| {{#Wiki_filter:AIRC.)apsPalo VerdeNuclear Generating StationPO Box 52034Phoenix, Arizona 85072-2034Mail Station 7636102-07038-TNW/M PE/TMJApril 24, 2015ATTN: Document Control DeskU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001 | | {{#Wiki_filter:AIRC.)apsPalo VerdeNuclear Generating StationPO Box 52034Phoenix, Arizona 85072-2034 Mail Station 7636102-07038-TNW/M PE/TMJApril 24, 2015ATTN: Document Control DeskU.S. Nuclear Regulatory Commission Washington, DC 20555-0001 |
|
| |
|
| ==Dear Sirs:== | | ==Dear Sirs:== |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3Docket Nos. STN 50-528/529/5302014 Annual Environmental Operating ReportEnclosed please find the 2014 Annual Environmental Operating Report forPVNGS Units 1, 2, and 3. Arizona Public Service Company is submittingthis report pursuant to Section 5.4.1 of Appendix B to the PVNGS Units 1,2, and 3 Renewed Operating License Nos. NPF-41, NPF-51, and NPF-74,respectively.No new commitments are being made to the NRC by this letter. Should youneed further information regarding this submittal, please contact MichaelDilorenzo, Licensing Section Leader, at (623) 393-3495.Sincerely,Thomas N. WeberDepartment Leader,TNW/MPE/TMJ/hscEnclosureRegulatory Affairscc: M.M.C.A.T.L. DapasM. WatfordA. PeabodyV. GodwinMoralesNRC Region IV Regional AdministratorNRC NRR Project Manager (electronic & hard copy)NRC Senior Resident Inspector for PVNGSArizona Radiation Regulatory Agency (ARRA)Arizona Radiation Regulatory Agency (ARRA)A member of the STARS (Strategic Teaming and Resource Sharing) AllianceCallaway | | |
| | Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3Docket Nos. STN 50-528/529/530 2014 Annual Environmental Operating ReportEnclosed please find the 2014 Annual Environmental Operating Report forPVNGS Units 1, 2, and 3. Arizona Public Service Company is submitting this report pursuant to Section 5.4.1 of Appendix B to the PVNGS Units 1,2, and 3 Renewed Operating License Nos. NPF-41, NPF-51, and NPF-74,respectively. |
| | No new commitments are being made to the NRC by this letter. Should youneed further information regarding this submittal, please contact MichaelDilorenzo, Licensing Section Leader, at (623) 393-3495. |
| | Sincerely, Thomas N. WeberDepartment Leader,TNW/MPE/TMJ/hsc Enclosure Regulatory Affairscc: M.M.C.A.T.L. DapasM. WatfordA. PeabodyV. GodwinMoralesNRC Region IV Regional Administrator NRC NRR Project Manager (electronic |
| | & hard copy)NRC Senior Resident Inspector for PVNGSArizona Radiation Regulatory Agency (ARRA)Arizona Radiation Regulatory Agency (ARRA)A member of the STARS (Strategic Teaming and Resource Sharing) |
| | AllianceCallaway |
| * Diablo Canyon | | * Diablo Canyon |
| * Palo Verde | | * Palo Verde |
| * Wolf Creek ENCLOSUREPalo Verde Nuclear Generating StationUnits 1, 2, and 32014 Annual Environmental Operating Report I. INTRODUCTIONThe Palo Verde Nuclear Generating Station (PVNGS) is located in Maricopa County, Arizona,approximately 50 miles west of the Phoenix metropolitan area. The PVNGS site comprisesapproximately 4280 acres. Site elevations range from 890 feet above mean sea level at thesouthern boundary to 1030 feet above mean sea level at the northern boundary. The stationconsists of three pressurized water reactor electrical generating units. Units 1, 2, and 3 have arated thermal power of 3990 MW.PVNGS was issued low power operating licenses NPF-34, NPF-46 and NPF-65 for Units 1, 2, and3 by the United States Nuclear Regulatory Commission (NRC) on December 31, 1984, December9, 1985, and March 25, 1987, respectively. PVNGS was issued full power operating licensesNPF-41, NPF-51 and NPF-74 for Units 1, 2, and 3 on June 1, 1985, April 24, 1986, andNovember 25, 1987, respectively. These licenses were renewed on April 21, 2011.Appendix B to these operating licenses is entitled the "Environmental Protection Plan (NonRadiological)". The Environmental Protection Plans (EPP) for each of the current operatinglicenses are identical.The EPP purpose is to provide for protection of environmental values during construction andoperation of the nuclear facility. The principal objectives of the EPP are as follows:(1) Verify that the station is operated in an environmentally acceptable manner, asestablished by the FES (Final Environmental Statement) and other NRC environmental impactassessments.(2) Coordinate NRC requirements and maintain consistency with other Federal, State andLocal requirements for environmental protection.(3) Keep NRC informed of the environmental effects of facility construction and operation andactions taken to control those effects.This Annual Environmental Operating Report is required by Section 5.4.1 of the EPP. This reportdescribes the activities during calendar year 2014 related to the PVNGS EPP. For purposes ofthis report, references to the EPP are considered to be the EPP of NPF-41, NPF-51, and NPF-74.II. ENVIRONMENTAL MONITORING SUMMARIES AND ANALYSISA. Cultural ResourcesSection 4.2.1 of the EPP requires that an archaeological survey be performed when finalalignment of the PVNGS-to-Saguaro transmission line is completed. As of the date of thisreport, plans for this transmission line have been indefinitely suspended. Therefore, there hasbeen no activity with regard to this requirement of the EPP.1 B. Terrestrial Ecology MonitoringAs communicated in a letter from William F. Conway, APS, to NRC, dated December 30, 1991,the salt deposition monitoring program was discontinued at the end of 1991.III. PLANT DESIGN AND OPERATION CHANGESSection 3.1 of the EPP allows changes in station design or operation or the performance of testsor experiments affecting the environment provided that such changes, tests, or experiments donot involve an unreviewed environmental question and do not involve a change to the EPP.Changes, tests, or experiments in which all measurable non-radiological effects are confined tothe on-site areas previously disturbed during site preparation and plant construction or in whichthe environment is not affected are exempt from the evaluation and reporting requirements ofSection 3.1.Section 3.2 of the EPP also exempts changes, tests, or experiments, which are required tocomply with other Federal, State, or local environmental regulations.No design and operational changes were initiated in 2014 that required an evaluation todetermine if they involved either an unreviewed environmental question or constituted a changein the EPP.IV. EPP NON-COMPLIANCESThere were no instances of non-compliance with the EPP identified during 2014.V. NON-ROUTINE REPORTSThere were no non-routine reports required by Section 5.4.2 of the EPP submitted during 2014.2}} | | * Wolf Creek ENCLOSURE Palo Verde Nuclear Generating StationUnits 1, 2, and 32014 Annual Environmental Operating Report I. INTRODUCTION The Palo Verde Nuclear Generating Station (PVNGS) is located in Maricopa County, Arizona,approximately 50 miles west of the Phoenix metropolitan area. The PVNGS site comprises approximately 4280 acres. Site elevations range from 890 feet above mean sea level at thesouthern boundary to 1030 feet above mean sea level at the northern boundary. |
| | The stationconsists of three pressurized water reactor electrical generating units. Units 1, 2, and 3 have arated thermal power of 3990 MW.PVNGS was issued low power operating licenses NPF-34, NPF-46 and NPF-65 for Units 1, 2, and3 by the United States Nuclear Regulatory Commission (NRC) on December 31, 1984, December9, 1985, and March 25, 1987, respectively. |
| | PVNGS was issued full power operating licensesNPF-41, NPF-51 and NPF-74 for Units 1, 2, and 3 on June 1, 1985, April 24, 1986, andNovember 25, 1987, respectively. |
| | These licenses were renewed on April 21, 2011.Appendix B to these operating licenses is entitled the "Environmental Protection Plan (NonRadiological)". |
| | The Environmental Protection Plans (EPP) for each of the current operating licenses are identical. |
| | The EPP purpose is to provide for protection of environmental values during construction andoperation of the nuclear facility. |
| | The principal objectives of the EPP are as follows:(1) Verify that the station is operated in an environmentally acceptable manner, asestablished by the FES (Final Environmental Statement) and other NRC environmental impactassessments. |
| | (2) Coordinate NRC requirements and maintain consistency with other Federal, State andLocal requirements for environmental protection. |
| | (3) Keep NRC informed of the environmental effects of facility construction and operation andactions taken to control those effects.This Annual Environmental Operating Report is required by Section 5.4.1 of the EPP. This reportdescribes the activities during calendar year 2014 related to the PVNGS EPP. For purposes ofthis report, references to the EPP are considered to be the EPP of NPF-41, NPF-51, and NPF-74.II. ENVIRONMENTAL MONITORING SUMMARIES AND ANALYSISA. Cultural Resources Section 4.2.1 of the EPP requires that an archaeological survey be performed when finalalignment of the PVNGS-to-Saguaro transmission line is completed. |
| | As of the date of thisreport, plans for this transmission line have been indefinitely suspended. |
| | Therefore, there hasbeen no activity with regard to this requirement of the EPP.1 B. Terrestrial Ecology Monitoring As communicated in a letter from William F. Conway, APS, to NRC, dated December 30, 1991,the salt deposition monitoring program was discontinued at the end of 1991.III. PLANT DESIGN AND OPERATION CHANGESSection 3.1 of the EPP allows changes in station design or operation or the performance of testsor experiments affecting the environment provided that such changes, tests, or experiments donot involve an unreviewed environmental question and do not involve a change to the EPP.Changes, tests, or experiments in which all measurable non-radiological effects are confined tothe on-site areas previously disturbed during site preparation and plant construction or in whichthe environment is not affected are exempt from the evaluation and reporting requirements ofSection 3.1.Section 3.2 of the EPP also exempts changes, tests, or experiments, which are required tocomply with other Federal, State, or local environmental regulations. |
| | No design and operational changes were initiated in 2014 that required an evaluation todetermine if they involved either an unreviewed environmental question or constituted a changein the EPP.IV. EPP NON-COMPLIANCES There were no instances of non-compliance with the EPP identified during 2014.V. NON-ROUTINE REPORTSThere were no non-routine reports required by Section 5.4.2 of the EPP submitted during 2014.2}} |
|
---|
Category:Environmental Monitoring Report
MONTHYEARML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML22119A2922022-04-29029 April 2022 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report 2021 ML22112A2352022-04-22022 April 2022 2021 Annual Environmental Operating Report ML21126A3412021-05-0606 May 2021 Annual Radiological Environmental Operating Report 2020 ML21117A4272021-04-27027 April 2021 Annual Radioactive Effluent Release Report 2020 ML21104A4292021-04-14014 April 2021 Annual Environmental Operating Report ML20121A3132020-04-30030 April 2020 2019 Annual Radioactive Effluent Release Report ML20105A4362020-04-14014 April 2020 2019 Annual Environmental Operating Report ML20100N7422020-04-0909 April 2020 Annual Radiological Environmental Operating Report 2019 ML19115A4182019-04-25025 April 2019 Annual Radioactive Effluent Release Report 2018 ML19109A2842019-04-19019 April 2019 2018 Annual Environmental Operating Report ML18131A3532018-05-10010 May 2018 Annual Radiological Environmental Operating Report ML18117A5152018-04-27027 April 2018 Annual Environmental Operating Report ML17115A3832017-04-21021 April 2017 Annual Radioactive Effluent Release Report 2016 ML17110A0552017-04-19019 April 2017 Transmittal of 2016 Annual Environmental Operating Report ML16343B0702016-12-0808 December 2016 Mitigating Strategies Assessment for Flooding ML16120A6132016-04-29029 April 2016 ISFSI - Annual Radioactive Effluent Release Report (ARERR) 2015 ML16124B0992016-04-29029 April 2016 Annual Radiological Environmental Operating Report 2015 ML16120A6122016-04-29029 April 2016 Transmittal of the 2015 Annual Environmental Operating Report ML15126A1662015-04-30030 April 2015 ISFSI - Annual Radioactive Effluent Release Report 2014 ML15125A0222015-04-24024 April 2015 2014 Annual Radiological Environmental Operating Report ML15125A0212015-04-24024 April 2015 2014 Annual Environmental Operating Report ML14129A0072014-05-0202 May 2014 Submittal of Annual Radiological Environmental Operating Report 2013 ML14125A2952014-04-30030 April 2014 Independent Spent Fuel Storage Installation (Isfsi), Annual Radioactive Effluent Release Report 2013 ML14120A3132014-04-25025 April 2014 2013 Annual Environmental Operating Report ML13128A0072013-04-30030 April 2013 Independent Spent Fuel Installation (Isfsi), Annual Radioactive Effluent Release Report 2012 ML13128A0062013-04-26026 April 2013 Submittal of Annual Radiological Environmental Operating Report 2012 ML12138A1342012-04-27027 April 2012 Annual Environmental Operating Report ML12138A1362012-04-27027 April 2012 2011 Annual Radiological Environmental Operating Report ML11146A0322011-05-13013 May 2011 Annual Radiological Environmental Operating Report 2010 ML11136A0422011-04-29029 April 2011 Submittal of Annual Radioactive Effluent Release Report 2010 ML11129A0302011-04-26026 April 2011 2010 Annual Environmental Operating Report ML1033603642010-05-14014 May 2010 APS 2010c Palo Verde 2009 Annual Compliance and Monitoring Report ML1013900612010-05-11011 May 2010 Submittal of Annual Radiological Environmental Operating Report for 2009 ML1013302702010-04-30030 April 2010 Annual Environmental Operating Report ML1013202882010-04-30030 April 2010 Annual Radioactive Effluent Release Report 2009 ML0931001842009-10-19019 October 2009 Arizona Game and Fish Department Fax to Lisa Regner Dated October 19, 2009 ML1015503292009-05-15015 May 2009 APS 2009c PVNGS 5-Year Monitoring Program Evaluation Report, May 15, 2009. 3-12-PV-413 ML1015503412009-05-13013 May 2009 APS 2009e Palo Verde, 2008 Annual Monitoring and Compliance Report ML1015503162009-04-24024 April 2009 APS 2009b Palo Verde, 2008 Annual Air Emissions Inventory ML0912504382009-04-20020 April 2009 Annual Radioactive Effluent Release Report 2008 ML1015901172009-03-31031 March 2009 APS 2009d PVNGS 2008 Annual Water Withdrawal and Use Report - Groundwater Right 58-114051.0001. Filed with Adwr March 31, 2009 ML0811505102008-04-18018 April 2008 Annual Radiological Environmental Operating Report for 2007 ML1015501462008-03-28028 March 2008 APS 2008c PVNGS 2007 Annual Water Withdrawal and Use Report - Groundwater Right 58-114051.0001 ML1015502322008-01-11011 January 2008 APS 2008g PVNGS Update to the Notification of Discharge of Non-Hazardous Materials (Tritium) 90-Day Report: Well Installation Report - Monitoring Wells in the Protected Area. Jan 11, 2008 ML0713101372007-05-0101 May 2007 Annual Radiological Environmental Operating Report 2006 ML0612902752006-04-27027 April 2006 Annual Environmental Operating Report 2005 ML0612902932006-04-25025 April 2006 Annual Radiological Environmental Operating Report 2005 2023-04-26
[Table view] Category:Letter
MONTHYEARML24019A2012024-01-19019 January 2024 Fourth 10-Year Interval, Second Period Owners Activity Report Number 1R24 ML24019A1362024-01-18018 January 2024 Inservice Inspection Request for Information ML24012A2452024-01-12012 January 2024 Response to Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24010A1532024-01-10010 January 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection ML23341A0062023-12-21021 December 2023 Project Manager Assignment IR 05000528/20230112023-12-18018 December 2023 License Renewal Inspection Report 05000528/2023011 ML23335A0782023-11-30030 November 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1602023-11-17017 November 2023 Supplemental Submittal - Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20234032023-11-13013 November 2023 NRC Security Inspection Report 05000528 2023403, 05000529 2023403, 05000530 2023403 (Full Report) ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23299A3052023-10-26026 October 2023 Response to Request for Additional Information Relief Request 70 Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle IR 05000528/20230032023-10-17017 October 2023 Integrated Inspection Report 05000528 2023003 and 05000529 2023003 and 05000530 2023003 ML23270B9232023-09-28028 September 2023 Notification of Age-Related Degradation Inspection (05000528/2024012, 05000529/2024012, and 05000530/2024012) and Request for Information ML23251A2332023-09-13013 September 2023 Notification of Post Approval Site Inspection for License Renewal and Request for Information Inspection (05000528/2023011) ML23241B0182023-09-13013 September 2023 Use of Honeywell Mururoa V4F1 and MTH2 Supplied Air Suits within Respiratory Protection Program IR 05000528/20243012023-09-0606 September 2023 Notification of NRC Initial Operator Licensing Examination 05000528/2024301; 05000529/2024301; 05000530/2024301 IR 05000528/20230102023-08-22022 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000528/2023010, 05000529/2023010 and 05000530/2023010 IR 05000528/20230052023-08-21021 August 2023 Updated Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Report 05000528/2023005 and 05000529/2023005 and 05000530/2023005) ML23222A2762023-08-10010 August 2023 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canister Identification Numbers AMZDFX175 and AMZDFX176 and Vertical Concrete Cask Identification Numbers AMZDNE175, and AMZDNE176 ML23199A2942023-08-0909 August 2023 Issuance of Amendment Nos. 221, 221, and 221, to Revise Technical Specifications to Adopt TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable IR 05000528/20230022023-08-0808 August 2023 Integrated Inspection Report 05000528/2023002 and 05000529/2023002 and 05000530/2023002 ML23207A2482023-07-26026 July 2023 License Renewal Pressurizer Surge Line Inspection ML23188A1872023-07-0707 July 2023 Fourth 10-Year Interval, Second Period Owners Activity Report Number 2R24 ML23166B0832023-07-0505 July 2023 Independence Spent Fuel Storage Installation - Issuance of Exemption ML23181A1602023-06-30030 June 2023 2 to Updated Final Safety Analysis Report, and Revision 3 to Operations Quality Assurance Program Description ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23181A0772023-06-29029 June 2023 Program Review - Simulator Testing Methodology ML23157A1292023-06-0101 June 2023 Annual Report of Guarantee of Payment of Deferred Premium ML23144A3722023-05-24024 May 2023 Response to Regulatory Issue Summary (RIS) 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23143A3912023-05-23023 May 2023 Independent Spent Fuel Storage Installation - Request for Exemption from NAC-MAGNASTOR Certificate of Compliance 72-1031 - Cask Lid Batch 3 Design Requirements ML23145A2772023-05-17017 May 2023 10-PV-2023-05 Post-Exam Comments ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls IR 05000528/20230012023-05-0808 May 2023 and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000528/2023001 and 05000529/2023001 and 05000530/2023001 and 07200044/2023001 ML23128A0692023-05-0808 May 2023 Notification of Biennial Problem Dentification and Resolution Inspection and Request for Information ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23122A1912023-04-29029 April 2023 Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31 ML23116A2772023-04-26026 April 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2022 ML23115A4012023-04-26026 April 2023 Review of the 2022 Steam Generator Tube Inspections During Refueling Outage 23 ML23115A4982023-04-25025 April 2023 2022 Annual Environmental Operating Report IR 05000528/20230122023-04-19019 April 2023 Notification of Commercial Grade Dedication Inspection (05000528/2023012, 05000529/2023012, and 05000530/2023012) and RFI ML23108A0342023-04-18018 April 2023 NRC Initial Operator Licensing Examination Approval 05000528/2023301; 05000529/2023301; 05000530/2023301 ML23103A4642023-04-13013 April 2023 Annual Radiological Environmental Operating Report 2022 ML23103A4312023-04-13013 April 2023 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2022 IR 05000528/20224012023-04-13013 April 2023 Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23089A4002023-03-30030 March 2023 Consolidated Decommissioning Funding Status Report - 2022 ML23088A4012023-03-30030 March 2023 Project Manager Assignment IR 05000528/20234022023-03-29029 March 2023 and 3 - NRC Security Inspection Report 05000528-2023402, 05000529-2023402, and 05000530-2023402, (Cover Letter Only) ML23080A3002023-03-21021 March 2023 Present Levels of Financial Protection 2024-01-19
[Table view] |
Text
AIRC.)apsPalo VerdeNuclear Generating StationPO Box 52034Phoenix, Arizona 85072-2034 Mail Station 7636102-07038-TNW/M PE/TMJApril 24, 2015ATTN: Document Control DeskU.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3Docket Nos. STN 50-528/529/530 2014 Annual Environmental Operating ReportEnclosed please find the 2014 Annual Environmental Operating Report forPVNGS Units 1, 2, and 3. Arizona Public Service Company is submitting this report pursuant to Section 5.4.1 of Appendix B to the PVNGS Units 1,2, and 3 Renewed Operating License Nos. NPF-41, NPF-51, and NPF-74,respectively.
No new commitments are being made to the NRC by this letter. Should youneed further information regarding this submittal, please contact MichaelDilorenzo, Licensing Section Leader, at (623) 393-3495.
Sincerely, Thomas N. WeberDepartment Leader,TNW/MPE/TMJ/hsc Enclosure Regulatory Affairscc: M.M.C.A.T.L. DapasM. WatfordA. PeabodyV. GodwinMoralesNRC Region IV Regional Administrator NRC NRR Project Manager (electronic
& hard copy)NRC Senior Resident Inspector for PVNGSArizona Radiation Regulatory Agency (ARRA)Arizona Radiation Regulatory Agency (ARRA)A member of the STARS (Strategic Teaming and Resource Sharing)
AllianceCallaway
- Wolf Creek ENCLOSURE Palo Verde Nuclear Generating StationUnits 1, 2, and 32014 Annual Environmental Operating Report I. INTRODUCTION The Palo Verde Nuclear Generating Station (PVNGS) is located in Maricopa County, Arizona,approximately 50 miles west of the Phoenix metropolitan area. The PVNGS site comprises approximately 4280 acres. Site elevations range from 890 feet above mean sea level at thesouthern boundary to 1030 feet above mean sea level at the northern boundary.
The stationconsists of three pressurized water reactor electrical generating units. Units 1, 2, and 3 have arated thermal power of 3990 MW.PVNGS was issued low power operating licenses NPF-34, NPF-46 and NPF-65 for Units 1, 2, and3 by the United States Nuclear Regulatory Commission (NRC) on December 31, 1984, December9, 1985, and March 25, 1987, respectively.
PVNGS was issued full power operating licensesNPF-41, NPF-51 and NPF-74 for Units 1, 2, and 3 on June 1, 1985, April 24, 1986, andNovember 25, 1987, respectively.
These licenses were renewed on April 21, 2011.Appendix B to these operating licenses is entitled the "Environmental Protection Plan (NonRadiological)".
The Environmental Protection Plans (EPP) for each of the current operating licenses are identical.
The EPP purpose is to provide for protection of environmental values during construction andoperation of the nuclear facility.
The principal objectives of the EPP are as follows:(1) Verify that the station is operated in an environmentally acceptable manner, asestablished by the FES (Final Environmental Statement) and other NRC environmental impactassessments.
(2) Coordinate NRC requirements and maintain consistency with other Federal, State andLocal requirements for environmental protection.
(3) Keep NRC informed of the environmental effects of facility construction and operation andactions taken to control those effects.This Annual Environmental Operating Report is required by Section 5.4.1 of the EPP. This reportdescribes the activities during calendar year 2014 related to the PVNGS EPP. For purposes ofthis report, references to the EPP are considered to be the EPP of NPF-41, NPF-51, and NPF-74.II. ENVIRONMENTAL MONITORING SUMMARIES AND ANALYSISA. Cultural Resources Section 4.2.1 of the EPP requires that an archaeological survey be performed when finalalignment of the PVNGS-to-Saguaro transmission line is completed.
As of the date of thisreport, plans for this transmission line have been indefinitely suspended.
Therefore, there hasbeen no activity with regard to this requirement of the EPP.1 B. Terrestrial Ecology Monitoring As communicated in a letter from William F. Conway, APS, to NRC, dated December 30, 1991,the salt deposition monitoring program was discontinued at the end of 1991.III. PLANT DESIGN AND OPERATION CHANGESSection 3.1 of the EPP allows changes in station design or operation or the performance of testsor experiments affecting the environment provided that such changes, tests, or experiments donot involve an unreviewed environmental question and do not involve a change to the EPP.Changes, tests, or experiments in which all measurable non-radiological effects are confined tothe on-site areas previously disturbed during site preparation and plant construction or in whichthe environment is not affected are exempt from the evaluation and reporting requirements ofSection 3.1.Section 3.2 of the EPP also exempts changes, tests, or experiments, which are required tocomply with other Federal, State, or local environmental regulations.
No design and operational changes were initiated in 2014 that required an evaluation todetermine if they involved either an unreviewed environmental question or constituted a changein the EPP.IV. EPP NON-COMPLIANCES There were no instances of non-compliance with the EPP identified during 2014.V. NON-ROUTINE REPORTSThere were no non-routine reports required by Section 5.4.2 of the EPP submitted during 2014.2