ML18117A210: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:     UNITED STATES      NUCLEAR REGULATORY COMMISSION      REGION I      2100 RENAISSANCE BLVD.      KING OF PRUSSIA, PA 19406-2713  April 26, 2018  Mr. Bryan C. Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL  60555 
{{#Wiki_filter:}}
 
==SUBJECT:==
NINE MILE POINT NUCLEAR STATION, UNIT 1 - SENIOR REACTOR  AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS 
 
==Dear Mr. Hanson:==
 
In a telephone conversation on April 26, 2018 between Mr. Peter Presby, Chief Examiner and Mr. Paul Isham, Facility Exam Author, arrangements were made for the administration of licensing examinations at Nine Mile Point, Unit 1, during the week of December 3, 2018. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of November 5, 2018. As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11 to NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."  The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by July 5, 2018. The NRC staff provided the written examination outline on January 2, 2018. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by September 18, 2018. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations, and tests before they are submitted to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
B. Hanson 2  To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (OMB approval number 3150-0090) at least 60 days before the first examination date. Preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090) and medical certifications (OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
Although the minimum guidelines for receiving waiver or excusal requests is 30 days before the first examination date, the requests should be submitted as early in the process as possible. Guidance on processing such requests resulting from verbal inquiries by the licensee to the NRC is not binding. Any licensee submittals addressing this should be in the form of a written request. Licensee submittals should request a formal correspondence documenting their disposition. Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these voluntary information collections is estimated to average 2,250 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. Send comments regarding this burden estimate or any other aspects of these information collections, including suggestions for reducing the burden, to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to infocollects.resource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. 
 
Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number  In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
B. Hanson 3 After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
 
Thank you for your cooperation in this matter. Mr. Isham has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Presby at (610) 337-5392 or me at (610) 337-5306.
 
Sincerely, 
          /RA/  Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No.:  50-220 cc: Training Manager cc: Distribution via ListServ
 
B. Hanson 4 
 
==SUBJECT:==
NINE MILE POINT NUCLEAR STATION, UNIT 1 - SENIOR REACTOR  AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS dated April 26, 2018  DISTRIBUTION: (via email) DLew, RA  (R1ORAMAIL RESOURCE)  MFerdas, DRP DCollins, DRA  (R1ORAMAIL RESOURCE)  MCatts, DRP DPelton, DRP  (R1DRPMAIL RESOURCE)  ARosebrook, DRP  MGray, DRP  (R1DRPMAIL RESOURCE)  MHardgrove, DRP JYerokun, DRS (R1DRSMAIL RESOURCE)  SObadina, DRP BWelling, DRS (R1DRSMAIL RESOURCE)  DJackson, DRS, Ops Branch Chief EMiller, DRP, SRI      PPresby, DRS, Chief Examiner BSienel, DRP, RI      JBowen, RI OEDO  ATrudell, DRP, AA      RidsNrrDorlLpl1 Resource RidsNrrPMNineMilePoint Resource
 
FILE:  G:\DRS\Operations Branch\PRESBY\Exam FY19-NMP1 Dec 2018\ES-201-R11-CorpNotifyLtr.docx ADAMS PKG No. ML18115A437    ADAMS ACCESSION No.: ML18117A210    SUNSI Review  Non-Sensitive  Sensitive  Publicly Available  Non-Publicly Available  OFFICE RI/DRS/OB:CE RI/DRS/OB:BC  NAME PPresby DJackson  DATE 04/26/2018 04/26/2018  OFFICIAL RECORD COPY   
}}

Revision as of 16:33, 9 May 2018

Nine Mile Point Nuclear Station, Unit 1 - Senior Reactor and Reactor Operator Initial License Examinations
ML18117A210
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/26/2018
From: Jackson D E
Operations Branch I
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Jackson D E
References
Download: ML18117A210 (4)


Text