ML14139A001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 13: Line 13:
| document type = E-Mail
| document type = E-Mail
| page count = 2
| page count = 2
| project = TAC:MF3649
| stage = Acceptance Review
}}
}}
=Text=
{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Lyon, FredSent:Friday, May 16, 2014 9:54 AMTo:Williams, Lisa L. (llwilliams@energy-northwest.com)Cc:Trautvetter, Jody R. (JR) (jrtrautvetter@energy-northwest.com)
==Subject:==
Acceptance Review (TAC No. MF3649)By letter dated March 18, 2014, Energy Northwest submitted a license amendment request for Columbia Generating Station to revise TSs to adopt TSTF-535, Rev. 0.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
Hearing Identifier:  NRR_PMDA  Email Number:  1284  Mail Envelope Properties  (Fred.Lyon@nrc.gov20140516095300) 
==Subject:==
Acceptance Review (TAC No. MF3649)  Sent Date:  5/16/2014 9:53:37 AM  Received Date:  5/16/2014 9:53:00 AM  From:    Lyon, Fred  Created By:  Fred.Lyon@nrc.gov  Recipients:    "Trautvetter, Jody R. (JR) (jrtrautvetter@energy-northwest.com)" <jrtrautvetter@energy-northwest.com>  Tracking Status: None  "Williams, Lisa L. (llwilliams@energy-northwest.com)" <llwilliams@energy-northwest.com>  Tracking Status: None  Post Office:      Files    Size      Date & Time  MESSAGE    1779      5/16/2014 9:53:00 AM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}

Revision as of 12:45, 28 June 2018

2014/05/16 NRR E-mail Capture - Acceptance Review (TAC No. MF3649)
ML14139A001
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/16/2014
From: Lyon F
Division of Operating Reactor Licensing
To: Williams L L
Energy Northwest
References
MF3649
Download: ML14139A001 (2)


Text

1NRR-PMDAPEm ResourceFrom:Lyon, FredSent:Friday, May 16, 2014 9:54 AMTo:Williams, Lisa L. (llwilliams@energy-northwest.com)Cc:Trautvetter, Jody R. (JR) (jrtrautvetter@energy-northwest.com)

Subject:

Acceptance Review (TAC No. MF3649)By letter dated March 18, 2014, Energy Northwest submitted a license amendment request for Columbia Generating Station to revise TSs to adopt TSTF-535, Rev. 0.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

Hearing Identifier: NRR_PMDA Email Number: 1284 Mail Envelope Properties (Fred.Lyon@nrc.gov20140516095300)

Subject:

Acceptance Review (TAC No. MF3649) Sent Date: 5/16/2014 9:53:37 AM Received Date: 5/16/2014 9:53:00 AM From: Lyon, Fred Created By: Fred.Lyon@nrc.gov Recipients: "Trautvetter, Jody R. (JR) (jrtrautvetter@energy-northwest.com)" <jrtrautvetter@energy-northwest.com> Tracking Status: None "Williams, Lisa L. (llwilliams@energy-northwest.com)" <llwilliams@energy-northwest.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 1779 5/16/2014 9:53:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: