ML16033A385: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 19: | Line 19: | ||
{{#Wiki_filter:0CAN021601 | {{#Wiki_filter:0CAN021601 | ||
February 2, 2016 | February 2, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 | ||
==Subject:== | ==Subject:== | ||
Emergency Plan Revision 40 Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313, 50-368, and 72-13 License Nos. DPR-51 and NPF-6 | Emergency Plan Revision 40 Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313, 50-368, and 72-13 License Nos. DPR-51 and NPF-6 | ||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
In accordance with 10 CFR 50.4(b)(5), 10 CFR 50.54(q)(5), 10 CFR 72.4, and 10 CFR 72.44(f), | In accordance with 10 CFR 50.4(b)(5), 10 CFR 50.54(q)(5), 10 CFR 72.4, and 10 CFR 72.44(f), | ||
the Arkansas Nuclear One (ANO) Emergency Plan (EPlan) has been revised and is included in of this letter. A summary of the changes to the EPlan is included in Attachment 1 of this letter. Pursuant to 10 CFR 50.54(q), a screening and/or evaluation of the changes to the EPlan and associated implementing documents was performed. The screening and/or evaluation concluded that the changes do not reduce the effectiveness of the EPlan, and the EPlan continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E. This correspondence contains no new commitments. Should you have any questions regarding this submittal, please contact me. | the Arkansas Nuclear One (ANO) Emergency Plan (EPlan) has been revised and is included in of this letter. A summary of the changes to the EPlan is included in Attachment 1 of this letter. | ||
Pursuant to 10 CFR 50.54(q), a screening and/or evaluation of the changes to the EPlan and associated implementing documents was performed. The screening and/or evaluation concluded that the changes do not reduce the effectiveness of the EPlan, and the EPlan continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E. | |||
This correspondence contains no new commitments. Should you have any questions regarding this submittal, please contact me. | |||
Sincerely, | Sincerely, ORIGINAL SIGNED BY STEPHENIE L. PYLE | ||
SLP/dbb Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 0CAN021601 Page 2 of 2 Attachments: 1. Summary of Changes to the ANO Emergency Plan | SLP/dbb Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 0CAN021601 Page 2 of 2 | ||
: 2. Arkansas Nuclear One Emergency Plan, Revision 40 cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 | |||
NRC Region IV (Senior Emergency Planning Inspector) | Attachments: 1. Summary of Changes to the ANO Emergency Plan | ||
Division of Reactor Safety 612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125 | : 2. Arkansas Nuclear One Emergency Plan, Revision 40 | ||
cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector | |||
Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Ms. Andrea E. George MS O-8B1 | |||
One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Mark D. Lombard Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington D. C. 20555 Mr. Gilberto L. Guerra, Jr. | |||
NRC Region IV (Senior Emergency Planning Inspector) | |||
Division of Reactor Safety 612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125 Mr. Bernard R. Bevill | |||
Arkansas Department of Health Radiation Control Section 4815 West Markham Street | |||
Slot #30 Little Rock, AR 72205 | |||
0CAN021601 | 0CAN021601 | ||
February 2, 2016 | February 2, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 | ||
==Subject:== | ==Subject:== | ||
Emergency Plan Revision 40 Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313, 50-368, and 72-13 License Nos. DPR-51 and NPF-6 | Emergency Plan Revision 40 Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313, 50-368, and 72-13 License Nos. DPR-51 and NPF-6 | ||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
In accordance with 10 CFR 50.4(b)(5), 10 CFR 50.54(q)(5), 10 CFR 72.4, and 10 CFR 72.44(f), | In accordance with 10 CFR 50.4(b)(5), 10 CFR 50.54(q)(5), 10 CFR 72.4, and 10 CFR 72.44(f), | ||
the Arkansas Nuclear One (ANO) Emergency Plan (EPlan) has been revised and is included in of this letter. A summary of the changes to the EPlan is included in Attachment 1 of this letter. Pursuant to 10 CFR 50.54(q), a screening and/or evaluation of the changes to the EPlan and associated implementing documents was performed. The screening and/or evaluation concluded that the changes do not reduce the effectiveness of the EPlan, and the EPlan continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E. This correspondence contains no new commitments. Should you have any questions regarding this submittal, please contact me. | the Arkansas Nuclear One (ANO) Emergency Plan (EPlan) has been revised and is included in of this letter. A summary of the changes to the EPlan is included in Attachment 1 of this letter. | ||
Pursuant to 10 CFR 50.54(q), a screening and/or evaluation of the changes to the EPlan and associated implementing documents was performed. The screening and/or evaluation concluded that the changes do not reduce the effectiveness of the EPlan, and the EPlan continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E. | |||
This correspondence contains no new commitments. Should you have any questions regarding this submittal, please contact me. | |||
Sincerely, ORIGINAL SIGNED BY STEPHENIE L. PYLE | |||
SLP/dbb Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 0CAN021601 Page 2 of 2 | |||
Attachments: 1. Summary of Changes to the ANO Emergency Plan | |||
: 2. Arkansas Nuclear One Emergency Plan, Revision 40 | |||
cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector | |||
Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Ms. Andrea E. George MS O-8B1 | |||
One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Mark D. Lombard Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington D. C. 20555 Mr. Gilberto L. Guerra, Jr. | |||
NRC Region IV (Senior Emergency Planning Inspector) | |||
Division of Reactor Safety 612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125 Mr. Bernard R. Bevill | |||
Arkansas Department of Health Radiation Control Section 4815 West Markham Street | |||
Slot #30 Little Rock, AR 72205}} | |||
Revision as of 14:19, 30 June 2018
ML16033A385 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 02/02/2016 |
From: | Stephanie Pyle Entergy Operations |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
Shared Package | |
ML16039A275 | List: |
References | |
0CAN021601 | |
Download: ML16033A385 (2) | |
Text
0CAN021601
February 2, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Emergency Plan Revision 40 Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313, 50-368, and 72-13 License Nos. DPR-51 and NPF-6
Dear Sir or Madam:
In accordance with 10 CFR 50.4(b)(5), 10 CFR 50.54(q)(5), 10 CFR 72.4, and 10 CFR 72.44(f),
the Arkansas Nuclear One (ANO) Emergency Plan (EPlan) has been revised and is included in of this letter. A summary of the changes to the EPlan is included in Attachment 1 of this letter.
Pursuant to 10 CFR 50.54(q), a screening and/or evaluation of the changes to the EPlan and associated implementing documents was performed. The screening and/or evaluation concluded that the changes do not reduce the effectiveness of the EPlan, and the EPlan continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E.
This correspondence contains no new commitments. Should you have any questions regarding this submittal, please contact me.
Sincerely, ORIGINAL SIGNED BY STEPHENIE L. PYLE
SLP/dbb Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 0CAN021601 Page 2 of 2
Attachments: 1. Summary of Changes to the ANO Emergency Plan
- 2. Arkansas Nuclear One Emergency Plan, Revision 40
cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector
Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Ms. Andrea E. George MS O-8B1
One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Mark D. Lombard Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington D. C. 20555 Mr. Gilberto L. Guerra, Jr.
NRC Region IV (Senior Emergency Planning Inspector)
Division of Reactor Safety 612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125 Mr. Bernard R. Bevill
Arkansas Department of Health Radiation Control Section 4815 West Markham Street
Slot #30 Little Rock, AR 72205
0CAN021601
February 2, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Emergency Plan Revision 40 Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313, 50-368, and 72-13 License Nos. DPR-51 and NPF-6
Dear Sir or Madam:
In accordance with 10 CFR 50.4(b)(5), 10 CFR 50.54(q)(5), 10 CFR 72.4, and 10 CFR 72.44(f),
the Arkansas Nuclear One (ANO) Emergency Plan (EPlan) has been revised and is included in of this letter. A summary of the changes to the EPlan is included in Attachment 1 of this letter.
Pursuant to 10 CFR 50.54(q), a screening and/or evaluation of the changes to the EPlan and associated implementing documents was performed. The screening and/or evaluation concluded that the changes do not reduce the effectiveness of the EPlan, and the EPlan continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E.
This correspondence contains no new commitments. Should you have any questions regarding this submittal, please contact me.
Sincerely, ORIGINAL SIGNED BY STEPHENIE L. PYLE
SLP/dbb Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 0CAN021601 Page 2 of 2
Attachments: 1. Summary of Changes to the ANO Emergency Plan
- 2. Arkansas Nuclear One Emergency Plan, Revision 40
cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector
Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Ms. Andrea E. George MS O-8B1
One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Mark D. Lombard Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington D. C. 20555 Mr. Gilberto L. Guerra, Jr.
NRC Region IV (Senior Emergency Planning Inspector)
Division of Reactor Safety 612 East Lamar Blvd, Suite 400 Arlington, TX 76011-4125 Mr. Bernard R. Bevill
Arkansas Department of Health Radiation Control Section 4815 West Markham Street
Slot #30 Little Rock, AR 72205