF RE UEST NUMBER 60 (Continued)

ISI-T-200.0 RELIEF RE UEST NUMBER 60 5~)Sgstem,:-.'..:.':

MSIV MSIV MSIV MSIV MSIV MSIV MSIV MSIV M-2141 M-2141 M-2141 M-2141 M-2141 M-2141 M-2141 M-2141 g:':,.':gVaIi'e.NNumb'ir",..;;.'41FO24A 241FO24B 241FO24C 241FO24D.241FO29A 241FO29B 241FO29C 241FO29D"%l;:;,YC;:CIass'!lg'j.::'.',Cat'egos,'.,,',;'unction:

Prevent reverse flow out through MSIV accumulator inlet (air)line.Impractical Test Requirement:

Exercise valves to their closed positions once per 92 days (per IWP-3521).

Basis For Relief: These check valves, located in MSIV accumulator inlet(air) lines provide Containment Instrument Gas System and Instrument Air System gas flow into their respective MSIV accumulators, while , preventing flow of gas stored in the MSIV accumulator in the reverse direction, during closure of their respective MSIV's at the onset of a LOCA.Plant configuration and exclusion of personnel from the purged drywell during operation preclude completion of closure exercise testing throughout the period of each plant operating cycle.Any exercise testing of these check valves requires or causes closure of the associated MSIVs, rendering it impractical except during refueling outages.The design basis of these check valves for the inboard MSIVs is established by PP&L Calculations M-MSS-025 and M-MSS-028, from which testing appropriate to their safety function is derived.E Exercise testing of these check valves requires both access to each MSIV accumulator and that the MSIV associated with each check valve tested remain closed throughout the test to prevent unplanned actuations of Engineered Safety Features.As the primary containment is not opened and entered during every cold shutdown and as plant configuration does not always support MSIV closure 2RR60-1 Rev.5 05/93

'Cs*I 0 RELIEF RE UEST NUMBER 60 (Continued)

ISI-T-200.0 while primary containment entry is in progress, exercise testing of these check valves is not practical at every cold shutdown, and can be performed safely and reliably only during each refueling outage.A1ternative Testing: Demonstrate closure of each MSIV accumulator check valve by monitoring the essential restriction of its reverse flow of gas, through measurement of the rate of decay of pressure in its respective MSIV accumulator (downstream of the check valve under test)once per refueling outage.This MSIV accumulator pressure decay test provides verification of the closure of the inlet check valve.2RR60-2 Rev.5 05/93 P I'r Y' ISI-T-200.0 RELIEF RE UEST NUMBER 61 System: PAID: Valves: Control Rod Drive Hydraulic M-2147 XV-247FO10A, XV-247FO11A XV-247F010B, XV-247F011B Class: Function: CRD Scram Discharge Volume venting and draining Impractical Test Requirement:

Paragraph IWV-3417(a)

Corrective Action, increasing test frequency to monthly whenever stroke time increases by)25%(when over 10 seconds)or by)50%(when under 10 seconds)~Basis For Relief: These globe valves are air operated and have comparatively complex actuation logic schemes sequencing their start and stop times.P&ID M-2147 Notes¹21 Sc 22 establish additional restraints, which are satisfied administratively, upon the stroke times and sequencing of these valves.The pneumatic actuators of these valves have their exhaust airflows metered by needle valves.Their actuation rate is extremely sensitive to the slightest changes in the positions of the needles in these needle valves, as caused by readjustment, by physical shock, or by thermal change.By readjustment of the exhaust needle valve position, these valves are maintained in compliance with the stroke time and sequencing limitations of the PAID, which, although dissimilar from those of Article IWV-3000, provide a more relevant basis for verifying the operational readiness of these particular valves.Stroke time measurement of these AOVs is primarily a measure of the balance of their entire actuating air supply/exhaust network;it is not a reliable measure of the physical condition of the valve under test.Position change of the common needle valves in the actuating air exhaust lines has been the primary, dominant, and only significant cause of changes in stroke times of these AOVs.Measurements of the stroke times of these AOVs are indicative mainly of needle valve position;and not of the AOV physical condition.

Mechanical failure of any of these valves would cause a large and definitive increase in its stroke time, causing it to exceed its 30 second Limit Stroke Time and plant Technical Specification 4.1.3.1.4.a.1 limit.2RR61-1 Rev.5 05/93 I~~

RELIEF RE UEST NUMBER 61 (Continued)

ISI-T-200.0 These valves are located in a radiologically contaminated area of the plant.They have no remote position indication usable for testing;and they have no individual control mechanism (only two common pushbuttons):

Consequently, exercise testing of the valves requires simultaneous entry of their radiologically contaminated area by four observers.

Upon the common actuation of all four valves, simultaneous direct observation (accompanied by stopwatch timing)is made of the valve stems of all four AOVs during their closure strokes.This crude testing method of simultaneous direct observation of valve stem motion does not produce stroke timing results accurate, enough to justify any concern over 25%(or 50%)rates of variation in individual stroke time measurements.

Alternative Testing: Exercise testing of the four valves is to be performed quarterly, per IWV-3410 requirements, except that the IWV-3417(a) stroke time increase limitations (of 25%above 10 seconds and 50%below 10 seconds)will not be applied.No trending of valve stroke times will be done.2RR61-2 Rev.5 05/93

~, f t, 1 ISI-T-200.0 RELIEF RE UEST NUMBER 62 RELI EF REQU EST DELETED This Page Intentionally Left Blank.2RR62-1 Rev.5 05/93

ISI-T-200.0 RELIEF RE UEST NUMBER 63 System: P&ID: , Pumps: Class: High Pressure Coolant Injection M-2156 2P204 and 2P209 (combination)

Impractical Test Requirement:

Paragraph IWP-3500(a) requires for the duration of the test to be at least 5 minutes, with the pump run under conditions as stable as the system permits.Basis For Relief: These pumps are driven by a steam turbine which exhausts steam into the suppression pool, heating it toward its Technical Specification limit of 105'F.This is a severe limitation on test duration.Increasing suppression pool temperature toward its 105'F limit, while within limits, does reduce plant safety margin in the event of an accident occurring during or after a test.Frequent test repetition is not desirable due to the strong transient nature of a HPCI quick start.Such quick starts are recommended by INPO and have been adopted as PP&L's test method.Pump speed is not directly controllable, but can only be achieved through coordinated manipulation of the pump flow controller and the test system throttling valve.Test results are extremely sensitive to variations in pump speed;from all sources.These factors make this test uniquely time-dependent.

I Furthermore, the HPCI Pump quarterly surveillance test procedure is structured to first demonstrate satisfaction of Technical Specification 4.5.1.b.3 by running the pump at its rated flow rate and discharge pressure conditions, which create essentially the same test conditions as those for inservice testing.This prior technical specification test performance has the effect of providing several minutes of pump warmup time at rated conditions before the inservice test.Alternative Testing: The pumps shall be run for at least one minute under conditions as stable as the system permits.At the end of this time at least one measurement or observation of each of the quantities specified shall be made and recorded.2RR63-1 Rev.5 05/93 1 1~.I I ISI-T-200.0 RELIEF RE T ER 64 System ESW ESW ESW ESW P&ID M-2111 211132 M-2111 211133 M-2111 211134 M-2111 211135 Valve Category Class Function ESG&Load Center Rooms cooling ESG&Load Center Rooms cooling ESG&Load Center Rooms cooling ESG&Load Center Rooms cooling RCIC RCIC LPCS HPCI HPCI M-2149 249 F063 M-2149 249 F064 M-2151 251FO46 A/B/C/D M-2152 252FO36 A/B/C/D M-2155 255FO76 M-2155 255 F077 Turbine exh steam line vac brkr Turbine exh steam line vac brkr RHR pump minimum flow line CS pump minimum flow line Turbine exh steam line vac brkr Turbine exh steam line vac brkr Impractical Test Requirement:

NRC Generic Letter 89-04 Position 1 requirement that, during opening exercise testing, a check valve's"full-stroke" to the open position be verified by passage of"maximum required accident condition flow" through the check valve;and ASME Code Section XI Paragraph IWV-3521 requirement that check valves be tested every 3 months.Basis For Relief: In recognition that establishing design accident flow through these valves for testing could result in degradation or damage to major plant equipment, NRC Generic'Letter 89-04 Position 2 establishes that disassembly and inspection of these check valves may be used as a positive means of determining that a valve's disk will"full-stroke" open..., as permitted by ASME Code Section XI Paragraph IWV-3522.If possible, partial valve stroking quarterly or during cold shutdowns or after reassembly must be performed, additionally.

Due to the scope of these inspections, the personnel hazards involved, and system operating restrictions, NRC Generic Letter 89-04 Position 2 establishes that valve disassembly and 2RR64-1 Rev.4 12/91 e'q I 0't 4~l I'l'n RELIEF RE UEST NUMBER 64 (Cont'd.)ISI-T-200.0 inspection may be performed during reactor refueling outages.As it is burdensome to disassemble and inspect all of the subject valves each refueling outage, NRC Generic Letter 89-04 Position 2 establishes that a sample inspection plan for groups of up to four identical valves in similar applications may be employed, within~the NRC guidelines specified within Position 2.Alternative Testing: Perform partial valve stroke exercise testing at quarterly testing frequency, at cold shutdown testing frequency, or at other frequency, as specified in separate Relief Requests, specific to each check valve.Establish and employ a sample disassembly and , inspection plan for groups of up to four identical valves in similar applications.

Disassemble, inspect, verify structural soundness of internal components, and manually exercise the disk through its full stroke for one different valve in each group at each successive refueling outage (or 18 month+3 month period for common plant valves and ESW valves), until the entire group has been inspected.

As an alternative to inspection, optionally perform full valve stroke exercise testing, utilizing a non-intrusive diagnostic test system, employing externally generated magnetic flux monitoring, acoustic emission monitoring and/or ultrasonic techniques, on the same schedule;i.e., diagnostic test one different valve in each group at each successive refueling outage (or 18 month+3 month period for common plant valves), until the entire group has been'iagnostic-tested or inspected.

2RR64-2 Rev.5 05/93 y~4'I 1 k 4'IN Q g d ISI-T-200.0 RELIEF RE UEST NUMBER 65 O,System':"'.:.::,-:P&lo.~

RCIC M-2149 FPC&C M-2153 HPCI M-2155 HPCI M-2155 HPCI M-2156 HPCI M-2156~':.i.".:,,;:i,:.'::.";;',Vil'v,e;,:'.;:.:';:::;,':;:..:':,'",',,",;'::,:;,i;::

.':::;:::;.:':;,Cate'jo'ry",.:',::::;;

249F021 253071 A/B , 255 F045 255F046 256F048 256F057 Clas's':;::

2 RCIC pump minimum flow line FPC&C isolation from ESW system 2 HPCI supp pool suction line 2 HPCI pump minimum fiow line HPCI lube oil cooler return line 2 HPCI lube oil outlet line Impractical Test Requirement:

NRC Generic Letter 89-04 Position 1 requirement that, during opening exercise testing, a check valve's"full-stroke" to the open position be verified by passage of"maximum required accident condition flow" through the check valve;and ASME Code Section XI Paragraph IWV-3521 requirement that check valves be tested every 3 months.Basis For Relief:, In recognition that establishing design accident flow through these valves for testing could result in degradation or damage to major plant equipment, NRC Generic Letter 89-04 Position 2 establishes that disassembly and inspection of these check valves may be used as a positive means of determining that a valve's disk will"full-stroke" open..., as permitted by ASME Code Section XI Paragraph IWV-3522.If possible, partial valve stroking quarterly or during cold shutdowns or after reassembly must be performed, additionally.

Due to the scope of these inspections, the personnel hazards involved, and system operating restrictions, NRC Generic Letter 89-04 Position 2 establishes that valve disassembly and inspection may be performed during reactor refueling outages.As it is burdensome to disassemble and inspect all of the subject valves each refueling outage, NRC Generic Letter 89-04 Position 2 establishes that a sample inspection plan for groups of up to four identical valves in similar applications may be employed, within the NRC guidelines specified 2RR65-1 Rev.4 12I91 p I 0 RELIEF RE VEST NUMBER 65 (Cont'd.)ISI-T-200.0 within Position 2.As the population of identical valves, among those listed above, is extremely small," groups of up to four identical valves in similar applications in both units will be created for sampling.Alternative Testing: Perform partial valve stroke exercise testing at quarterly testing frequency, at cold shutdown testing frequency, or at other frequency, as specified in separate Relief Requests, specific to each check valve.Establish and employ a sample disassembly and inspection plan for groups of up to four identical valves, shared among both units, in similar applications.

Disassemble, inspect, verify structural soundness of internal components, and manually exercise the disk through its full stroke for one different valve in each group at every"pair" of refueling outages, alternating between the two units, until the entire group has been inspected.

The Fuel Pool Cooling and Cleanup check valves, not normally tested during refueling outages, are tested on a 72 month frequency for each valve.As an alternative to inspection, optionally perform full valve stroke exercise testing, utilizing a non-intrusive diagnostic test system, employing externally generated magnetic flux monitoring, acoustic emission monitoring and/or ultrasonic techniques, on the same schedule;i.e., diagnostic test one different valve in each group at every"pair" of refueling outages, alternating between the two units, until the entire group has been diagnostic-tested or inspected.

2RR65-2 Rev.4 12/91 I'I*'I't~I~~I*II~'I~J~'\~

ISI-T-200.0 RELIEF RE VEST NUMBER 66 System: P&ID: Valves: Category: Class: Function: Containment Instrument Gas M-2126 226018 and 226029 Provide Actuating Gas to Automatic Depressurization Feature of Main Steam Relief Valves.Impractical Test Requirement:

Basis For Relief: Exercise valves once per 92 days (per IWV-3521).

Closure of the subject valves for exercise testing interrupts instrument gas supply to the ADS solenoids of the Safety/Relief Valves, compromising their ability to provide the opening motive force for the ADS valves, in support of the" long-term cooling ECCS function.Due to the configuration of the CIG System, depressurization and venting of sufficient pipe lines to permit closure exercise testing of these valves further interrupts instrument gas supply to several important valves inside containment, such as the Safety/Relief Valves (non-ADS relief function)and the MSIV'S.This could compromise the ability of the SRV's to operate in the relief mode which, while not an ECCS function, is important to safety.Loss of instrument gas supply could also cause the MSIV's to close, resulting in a severe reactor transient if operating; or in an undesirable ESF actuation, if shut down.Loss of instrument gas supply could also cause isolation of the drywell cooling lines, resulting in a drywell temperature excursion.

Testing of these check valves at every cold shutdown is not practical because it requires isolation of a line feeding 25 air operated primary containment isolation valves.Isolation of this line at any time other than at a refueling outage creates the danger of unplanned actuations of Engineered Safety Features.Additionally, 4 of these 25 air operated containment isolation valves isolate drywell cooling lines.2RR66-1 Rev.5 05/93

~4 r su I l I N~J~4 E~y A~P'I P I JC l' ISI-T-200.0 Unplanned isolation of dry well cooling during cold shutdown could cause a containment temperature transient that could exceed the design maximum temperature of the drywell.Only during refueling outages are provisions made for temporary additional cooling of the drywell.Alternative Testing: Demonstrate closure of each check valve by monitoring the essential restriction of its reverse airflow, through the test connection downstream of the opposite division check valve, once per refueling outage.2RR66-2 Rev.5 05/93

,s, II)c p II=I~4 I h i I f~r M d J 1 n~~P II ISI-T-200.0 RELIEF RE UEST NUMBER 67.;:I..;.:-.i::,::System'::.",:.::p:,'.'":,",,.i,:!,::,"':,'P&lO:,;,;

':-::::::::::::
.'<%Vali'es::::

4::':'"::::":

'"':>'Categoiy'":::::::

Clasi'HR RHR RHR RHR Core Spray Core Spray Core Spray M-2151 M-2151 M-2151 M-2151 M-2151 M-2151 M-2151 M-2152 M-2152, M-2152 HV-251F008 HV-251F009 HV-251F015A/B HV-251F022 HV-251F023 HV-251FOSOA/B HV-251F122A/B HV-252F005A/B HV-252F006A/B HV-252F037A/B A A Function: F Impractical Test Requirement:

Pressure Isolation of reactor coolant system pressure from each attached low pressure system.'dditional corrective actions specified for valves 6 inches and larger, that exhibit increases in leakage rate, per IWV-3427(b).

Basis For Relief: Alternative Testing: Leakage rate testing is governed by Susquehanna SES Technical Specification 3.4.3.2.Compliance with these requirements is described in Technical Specification 4.4.3.2.The additional corrective actions specified by ASME Code Section XI, paragraph IWV-3427(b) are not generally effective.

Their usefulness does not justify the burden of complying with this requirement.

Their adherence could require a shutdown of the plant during an 18 month operating cycle for the accompishment of the additional leakage tests.II Pressure isolation valve testing will be performed in accordance with Technical Specification 4.4.3.2.Evaluation of pressure isolation valve leak test results will be conducted in accordance with the requirements of Technical Specification 3.4.3.2.,Leakage rate measurements shall be compared with previous measurements and with the permissible valve leakage rates specified by Technical Specification 3.4.3.2.2RR67-1 Rev.5 05/93 e~I~~IV I~~e~, I~I~"~'~'~.4".,'4"~I'I v I~~I fd I'4 ,)~,~4))~-4 I~e I IC ISI-T-200.0 RELIEF RE UEST NUMBER 68 System: P&ID: Valve: Category: Class: Function: General General General General General As applicable to specific valves.Impractical Test Requirement:

Paragraph IWV-3412 requires that valves that cannot be exercised during plant operation be specifically identified by the Owner and be full stroke exercised during cold shutdowns.

Basis For Relief: By omission of any exceptions, the paragraph IWV-3412 statement implies that all valves not exercised during normal plant operation must be exercised at every cold shutdown, meeting the 3 month test interval qualification.

In rare cases where it may be advantageous to resume operation immediately after reaching cold shutdown, plant duration in the cold shutdown condition may not permit exercise testing of all valves designated for test.In such cases, maintaining the plant in a cold shutdown status solely to exercise test additional valves would not justify the burden of complying'with this requirement.

Alternative Testing: Exercise testing of cold shutdown frequency valves shall commence no later than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after the plant enters Cold Shutdown (Operational Condition 4)from Power Operation, except during refueling outages.Valves identified for cold shutdown test frequency are subject to testing if they have not been tested in the previous 92 days.Testing shall continue until all subject valves are tested or the plant begins startup.Testing at subsequent cold shutdowns will commence with those valves having the longest interval, greater than 92 days, since previous tests.2RR68-1 Rev.5 05/93