ML20095C107: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:^ | ||
* m, gg No Atla c Energy Service Corporation fjl Atlantic Seabrook, NII O3874 (603)474-9521, Fax (603)474-2987 | |||
'Ihe Northeast Utilities System NYN- 95101 Ted C. Feigenbaum Senior Vice President & | |||
December 8,1995 Chief Nuclear Officer United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk | |||
==References:== | |||
Facility Operating License NPF-86, Docket No. 50-443 | |||
==Subject:== | |||
Monthly Operating Report Gentleman: ; | |||
Enclosed please find Monthly Operating Report 95-11. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of November,1995 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5. | |||
Very ly yours, | |||
&& 67s Ted C. Feigenbaum TCF/ALL:sm Enclosure cc: Mr. Thomas T. Martin Regional Administrator United States Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Mr. Albert W. De Agazio, Sr. Project Manager Project Directorate I-4 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. John B. Macdonald NRC Senior Recident Inspector PO Box 1149 Seabrook, NH 03874 1 9 (\ ().4 ") | |||
9512110370-951130 [)y 8 PDR ADOCK 05000443 A | |||
. _.R _.~.. _. __.fDR_ _ _ . i | |||
l OPERATING DATA REPORT ! | |||
DOCKET NO. 50443 , | |||
j UNIT Seabrook1 DATE 12/01/95 COMPLETED BY P.E. Nardone i | |||
TELEPIIONE- 603/474-9521 Ext. 4074 DPERATING RI'A'IUS i 4 | |||
: 1. Unit Name: Seabrook Station Unit 1. | |||
: 2. Reporting Period: NOVEMBER 1995 t 3. Licensed 7hermal Power (MWt): 3411 | |||
: 4. Nameplane Rating (Gross MWe): 1197 | |||
+' 5. Design Electrical Ratitig (Not MWe): 1148 | |||
: 6. Maalmum Dependabic Capacity (Gross MWe): 1200 l 7. Masinum Dependable Capacity (Net MWe): 1150 | |||
: 8. If Changes Occur in Capacity Ratings (1: ems Number 3 throigh 7) Since Last Not Applicable Report, Give Reasons | |||
: 9. Power level To Which Restricted, if Any (Net MWe): None | |||
: 10. Reasons For Restrictions, If Any: Not Applicable This Month Yr-to-Date Cumulative - | |||
: 11. Hours in Reporting Period 720.0 8016.0 79969.0 1 i | |||
l | |||
: 12. Number of Hours Reactor Was Critical 76.1 7121.7 40388.7 | |||
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 953.3 | |||
: 14. Hours Generator On-Line 72.0 6974.9 38119.1 | |||
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | |||
: 16. Gmss Thermal Energy Generated (MWH) 192874 23757420 125594228 17, Gross Elec. Energy Generated (MWH) 64128 8197446 43621780 | |||
: 18. Net Electrical Energy Generated (MWH) 60939 7879191 41906308 l | |||
* 19. Unit Service Factor 10.0 87.0 79.4 | |||
*20. ' Unit Availability Factor 10.0 87.0 79.4 | |||
*21. Unit Capacity Factor (Using MDC Net) 7.4 85.5 76.7 | |||
- *22. Unit Capacity Factor (Using DER Net) 7.4 85.6 76.9 | |||
*23. Unit Forced Outage Rose 0.0 5.3 6.5 | |||
: 24. Shutdowns Echi~t Over Next 6 Months (Type, Date, Refueling. Started 11/04/95, 36 Days and Duration of Each): | |||
: 25. If Shut Down At End Of Report Period, Estimated Date of 12/09/95 I' Startup: | |||
; I | |||
* NOTE: | |||
* Cumulative" values based on total hours starting 8/19/90, date Regular Full Power Operation began. > | |||
? | |||
I of 4 | |||
e 1 I | |||
] | |||
< l AVERAGE DAILY UNIT POWER LEVEL 1 DOCKET NO. 50443 | |||
] | |||
UNIT Seabrooki DATE 12/01/95 l COMPLETED BY P.E. Nardone TELEPHONE 603/474-9521 1 Ext. 4074 l MONTH: NOVEMBER,1995 DAY AVERAOE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l (MWe-Net) (MWe-Net) | |||
I 1112 17 0 i 2 1067 18 0 3 360 19 0 l 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 0 l 11 0 27 12 0 28 0 13 0 29 0 | |||
. 14 0 30 0 15 0 | |||
$ 16 0 INS 11tUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole rnegawatt. | |||
i 2 of 4 . | |||
i | |||
o , | |||
UNrf SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50443 , | |||
UNIT Seabrook l DATE 12/01/95 COMPLETED BY P.E. Nardone THf1110NE 603/474-9521 Ext. 4074 REPORT MONTH NOVEMBER 1995 NO. DATE TITE' DURATION REASON | |||
* METilOD OF SHUITING LICENSEE EVENT CAUSE & CORRECTIVE ACTION TD PREVENT (IIOURS) DOWN REACIOR' REPORT # RECURRENCE Page1et1 9543 11/04/95 5 648.0 C 1 N/A 3' '"8 8'" | |||
I 2 3 F: Forced Reasort Method: | |||
S: Sclieduled A - Equipment Failure (Explain) 1 - Mamal B - Mairnenance or Test 2 - Manual Scram C - Refuelmg 3 - Autmnanc Scram D - Regulatory Restnction 4 - Contumed from previous morah E - Operator Training & License Mi- -iu 5 - Power Reduccon (Duration = 0) | |||
F - Aama,u.u-e 9 - Other (Explam) | |||
G - Operational Error (Explain) | |||
II - Other (Explain) 3 of 4 | |||
y T | |||
,_ .. s I REFUEUNG INFORMN ON REQUEST DOCKET NO. ~ 50443 UNrr Seabrook 1 DATE .12/01/95 COMPLE!ED BY . P.E. Nasdons ' | |||
t TELEPHONE. 603/474 4521 J Est.4074 | |||
: 1. Name of Facility: Seabrook Unit 1 - | |||
: 2. Scheduled date for next refueling shutdown: Refueling Outage 4,11/04/95 | |||
: 3. NM date for restart following refueling: . Refueling Outage 4,12/09/95 | |||
: 4. - Will refueling or resumption of operation thereafter require a technical specikation change or other license amendment? | |||
All license amendments required for the current refueling or resumption of operation thereaAer have been issued. | |||
: 5. Schedule date(s) for submitting licensing action and supporting information: | |||
N/A | |||
: 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures: | |||
N/A | |||
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: | |||
IM (b) ?AR (a)In Core: | |||
S. . 'Ihe present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: | |||
Present licensed capacity: 1236 No increase in storage capacity requested or planned. | |||
: 9. . The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: | |||
Licensed capxity of 1236 fuel assemblies based on two annual and twelve eighteen-month refuelings with full core offload capability. | |||
The current licensed capacity is adequate until at least the year 2010. | |||
4 of 4}} |
Latest revision as of 13:20, 12 May 2020
ML20095C107 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 11/30/1995 |
From: | Feigenbaum T, Nardone P NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
NYN-95101, NUDOCS 9512110370 | |
Download: ML20095C107 (5) | |
Text
^
- m, gg No Atla c Energy Service Corporation fjl Atlantic Seabrook, NII O3874 (603)474-9521, Fax (603)474-2987
'Ihe Northeast Utilities System NYN- 95101 Ted C. Feigenbaum Senior Vice President &
December 8,1995 Chief Nuclear Officer United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk
References:
Facility Operating License NPF-86, Docket No. 50-443
Subject:
Monthly Operating Report Gentleman: ;
Enclosed please find Monthly Operating Report 95-11. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of November,1995 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Very ly yours,
&& 67s Ted C. Feigenbaum TCF/ALL:sm Enclosure cc: Mr. Thomas T. Martin Regional Administrator United States Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Mr. Albert W. De Agazio, Sr. Project Manager Project Directorate I-4 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. John B. Macdonald NRC Senior Recident Inspector PO Box 1149 Seabrook, NH 03874 1 9 (\ ().4 ")
9512110370-951130 [)y 8 PDR ADOCK 05000443 A
. _.R _.~.. _. __.fDR_ _ _ . i
l OPERATING DATA REPORT !
DOCKET NO. 50443 ,
j UNIT Seabrook1 DATE 12/01/95 COMPLETED BY P.E. Nardone i
TELEPIIONE- 603/474-9521 Ext. 4074 DPERATING RI'A'IUS i 4
- 1. Unit Name: Seabrook Station Unit 1.
- 2. Reporting Period: NOVEMBER 1995 t 3. Licensed 7hermal Power (MWt): 3411
- 4. Nameplane Rating (Gross MWe): 1197
+' 5. Design Electrical Ratitig (Not MWe): 1148
- 6. Maalmum Dependabic Capacity (Gross MWe): 1200 l 7. Masinum Dependable Capacity (Net MWe): 1150
- 8. If Changes Occur in Capacity Ratings (1: ems Number 3 throigh 7) Since Last Not Applicable Report, Give Reasons
- 9. Power level To Which Restricted, if Any (Net MWe): None
- 10. Reasons For Restrictions, If Any: Not Applicable This Month Yr-to-Date Cumulative -
- 11. Hours in Reporting Period 720.0 8016.0 79969.0 1 i
l
- 12. Number of Hours Reactor Was Critical 76.1 7121.7 40388.7
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 953.3
- 14. Hours Generator On-Line 72.0 6974.9 38119.1
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gmss Thermal Energy Generated (MWH) 192874 23757420 125594228 17, Gross Elec. Energy Generated (MWH) 64128 8197446 43621780
- 18. Net Electrical Energy Generated (MWH) 60939 7879191 41906308 l
- 19. Unit Service Factor 10.0 87.0 79.4
- 20. ' Unit Availability Factor 10.0 87.0 79.4
- 21. Unit Capacity Factor (Using MDC Net) 7.4 85.5 76.7
- *22. Unit Capacity Factor (Using DER Net) 7.4 85.6 76.9
- 23. Unit Forced Outage Rose 0.0 5.3 6.5
- 24. Shutdowns Echi~t Over Next 6 Months (Type, Date, Refueling. Started 11/04/95, 36 Days and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of 12/09/95 I' Startup:
- I
- NOTE:
- Cumulative" values based on total hours starting 8/19/90, date Regular Full Power Operation began. >
?
I of 4
e 1 I
]
< l AVERAGE DAILY UNIT POWER LEVEL 1 DOCKET NO. 50443
]
UNIT Seabrooki DATE 12/01/95 l COMPLETED BY P.E. Nardone TELEPHONE 603/474-9521 1 Ext. 4074 l MONTH: NOVEMBER,1995 DAY AVERAOE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l (MWe-Net) (MWe-Net)
I 1112 17 0 i 2 1067 18 0 3 360 19 0 l 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 0 l 11 0 27 12 0 28 0 13 0 29 0
. 14 0 30 0 15 0
$ 16 0 INS 11tUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole rnegawatt.
i 2 of 4 .
i
o ,
UNrf SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50443 ,
UNIT Seabrook l DATE 12/01/95 COMPLETED BY P.E. Nardone THf1110NE 603/474-9521 Ext. 4074 REPORT MONTH NOVEMBER 1995 NO. DATE TITE' DURATION REASON
- METilOD OF SHUITING LICENSEE EVENT CAUSE & CORRECTIVE ACTION TD PREVENT (IIOURS) DOWN REACIOR' REPORT # RECURRENCE Page1et1 9543 11/04/95 5 648.0 C 1 N/A 3' '"8 8'"
I 2 3 F: Forced Reasort Method:
S: Sclieduled A - Equipment Failure (Explain) 1 - Mamal B - Mairnenance or Test 2 - Manual Scram C - Refuelmg 3 - Autmnanc Scram D - Regulatory Restnction 4 - Contumed from previous morah E - Operator Training & License Mi- -iu 5 - Power Reduccon (Duration = 0)
F - Aama,u.u-e 9 - Other (Explam)
G - Operational Error (Explain)
II - Other (Explain) 3 of 4
y T
,_ .. s I REFUEUNG INFORMN ON REQUEST DOCKET NO. ~ 50443 UNrr Seabrook 1 DATE .12/01/95 COMPLE!ED BY . P.E. Nasdons '
t TELEPHONE. 603/474 4521 J Est.4074
- 1. Name of Facility: Seabrook Unit 1 -
- 2. Scheduled date for next refueling shutdown: Refueling Outage 4,11/04/95
- 3. NM date for restart following refueling: . Refueling Outage 4,12/09/95
- 4. - Will refueling or resumption of operation thereafter require a technical specikation change or other license amendment?
All license amendments required for the current refueling or resumption of operation thereaAer have been issued.
- 5. Schedule date(s) for submitting licensing action and supporting information:
N/A
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
IM (b) ?AR (a)In Core:
S. . 'Ihe present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity: 1236 No increase in storage capacity requested or planned.
- 9. . The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capxity of 1236 fuel assemblies based on two annual and twelve eighteen-month refuelings with full core offload capability.
The current licensed capacity is adequate until at least the year 2010.
4 of 4