{{#Wiki_filter:L 42Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTIS Sheet 319 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SW3963 Equipment Description Equip. Class 7. Pneumatic-Operated Valves RELIEF VALVE SW 3963 Location:
Bldg.INTK Floor El. 566.25 Room 53 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Mounted on insludated pipe. No degraded condition identified
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Anchorage of supporting main line found with minor spalled grout.Judged not to reduce seismic capacity of support base.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N LIZIL Y N U N/A Y I U x Y N U N/A Y N U N/A Y N U N/A__ __r I x Y N U X II LCQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 320 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SW3963 Equipment Description Equip. Class 7. Pneumatic-Operated Valves RELIEF VALVE SW 3963 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Scaffold is the area is properly restrained Y N U x I I I Comments (Additional pages may be added as necessary)
Evaluated by: Date: 7/25/2012 Eddie M. Guerra Date: 7/25/2012 Adam L. Helffrich
[ e---- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 321 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SW3963 Equipment Description RELIEI Equip. Class 7. Pneumatic-Operated Valves VALVE SW 3963 Other supporting or relevant documents and photos (if any): SW3963 Plate ID Plate of component SW3963 Ueneral General view of component LKQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 322 of 379 StatusQnN U Seismic Walkdown Checklist (SWC)Equipment ID No. SW-5896 Equipment Description Equip. Class 7. Pneumatic-Operated Valves CTRM EMERG COND I-1 Location:
Bldg.AUXB Floor El. 638 Room 603 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one E of the 50% of SWEL items requiring such verification)?
Small valve on -2.5" diameter pipe. Pipe span <-6.5' with rigid supports.
Value is -12" from one end of the span. Valve height -24". OK.2. Is the anchorage free of bent, broken, missing or loose hardware?
K 3. Is the anchorage free of corrosion that is more than mild surface K oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? K 5. Is the anchorage configuration consistent with plant documentation?
K (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of K potentially adverse seismic conditions?
Y N I xLL Y N U N/A 7 I x Y N U N/A 7- x Y N U N/A 7 I x Y N U N/A_ I x fr N zU Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANWS Sheet 323 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. SW-5896 Equipment Description Equip. Class 7. Pneumatic-Operated Valves CTRM EMERG COND 1-1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Y N U N/A X Y N U N/A x Y N U N/A X Y N U x I I 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U X II I Comments (Additional pages may be added as necessary)
Evaluated by: Date: 7/25/2012 Eddie M. Guerra Date: 7/25/2012 Adam L. Helffrich L 4Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 324 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SW-5896 Equipment Description CTRM Equip. Class 7. Pneumatic-Operated Valves EMERG COND 1-1 Other supporting or relevant documents and photos (if any): SW5896 general General view of component Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 325 of 379 StatusQ N U Seismic Walkdown Checklist (SWC)Equipment ID No. SW82 Equipment Description Equip. Class Od. Other -check/manual valve MANUAL VALVE SW 82 Location:
Bldg.INTK Floor El. 565 Room 251 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Small manual valve on -12" diameter insulated pipe. Pipe is rigidly supported at about three pipe diamters on either side of valve. OK.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N I X Y N U N/A--F x Y N U N/A-I x Y N U N/A x Y N U N/A x Y N U x I I L I Paul C. Rizzo Associates, Inc.Sheet 326 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SW82 Equipment Description Equip. Class Od. Other -check/manual valve MANUAL VALVE SW 82 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I I I Comments (Additional pages may be added as necessary)
Evaluated by: Date: 7/25/2012 Eddie M. Guerra Date: 7/25/2012 Adam L. Helffrich 1-0%-< Paul C. Rizzo Associates, Inc.Sheet 327 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SW82 Equipment Description MANU Equip. Class Od. Other -check/manual valve AL VALVE SW 82 Other supporting or relevant documents and photos (if any): SW82 Plate and General Overall view of component XY Paul C. Rizzo Associates, Inc.Sheet 328 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. TIO Equipment Description Equip. Class 21. Tanks and Heat Exchangers BORATED WATER STORAGE TANK 1-I Location:
Bldg.AUXB Floor El. 565 Room PT Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?No missing parts identified
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Slight surface rust on one anchor bolt. OK.4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Tank anchorage verifiedfrom drawing C-34-147 and SQUG calculation C-CSS-TI O showing 48 -2.5 "diam. Bolts.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N x I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I LU-- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANr'S Sheet 329 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment 1DNo. TIO Equipment Description Equip. Class 21. Tanks and Heat Exchangers BORATED WATER STORAGE TANK I1-I Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Temporary maintenance equipment identified in the area but no significant potential interaction was expected 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A X Y N U x II Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x T -- --Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich L C Paul C. Rizzo Associates, Inc.Sheet 330 of 379 ENGINEERS
& CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment IDNo. T1O Equipment Description BORAI StatusQN U Equip. Class 21. Tanks and Heat Exchangers ED WATER STORAGE TANK 1-1 Other supporting or relevant documents and photos (if any): BWST General ID Plate of component I BWST Anchorage Partial view of anchorage, view is typical of all anchors Q CY- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 331 of 379 Status:QN U Seismic Walkdown Checklist (SWC)Equipment IDNo. Tl2 Equipment Description Equip. Class 21. Tanks and Heat Exchangers COMPONENT COOLING SURGE TANLK, T12 Location:
Bldg.AUXB Floor El. 623 Room 501 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage Y i. Is the anchorage configuration verification required (i.e., is the item one X of the 50% of SWEL items requiring such verification)?
Horizontal tank on two saddles with cross bracing anchored to short concrete pedestals.
Y 2. Is the anchorage free of bent, broken, missing or loose hardware?
X A small gap 1/4 "found between a nut and washer at one anchor location.Judged not to be a significant adverse condition.
Y 3. Is the anchorage free of corrosion that is more than mild surface X oxidation?
Y 4. Is the anchorage free of visible cracks in the concrete near the anchors? X See item 6 below.Y 5. Is the anchorage configuration consistent with plant documentation?
IX (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage verification based on SQUG calculation C-CSS-TI2 showing 8 -1" diam bolts.Y 6. Based on the above anchorage evaluations, is the anchorage free of L X potentially adverse seismic conditions?
Hairline crack on one of the concrete pedestals.
Judged not a significant adverse condition N 1111I N U N/A N U N/A N U N/A N U N/A N Ujz~
UC4Z Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANrS Sheet 332 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. T12 Equipment Description Equip. Class 21. Tanks and Heat Exchangers COMPONENT COOLING SURGE TANLK, T12 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Adjacent pipe lines running close to tank judged not an adverse condition Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x T -I Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 Sheet 333 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSIJLTAN"S StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. T12 Equipment Description COMP(Other supp Equip. Class 21. Tanks and Heat Exchangers)NENT COOLING SURGE TANLK, T12-r -fon ..,In~n~ anti -nbtn f n.A.1 12 plate ID Plate of component T 12 general General view of component L :Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 334 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. T12 Equipment Description COMPI Equip. Class 21. Tanks and Heat Exchangers ONENT COOLING SURGE TANLK. T12 i z ancnorage typicai Partial view of anchorage, view is typical of all anchors I I/- IVUsV OUlL IUDJIL FrgInL Anchor bolt coming loose on the front right of component XQO Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANT"S Sheet 335 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. T12 Equipment Description COMP(Equip. Class 21. Tanks and Heat Exchangers ONENT COOLING SURGE TANLK. T 12 T12 Pedestal with Minor Hairline Crack Y  Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANUS Sheet 336 of 379 StatusON U Seismic Walkdown Checklist (SWC)Equipment IDNo. T153-1 Equip. Class 21. Tanks and Heat Exchangers Equipment Description EDG FUEL OIL STORAGE TANK 1-1, FOR EDG !-1, PARTIALLY BELOW GROUND Location:
Bldg.YARD Floor El. YARD Room YARD Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Tank partially buried, unable to view anchorage.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?None observed 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
None observed, anchorage not accessible.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?None observed, anchorage not accessible.
: 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N I X Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A 7 x Y N U x I I -
L ---- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 337 of 379 StatusQN U Seismic Walkidown Checklist (SWC)Equipment IDNo. T153-1 Equip. Class 21. Tanks and Heat Exchangers Equipment Description EDG FUEL OIL STORAGE TANK 1-1. FOR EDG 1-1. PARTIALLY BELOW GROUND Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I I Comments (Additional pages may be added as necessary)
SQUG Calc (C-CSS-T153-1 concludes anchorage and attached lines are adequate.Evaluated by: Date: 7/25/2012 Eddie M. Guerra Date: 7/25/2012 Adam L. Helffrich LCQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 338 of 379 StatusQN U Seismic Walkdown Checklist Equipment IDNo. T153-1 Equipment Description (SWC)Equip. Class 21. Tanks and Heat Exchangers EDG FUEL OIL STORAGE TANK 1-1, FOR EDG 1-1, PARTIALLY BELOW GROUND Other supporting or relevant documents and photos (if any): T153-1 General General View of Component LC' <Paul C. Rizzo Associates, Inc.Sheet 339 of 379 ENGINEERS
& CONSULTANTS StatusON U Seismic Walkdown Checklist (SWC) 1 Equipment ID No. T46-1 Equipment Description Equip. Class 21. Tanks and Heat Exchangers EMERGENCY DIESEL GENERATOR DAY TANK I- I, FOR EDG I- I Location:
Bldg.AUXB Floor El. 585 Room 321A Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Each tank saddle anchored with 4-3/4" anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Anchorage found in good condition.
No signs of corrosion identified
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage verified from SQUG calc C-CSS-T46-1 and drawing C-0213A for two saddles and 4-3i4"diam bolts at each support.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N LIZIIJZI Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A X Y N U x II L OQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 340 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. T46-1 Equipment Description Equip. Class 21. Tanks and Heat Exchangers EMERGENCY DIESEL GENERATOR DAY TANK 1-1, FOR EDG 1-I Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic capacity of block walls in the area verified Block walls 305D and 306D verified to be to be seismically adequate based on refs.VBWI2-BO01-065, Rev 5 (4/21/88) and VBW12-BO01-066, Rev 6 (8/26/87)9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x T -7 I Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 QcQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 341 of 379 StatusQN U Seismic Walkdown Checklist Equipment ID No. T46-1 Equipment Description (SWC)Equip. Class 21. Tanks and Heat Exchangers EMERGENCY DIESEL GENERATOR DAY TANK 1-1. FOR EDG I-I Other supporting or relevant documents and photos (if any): I'm- I puate ID Plate of component T46-1 general General view of component L K -Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 342 of 379 StatusQN U Seismic Walkdown Checklist Equipment ID No. T46-1 Equipment Description (SWC)Equip. Class 21. Tanks and Heat Exchangers EMERGENCY DIESEL GENERATOR DAY TANK 1-1, FOR EDG 1-1 1P a o- vi llallsl-lgo Partial view of anchorage, view is typical of all anchors o t n 'Ui I frmmSUnll ryy W wIj a r Potential interaction hazard from masonry wall near unit Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTrS Sheet 343 of 379 StatusQ N U Seismic Walkdown Checklist (SWC)Equipment ID No. TE-5329 Equipment Description Equip. Class 19. Temperature Sensors EDG RM 318 TEMP ELEMENT Location:
Bldg.AUXB Floor El. 585 Room 318 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Very small temperature element mounted on a strut channel with two 1/4" diameter channel nuts. The strut channel is then anchored to a block wall with two 3/8" diameter anchor bolts. OK.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N~Y N U N/A x Y N U N/A F -I Ix Y N U N/A I x Y N U N/A F I I Ix Y N U x I I LCQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 344 of 379 StatusQN U Equipment ID No. TE-5329 Equip. Class 19. Temperature Sensors Equipment Description EDG RM 318 TEMP ELEMENT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
[8. Are overhead equipment, distribution systems, ceiling tiles and lighting, [and masonry block walls not likely to collapse onto the equipment?
Component is anchored to Block Walls 308D/309D.
Seismic adequacy verified by calculations VBWI2-BO01-068, Rev 3 (5/27/81) and VBWI3-BO01-069, Rev 3 (5/28/81)9. Do attached lines have adequate flexibility to avoid damage? [10. Based on the above seismic interaction evaluations, is equipment free [of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x I I Y N U x I I Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I I I Comments (Additional pages may be added as necessary)
Eddie M. Guerra Evaluated by: Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 I -Paul C. Rizzo Associates, Inc.Sheet 345 of 379 ENGINEERS
& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. TE-5329 Equipment Description EDG R1 Equip. Class 19. Temperature Sensors M 318 TEMP ELEMENT Other supporting or relevant documents and photos (if any): TE5329 plate and general Overall view of component and anchorage IYQ_ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 346 of 379 Status N U Seismic Walkdown Checklist (SWC)Equipment ID No. TS-5261 Equipment Description Equip. Class 18. Instrument (on) Racks CTRM EMERG VENT FAN I TEMP SWT Location:
Bldg.AUXB Floor El. 638 Room 603 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage Y N 1. Is the anchorage configuration verification required (i.e., is the item one X of the 50% of SWEL items requiring such verification)?
Very lightweight temperature switch mounted on a cantilevered rack (HSS 6x6) which is anchored to floor with four 1/2" diameter anchor bolts. The sensor is attached to two welded strut channels (to HSS) with four 1/4" diameter channel nuts. OK.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A--T x Y N U x I I L2C_ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 347 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. TS-5261 Equipment Description Equip. Class 18. Instrument (on) Racks CTRM EMERG VENT FAN 1 TEMP SWT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic capacity of block walls in the area verified Block walls 6017, 6107 and 6097 verified to be to be seismically adequate based on ref VBW31-B001-164, Rev 3 (2/14/06), VBW32-BO01-168, Rev 2 (5/10/88) and VBW32-B001-167, Rev 8 (11/7/84).
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U X I I I Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Anchor spacing to other nearby instrument racks was judged adequate.Y N U x Comments (Additional pages may be added as necessary)
Eddie M. Guerra Evaluated by: Date: 7/25/2012 b //'/ , s Date: 7/25/2012 Adam L. Helffrich L2Q <Paul C. Rizzo Associates, Inc.Sheet 348 of 379 ENGINEERS
& CONSULTANTS StatusQDN U Seismic Walkdown Checklist (SWC)Equipment ID No. TS-5261 Equipment Description CTRM Equip. Class 18. Instrument (on) Racks EMERG VENT FAN I TEMP SWT Other supporting or relevant documents and photos (if any): T5261 plate ID Plate of component T5261 general General view of component Sheet 349 of 379 U 0 1Z Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Status/v'N U Seismic Walkdown Checklist (SWC)Equipment ID No. TS-5261 Equip. Class 18. Instrument (on) Racks Equipment Description CTRM EMERG VENT FAN 1 TEMP SWT T5261 block wall Potential interaction hazard from masonry wall near unit 15261 anchorage View of anchorage ULcY Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANr1S Sheet 350 of 379 StatusQ N U Seismic Walkdown Checklist (SWC)Equipment IDNo. XCEI-I Equipment Description Equip. Class 4. Transformers TRANSFORMER CE I1-I Location:
Bldg.AUXB Floor El. 603 Room 429 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Attached to unit substation El. The transformer is welded to embed channels with stitch welds at one side and plug welds at the opposite side.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y N X I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A 5. Is the anchorage configuration consistent with plant documentation?
I X I I (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage configuration evaluated in SQUG calculations C-CSS-CEJ-l and C-CSS-DFI-2 andfound acceptable.
Based on page 6 of I I of C-CSS-DFI-2, confirmed that one side has two 3/8" thick, 3.5" long welds and opposite side has plug welds.I I Y N U x I I 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
L  Paul C. Rizzo Associates, Inc.Sheet 351 of 379 ENGINEERS
& CONSULTANTS Status Q N U Seismic Walkdown Checklist (SWC)Equipment ID No. XCEI-I Equipment Description Equip. Class 4. Transformers TRANSFORMER CE 1-1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
No potential interaction hazard indetified in the area.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I I I Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 I 001Z Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANrS Sheet 352 of 379 StatusQN U Seismic Walkdown Checklist Equipment IDNo. XCEI-i Equipment Description Equip. Class 4. Transformers TRANSFORMER CE I -I Equip. Class 4. Transformers TRANSFORMER CE 1-1 Other supporting or relevant doc XCE-I Plate ID Plate of component Aut- i uenerai General view of component
-Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTAWrS Sheet 353 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. XCEI-I Equipment Description TRANM Equip. Class 4. Transformers FORMER CE 1-1 XCE-1 Stitch Weld Partial view of anchorage, view is typical of all anchors Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 354 of 379 StatusON U Seismic Walkdown Checklist (SWC)Equipment ID No. XDFI-2 Equipment Description Equip. Class 4. Transformers TRANSFORMER DF 1-2 Location:
Bldg.AUXB Floor El. 603 Room 428 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Attached to unit substation Fl. The transformer is welded to embed channels with stitch welds at one side and plug welds at the opposite side.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y N EX I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
As-installed anchorage configuration evaluated andfound adequate in SQUG calculation C-CSS-DFI-2.
Based on page 6 of 11 of C-CSS-DFJ-2, confirmed that one side has two 3/8" thick, 3.5" long welds and opposite side has plug welds.Y N U x I I 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
L-- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 355 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. XDFI-2 Equipment Description Equip. Class 4. Transformers TRANSFORMER DF 1-2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
No potential interaction hazard indetified in the area.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x Comments (Additional pages may be added as necessary)
Evaluated by: Date: 7/25/2012 Eddie M. Guerra Eddie M. Guerra' -Date: 7/25/2012 Adam L. Helffrich U&Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 356 of 379 StatusQN U Seismic Walkdown Checki Equipment IDNo. XDFI-Equipment Description list (SWC)2 Equip. Class 4. Transformers TRANSFORMER DF 1-2 Other supporting or relevant documents and photos (if any): Aur I -z rietu ID Plate of component XL)F 1-2 (eneral General view of component i--% Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 357 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. XDFI-2 Equipment Description Equip. Class 4. Transformers TRANSFORMER DF 1-2 XDFI-2 Stitch Weld Front Unit is stitch welded along the entire front of the component XDF I-2 No Anchorage Rear No welding apparent on rear of component as used on the front of the unit LUM- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 358 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. Y105 Equipment Description Equip. Class 20. Instrument and Control Panels EDG 1-1 DISCONNECT SWITCH FOR C3615 inside PNL YI Location:
Bldg.AUXB Floor El. 603 Room 429 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Inside Panel YI. Panel mounted with four 3/4" anchors.No degraded condition found 2. Is the anchorage free of bent, broken, missing or loose hardware?None observed during walkdown.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
None observed during walkdown.4. Is the anchorage free of visible cracks in the concrete near the anchors?None observed during walkdown.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N II X Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I LI&Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 359 of 379 StatusON U Seismic Walkdown Checklist (SWC)Equipment ID No. Y105 Equipment Description Equip. Class 20. Instrument and Control Panels EDG 1-1 DISCONNECT SWITCH FOR C3615 inside PNL YI Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Top bracing provided by top entry conduit.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I I I Comments (Additional pages may be added as necessary)
A Evaluated by: Date: 7/25/2012 Eddie M. Guerra Eddie M. Guerra/Date: 7/25/2012 Adam L. Helffrich
[XY Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 360 of 379 StatusO N U Equipment ID No. Y2 Equip. Class 14. Distribution Panels Equipment Description PNL Y2 Location:
Bldg.AUXB Floor El. 603 Room 428 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Panel anchored with four 1" diameter anchor bolts and two stiffened brackets at one side of the panel which are anchored each with one 3/4" diameter anchor.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface K oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? L 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage configuration is shown seismically adequate in SQUG calculation C-CSS- Y2.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N x I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U L Y Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 361 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. Y2 Equipment Description Equip. Class 14. Distribution Panels PNL Y2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Top entry conduits are rigidly connected and provide lateral restraint.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A X Y N U X II Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U X --T Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 L Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 362 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. Y2 Equipment Description PNL Y Equip. Class 14. Distribution Panels 2 Other supporting or relevant documents and photos (if any): Y2 plate ID Plate of component Y2 general General view of component
[OQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 363 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. Y2 Equipment Description Equip. Class 14. Distribution Panels PNL Y2 Y2 anchorage Partial view of anchorage, view is typical of all anchors Y2 anchorage one side only Additional anchorage on outside of the unit, on one side only Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 364 of 379 StatuQ.Y-"l U Seismic Walkdown Checklist (SWC)Equipment ID No. YE2B Equipment Description Equip. Class 4. Transformers 240-I120V TRANSFORMER Location:
Bldg.AUXB Floor El. 585 Room 304 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Y N II x Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U 6. Based on the above anchorage evaluations, is the anchorage free of X potentially adverse seismic conditions?
Transformer is located inside MCC YE2. 3 Section MCC, typical MCC anchorage.(i.e. MCC connected to its inverted base channels with 3/8" diameter bolts and the base channel is stitch welded to the embedded channel in concrete floor)No adverse condition identified for stitch weld of cabinet.
LCQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTrS Sheet 365 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. YE2B Equipment Description Equip. Class 4. Transformers 240-120V TRANSFORMER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
No maintenance equipment identified in the area.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?Rigid conduits on end have rigid supports and will provide lateral restraint 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra A/Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 CQ--- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 366 of 379 StatusQN U Seismic Walkdown Checkl Equipment ID No. YE2B Equipment Description ist (SWC)Equip. Class 4. Transformers 240-120V TRANSFORMER Other supporting or relevant documents and photos (if any): YE2B Plate YE2B General ID Plate of component General view of component Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 367 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. YE2B Equipment Description Equip. Class 4. Transformers 240-1 20V TRANSFORMER YE21B stitch weld Partial view of anchorage, view is typical of all anchors LQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 368 of 379 Statuse N U Seismic Walkdown Checklist (SWC)Equipment ID No. YFI Equipment Description Equip. Class 14. Distribution Panels MCC YFI .Emergency Diesel Generator Room 2 Location:
Bldg.AUXB Floor El. 585 Room 319 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
in line with MCC F12B welded to embeded channel with an average of at least 5" of 3!16".fillet welds at front and back.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
SQUG calculations C-CSS-YFJ and C-CSS-FI2B verifies seismic adequacy of the as-built anchorage configuration.
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N Ex I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I
-Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 369 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. YFI Equipment Description Equip. Class 14. Distribution Panels MCC YF1 , Emer2ency Diesel Generator Room 2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
No maintenance equipment identified in the area.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x Comments (Additional pages may be added as necessary)
Evaluated by: Date: 7/25/2012 Eddie M. Guerra_____,_____________
__,__________________Date:
7/25/2012 Adam L. Helffrich CQ-- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 370 of 379 StatusQN U Seismic Walkdown Checkl Equipment IDNo. YFI Equipment Description list (SWC)Equip. Class 14. Distribution Panels MCC YFI , Emergency Diesel Generator Room 2 Other supporting or relevant documents and photos (if any): YFI Plate ID Plate of component Y r i %jenerai General view of component
--- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 371 of 379 Status:Q4 U Seismic Walkdown Checklist (SWC)Equipment ID No. YRF2 Equipment Description Equip. Class 16. Battery Chargers and Inverters Regulating Rectifier YRF2 Location:
Bldg.AUXB Floor El. 603 Room 428 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
The equipment is in a line with other cabinets D2P and YV2. The internal connection of these panels was verified Each of these panels are anchored to the concrete floor with four I " diameter anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
SQUG calculation C-CSS-YV2 references YRW2 with no anchorage concerns.YRF2 is referenced as lighter and exact same cabinet as YV2.The seismic qualification of the line-up that consists of YRF2, D2P and YV2 is in SQUG calculation C-CSS-D2P.
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y N EZZIZII Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I L2C- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 372 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. YRF2 Equipment Description Equip. Class 16. Battery Chargers and Inverters Regulating Rectifier YRF2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
[8. Are overhead equipment, distribution systems, ceiling tiles and lighting, [and masonry block walls not likely to collapse onto the equipment?
Nearby fire extinguisher not strapped to wall. Judged not to be a significant interaction.
: 9. Do attached lines have adequate flexibility to avoid damage? [Top entry conduits have adequate flexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free [of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x I Y N U I x I Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra~;//1/Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich Adam L. Helffrich LQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 373 of 379 Status:Q4'I U Seismic Walkdown Checklist (SWC)Equipment ID No. YRF2 Equipment Description Regulat Equip. Class 16. Battery Chargers and Inverters ing Rectifier YRF2 Other supporting or relevant documents and photos (if any): LL- 7.71 in 1 am YRF2 plate ID Plate of component YRF2 general General view of component L C Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 374 of 379 Status:6%4 U Seismic Walkdown Checklist (SWC)Equipment ID No. YRF2 Equipment Description Regulat Equip. Class 16. Battery Chargers and Inverters ting Rectifier YRF2 YRFI open connected to DIP Corresponding train I component opened to view internal bolting
[ C -Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANt'S Seismic Walkdown Checklist (SWC)Sheet 375 of 379 StatusQN U Equipment ID No. YV2 Equip. Class 16. Battery Chargers and Inverters Equipment Description Regulating Inverter YV2 Location:
Bldg.AUXB Floor El. 603 Room 428 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one [of the 50% of SWEL items requiring such verification)?
The equipment is in a line with other cabinets D2P and YRF2. The internal connection of these panels was verified Each of these panels are anchored to the concrete floor with four I " diameter anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?
[3. Is the anchorage free of corrosion that is more than mild surface [oxidation?
No significant corrosion identifeid
: 4. Is the anchorage free of visible cracks in the concrete near the anchors? [Y N x I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A 5. Is the anchorage configuration consistent with plant documentation?
[ X (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
The seismic qualification of the line-up that consists of YRF2, D2P and YV2 is in SQUG calculation C-CSS-D2P.
SQUG calculation C-CSS- YV2 indicates FCR 86-02 72 implemented to resolve a pounding concern.No gap observed between cabinets, confirming FCR 86-02 72.-I -I Y N U x I I 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Uc2- Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 376 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. YV2 Equipment Description Equip. Class 16. Battery Chargers and Inverters Regulating Inverter YV2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
No maintenance equipment identified in the area.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x I I I Comments (Additional pages may be added as necessary)
Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 LCZQ Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTAWNS Seismic Walkdown Checklist (SWC)Equipment ID No. YV2 Equip. Class Equipment Description Regulating Inverter YV Sheet 377 of 379 StatusQDN U 16. Battery Chargers and Inverters 2 Other supporting or relevant documents and photos (if any): YV2 plate ID Plate of component YV2 general General view of component YV2 4 anchor bolts Partial view of anchorage, view is typical of all anchors I -Paul C. Rizzo Associates, Inc.Sheet 378 of 379 ENGINEERS
& CONSULTANTIS Status@`v U Seismic Walkdown Checklist (SWC)Equipment ID No. YV4 Equipment Description Equip. Class 16. Battery Chargers and Inverters 125 VDC/1I20 VAC INVERTER CH 4 Location:
Bldg.AUXB Floor El. 603 Room 428B Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
This panel is part of a line-up that includes D2N and YRF4. Each panel is anchored to the concrete with four 3/4" diameter anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y N XIU I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
SQUG Calculation C-CSS-YV4 indicates four 3/4" anchors and that MOD-95-0034 resolves a pounding concern.Anchorage and implementation of MOD-95-0034 were confirmed during walkdown Y N U x 1 1 7 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
u?Q Paul C. Rizzo Associates, Inc.ENGINEERS
& CONSULTANTS Sheet 379 of 379 Status( N U Seismic Walkdown Checklist (SWC)Equipment ID No. YV4 Equipment Description Equip. Class 16. Battery Chargers and Inverters 125VDC/120VAC INVERTER CH 4 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic capacity of block walls in the area verified Block wall 4016 verified to be to be seismically adequate based on ref VBW20-BO01-100, Rev 14 (12/6/88).
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?
Y N U x Comments (Additional pages may be added as necessary)
Evaluated by: Date: 7/25/2012 Eddie M. Guerra Date: 7/25/2012 Adam L. Helffrich}}

Revision as of 16:09, 19 July 2018

Beaver Valley Power Station Unit 2, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (Swcs), Relief Valves SW 3963. Pages 319 - End
ML13008A046
Person / Time
Site: Beaver Valley
Issue date: 10/31/2012
From: Guerra E M, Helffrich A L
Paul C. Rizzo Associates, ABS Consulting, FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
SW3963, L-12-283
Download: ML13008A046 (61)


Text

L 42Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTIS Sheet 319 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SW3963 Equipment Description Equip. Class 7. Pneumatic-Operated Valves RELIEF VALVE SW 3963 Location:

Bldg.INTK Floor El. 566.25 Room 53 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Mounted on insludated pipe. No degraded condition identified

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Anchorage of supporting main line found with minor spalled grout.Judged not to reduce seismic capacity of support base.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N LIZIL Y N U N/A Y I U x Y N U N/A Y N U N/A Y N U N/A__ __r I x Y N U X II LCQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 320 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SW3963 Equipment Description Equip. Class 7. Pneumatic-Operated Valves RELIEF VALVE SW 3963 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Scaffold is the area is properly restrained Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Date: 7/25/2012 Eddie M. Guerra Date: 7/25/2012 Adam L. Helffrich

[ e---- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 321 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SW3963 Equipment Description RELIEI Equip. Class 7. Pneumatic-Operated Valves VALVE SW 3963 Other supporting or relevant documents and photos (if any): SW3963 Plate ID Plate of component SW3963 Ueneral General view of component LKQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 322 of 379 StatusQnN U Seismic Walkdown Checklist (SWC)Equipment ID No. SW-5896 Equipment Description Equip. Class 7. Pneumatic-Operated Valves CTRM EMERG COND I-1 Location:

Bldg.AUXB Floor El. 638 Room 603 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one E of the 50% of SWEL items requiring such verification)?

Small valve on -2.5" diameter pipe. Pipe span <-6.5' with rigid supports.

Value is -12" from one end of the span. Valve height -24". OK.2. Is the anchorage free of bent, broken, missing or loose hardware?

K 3. Is the anchorage free of corrosion that is more than mild surface K oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? K 5. Is the anchorage configuration consistent with plant documentation?

K (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of K potentially adverse seismic conditions?

Y N I xLL Y N U N/A 7 I x Y N U N/A 7- x Y N U N/A 7 I x Y N U N/A_ I x fr N zU Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANWS Sheet 323 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. SW-5896 Equipment Description Equip. Class 7. Pneumatic-Operated Valves CTRM EMERG COND 1-1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Y N U N/A X Y N U N/A x Y N U N/A X Y N U x I I 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U X II I Comments (Additional pages may be added as necessary)

Evaluated by: Date: 7/25/2012 Eddie M. Guerra Date: 7/25/2012 Adam L. Helffrich L 4Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 324 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SW-5896 Equipment Description CTRM Equip. Class 7. Pneumatic-Operated Valves EMERG COND 1-1 Other supporting or relevant documents and photos (if any): SW5896 general General view of component Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 325 of 379 StatusQ N U Seismic Walkdown Checklist (SWC)Equipment ID No. SW82 Equipment Description Equip. Class Od. Other -check/manual valve MANUAL VALVE SW 82 Location:

Bldg.INTK Floor El. 565 Room 251 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Small manual valve on -12" diameter insulated pipe. Pipe is rigidly supported at about three pipe diamters on either side of valve. OK.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N I X Y N U N/A--F x Y N U N/A-I x Y N U N/A x Y N U N/A x Y N U x I I L I Paul C. Rizzo Associates, Inc.Sheet 326 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SW82 Equipment Description Equip. Class Od. Other -check/manual valve MANUAL VALVE SW 82 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Date: 7/25/2012 Eddie M. Guerra Date: 7/25/2012 Adam L. Helffrich 1-0%-< Paul C. Rizzo Associates, Inc.Sheet 327 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SW82 Equipment Description MANU Equip. Class Od. Other -check/manual valve AL VALVE SW 82 Other supporting or relevant documents and photos (if any): SW82 Plate and General Overall view of component XY Paul C. Rizzo Associates, Inc.Sheet 328 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. TIO Equipment Description Equip. Class 21. Tanks and Heat Exchangers BORATED WATER STORAGE TANK 1-I Location:

Bldg.AUXB Floor El. 565 Room PT Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?No missing parts identified
3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Slight surface rust on one anchor bolt. OK.4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Tank anchorage verifiedfrom drawing C-34-147 and SQUG calculation C-CSS-TI O showing 48 -2.5 "diam. Bolts.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N x I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I LU-- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANr'S Sheet 329 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment 1DNo. TIO Equipment Description Equip. Class 21. Tanks and Heat Exchangers BORATED WATER STORAGE TANK I1-I Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Temporary maintenance equipment identified in the area but no significant potential interaction was expected 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A X Y N U x II Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x T -- --Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich L C Paul C. Rizzo Associates, Inc.Sheet 330 of 379 ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment IDNo. T1O Equipment Description BORAI StatusQN U Equip. Class 21. Tanks and Heat Exchangers ED WATER STORAGE TANK 1-1 Other supporting or relevant documents and photos (if any): BWST General ID Plate of component I BWST Anchorage Partial view of anchorage, view is typical of all anchors Q CY- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 331 of 379 Status:QN U Seismic Walkdown Checklist (SWC)Equipment IDNo. Tl2 Equipment Description Equip. Class 21. Tanks and Heat Exchangers COMPONENT COOLING SURGE TANLK, T12 Location:

Bldg.AUXB Floor El. 623 Room 501 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage Y i. Is the anchorage configuration verification required (i.e., is the item one X of the 50% of SWEL items requiring such verification)?

Horizontal tank on two saddles with cross bracing anchored to short concrete pedestals.

Y 2. Is the anchorage free of bent, broken, missing or loose hardware?

X A small gap 1/4 "found between a nut and washer at one anchor location.Judged not to be a significant adverse condition.

Y 3. Is the anchorage free of corrosion that is more than mild surface X oxidation?

Y 4. Is the anchorage free of visible cracks in the concrete near the anchors? X See item 6 below.Y 5. Is the anchorage configuration consistent with plant documentation?

IX (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage verification based on SQUG calculation C-CSS-TI2 showing 8 -1" diam bolts.Y 6. Based on the above anchorage evaluations, is the anchorage free of L X potentially adverse seismic conditions?

Hairline crack on one of the concrete pedestals.

Judged not a significant adverse condition N 1111I N U N/A N U N/A N U N/A N U N/A N Ujz~

UC4Z Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANrS Sheet 332 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. T12 Equipment Description Equip. Class 21. Tanks and Heat Exchangers COMPONENT COOLING SURGE TANLK, T12 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Adjacent pipe lines running close to tank judged not an adverse condition Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x T -I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 Sheet 333 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSIJLTAN"S StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. T12 Equipment Description COMP(Other supp Equip. Class 21. Tanks and Heat Exchangers)NENT COOLING SURGE TANLK, T12-r -fon ..,In~n~ anti -nbtn f n.A.1 12 plate ID Plate of component T 12 general General view of component L :Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 334 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. T12 Equipment Description COMPI Equip. Class 21. Tanks and Heat Exchangers ONENT COOLING SURGE TANLK. T12 i z ancnorage typicai Partial view of anchorage, view is typical of all anchors I I/- IVUsV OUlL IUDJIL FrgInL Anchor bolt coming loose on the front right of component XQO Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANT"S Sheet 335 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. T12 Equipment Description COMP(Equip. Class 21. Tanks and Heat Exchangers ONENT COOLING SURGE TANLK. T 12 T12 Pedestal with Minor Hairline Crack Y Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANUS Sheet 336 of 379 StatusON U Seismic Walkdown Checklist (SWC)Equipment IDNo. T153-1 Equip. Class 21. Tanks and Heat Exchangers Equipment Description EDG FUEL OIL STORAGE TANK 1-1, FOR EDG !-1, PARTIALLY BELOW GROUND Location:

Bldg.YARD Floor El. YARD Room YARD Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Tank partially buried, unable to view anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?None observed 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

None observed, anchorage not accessible.

4. Is the anchorage free of visible cracks in the concrete near the anchors?None observed, anchorage not accessible.
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N I X Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A 7 x Y N U x I I -

L ---- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 337 of 379 StatusQN U Seismic Walkidown Checklist (SWC)Equipment IDNo. T153-1 Equip. Class 21. Tanks and Heat Exchangers Equipment Description EDG FUEL OIL STORAGE TANK 1-1. FOR EDG 1-1. PARTIALLY BELOW GROUND Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I Comments (Additional pages may be added as necessary)

SQUG Calc (C-CSS-T153-1 concludes anchorage and attached lines are adequate.Evaluated by: Date: 7/25/2012 Eddie M. Guerra Date: 7/25/2012 Adam L. Helffrich LCQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 338 of 379 StatusQN U Seismic Walkdown Checklist Equipment IDNo. T153-1 Equipment Description (SWC)Equip. Class 21. Tanks and Heat Exchangers EDG FUEL OIL STORAGE TANK 1-1, FOR EDG 1-1, PARTIALLY BELOW GROUND Other supporting or relevant documents and photos (if any): T153-1 General General View of Component LC' <Paul C. Rizzo Associates, Inc.Sheet 339 of 379 ENGINEERS

& CONSULTANTS StatusON U Seismic Walkdown Checklist (SWC) 1 Equipment ID No. T46-1 Equipment Description Equip. Class 21. Tanks and Heat Exchangers EMERGENCY DIESEL GENERATOR DAY TANK I- I, FOR EDG I- I Location:

Bldg.AUXB Floor El. 585 Room 321A Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Each tank saddle anchored with 4-3/4" anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Anchorage found in good condition.

No signs of corrosion identified

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage verified from SQUG calc C-CSS-T46-1 and drawing C-0213A for two saddles and 4-3i4"diam bolts at each support.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N LIZIIJZI Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A X Y N U x II L OQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 340 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. T46-1 Equipment Description Equip. Class 21. Tanks and Heat Exchangers EMERGENCY DIESEL GENERATOR DAY TANK 1-1, FOR EDG 1-I Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic capacity of block walls in the area verified Block walls 305D and 306D verified to be to be seismically adequate based on refs.VBWI2-BO01-065, Rev 5 (4/21/88) and VBW12-BO01-066, Rev 6 (8/26/87)9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x T -7 I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 QcQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 341 of 379 StatusQN U Seismic Walkdown Checklist Equipment ID No. T46-1 Equipment Description (SWC)Equip. Class 21. Tanks and Heat Exchangers EMERGENCY DIESEL GENERATOR DAY TANK 1-1. FOR EDG I-I Other supporting or relevant documents and photos (if any): I'm- I puate ID Plate of component T46-1 general General view of component L K -Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 342 of 379 StatusQN U Seismic Walkdown Checklist Equipment ID No. T46-1 Equipment Description (SWC)Equip. Class 21. Tanks and Heat Exchangers EMERGENCY DIESEL GENERATOR DAY TANK 1-1, FOR EDG 1-1 1P a o- vi llallsl-lgo Partial view of anchorage, view is typical of all anchors o t n 'Ui I frmmSUnll ryy W wIj a r Potential interaction hazard from masonry wall near unit Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTrS Sheet 343 of 379 StatusQ N U Seismic Walkdown Checklist (SWC)Equipment ID No. TE-5329 Equipment Description Equip. Class 19. Temperature Sensors EDG RM 318 TEMP ELEMENT Location:

Bldg.AUXB Floor El. 585 Room 318 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Very small temperature element mounted on a strut channel with two 1/4" diameter channel nuts. The strut channel is then anchored to a block wall with two 3/8" diameter anchor bolts. OK.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N~Y N U N/A x Y N U N/A F -I Ix Y N U N/A I x Y N U N/A F I I Ix Y N U x I I LCQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 344 of 379 StatusQN U Equipment ID No. TE-5329 Equip. Class 19. Temperature Sensors Equipment Description EDG RM 318 TEMP ELEMENT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

[8. Are overhead equipment, distribution systems, ceiling tiles and lighting, [and masonry block walls not likely to collapse onto the equipment?

Component is anchored to Block Walls 308D/309D.

Seismic adequacy verified by calculations VBWI2-BO01-068, Rev 3 (5/27/81) and VBWI3-BO01-069, Rev 3 (5/28/81)9. Do attached lines have adequate flexibility to avoid damage? [10. Based on the above seismic interaction evaluations, is equipment free [of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x I I Y N U x I I Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Eddie M. Guerra Evaluated by: Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 I -Paul C. Rizzo Associates, Inc.Sheet 345 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. TE-5329 Equipment Description EDG R1 Equip. Class 19. Temperature Sensors M 318 TEMP ELEMENT Other supporting or relevant documents and photos (if any): TE5329 plate and general Overall view of component and anchorage IYQ_ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 346 of 379 Status N U Seismic Walkdown Checklist (SWC)Equipment ID No. TS-5261 Equipment Description Equip. Class 18. Instrument (on) Racks CTRM EMERG VENT FAN I TEMP SWT Location:

Bldg.AUXB Floor El. 638 Room 603 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage Y N 1. Is the anchorage configuration verification required (i.e., is the item one X of the 50% of SWEL items requiring such verification)?

Very lightweight temperature switch mounted on a cantilevered rack (HSS 6x6) which is anchored to floor with four 1/2" diameter anchor bolts. The sensor is attached to two welded strut channels (to HSS) with four 1/4" diameter channel nuts. OK.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A--T x Y N U x I I L2C_ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 347 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. TS-5261 Equipment Description Equip. Class 18. Instrument (on) Racks CTRM EMERG VENT FAN 1 TEMP SWT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic capacity of block walls in the area verified Block walls 6017, 6107 and 6097 verified to be to be seismically adequate based on ref VBW31-B001-164, Rev 3 (2/14/06), VBW32-BO01-168, Rev 2 (5/10/88) and VBW32-B001-167, Rev 8 (11/7/84).

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U X I I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Anchor spacing to other nearby instrument racks was judged adequate.Y N U x Comments (Additional pages may be added as necessary)

Eddie M. Guerra Evaluated by: Date: 7/25/2012 b //'/ , s Date: 7/25/2012 Adam L. Helffrich L2Q <Paul C. Rizzo Associates, Inc.Sheet 348 of 379 ENGINEERS

& CONSULTANTS StatusQDN U Seismic Walkdown Checklist (SWC)Equipment ID No. TS-5261 Equipment Description CTRM Equip. Class 18. Instrument (on) Racks EMERG VENT FAN I TEMP SWT Other supporting or relevant documents and photos (if any): T5261 plate ID Plate of component T5261 general General view of component Sheet 349 of 379 U 0 1Z Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Status/v'N U Seismic Walkdown Checklist (SWC)Equipment ID No. TS-5261 Equip. Class 18. Instrument (on) Racks Equipment Description CTRM EMERG VENT FAN 1 TEMP SWT T5261 block wall Potential interaction hazard from masonry wall near unit 15261 anchorage View of anchorage ULcY Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANr1S Sheet 350 of 379 StatusQ N U Seismic Walkdown Checklist (SWC)Equipment IDNo. XCEI-I Equipment Description Equip. Class 4. Transformers TRANSFORMER CE I1-I Location:

Bldg.AUXB Floor El. 603 Room 429 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Attached to unit substation El. The transformer is welded to embed channels with stitch welds at one side and plug welds at the opposite side.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?Y N X I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A 5. Is the anchorage configuration consistent with plant documentation?

I X I I (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configuration evaluated in SQUG calculations C-CSS-CEJ-l and C-CSS-DFI-2 andfound acceptable.

Based on page 6 of I I of C-CSS-DFI-2, confirmed that one side has two 3/8" thick, 3.5" long welds and opposite side has plug welds.I I Y N U x I I 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

L Paul C. Rizzo Associates, Inc.Sheet 351 of 379 ENGINEERS

& CONSULTANTS Status Q N U Seismic Walkdown Checklist (SWC)Equipment ID No. XCEI-I Equipment Description Equip. Class 4. Transformers TRANSFORMER CE 1-1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

No potential interaction hazard indetified in the area.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 I 001Z Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANrS Sheet 352 of 379 StatusQN U Seismic Walkdown Checklist Equipment IDNo. XCEI-i Equipment Description Equip. Class 4. Transformers TRANSFORMER CE I -I Equip. Class 4. Transformers TRANSFORMER CE 1-1 Other supporting or relevant doc XCE-I Plate ID Plate of component Aut- i uenerai General view of component

-Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAWrS Sheet 353 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. XCEI-I Equipment Description TRANM Equip. Class 4. Transformers FORMER CE 1-1 XCE-1 Stitch Weld Partial view of anchorage, view is typical of all anchors Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 354 of 379 StatusON U Seismic Walkdown Checklist (SWC)Equipment ID No. XDFI-2 Equipment Description Equip. Class 4. Transformers TRANSFORMER DF 1-2 Location:

Bldg.AUXB Floor El. 603 Room 428 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Attached to unit substation Fl. The transformer is welded to embed channels with stitch welds at one side and plug welds at the opposite side.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?Y N EX I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

As-installed anchorage configuration evaluated andfound adequate in SQUG calculation C-CSS-DFI-2.

Based on page 6 of 11 of C-CSS-DFJ-2, confirmed that one side has two 3/8" thick, 3.5" long welds and opposite side has plug welds.Y N U x I I 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

L-- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 355 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. XDFI-2 Equipment Description Equip. Class 4. Transformers TRANSFORMER DF 1-2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

No potential interaction hazard indetified in the area.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x Comments (Additional pages may be added as necessary)

Evaluated by: Date: 7/25/2012 Eddie M. Guerra Eddie M. Guerra' -Date: 7/25/2012 Adam L. Helffrich U&Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 356 of 379 StatusQN U Seismic Walkdown Checki Equipment IDNo. XDFI-Equipment Description list (SWC)2 Equip. Class 4. Transformers TRANSFORMER DF 1-2 Other supporting or relevant documents and photos (if any): Aur I -z rietu ID Plate of component XL)F 1-2 (eneral General view of component i--% Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 357 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. XDFI-2 Equipment Description Equip. Class 4. Transformers TRANSFORMER DF 1-2 XDFI-2 Stitch Weld Front Unit is stitch welded along the entire front of the component XDF I-2 No Anchorage Rear No welding apparent on rear of component as used on the front of the unit LUM- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 358 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. Y105 Equipment Description Equip. Class 20. Instrument and Control Panels EDG 1-1 DISCONNECT SWITCH FOR C3615 inside PNL YI Location:

Bldg.AUXB Floor El. 603 Room 429 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Inside Panel YI. Panel mounted with four 3/4" anchors.No degraded condition found 2. Is the anchorage free of bent, broken, missing or loose hardware?None observed during walkdown.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

None observed during walkdown.4. Is the anchorage free of visible cracks in the concrete near the anchors?None observed during walkdown.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N II X Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I LI&Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 359 of 379 StatusON U Seismic Walkdown Checklist (SWC)Equipment ID No. Y105 Equipment Description Equip. Class 20. Instrument and Control Panels EDG 1-1 DISCONNECT SWITCH FOR C3615 inside PNL YI Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Top bracing provided by top entry conduit.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

A Evaluated by: Date: 7/25/2012 Eddie M. Guerra Eddie M. Guerra/Date: 7/25/2012 Adam L. Helffrich

[XY Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 360 of 379 StatusO N U Equipment ID No. Y2 Equip. Class 14. Distribution Panels Equipment Description PNL Y2 Location:

Bldg.AUXB Floor El. 603 Room 428 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Panel anchored with four 1" diameter anchor bolts and two stiffened brackets at one side of the panel which are anchored each with one 3/4" diameter anchor.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface K oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? L 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configuration is shown seismically adequate in SQUG calculation C-CSS- Y2.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N x I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U L Y Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 361 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. Y2 Equipment Description Equip. Class 14. Distribution Panels PNL Y2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Top entry conduits are rigidly connected and provide lateral restraint.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A X Y N U X II Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U X --T Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 362 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. Y2 Equipment Description PNL Y Equip. Class 14. Distribution Panels 2 Other supporting or relevant documents and photos (if any): Y2 plate ID Plate of component Y2 general General view of component

[OQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 363 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. Y2 Equipment Description Equip. Class 14. Distribution Panels PNL Y2 Y2 anchorage Partial view of anchorage, view is typical of all anchors Y2 anchorage one side only Additional anchorage on outside of the unit, on one side only Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 364 of 379 StatuQ.Y-"l U Seismic Walkdown Checklist (SWC)Equipment ID No. YE2B Equipment Description Equip. Class 4. Transformers 240-I120V TRANSFORMER Location:

Bldg.AUXB Floor El. 585 Room 304 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Y N II x Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U 6. Based on the above anchorage evaluations, is the anchorage free of X potentially adverse seismic conditions?

Transformer is located inside MCC YE2. 3 Section MCC, typical MCC anchorage.(i.e. MCC connected to its inverted base channels with 3/8" diameter bolts and the base channel is stitch welded to the embedded channel in concrete floor)No adverse condition identified for stitch weld of cabinet.

LCQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTrS Sheet 365 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. YE2B Equipment Description Equip. Class 4. Transformers 240-120V TRANSFORMER Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

No maintenance equipment identified in the area.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Rigid conduits on end have rigid supports and will provide lateral restraint 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra A/Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 CQ--- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 366 of 379 StatusQN U Seismic Walkdown Checkl Equipment ID No. YE2B Equipment Description ist (SWC)Equip. Class 4. Transformers 240-120V TRANSFORMER Other supporting or relevant documents and photos (if any): YE2B Plate YE2B General ID Plate of component General view of component Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 367 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. YE2B Equipment Description Equip. Class 4. Transformers 240-1 20V TRANSFORMER YE21B stitch weld Partial view of anchorage, view is typical of all anchors LQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 368 of 379 Statuse N U Seismic Walkdown Checklist (SWC)Equipment ID No. YFI Equipment Description Equip. Class 14. Distribution Panels MCC YFI .Emergency Diesel Generator Room 2 Location:

Bldg.AUXB Floor El. 585 Room 319 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

in line with MCC F12B welded to embeded channel with an average of at least 5" of 3!16".fillet welds at front and back.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SQUG calculations C-CSS-YFJ and C-CSS-FI2B verifies seismic adequacy of the as-built anchorage configuration.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N Ex I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I

-Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 369 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. YFI Equipment Description Equip. Class 14. Distribution Panels MCC YF1 , Emer2ency Diesel Generator Room 2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

No maintenance equipment identified in the area.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x Comments (Additional pages may be added as necessary)

Evaluated by: Date: 7/25/2012 Eddie M. Guerra_____,_____________

__,__________________Date:

7/25/2012 Adam L. Helffrich CQ-- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 370 of 379 StatusQN U Seismic Walkdown Checkl Equipment IDNo. YFI Equipment Description list (SWC)Equip. Class 14. Distribution Panels MCC YFI , Emergency Diesel Generator Room 2 Other supporting or relevant documents and photos (if any): YFI Plate ID Plate of component Y r i %jenerai General view of component

--- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 371 of 379 Status:Q4 U Seismic Walkdown Checklist (SWC)Equipment ID No. YRF2 Equipment Description Equip. Class 16. Battery Chargers and Inverters Regulating Rectifier YRF2 Location:

Bldg.AUXB Floor El. 603 Room 428 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

The equipment is in a line with other cabinets D2P and YV2. The internal connection of these panels was verified Each of these panels are anchored to the concrete floor with four I " diameter anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SQUG calculation C-CSS-YV2 references YRW2 with no anchorage concerns.YRF2 is referenced as lighter and exact same cabinet as YV2.The seismic qualification of the line-up that consists of YRF2, D2P and YV2 is in SQUG calculation C-CSS-D2P.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N EZZIZII Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I I L2C- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 372 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. YRF2 Equipment Description Equip. Class 16. Battery Chargers and Inverters Regulating Rectifier YRF2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

[8. Are overhead equipment, distribution systems, ceiling tiles and lighting, [and masonry block walls not likely to collapse onto the equipment?

Nearby fire extinguisher not strapped to wall. Judged not to be a significant interaction.

9. Do attached lines have adequate flexibility to avoid damage? [Top entry conduits have adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free [of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x I Y N U I x I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra~;//1/Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich Adam L. Helffrich LQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 373 of 379 Status:Q4'I U Seismic Walkdown Checklist (SWC)Equipment ID No. YRF2 Equipment Description Regulat Equip. Class 16. Battery Chargers and Inverters ing Rectifier YRF2 Other supporting or relevant documents and photos (if any): LL- 7.71 in 1 am YRF2 plate ID Plate of component YRF2 general General view of component L C Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 374 of 379 Status:6%4 U Seismic Walkdown Checklist (SWC)Equipment ID No. YRF2 Equipment Description Regulat Equip. Class 16. Battery Chargers and Inverters ting Rectifier YRF2 YRFI open connected to DIP Corresponding train I component opened to view internal bolting

[ C -Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANt'S Seismic Walkdown Checklist (SWC)Sheet 375 of 379 StatusQN U Equipment ID No. YV2 Equip. Class 16. Battery Chargers and Inverters Equipment Description Regulating Inverter YV2 Location:

Bldg.AUXB Floor El. 603 Room 428 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one [of the 50% of SWEL items requiring such verification)?

The equipment is in a line with other cabinets D2P and YRF2. The internal connection of these panels was verified Each of these panels are anchored to the concrete floor with four I " diameter anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?

[3. Is the anchorage free of corrosion that is more than mild surface [oxidation?

No significant corrosion identifeid

4. Is the anchorage free of visible cracks in the concrete near the anchors? [Y N x I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A 5. Is the anchorage configuration consistent with plant documentation?

[ X (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

The seismic qualification of the line-up that consists of YRF2, D2P and YV2 is in SQUG calculation C-CSS-D2P.

SQUG calculation C-CSS- YV2 indicates FCR 86-02 72 implemented to resolve a pounding concern.No gap observed between cabinets, confirming FCR 86-02 72.-I -I Y N U x I I 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Uc2- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 376 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. YV2 Equipment Description Equip. Class 16. Battery Chargers and Inverters Regulating Inverter YV2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

No maintenance equipment identified in the area.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 LCZQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAWNS Seismic Walkdown Checklist (SWC)Equipment ID No. YV2 Equip. Class Equipment Description Regulating Inverter YV Sheet 377 of 379 StatusQDN U 16. Battery Chargers and Inverters 2 Other supporting or relevant documents and photos (if any): YV2 plate ID Plate of component YV2 general General view of component YV2 4 anchor bolts Partial view of anchorage, view is typical of all anchors I -Paul C. Rizzo Associates, Inc.Sheet 378 of 379 ENGINEERS

& CONSULTANTIS Status@`v U Seismic Walkdown Checklist (SWC)Equipment ID No. YV4 Equipment Description Equip. Class 16. Battery Chargers and Inverters 125 VDC/1I20 VAC INVERTER CH 4 Location:

Bldg.AUXB Floor El. 603 Room 428B Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

This panel is part of a line-up that includes D2N and YRF4. Each panel is anchored to the concrete with four 3/4" diameter anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?Y N XIU I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SQUG Calculation C-CSS-YV4 indicates four 3/4" anchors and that MOD-95-0034 resolves a pounding concern.Anchorage and implementation of MOD-95-0034 were confirmed during walkdown Y N U x 1 1 7 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

u?Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 379 of 379 Status( N U Seismic Walkdown Checklist (SWC)Equipment ID No. YV4 Equipment Description Equip. Class 16. Battery Chargers and Inverters 125VDC/120VAC INVERTER CH 4 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic capacity of block walls in the area verified Block wall 4016 verified to be to be seismically adequate based on ref VBW20-BO01-100, Rev 14 (12/6/88).

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x Comments (Additional pages may be added as necessary)

Evaluated by: Date: 7/25/2012 Eddie M. Guerra Date: 7/25/2012 Adam L. Helffrich