~Entergx Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704

  • Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One OCAN061702 June 26, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Emergency Plan On-Shift Staffing Analysis, Revision 1 Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313, 50-368, and 72-13 License Nos. DPR-51 and NPF-6

Reference:

Entergy letter dated February 2, 2016, "Emergency Plan Revision 40" (OCAN021601) (ML16033A385)

Dear Sir or Madam:

In accordance with 10 CFR 50.4(b)(5), 10 CFR 50.54(q)(5), 10 CFR 72.4, and 10 CFR 72.44(f),

the Arkansas Nuclear One (ANO) Emergency Plan (EPlan) On-Shift Staffing Analysis (OSA) has been revised and is included in attachment to this letter.

ANO has a five-member fire brigade. An additional operator was previously added to each shift to act as the 5th fire brigade member, replacing the previous reliance on a security officer to fill this position. Revision 40 of the ANO EPlan captured this change (see above reference). The ANO OSA Report was updated thereafter (December 2016). Note that the NRG was not notified in writing of the change to the OSA within 30 days as required by 10 CFR 50.54(q)(5).

This failure to notify the NRG within 30 days is captured in ANO Condition Report CR-ANO-C-2017-2341.

10 CFR 50, Appendix E, Section IV.A.9, establishes the OSA as part of the EPlan. NRG NSIR/DPR-ISG-01, "Emergency Planning for Nuclear Power Plants,"Section IV.C, also speaks of staffing analyses as part of the EPlan. Pursuant to 10 CFR 50.54(q), a screening and/or evaluation of the changes to the ANO OSA was performed. The screening and/or evaluation concluded that the changes do not reduce the effectiveness of the EPlan, and the EPlan continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

OCAN061702 Page 2of2 This correspondence contains no new commitments. Should you have any questions regarding this submittal, please contact me.

Sincerely, SLP/dbb

Attachment:

ANO Emergency Plan On-Shift Staffing Analysis Report, Revision 1 cc: Mr. Kriss M. Kennedy Regional Administrator U.S. Nuclear Regulatory Commission RGN-IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P. 0. Box 310 London, AR 7284 7 U.S. Nuclear Regulatory Commission Attn: Mr. Thomas Wengert MS 0-08B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Mike Layton Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington D. C. 20555 Mr. Sean Hedger NRC Region IV (Senior Emergency Planning Inspector)

Division of Reactor Safety 1600 East Lamar Blvd, Suite 400 Arlington, TX 76011-4511 Mr. Bernard R. Bevill Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot#30 Little Rock, AR 72205