Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000346-11-003(DRS)
ML11130A144
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/09/2011
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Allen B
FirstEnergy Nuclear Operating Co
Loretta Sellers
References
IR-11-003
Download: ML11130A144 (9)


See also: IR 05000346/2011003

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

May 9, 2011

Mr. Barry Allen

Site Vice President

FirstEnergy Nuclear Operating Company

Davis-Besse Nuclear Power Station

5501 North State Route 2, Mail Stop A-DB-3080

Oak Harbor, OH 43449-9760

SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION - NOTIFICATION OF AN NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR

INFORMATION INSPECTION REPORT 05000 346/2011003(DRS)

Dear Mr. Allen:

On June 27, 2011, the NRC will begin the onsite portion of the Triennial Heat Sink

Performance Inspection at your Davis-Besse Nuclear Power Plant. This inspection will be

performed in accordance with NRC baseline inspection procedure (IP) 71111.07.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

  • The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the lead inspector no later than May 18, 2011. By

May 25, 2011, the inspector will communicate the initial selected set of approximately 2-3

risk significant heat exchangers.

  • The second group of documents requested is those items needed to support our in-office

preparation activities. This set of documents, including the calculations associated with

the selected heat exchangers, should be available at the Regional Office no later than

June 15, 2011. This information should be separated for each selected component,

especially if provided electronically (e.g., folder with component name that includes

calculations, condition reports, maintenance history, etc.). During the in-office preparation

activities, the inspector may identify additional information needed to support the

inspection.

  • The last group includes the additional information above, as well as plant specific reference

material. This information should be available onsite to the inspector on June 27, 2011. It

is also requested that corrective action documents and/or questions developed during the

inspection be provided to the inspector as the documents are generated.

B. Allen -2-

The lead inspector for this inspection is Gerard ODwyer. If there are questions about the

material requested, or the inspection, please call Gerard ODwyer at (630) 829-9624. Please

send the information to the following e-mail address Gerard.ODwyer@nrc.gov. A hard-copy

with the required information is also an acceptable option.

It is important that these documents are as complete as possible, in order to minimize the

number of documents requested during the preparation week or during the onsite inspection.

All requested documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink performance

inspection. If no activities were accomplished in that time period, then the request applies to

the last applicable document in the previous time period.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-346

License No. NPF-3

Enclosure: TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT

REQUEST

cc w/encl: Distribution via ListServ

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

DOCUMENT REQUEST

Inspection Report: 05000346/2011003

Inspection Dates: June 27, 2011 - July 1, 2011

Inspection Procedure: IP 71111.07T Heat Sink Performance

Lead Inspector: Gerard F. ODwyer

(630) 829-9624

Gerard.ODwyer@nrc.gov

Team Member: Larry J. Jones Jr.

(630) 829-9864

Larry.Jones@nrc.gov

I. Information Requested By May 18, 2011

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of corrective action program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat

exchanger testing, for the previous three years or since the last corrective action

program document list was sent to the NRC for the previous heat sink performance

inspection. The list should include all corrective action program documents not on

the last corrective action program document list.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5. Last two system health report(s) and maintenance rule system notebooks for all the

GL 89-13 heat exchangers.

6. List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be for

the time period from the onsite inspection period back to the documents that were

provided in response to the previous heat sink performance inspection.

7. List of permanent and temporary modifications (with a short description) associated

with GL 89-13 heat exchangers. The requested documents are to be for the time

period from the onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection.

1 Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

DOCUMENT REQUEST

II. Information Requested By June 15, 2011

1. Copy of the UFSAR section applicable to the GL 89-13 Heat Exchanger Program.

2. Copies of procedures developed to implement the recommendations of GL 89-13

(e.g., the GL 89-13 Heat Exchanger Program description).

3. For the specific heat exchangers selected:

a. Copies of the Updated Final Safety Analysis Report (UFSAR) sections applicable

for each heat exchanger;

b. Copy of system description and design basis document for the heat exchangers

(as applicable);

c. Provide a list of calculations (with a short description), which currently apply to

each heat exchanger; and

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers.

4. For the ultimate heat sink (UHS) and the safety-related service water system (or

equivalent):

a. Copies of the applicable Updated Final Safety Analysis Report (UFSAR)

sections;

b. Copy of system description and design basis document (as applicable);

c. Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service water system; and

d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that

states the maximum cooling water system inlet temperature limit that still allows

full licensed power operation of the nuclear reactor.

5. A schedule of all inspections, cleanings, maintenance, or testing of any

safety-related plant heat exchanger to be performed during the onsite portion

of the inspection.

III. Information Requested to be Available on First Day of Inspection, June 27, 2011

1. For the specific heat exchangers selected.

a. Copy of the calculation that correlates surveillance testing results from these heat

exchangers with design basis heat removal capability (e.g., basis for surveillance

test acceptance criteria);

2 Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

DOCUMENT REQUEST

b. Copies of the two most recent completed tests and evaluation data confirming

thermal performance for those heat exchangers, which are performance tested;

c. Documentation and procedures that identify the types, accuracy, and location of

any special instrumentation used for the two most recently completed thermal

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests;

d. Information regarding any alarms which monitor on-line performance;

e. Copy of the document describing the inspection results of each heat exchanger.

The requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection;

f. The cleaning and inspection maintenance schedule for each heat exchanger for

the next 5 years;

g. Copy of the design specification and heat exchanger data sheets for each heat

exchanger;

h. Copy of the vendor manuals including component drawings for each heat

exchanger;

i. Copy of the calculation which establishes the limiting (maximum) design basis

heat load which is required to be removed by each of these heat exchangers;

j. Copy of the operating procedure that ensures that the maximum cooling water

system inlet temperature limit is not exceeded;

k. Copy of the calculations or documents which evaluate the potential for water

hammer in each heat exchanger or associated piping;

l. Copy of the calculations that evaluate excessive tube vibration in each heat

exchanger and the documents that describe the controls that prevent heat

exchanger degradation due to excessive flow induced vibration during operation;

m. Copy of the periodic flow testing at or near maximum design flow. The requested

documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink

performance inspection;

n. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation which establishes the

maximum number of tubes, which can be plugged in each heat exchanger;

o. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes, which are identified in each heat exchanger;

3 Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

DOCUMENT REQUEST

p. Copies of the documents that verify the structural integrity of the heat exchanger

(e.g., eddy current summary sheets, ultrasonic testing results, and visual

inspection results); and

q. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

2. For the UHS:

a. Copies of the inspection procedures for the verification of the structural integrity

of underwater UHS and the associated results. The requested documents are to

be for the time period from the onsite inspection period back to the documents

that were provided in response to the previous heat sink performance inspection;

b. Copies of the maintenance and/or inspection procedures for underwater UHS

sediment intrusion and the associated results including underwater diving

inspections and/or sediment removal activities. The requested documents are to

be for the time period from the onsite inspection period back to the documents

that were provided in response to the previous heat sink performance inspection;

c. Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability; and

d. Copies of surveillance procedures and testing results performed on the

instrumentation relied upon to determine UHS reservoir capability. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

3. For the review of the operation of the safety-related service water system (or

equivalent) and the UHS:

a. Copies of any design change performed on the UHS. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink performance

inspection;

b. Copies of any design change performed on the safety-related service water

system. The requested documents are to be for the time period from the onsite

inspection period back to the documents that were provided in response to the

previous heat sink performance inspection;

c. Copies of procedures for a loss of UHS;

d. Copies of procedures for a loss of service water system;

e. Inspections and/or maintenance related to preventing macrofouling (e.g., silt,

dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or kelp).

The requested documents that were provided in response to the previous heat

sink performance inspection;

4 Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

DOCUMENT REQUEST

f. Copies of chemistry procedures that monitor for pH, calcium hardness, etc. Also,

provide copies of the associated results. The requested documents are to be for

the time period from the onsite inspection period back to the documents that

were provided in response to the previous heat sink performance inspection; and

g. Copies of documents associated with the monitoring of pump performance for

potential strong-pump vs. weak-pump interaction.

If the information requested above will not be available, please contact Gerard ODwyer as soon

as possible at (630) 829-9624 or email Gerard.ODwyer@nrc.gov.

5 Enclosure

B. Allen -2-

The lead inspector for this inspection is Gerard ODwyer. If there are questions about the material

requested, or the inspection, please call Gerard ODwyer at (630) 829-9624. Please send the information

to the following e-mail address Gerard.ODwyer@nrc.gov. A hard-copy with the required information is

also an acceptable option.

It is important that these documents are as complete as possible, in order to minimize the number of

documents requested during the preparation week or during the onsite inspection.

All requested documents are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink performance inspection. If no

activities were accomplished in that time period, then the request applies to the last applicable document

in the previous time period.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements

were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not

conduct or sponsor, and a person is not required to respond to, a request for information or an

information collection requirement unless the requesting document displays a currently valid Office of

Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure

will be available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the

NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-346

License No. NPF-3

Enclosure: TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

cc w/encl: Distribution via ListServ

DISTRIBUTION:

See next page

DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 050911 Davis-Besse HS RFI LJJ.docx

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII DRS

NAME LJones:ls GODwyer AMStone

DATE 05/09/11 05/09/11 5/09/11

OFFICIAL RECORD COPY

Letter to Mr. Barry Allen from Ms. Ann Marie Stone dated May 9, 2011.

SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION - NOTIFICATION OF AN NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR

INFORMATION INSPECTION REPORT 05000 346/2011003 (DRS)

DISTRIBUTION:

RidsNrrDorlLpl3-2 Resource

Daniel Merzke

RidsNrrPMDavisBesse Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Steven Orth

Jared Heck

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Tammy Tomczak

ROPreports Resource