Information Notice 2003-06, Failure of Safety-Related Linestarter Relays at San Onofre Nuclear Generating Station: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 72: Line 72:
outage maintenance windows, and will be completed by the end of the Unit 2 outage in 2004.On January 18, 2003, during a Unit 3 refueling outage, the quench tank sample containmentisolation valve failed to open during surveillance testing.  Examination of the contact revealed
outage maintenance windows, and will be completed by the end of the Unit 2 outage in 2004.On January 18, 2003, during a Unit 3 refueling outage, the quench tank sample containmentisolation valve failed to open during surveillance testing.  Examination of the contact revealed


that a similar chemical attack had occurred and caused the valve failure.On February 10, 2003, during an inspection of Unit 3 LPSI header stop valve linestarters, anauxiliary contact failed on the 20th cycle of the auxiliary contact test.  The linestarter inspectionsincluded a test to cycle each auxiliary contact 20 times.  This auxiliary contact cycle test was
that a similar chemical attack had occurred and caused the valve failure.On February 10, 2003, during an inspection of Unit 3 LPSI header stop valve linestarters, anauxiliary contact failed on the 20
th cycle of the auxiliary contact test.  The linestarter inspectionsincluded a test to cycle each auxiliary contact 20 times.  This auxiliary contact cycle test was


performed to determine the functionality of the auxiliary contacts in the linestarter.On Unit 3, all 86 linestarters have been inspected with two surveillance test failures noted andone maintenance test failure.  The licensee replaced 42 auxiliary contacts from the linestarters
performed to determine the functionality of the auxiliary contacts in the linestarter.On Unit 3, all 86 linestarters have been inspected with two surveillance test failures noted andone maintenance test failure.  The licensee replaced 42 auxiliary contacts from the linestarters
Line 79: Line 80:
33 linestarters have been inspected as of May 2, 2003, with no failures noted; however, four
33 linestarters have been inspected as of May 2, 2003, with no failures noted; however, four


auxiliary contacts showed signs of chemical attack on the plastic contact case.DiscussionAs a result of the valve stroke failure on August 30, 2002, the licensee initiated a laboratoryanalysis of the suspect auxiliary contact from the linestarter.  The contact was coated with a
auxiliary contacts showed signs of chemical attack on the plastic contact case.
 
DiscussionAs a result of the valve stroke failure on August 30, 2002, the licensee initiated a laboratoryanalysis of the suspect auxiliary contact from the linestarter.  The contact was coated with a


plastic residue from the deterioration of the plastic switch bodies.  The licensee concluded that
plastic residue from the deterioration of the plastic switch bodies.  The licensee concluded that
Line 142: Line 145:
Division of Regulatory Improvement Programs
Division of Regulatory Improvement Programs


Office of Nuclear Reactor RegulationTechnical Contacts:Gregory G. WarnickVern Hodge623-386-3638301-415-1861 Email:gxw2@nrc.govEmail: cvh@nrc.govAttachment: List of Recently Issued NRC Information Notices The licensee missed several opportunities from plant and industry experience to recognize theneed for an extent-of-condition review.  An extent-of-condition review could have identified any
Office of Nuclear Reactor RegulationTechnical Contacts:Gregory G. WarnickVern Hodge623-386-3638301-415-1861 Email:gxw2@nrc.govEmail: cvh@nrc.govAttachment: List of Recently Issued NRC Information Notices


equipment degradation that occurred throughout the plant due to improper use of cleaning
031700033DOCUMENT NAME: G:\RORP\OES\Staff Folders\Hodge\san_line inf.wpdOFFICEOES:RORP:DRIPTech EditorRIVEMCBNAMECVHodgePKleeneGWarnickKParcszewskiDATE06/10/200306/09/200306/12/200306/10/2003OFFICESC:OES:RORP:DRIPPD:RORP:DRIPNAMETReisWDBecknerDATE06/18/200306/19/2003
 
______________________________________________________________________________________OL = Operating License
solvents.  One of these prior opportunities was the review of Information Notice 93-76,
"Inadequate Control of Paint and Cleaners for Safety Related Equipment," which the licenseeperformed in February 1994.  The review determined that the programs in place were sufficient
 
to avoid problems similar to those discussed in the notice. The licensee focused on the TCE-
based cleaner controls in place at the time of the information notice review, but overlooked the
 
fact that safety-related equipment could have been damaged prior to the implementation of the
 
controls in April 1989.  This oversight was a missed opportunity to correct the equipment


deficiency that has been revealed by the recent linestarter failures and the discovery of
CP = Construction PermitAttachment LIST OF RECENTLY ISSUEDNRC INFORMATION NOTICES


degraded contacts.The San Onofre linestarter experience emphasizes the need to perform an extent-of-conditionreview to determine equipment impact when an improper maintenance practice is recognized
_____________________________________________________________________________________InformationDate of


and corrected.  Further, the root cause analysis revealed that past improper use of corrosive
===Notice No.        SubjectIssuanceIssued to===
 
_____________________________________________________________________________________2003-05Failure to Detect FreespanCracks in PWR Steam
cleaners could result in degraded plant equipment that could remain undetected for a
 
considerable length of time before showing up in equipment failures.This information notice requires no specific action or written response.  If you have anyquestions about the information in this notice, please contact one of the technical contacts
 
listed below or the appropriate Office of Nuclear Reactor Regulation (NRR) project manager./RA/William D. Beckner, Program Director
 
===Operating Reactor Improvements Program===
Division of Regulatory Improvement Programs
 
Office of Nuclear Reactor RegulationTechnical Contacts:Gregory G. WarnickVern Hodge623-386-3638301-415-1861 Email:gxw2@nrc.govEmail: cvh@nrc.govAttachment: List of Recently Issued NRC Information NoticesDISTRIBUTION:ADAMS
 
IN FileADAMS ACCESSION NUMBER:031700033DOCUMENT NAME: G:\RORP\OES\Staff Folders\Hodge\san_line inf.wpdOFFICEOES:RORP:DRIPTech EditorRIVEMCBNAMECVHodgePKleeneGWarnickKParcszewskiDATE06/10/200306/09/200306/12/200306/10/2003OFFICESC:OES:RORP:DRIPPD:RORP:DRIPNAMETReisWDBecknerDATE06/18/200306/19/2003OFFICIAL RECORD COPY
 
______________________________________________________________________________________OL = Operating License
 
CP = Construction PermitAttachment LIST OF RECENTLY ISSUEDNRC INFORMATION NOTICES_____________________________________________________________________________________InformationDate of
 
Notice No.        SubjectIssuanceIssued to_____________________________________________________________________________________2003-05Failure to Detect FreespanCracks in PWR Steam


Generator Tubes06/05/2003All holders of operating licensesor construction permits for
Generator Tubes06/05/2003All holders of operating licensesor construction permits for
Line 223: Line 199:
Inoperable01/27/2003All holders of operating licensesor construction permits for
Inoperable01/27/2003All holders of operating licensesor construction permits for


nuclear power reactors.Note:NRC generic communications may be received in electronic format shortly after they areissued by subscribing to the NRC listserver as follows:To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the followingcommand in the message portion:subscribe gc-nrr firstname lastname
nuclear power reactors.Note:NRC generic communications may be received in electronic format shortly after they areissued by subscribing to the NRC listserver as follows:To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the followingcommand in the message portion:subscribe gc-nrr firstname lastname}}
 
}}


{{Information notice-Nav}}
{{Information notice-Nav}}

Revision as of 12:37, 31 August 2018

Failure of Safety-Related Linestarter Relays at San Onofre Nuclear Generating Station
ML031700033
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/19/2003
From: Beckner W D
NRC/NRR/DRIP/RORP
To:
Hodge, CV, NRR/DRIP/RORP, (415-1861)
References
+sunsimjr=200611, -RFPFR IN-03-006
Download: ML031700033 (5)


UNITED STATESNUCLEAR REGULATORY COMMISSIONOFFICE OF NUCLEAR REACTOR REGULATIONWASHINGTON, DC 20555-0001June 19, 2003NRC INFORMATION NOTICE 2003-06:FAILURE OF SAFETY-RELATED LINESTARTERRELAYS AT SAN ONOFRE NUCLEAR

GENERATING STATION

Addressees

All holders of operating licenses or construction permits for nuclear power reactors, exceptthose that have permanently ceased operations and have certified that fuel has been

permanently removed from the reactor.

Purpose

The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice to informaddressees of recent failures of safety-related valves due to linestarter relay degradation. The

degradation was caused by past use of excessive amounts of trichloroethane-based cleaners

during preventive maintenance. It is expected that recipients will review the information for

applicability to their facilities and consider actions, as appropriate, to avoid similar problems.

However, suggestions in this information notice are not NRC requirements; therefore, no

specific action or written response is required.

Description of Circumstances

San Onofre Nuclear Generating Station utilizes reversing linestarters manufactured by SquareD to operate the motors on safety-related motor-operated valves. The linestarter consists of

two relays that provide 480 volt power to the motor and contain auxiliary contacts associated

with interlock and seal-in functions. The interlock function provides a means to avoid

energizing both open and closed relays at the same time. The seal-in function keeps the relay

energized until the valve has completed its stroke. All reversing linestarters have interlock

auxiliary contacts. San Onofre has 172 Square D linestarters associated with safety-related

motor-operated valves, 86 in each unit.On August 30, 2002, a Unit 3 low-pressure safety injection (LPSI) pump mini-recirculation valvefailed to open during surveillance testing. Subsequent analysis determined that the plastic

housing on an auxiliary contact in the associated linestarter was degraded. The licensee

determined that the auxiliary contact housing degradation was caused by the past use of

excessive amounts of Inhibisol, a cleaning solvent based on trichloroethane (TCE). The

cleaning solvent caused the plastic to break down. Over time, small amounts of the plastic

came loose and interfered with the electrical contacts, resulting in the valve failure. In response to the LPSI pump mini-recirculation valve failure, San Onofre developed a plan toinspect a sample of other safety-related linestarters installed in Units 2 and 3. In October 2002, San Onofre completed the inspection of 19 additional linestarters. This sample inspection

identified two auxiliary contacts that showed signs of chemical attack (i.e., cloudy plastic contact

housing); however, both were found to be functional. Subsequently, the licensee developed a

risk-informed plan to inspect all safety-related linestarters and replace all auxiliary contacts

showing signs of chemical attack. The linestarter inspections were scheduled into online and

outage maintenance windows, and will be completed by the end of the Unit 2 outage in 2004.On January 18, 2003, during a Unit 3 refueling outage, the quench tank sample containmentisolation valve failed to open during surveillance testing. Examination of the contact revealed

that a similar chemical attack had occurred and caused the valve failure.On February 10, 2003, during an inspection of Unit 3 LPSI header stop valve linestarters, anauxiliary contact failed on the 20

th cycle of the auxiliary contact test. The linestarter inspectionsincluded a test to cycle each auxiliary contact 20 times. This auxiliary contact cycle test was

performed to determine the functionality of the auxiliary contacts in the linestarter.On Unit 3, all 86 linestarters have been inspected with two surveillance test failures noted andone maintenance test failure. The licensee replaced 42 auxiliary contacts from the linestarters

due to evidence of chemical attack on the plastic auxiliary contact housing. On Unit 2,

33 linestarters have been inspected as of May 2, 2003, with no failures noted; however, four

auxiliary contacts showed signs of chemical attack on the plastic contact case.

DiscussionAs a result of the valve stroke failure on August 30, 2002, the licensee initiated a laboratoryanalysis of the suspect auxiliary contact from the linestarter. The contact was coated with a

plastic residue from the deterioration of the plastic switch bodies. The licensee concluded that

excessive use of cleaning solvents during previous preventive maintenance activities had

caused the failure of the contacts. The licensee believes that all damage to the auxiliary contact housings occurred prior to 1989and is showing up in the recent safety-related valve failures. The original linestarter preventive

maintenance procedure was issued in April 1984, and required the use of cleaning solvents on

linestarters, but had no caution regarding the potential for damage to plastic components within

the linestarter. Also, the procedure did not require visual inspection of internally mounted

auxiliary contact assemblies. As a result, Inhibisol was used liberally, which allowed the cleaner

to come in contact with plastics that were susceptible to chemical degradation. In April 1989, the licensee recognized that TCE-based cleaners were being used improperly and that controls

needed to be implemented to prevent future damage to equipment containing plastics. The

licensee revised the consumables controls manual to restrict the use of TCE-based cleaners on

plastics, and provided guidance on the approved method for use of the cleaner (i.e., spray on

cloth, then wipe component). Additionally, the linestarter preventive maintenance procedure

was revised to caution that cleaning solvents should be used sparingly to avoid damage to

plastic components. In response to the recent valve failures, the licensee took action on

March 7, 2003, to prohibit the use of all TCE-based cleaners for electrical maintenance

applications. The licensee missed several opportunities from plant and industry experience to recognize theneed for an extent-of-condition review. An extent-of-condition review could have identified any

equipment degradation that occurred throughout the plant due to improper use of cleaning

solvents. One of these prior opportunities was the review of Information Notice 93-76,

"Inadequate Control of Paint and Cleaners for Safety Related Equipment," which the licensee

performed in February 1994. The review determined that the programs in place were sufficient

to avoid problems similar to those discussed in the notice. The licensee focused on the TCE-

based cleaner controls in place at the time of the information notice review, but overlooked the

fact that safety-related equipment could have been damaged prior to the implementation of the

controls in April 1989. This oversight was a missed opportunity to correct the equipment

deficiency that has been revealed by the recent linestarter failures and the discovery of

degraded contacts.The San Onofre linestarter experience emphasizes the need to perform an extent-of-conditionreview to determine equipment impact when an improper maintenance practice is recognized

and corrected. Further, the root cause analysis revealed that past improper use of corrosive

cleaners could result in degraded plant equipment that could remain undetected for a

considerable length of time before showing up in equipment failures.This information notice requires no specific action or written response. If you have anyquestions about the information in this notice, please contact one of the technical contacts

listed below or the appropriate Office of Nuclear Reactor Regulation (NRR) project manager./RA/William D. Beckner, Program Director

Operating Reactor Improvements Program

Division of Regulatory Improvement Programs

Office of Nuclear Reactor RegulationTechnical Contacts:Gregory G. WarnickVern Hodge623-386-3638301-415-1861 Email:gxw2@nrc.govEmail: cvh@nrc.govAttachment: List of Recently Issued NRC Information Notices

031700033DOCUMENT NAME: G:\RORP\OES\Staff Folders\Hodge\san_line inf.wpdOFFICEOES:RORP:DRIPTech EditorRIVEMCBNAMECVHodgePKleeneGWarnickKParcszewskiDATE06/10/200306/09/200306/12/200306/10/2003OFFICESC:OES:RORP:DRIPPD:RORP:DRIPNAMETReisWDBecknerDATE06/18/200306/19/2003

______________________________________________________________________________________OL = Operating License

CP = Construction PermitAttachment LIST OF RECENTLY ISSUEDNRC INFORMATION NOTICES

_____________________________________________________________________________________InformationDate of

Notice No. SubjectIssuanceIssued to

_____________________________________________________________________________________2003-05Failure to Detect FreespanCracks in PWR Steam

Generator Tubes06/05/2003All holders of operating licensesor construction permits for

pressurized-water reactors

(PWRs).2002-15, Sup 1Potential HydrogenCombustion Events in BWR

Piping05/06/2003All holders of operating licensesfor light water reactors, except

those who have permanently

ceased operations and have

certified that fuel has been

permanently removed from the

reactor.2002-21, Sup 1Axial Outside-diameterCracking Affecting Thermally

Treated Alloy 600 Steam

Generator Tubing04/01/2003All holders of operating licenseesfor nuclear power reactors, except those who have

permanently ceased operations

and have certified that fuel has

been permanently removed from

the reactor vessel.2003-04Summary of Fitness-For-DutyProgram Performance Reports

for Calendar Year 200002/06/2003All holders of operating licenseesfor nuclear power reactors, except those who have

permanently ceased operations

and have certified that fuel has

been permanently removed from

the reactor vessel.2003-03Part 21 - Inadequately StakedCapscrew Renders Residual

Heat Removal Pump

Inoperable01/27/2003All holders of operating licensesor construction permits for

nuclear power reactors.Note:NRC generic communications may be received in electronic format shortly after they areissued by subscribing to the NRC listserver as follows:To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the followingcommand in the message portion:subscribe gc-nrr firstname lastname