Line 2: |
Line 2: |
| | number = ML023120091 | | | number = ML023120091 |
| | issue date = 11/27/2002 | | | issue date = 11/27/2002 |
| | title = Withholding from Public Disclosure, WCAP-14787, (TAC MB4956 and TAC MB4957) | | | title = Withholding from Public Disclosure, WCAP-14787, |
| | author name = Spaulding D | | | author name = Spaulding D |
| | author affiliation = NRC/NRR/DLPM/LPD3 | | | author affiliation = NRC/NRR/DLPM/LPD3 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:}} | | {{#Wiki_filter:November 27, 2002 Mr. H. A. Sepp, Manager Regulatory and Licensing Engineering Westinghouse Electric Company Nuclear Services P. O. Box 355 Pittsburgh, PA 15230-0355 |
| | |
| | ==SUBJECT:== |
| | POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NOS. MB4956 AND MB4957) |
| | |
| | ==Dear Mr. Sepp:== |
| | |
| | By application dated April 9, 2002, and affidavit dated April 10, 2002, you requested that the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.790: |
| | "WCAP-14787, Revision 1, Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wisconsin Electric Power Company Point Beach Units 1 and 2 (Fuel Upgrade & Uprate to 1656 MWt-NSSS Power with Feedwater Venturis, or 1679 MWt-NSSS Power with LEFM on Feedwater Header), (Proprietary)" |
| | A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commissions (NRCs) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room. |
| | The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: |
| | (a) The information reveals the distinguishing aspects of a process (or component, structures, tool, method, etc.) where prevention of its use by any of Westinghouses competitors without licence from Westinghouse constitutes a competitive advantage over other companies. |
| | (b) It consists of supporting data, including test data, relative toa process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability. |
| | (c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product. |
| | |
| | H. Sepp We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
| | Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| | If you have any questions regarding this matter, I may be reached at 301-415-2928. |
| | Sincerely, |
| | /RA/ |
| | Deirdre W. Spaulding, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301 cc: See next page |
| | |
| | ML023120091 Point Beach Nuclear Plant, Units 1 and 2 cc: |
| | Mr. John H. ONeill, Jr. Ms. Sarah Jenkins Shaw, Pittman, Potts & Trowbridge Electric Division 2300 N Street, NW Public Service Commission of Wisconsin Washington, DC 20037-1128 P.O. Box 7854 Madison, WI 53707-7854 Mr. Richard R. Grigg President and Chief Operating Officer Mr. Roy A. Anderson Wisconsin Electric Power Company Executive Vice President and 231 West Michigan Street Chief Nuclear Officer Milwaukee, WI 53201 Nuclear Management Company, LLC 700 First Street Site Licensing Manager Hudson, WI 54016 Point Beach Nuclear Plant Nuclear Management Company, LLC Nuclear Asset Manager 6610 Nuclear Road Wisconsin Electric Power Company Two Rivers, WI 54241 231 West Michigan Street Milwaukee, WI 53201 Mr. Ken Duveneck Town Chairman Mr. Fred J. Cayia Town of Two Creeks Site Vice President 13017 State Highway 42 Point Beach Nuclear Plant Mishicot, WI 54228 Nuclear Management Company, LLC 6610 Nuclear Road Chairman Two Rivers, WI 54241 Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 October 2002}} |
Letter Sequence Other |
---|
|
|
MONTHYEARML0224801202002-09-0505 September 2002 Notice of Consideration, Increase Licensed Reactor Core Power Level Project stage: Other ML0232601412002-11-27027 November 2002 Withholding from Public Disclosure, WCAP-14787, Revision 2, MB4956 and MB4957 Project stage: Other ML0232601332002-11-27027 November 2002 Withholding from Public Disclosure, 1.4% Mur Power Uprate Support NRC RAI Responses Set 1 Question 4 Project stage: RAI ML0232601252002-11-27027 November 2002 Withholding from Public Disclosure, MPR-1619, Rev. 0 - Feedwater Flow Measurement with LEFM Chordal Systems, MB4956 and MB4957 Project stage: Other ML0231200912002-11-27027 November 2002 Withholding from Public Disclosure, WCAP-14787, Project stage: Other ML0233701332002-11-29029 November 2002 Safety Evaluation for Amendment Nos. 207 and 212, Increase the Licensed Reactor Core Power Level Project stage: Approval ML0233704602002-11-29029 November 2002 Technical Specifications for Amendment Nos. 207 and 212, Increase the Licensed Reactor Core Power Level Project stage: Other ML0233700932002-11-29029 November 2002 License Amendment Nos. 207 and 212, Increase the Licensed Reactor Core Power Level Project stage: Other NRC 2002-0109, Letter from A. J. Cayia Which Serves to Document the December 17, 2002 Conference Call Re Clarification of Safety Evaluation, License Amendments 207 and 2122002-12-20020 December 2002 Letter from A. J. Cayia Which Serves to Document the December 17, 2002 Conference Call Re Clarification of Safety Evaluation, License Amendments 207 and 212 Project stage: Other 2002-11-29
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000266/20240032024-11-0505 November 2024 Integrated Inspection Report 05000266/2024003 and 05000301/2024003 ML24295A1142024-10-31031 October 2024 Suppl Env Audit Summary Letter W/Enclosure 1 L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-160, Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41)2024-10-21021 October 2024 Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41) ML24295A0862024-10-21021 October 2024 Notification of NRC Baseline Inspection and Request for Information Inspection Report 0500026/2025002 L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-120, LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization2024-10-0808 October 2024 LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000266/2024011 and 05000301/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-145, Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency2024-09-0909 September 2024 Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency ML24207A0202024-08-28028 August 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Point Beach Nuclear Plant, Units 1 and 2 (Docket Numbers: 50-0266 and 50-0301) IR 05000266/20240052024-08-21021 August 2024 Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2024005 and 05000301/2024005) IR 05000266/20240022024-08-13013 August 2024 Integrated Inspection Report 05000266/2024002 and 05000301/2024002 L-2024-131, Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-08-0909 August 2024 Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24214A3092024-08-0202 August 2024 Confirmation of Initial License Examination ML24194A1802024-07-24024 July 2024 – Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-113, License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections2024-07-24024 July 2024 License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections IR 05000266/20244012024-07-23023 July 2024 Public - Point Beach Nuclear Plant Cyber Security Inspection Report 05000266/2024401 and 05000301/2024401 ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000266/20240102024-07-10010 July 2024 Age-Related Degradation Inspection Report 05000266/2024010 and 05000301/2024010 L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-105, License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-06-26026 June 2024 License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-107, Schedule for Subsequent License Renewal Environmental Review2024-06-25025 June 2024 Schedule for Subsequent License Renewal Environmental Review ML24176A2242024-06-24024 June 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-093, Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision2024-06-10010 June 2024 Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision IR 05000266/20244202024-06-0505 June 2024 Security Baseline Inspection Report 05000266/2024420 and 05000301/2024420 ML24149A1922024-05-28028 May 2024 Notification of NRC Baseline Inspection and Request for Information ML24141A1382024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection.Docx ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000266/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000266/2024301; 05000301/2024301 L-2024-067, Annual Monitoring Report2024-04-26026 April 2024 Annual Monitoring Report ML24116A0402024-04-23023 April 2024 Periodic Update of the Updated Final Safety Analysis Report ML24071A0912024-04-22022 April 2024 Issuance of Relief Request I6-RR-03 - Extension of the Unit 2 Steam Generator Primary Nozzle Dissimilar Metal Welds Sixth 10-Year Inservice Inspection Program Interval IR 05000266/20240012024-04-11011 April 2024 Integrated Inspection Report 05000266/2024001 and 05000301/2024001 L-2024-030, Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements2024-03-27027 March 2024 Supplement to Relief Request CISl-03-01 for Relief Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements L-2024-043, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-03-25025 March 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-011, And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 And Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications IR 05000266/20230062024-02-28028 February 2024 Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2023006 and 05000301/2023006) L-2024-020, Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections2024-02-22022 February 2024 Refueling Outage Owners Activity Report (OAR-1) Unit 1 for Inservice Inspections ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 ML24036A2652024-02-0505 February 2024 Notice of Inspection and Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000266/2024010 and 05000301/2024010 IR 05000266/20230042024-02-0101 February 2024 Integrated Inspection Report 05000266/2023004 and 05000301/2023004 ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 2024-09-09
[Table view] Category:Proprietary Information Review
MONTHYEARML17138A0122017-05-23023 May 2017 Request for Withholding Information from Public Disclosure Point Beach Nuclear Plant (Point Beach), Unit 1 ML16300A0382016-11-0202 November 2016 Request for Withholding Information from Public Disclosure Point Beach Nuclear Plant (Point Beach), Unit 1 ML16021A1612016-02-16016 February 2016 Request for Withholding Information from Public Disclosure for Point Beach Nuclear Plant, Unit 2 ML15299A0662015-11-12012 November 2015 Request for Withholding Information from Public Disclosure Point Beach Nuclear Plant Unit 2 ML14122A1252014-06-20020 June 2014 Request for Withholding of Proprietary Information from Public Disclosure ML0835309302009-03-25025 March 2009 FPL Energy Point Beach, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Point Beach Nuclear Plant, Units 1 and 2 ML0832505122008-11-26026 November 2008 FPL Energy Point Beach, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Point Beach Nuclear Plant, Units 1 and 2 ML0831108992008-11-18018 November 2008 FPL Energy Point Beach, LLC - Request for Withholding of Proprietary Information from Public Disclosure for Point Beach Nuclear Plant, Units 1 and 2 ML0825408582008-09-25025 September 2008 Request for Withholding Information from Public Disclosure for Point Beach Nuclear Plant, Unit 1 (Tac No. MD8800) ML0717903492007-08-24024 August 2007 Request for Withholding of Proprietary Information from Public Disclosure TAC Nos. MD3909 and MD3910 ML0703305282007-02-15015 February 2007 Letter, FPL Energy Point Beach ML0620500992006-08-0303 August 2006 Request for Withholding of Proprietary Information ML0616800072006-06-23023 June 2006 Withholding from Public Disclosure, Proprietary Information, WEP-06-33 P-Attachment, Transmittal of Figure 5-1 Reactor Coolant Temperature and Pressure Vs. Time Level D Transients ML0601200792006-01-23023 January 2006 Withholding Information from Public Disclosure, WEP-05-318-P - Attachment, Point Beach Unit 2 Reactor Vessel CMTRs ML0600501632006-01-23023 January 2006 Withholding of Proprietary Information from Public Disclosure, Westinghouse Letter WEP-05-168, Rev. 1-NP, MC7482 NRC 2004-0113, Units I and 2, Request for Withholding of Proprietary Information from Public Disclosure2004-10-28028 October 2004 Units I and 2, Request for Withholding of Proprietary Information from Public Disclosure ML0413101222004-04-30030 April 2004 Request for Closed Meeting with USNRC to Discuss NMC Refueling Plans ML0404105832004-02-26026 February 2004 Withholding from Public Disclosure, WCAP-15432, TAC MB8183 and MB8184 IR 05000193/19960002003-08-14014 August 2003 Withholding from Public Disclosure, 32-5019396-00, PB-1 CRDM Nozzle Idtb J-Groove Weld Flow Evaluation, 32-5019398-00, PB-1 CRDM Nozzle Idtb Weld Anomaly Flaw Evaluations & 32-5020244-00, Point Beach 1 CRDM Temperbead... ML0232601412002-11-27027 November 2002 Withholding from Public Disclosure, WCAP-14787, Revision 2, MB4956 and MB4957 ML0232601332002-11-27027 November 2002 Withholding from Public Disclosure, 1.4% Mur Power Uprate Support NRC RAI Responses Set 1 Question 4 ML0232601252002-11-27027 November 2002 Withholding from Public Disclosure, MPR-1619, Rev. 0 - Feedwater Flow Measurement with LEFM Chordal Systems, MB4956 and MB4957 ML0231200912002-11-27027 November 2002 Withholding from Public Disclosure, WCAP-14787, 2017-05-23
[Table view] |
Text
November 27, 2002 Mr. H. A. Sepp, Manager Regulatory and Licensing Engineering Westinghouse Electric Company Nuclear Services P. O. Box 355 Pittsburgh, PA 15230-0355
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NOS. MB4956 AND MB4957)
Dear Mr. Sepp:
By application dated April 9, 2002, and affidavit dated April 10, 2002, you requested that the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.790:
"WCAP-14787, Revision 1, Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wisconsin Electric Power Company Point Beach Units 1 and 2 (Fuel Upgrade & Uprate to 1656 MWt-NSSS Power with Feedwater Venturis, or 1679 MWt-NSSS Power with LEFM on Feedwater Header), (Proprietary)"
A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commissions (NRCs) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) The information reveals the distinguishing aspects of a process (or component, structures, tool, method, etc.) where prevention of its use by any of Westinghouses competitors without licence from Westinghouse constitutes a competitive advantage over other companies.
(b) It consists of supporting data, including test data, relative toa process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
H. Sepp We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-2928.
Sincerely,
/RA/
Deirdre W. Spaulding, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301 cc: See next page
ML023120091 Point Beach Nuclear Plant, Units 1 and 2 cc:
Mr. John H. ONeill, Jr. Ms. Sarah Jenkins Shaw, Pittman, Potts & Trowbridge Electric Division 2300 N Street, NW Public Service Commission of Wisconsin Washington, DC 20037-1128 P.O. Box 7854 Madison, WI 53707-7854 Mr. Richard R. Grigg President and Chief Operating Officer Mr. Roy A. Anderson Wisconsin Electric Power Company Executive Vice President and 231 West Michigan Street Chief Nuclear Officer Milwaukee, WI 53201 Nuclear Management Company, LLC 700 First Street Site Licensing Manager Hudson, WI 54016 Point Beach Nuclear Plant Nuclear Management Company, LLC Nuclear Asset Manager 6610 Nuclear Road Wisconsin Electric Power Company Two Rivers, WI 54241 231 West Michigan Street Milwaukee, WI 53201 Mr. Ken Duveneck Town Chairman Mr. Fred J. Cayia Town of Two Creeks Site Vice President 13017 State Highway 42 Point Beach Nuclear Plant Mishicot, WI 54228 Nuclear Management Company, LLC 6610 Nuclear Road Chairman Two Rivers, WI 54241 Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 October 2002