MONTHYEARML18017A9251999-10-21021 October 1999 Application for Amend to License NPF-63,implementing Selected Improvements Described in GL 93-05 ML18017A8511999-08-26026 August 1999 Application for Amend to License NPF-63,revising TS 3/4.9.4 & Associated Bases to Allow Penetrations Which Provide Direct Access from Containment Atmosphere to Outside Atmosphere to Remain Open During Refueling Operations ML18016B0501999-08-0404 August 1999 Application for Amend to License NPF-63,revising TS to Incorporate Analytical Methodology References in TS 6.9.1.6.2 Which Are Used to Determine Core Operating Limits ML18016B0431999-08-0202 August 1999 Application for Amend to License NPF-63,revising TS 6.2.2.e to Require Either Operations Manager or off-shift Operations Superintendent to Hold SRO License ML18016B0071999-07-0909 July 1999 Application for Amend to License NPF-63,revising TS 3/4.2.2, TS 3/4.2.3 & TS 3/4.2.5,providing Clarification & Reducing Burden of Addl License Amend Processing by Implementing Guidance in GL 88-16 & NUREG-1431,Rev 1, Std TS W Plants. ML18016B0111999-07-0909 July 1999 Application for Amend to License NPF-63,relocating TS 3/4.3.3.3,TS 3/4.3.3.4,TS 3/4.3.3.9 & TS 3/4.3.3.11 to Plant Procedure PLP-114, Relocated Tech Specs & Design Basis Requirements, IAW GL 95-10 ML18016A9891999-06-15015 June 1999 Application for Amend to License NPF-63,revising TS to Incorporate performance-based 10CFR50 App J,Option B for Type a Tests (Containment Integrated Leakage Rate Tests) ML18016A9761999-06-0202 June 1999 Application for Amend to License NPF-63,revising TS 6.5, Review & Audit, TS 6.8, Procedures & Program & TS 6.10, Record Retention. ML18016A8381999-02-26026 February 1999 Application for Amend to License NPF-63,revising TS Table Notations for TS Table 3.3-4, ESFAS Instrumentation Trip Setpoints. Description of Changes & Environmental Evaluation,Encl ML18016A7681998-12-23023 December 1998 Application for Amend to License NPF-63,revising TS 5.6, Fuel Storage, by Increasing Spent Fuel Storage Capacity by Adding Rack Modules to Pools 'C' & 'D.' Non-proprietary & Proprietary Licensing Repts Encl.Proprietary Info Withheld ML18016A6031998-10-0101 October 1998 Application for Amend to License NPF-63,further Revising TS 3.0.4 to Clarify Intent Re Mode Changes as Discussed in Proposed Bases.Change to Retyped Page TS 3.9.9,encl ML18016A5921998-09-23023 September 1998 Application for Amend to License NPF-63,revising TS 3/4.6.1.3 to Be Consistent with NUREG-1431,rev 1 Std Tech Specs,W Plants, Dtd Apr 1995 & to Clarify Requirements for Locking Air Lock Door Shut ML18016A5441998-09-0101 September 1998 Application for Amend to License NPF-63,revising TS 3/4.9.11 to Require 23 Feet of Water Above Top of Fuel Rods within Irradiated Fuel Assemblies Seated in Storage Racks ML18016A5391998-08-27027 August 1998 Application for Amend to License NPF-63,revising TS Re Applicability of LCO & Surveillance Requirements,Per GL 87-09 ML18016A5031998-08-14014 August 1998 Application for Amend to License NPF-63,deleting SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fuel Handling Bldg Emergency Exhaust Sys Is Locked in Balanced Position at Least Once Per 18 Months ML18016A3991998-04-24024 April 1998 Application for Amend to License NPF-63,revising TS 3/4.3.2, ESFAS Instrumentation, to Allow Two Hour Surveillance Interval to Facilitate Testing of 6.9 Kv Emergency Bus Undervoltage Relays ML18016A3461998-03-12012 March 1998 Application for Amend to License NPF-63,deleting TS SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fhb EES Is Locked in Balanced Position at Least Once Per 18 Months ML18016A2561997-12-16016 December 1997 Application for Amend to License NPF-63,revising TS 4.7.1.2.1.a.2.a to Change Differential Pressure & Flow Requirements of Steam turbine-driven AFW Pump to Allow Testing of Pump at Lower Speed than Is Currently Performed ML18016A2221997-10-29029 October 1997 Application for Amend to License NPF-63,revising TS 3/4.8.1, AC Sources - Operating & Associated Bases to Clarify Intent of Ts,Per NUREG-1431,Rev 1 ML18012A8101997-06-12012 June 1997 Application for Amend to License NPF-63,amending TS 6.0, Administrative Controls, TS 6.2.2.e & TS 6.2.2.f ML18012A7841997-05-16016 May 1997 Application for Amend to License NPF-63,informing That TS 4.6.2.3 a.2 Requires Verification at Least Once Per 31 Days of Cw Flow Rate of Greater than or Equal to 1425 Gpm to Each Containment Fan Cooler ML18012A6341997-04-23023 April 1997 Application for Amend to License NPF-63,incorporating Enhancements to TS Identified in Plant Review Performed IAW GL 96-01.Changes Affect Specs 4.3.2.1.1.a,4.3.2.1.4.b, 4.3.2.1.6.g,4.3.2.1.10.a,4.3.2.1.10.b & 4.7.3.b.3 ML18012A5761997-03-17017 March 1997 Application for Amend to License NPF-63,revising Tech Specs Surveillances 4.1.2.2.c,4.5.2.e,4.6.2.1.c,4.6.2.2.c,4.6.3.2, 4.7.1.2.1.b,4.7.3b & 4.7.4.b to Delete Specific Restrictions in Text of Surveillances ML18022B0021997-03-14014 March 1997 Application for Amend to License NPF-63,increasing AOT for Refueling Water Storage Tank to Twelve Hs While Performing TS Surveillance 4.4.6.2.2 ML18022B0051997-03-10010 March 1997 Application for Amend to License NPF-63,revising TS 3.5.1 to Provide Optional Method of Meeting Surveillance Requirement & to Add New Action Statement Re Boron Concentration ML18022B0011997-02-27027 February 1997 Application for Amend to License NPF-63,amending TS 3/4.4.5, Sgs, & Associated Bases,To Add Sleeve Installation as Alternative to Tube Plugging for Repairing Degraded ST Tubes.Trs encl.CEN-630-P,rev 1 Withheld ML18012A5291997-02-18018 February 1997 Application for Amend to License NPF-63,revising Tech Specs 3/4.7.1, Turbine Cycle Safety Valves. ML18012A4981997-02-0606 February 1997 Application for Amend to License NPF-63,adding New Entry 3.0.5 to 3/4.0 Applicability.New 3.0.5 Provides Specific Guidance for Returning Equipment to Svc for Sole Purpose of Performing Testing to Demonstrate Operability ML18012A4941997-01-29029 January 1997 Application for Amend to License NPF-63,requesting to Add New Entry 3.0.5 to 3/4.0 to Provide Specific Guidance for Returning Equipment to Service in Order to Demonstrate Operability ML18012A4621997-01-10010 January 1997 Application for Amend to License NPF-63,requesting Rev to TS 4.8.1.1.2.h.2 Re Test Tanks & Nonisolable Piping at Test Pressure ML18012A4491996-12-30030 December 1996 Application for Amend to License NPF-63,requesting Rev to Chemistry Data (Nickel Content) in TS 3/4.4.9 Re Pressure/ Temp Limits ML18012A4141996-10-31031 October 1996 Application for Amend to License NPF-63,revising TSs Re Ultimate Heat Sink Level & Temp ML18012A3931996-10-0808 October 1996 Application for Amend to License NPF-63,proposing to Implement Change to Bases for TSs 3/4.6.1.4 & 3/4.6.1.6 Revising Calculated Peak Pressure for MSLB Event ML18012A3701996-09-18018 September 1996 Application for Amend to License NPF-63,requesting Change in Diesel Fuel Oil Sys Pressure Testing ML18012A3031996-07-19019 July 1996 Application for Amend to License NPF-63,TS 3/4.6.2, Containment Spray Sys,Extending Surveillance Interval for Performance of Air or Smoke Flow Test Through CS Nozzles from Once Every 5 Years,To Once Every 10 Years ML18012A2511996-05-31031 May 1996 Application for Amend to License NPF-63,correcting Location Described for One of Three Triaxial Peak Accelerograph Recorders ML18012A1801996-03-20020 March 1996 Application for Amend to License NPF-63,relocating TS 3.3.3.2, Movable Incore Detectors & Associated Bases, Consistent w/NUREG-1431 & GL 95-10 ML18012A1411996-02-16016 February 1996 Application for Amend to License NPF-63,revising TS 4.3.2 Re ESFAS Instrumentation ML18011A8751995-04-0505 April 1995 Application for Amend to License NPF-63,revising Portions of Section 3/4.9, Refueling Operations to Be Consistent W/ NUREG-1431 & Relocating Applicable Sections Per Commission Final Policy Statement ML18011A8721995-03-30030 March 1995 Application for Amend to License NPF-63,revising EDG SR Contained in Section 4.8.1.1.2 to Be Consistent w/NUREG-1431 New Std TS for Westinghouse Plants & Eliminating Need for Duplicate EDG Testing Being Performed ML18011A8501995-03-20020 March 1995 Application for Amend to License NPF-63 to Relocate Cycle Specific Overpower & Overtemperature Delta T Trip Setpoint Parameters to COLR ML18011A8111995-03-0303 March 1995 Application for Amend to License NPF-63,eliminating Response Time Testing for Selected Pressure & Differential Pressure Sensors ML18022A9471995-02-0606 February 1995 Application for Amend to License NPF-63,revising TSs Re Relocation of Shutdown Margin Vs Boron Concentration ML18011A7691995-01-19019 January 1995 Application for Amend to License NPF-63,revising TS SR 4.0.3 & Associated Bases to Provide for Delay in Which to Perform Surveillance Discovered Not Performed within Specified Frequency ML18011A7411994-12-19019 December 1994 Application for Amend to License NPF-63,requesting one-time Schedular Rev to TS Re Containment Leak Rate Testing ML18011A7151994-12-0606 December 1994 Application for Amend to License NPF-63 to TS Re Revised TS Page Concerning Relocation of Selected TS in Accordance w/NUREG-1431 ML18011A7051994-12-0606 December 1994 Application for Amend to License NPF-63,revising TS to Relocate Certain TS Requirements in Accordance w/NUREG-1431, Std Ts,Westinghouse Plants. ML18011A6881994-11-23023 November 1994 Application for Amend to License NPF-63 to TS Re Changes to ECCS Evaluation Model ML18011A6141994-10-24024 October 1994 Application for Amend to License NPF-63,relocating Selected TS Per NUREG-1431 ML18011A5841994-09-12012 September 1994 Application for Amend to License NPF-63,revising TS3/4.8.1, AC Sources & Associated Bases 1999-08-04
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML18017A9251999-10-21021 October 1999 Application for Amend to License NPF-63,implementing Selected Improvements Described in GL 93-05 ML18017A8511999-08-26026 August 1999 Application for Amend to License NPF-63,revising TS 3/4.9.4 & Associated Bases to Allow Penetrations Which Provide Direct Access from Containment Atmosphere to Outside Atmosphere to Remain Open During Refueling Operations ML18016B0501999-08-0404 August 1999 Application for Amend to License NPF-63,revising TS to Incorporate Analytical Methodology References in TS 6.9.1.6.2 Which Are Used to Determine Core Operating Limits ML18016B0431999-08-0202 August 1999 Application for Amend to License NPF-63,revising TS 6.2.2.e to Require Either Operations Manager or off-shift Operations Superintendent to Hold SRO License ML18016B0111999-07-0909 July 1999 Application for Amend to License NPF-63,relocating TS 3/4.3.3.3,TS 3/4.3.3.4,TS 3/4.3.3.9 & TS 3/4.3.3.11 to Plant Procedure PLP-114, Relocated Tech Specs & Design Basis Requirements, IAW GL 95-10 ML18016B0071999-07-0909 July 1999 Application for Amend to License NPF-63,revising TS 3/4.2.2, TS 3/4.2.3 & TS 3/4.2.5,providing Clarification & Reducing Burden of Addl License Amend Processing by Implementing Guidance in GL 88-16 & NUREG-1431,Rev 1, Std TS W Plants. ML18016A9891999-06-15015 June 1999 Application for Amend to License NPF-63,revising TS to Incorporate performance-based 10CFR50 App J,Option B for Type a Tests (Containment Integrated Leakage Rate Tests) ML18016A9761999-06-0202 June 1999 Application for Amend to License NPF-63,revising TS 6.5, Review & Audit, TS 6.8, Procedures & Program & TS 6.10, Record Retention. ML18016A8381999-02-26026 February 1999 Application for Amend to License NPF-63,revising TS Table Notations for TS Table 3.3-4, ESFAS Instrumentation Trip Setpoints. Description of Changes & Environmental Evaluation,Encl ML18016A7681998-12-23023 December 1998 Application for Amend to License NPF-63,revising TS 5.6, Fuel Storage, by Increasing Spent Fuel Storage Capacity by Adding Rack Modules to Pools 'C' & 'D.' Non-proprietary & Proprietary Licensing Repts Encl.Proprietary Info Withheld ML18016A6031998-10-0101 October 1998 Application for Amend to License NPF-63,further Revising TS 3.0.4 to Clarify Intent Re Mode Changes as Discussed in Proposed Bases.Change to Retyped Page TS 3.9.9,encl ML18016A5921998-09-23023 September 1998 Application for Amend to License NPF-63,revising TS 3/4.6.1.3 to Be Consistent with NUREG-1431,rev 1 Std Tech Specs,W Plants, Dtd Apr 1995 & to Clarify Requirements for Locking Air Lock Door Shut ML18016A5441998-09-0101 September 1998 Application for Amend to License NPF-63,revising TS 3/4.9.11 to Require 23 Feet of Water Above Top of Fuel Rods within Irradiated Fuel Assemblies Seated in Storage Racks ML18016A5391998-08-27027 August 1998 Application for Amend to License NPF-63,revising TS Re Applicability of LCO & Surveillance Requirements,Per GL 87-09 ML18016A5031998-08-14014 August 1998 Application for Amend to License NPF-63,deleting SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fuel Handling Bldg Emergency Exhaust Sys Is Locked in Balanced Position at Least Once Per 18 Months ML18016A3991998-04-24024 April 1998 Application for Amend to License NPF-63,revising TS 3/4.3.2, ESFAS Instrumentation, to Allow Two Hour Surveillance Interval to Facilitate Testing of 6.9 Kv Emergency Bus Undervoltage Relays ML18016A3461998-03-12012 March 1998 Application for Amend to License NPF-63,deleting TS SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fhb EES Is Locked in Balanced Position at Least Once Per 18 Months ML18016A2561997-12-16016 December 1997 Application for Amend to License NPF-63,revising TS 4.7.1.2.1.a.2.a to Change Differential Pressure & Flow Requirements of Steam turbine-driven AFW Pump to Allow Testing of Pump at Lower Speed than Is Currently Performed ML18016A2221997-10-29029 October 1997 Application for Amend to License NPF-63,revising TS 3/4.8.1, AC Sources - Operating & Associated Bases to Clarify Intent of Ts,Per NUREG-1431,Rev 1 ML18012A8101997-06-12012 June 1997 Application for Amend to License NPF-63,amending TS 6.0, Administrative Controls, TS 6.2.2.e & TS 6.2.2.f ML18012A7841997-05-16016 May 1997 Application for Amend to License NPF-63,informing That TS 4.6.2.3 a.2 Requires Verification at Least Once Per 31 Days of Cw Flow Rate of Greater than or Equal to 1425 Gpm to Each Containment Fan Cooler ML18012A6341997-04-23023 April 1997 Application for Amend to License NPF-63,incorporating Enhancements to TS Identified in Plant Review Performed IAW GL 96-01.Changes Affect Specs 4.3.2.1.1.a,4.3.2.1.4.b, 4.3.2.1.6.g,4.3.2.1.10.a,4.3.2.1.10.b & 4.7.3.b.3 ML18012A5761997-03-17017 March 1997 Application for Amend to License NPF-63,revising Tech Specs Surveillances 4.1.2.2.c,4.5.2.e,4.6.2.1.c,4.6.2.2.c,4.6.3.2, 4.7.1.2.1.b,4.7.3b & 4.7.4.b to Delete Specific Restrictions in Text of Surveillances ML18022B0021997-03-14014 March 1997 Application for Amend to License NPF-63,increasing AOT for Refueling Water Storage Tank to Twelve Hs While Performing TS Surveillance 4.4.6.2.2 ML18022B0051997-03-10010 March 1997 Application for Amend to License NPF-63,revising TS 3.5.1 to Provide Optional Method of Meeting Surveillance Requirement & to Add New Action Statement Re Boron Concentration ML18022B0011997-02-27027 February 1997 Application for Amend to License NPF-63,amending TS 3/4.4.5, Sgs, & Associated Bases,To Add Sleeve Installation as Alternative to Tube Plugging for Repairing Degraded ST Tubes.Trs encl.CEN-630-P,rev 1 Withheld ML18012A5291997-02-18018 February 1997 Application for Amend to License NPF-63,revising Tech Specs 3/4.7.1, Turbine Cycle Safety Valves. ML18012A4981997-02-0606 February 1997 Application for Amend to License NPF-63,adding New Entry 3.0.5 to 3/4.0 Applicability.New 3.0.5 Provides Specific Guidance for Returning Equipment to Svc for Sole Purpose of Performing Testing to Demonstrate Operability ML18012A4941997-01-29029 January 1997 Application for Amend to License NPF-63,requesting to Add New Entry 3.0.5 to 3/4.0 to Provide Specific Guidance for Returning Equipment to Service in Order to Demonstrate Operability ML18012A4621997-01-10010 January 1997 Application for Amend to License NPF-63,requesting Rev to TS 4.8.1.1.2.h.2 Re Test Tanks & Nonisolable Piping at Test Pressure ML18012A4491996-12-30030 December 1996 Application for Amend to License NPF-63,requesting Rev to Chemistry Data (Nickel Content) in TS 3/4.4.9 Re Pressure/ Temp Limits ML18012A4141996-10-31031 October 1996 Application for Amend to License NPF-63,revising TSs Re Ultimate Heat Sink Level & Temp ML18012A3931996-10-0808 October 1996 Application for Amend to License NPF-63,proposing to Implement Change to Bases for TSs 3/4.6.1.4 & 3/4.6.1.6 Revising Calculated Peak Pressure for MSLB Event ML18012A3701996-09-18018 September 1996 Application for Amend to License NPF-63,requesting Change in Diesel Fuel Oil Sys Pressure Testing ML18012A3031996-07-19019 July 1996 Application for Amend to License NPF-63,TS 3/4.6.2, Containment Spray Sys,Extending Surveillance Interval for Performance of Air or Smoke Flow Test Through CS Nozzles from Once Every 5 Years,To Once Every 10 Years ML18012A2511996-05-31031 May 1996 Application for Amend to License NPF-63,correcting Location Described for One of Three Triaxial Peak Accelerograph Recorders ML18012A1801996-03-20020 March 1996 Application for Amend to License NPF-63,relocating TS 3.3.3.2, Movable Incore Detectors & Associated Bases, Consistent w/NUREG-1431 & GL 95-10 ML18012A1411996-02-16016 February 1996 Application for Amend to License NPF-63,revising TS 4.3.2 Re ESFAS Instrumentation ML18011A8751995-04-0505 April 1995 Application for Amend to License NPF-63,revising Portions of Section 3/4.9, Refueling Operations to Be Consistent W/ NUREG-1431 & Relocating Applicable Sections Per Commission Final Policy Statement ML18011A8721995-03-30030 March 1995 Application for Amend to License NPF-63,revising EDG SR Contained in Section 4.8.1.1.2 to Be Consistent w/NUREG-1431 New Std TS for Westinghouse Plants & Eliminating Need for Duplicate EDG Testing Being Performed ML18011A8501995-03-20020 March 1995 Application for Amend to License NPF-63 to Relocate Cycle Specific Overpower & Overtemperature Delta T Trip Setpoint Parameters to COLR ML18011A8111995-03-0303 March 1995 Application for Amend to License NPF-63,eliminating Response Time Testing for Selected Pressure & Differential Pressure Sensors ML18022A9471995-02-0606 February 1995 Application for Amend to License NPF-63,revising TSs Re Relocation of Shutdown Margin Vs Boron Concentration ML18011A7691995-01-19019 January 1995 Application for Amend to License NPF-63,revising TS SR 4.0.3 & Associated Bases to Provide for Delay in Which to Perform Surveillance Discovered Not Performed within Specified Frequency ML18011A7411994-12-19019 December 1994 Application for Amend to License NPF-63,requesting one-time Schedular Rev to TS Re Containment Leak Rate Testing ML18011A7151994-12-0606 December 1994 Application for Amend to License NPF-63 to TS Re Revised TS Page Concerning Relocation of Selected TS in Accordance w/NUREG-1431 ML18011A7051994-12-0606 December 1994 Application for Amend to License NPF-63,revising TS to Relocate Certain TS Requirements in Accordance w/NUREG-1431, Std Ts,Westinghouse Plants. ML18011A6881994-11-23023 November 1994 Application for Amend to License NPF-63 to TS Re Changes to ECCS Evaluation Model ML18011A6141994-10-24024 October 1994 Application for Amend to License NPF-63,relocating Selected TS Per NUREG-1431 ML18011A5841994-09-12012 September 1994 Application for Amend to License NPF-63,revising TS3/4.8.1, AC Sources & Associated Bases 1999-08-04
[Table view] |
Text
CATEGORY 1
<i' REGULATOR INFORMATION DISTRIBUTION STEM (RIDS)
ACCEP)SJON NBR:9607290228 DOC.DATE: 96/07/19 NOTARIZED: YES DOCKET I FACT'=-".50,,400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAM'"" AUTHOR AFFILIATION ROBINSON,'A.R. Carolina Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION
=
Document 'Control Branch (Document Control Desk)
-~
SUBJECT:
Application for amend to license NPF-63,TS 3/4.6.2, Containment Spray Sys,extending surveillance interval for performance of air or smoke flow test through CS nozzles from once every 5 years,to once every 10 years.
DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution E
NOTES:Application for permit renewal filed. 05000400 G
, RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 1 1 ILE CENTER 1 1 NRR/DE/EMCB 1 1 NRR HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR, 1 1 D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 4I5-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER .OF COPIES'EQUIRED:'LTTR 13 ENCL 12
Carolina Power & light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant SERIAL: HNP-96-094 10 CFR 50.90 JUL 19 1996 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CONTAINMENTSPRAY NOZZLE SURVEILLANCEINTERVAL
Dear Sir or Madam:
In accordance with the Code of Federal Regulations, Title 10, Part 50.90, Carolina Power 8c Light Company (CP&L) requests a revision to the Technical Specifications (TS) for the Harris Nuclear Plant (HNP). The proposed amendment to TS 3/4.6.2, Containment Spray System, will extend the surveillance interval for performance of an air or smoke flow test through containment spray nozzles from once per five years to once per ten years. This'hange is consistent with experience to date and with the guidance in NRC Generic Letter 93-05, "Line Item plant'esting Technical Specifications Improvements to Reduce Surveillance Requirements for Testing During Power Operations," and NUREG-1366, "Improvements to Technical Specifications Surveillance Requirements."
Enclosure 1 provides a description of the proposed changes and the basis for the changes.
Enclosure 2 details, in accordance with 10 CFR 50.91(a), the basis for the Company's determination that the proposed changes do not involve a significant hazards consideration.
Enclosure 3 provides an environmental evaluation which demonstrates that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental assessment needs to be prepared in connection with the issuance of the amendment.
Enclosure 4 provides page change instructions for incorporating the proposed revisions.
9607290228 9607i9 PDR ADOCK 05000400 3~(/(
P k( PDR g JVv s
State Road1134 New Hill NC Tel 919362-2502 Fax 919362-2095
r w E 'p I
bg l
. >>1'"
A I P p)
Cp> ~ p
~ I
~
i)ocument Control Desk HNP-96-094 / Page 2 Enclosure 5 provides the proposed Technical Specification pages.
In accordance with 10 CFR 50.91(b), CPkL is providing the State of North Carolina with a copy of the proposed license amendment.
CP&L requests approval of the proposed amendment by December 1, 1996 to support planning for the next HNP refueling outage, currently scheduled to begin in March 1997. CPkL requests that the proposed amendment be issued such that implementation will occur within 60 days of issuance to allow time for procedure revision and orderly incorporation into copies of the Technical Specifications.
Please refer any questions regarding this submittal to Mr. T. D. Walt at (919) 362-2711.
Sincerely, J. W. Donahue for W. R. Robinson LSR/lsr
Enclosures:
- 1. Basis for Change Request
- 2. 10 CFR 50.92 Evaluation
- 3. Environmental Considerations
- 4. Page Change Instructions
- 5. Technical Specification Pages J. W. Donahue, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are employees, contractors, and agents of Carolina Power 8c Light Company.
Notary, My commission expires: g Q Q ~TO /~ 6 ~4'c e 1,0'iAiiy O s
I'/JBL>C ~c,
"~OAIcoQ~;
~ 11111
1 l
(
I gr',g, I l
1 l
neat 4
4 C.
~tP~, (, ~~ii 1'
~
?)ocurnent Control Desk HNP-96-094 / Page 3 Mr. J. B. Brady, NRC Resident Inspector Mr. Dayne H. Brown, N.C. DEHNR Mr. S. D. Ebneter, NRC Regional Administrator Mr. N. B. Le, NRC Project Manager
ENCLOSURE TO SERIAL: HNP-96-094 ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CONTAINMENTSPRAY NOZZLE SURVEILLANCEINTERVAL BASIS FOR CHANGE RE UEST Pro osed Chan e The proposed amendment to TS 3/4.6.2, Containment Spray System, will extend the surveillance interval for performance of an air or smoke flow test through containment spray nozzles from once per five years to once per ten years. This change is consistent with plant testing experience to date and with the guidance in NRC Generic Letter 93-05, "Line Item Technical Specifications Improvements to Reduce Surveillance Requirements for Testing During Power Operations," and NUREG-1366, "Improvements to Technical Specifications Surveillance Requirements."
Basis As described in Final Safety Analysis Report, Section 6.2.2.2, the purpose of the Containment Spray System (CSS) is to spray borated sodium hydroxide solution through nozzles into the containment to cool the atmosphere and remove fission products following a loss of coolant accident (LOCA) or main steam line break (MSLB). The CSS consists of two independent and redundant trains, each containing a spray pump, stainless steel piping, valves, two spray headers, and spray nozzles.
As described in the CSS system description (SD-112), the containment spray pumps provide the borated water to the spray headers and nozzles, with spray additive eductors blending in sodium hydroxide. Spray headers are located in the containment dome to maximize heat removal. Each train of CSS has two headers containing a total of 106 spray nozzles per train. The spray nozzles have a diameter of approximately 0.375 inches. The nozzles disperse the flow to increase cooling effectiveness. As these droplets fall through the containment atmosphere they absorb heat and iodine.
HNP Technical Specification 3/4.6.2, Containment Spray System, currently requires an air or smoke flow test to be completed for each spray header at least once per 5 years to verify that each spray nozzle is unobstructed.
In December 1992, the NRC issued NUREG-1366, "Improvements to Technical Specifications Surveillance Requirements." Section 8.1 of the NUREG provides the NRC's staff evaluation with respect to Pressurized Water Reactor (PWR) containment spray systems. That evaluation noted that the NRC only identified three plants at which problems with a containment spray system had Page El-1
ENCLOSURE TO SERIAL: HNP-96-094 been identified through testing. HNP was not one of those plants. In each of the three cases, the problem was attributable to a construction error. Since the testing only provides a qualitative verification that the nozzles are not obstructed and cannot be used to determine degradation of other performance parameters such as system flow, the NRC concluded that it provided little benefit. Therefore, NUREG-1366 recommended that this test be extended to every 10 years.
Pre-operational testing of the CSS at HNP, performed in June 1986, verified air flow through each containment spray nozzle. Also, in April 1991, a containment spray system nozzle flow test was performed to satisfy Technical Specification 4.6.2.1.d. That testing also verified air flow through each nozzle.
On September 27, 1993, the NRC issued Generic Letter 93-05, "Line-Item Technical Specifications Improvements to Reduce Surveillance Requirements for Testing During Power Operation." The Generic Letter encouraged licensees to adopt the line-item TS improvements and provided guidance for licensees to use in preparing license amendments to reduce testing commensurate with the recommendations of NUREG-1366.
In Generic Letter 93-05, the NRC identified an additional problem at a plant which experienced nozzle clogging due to coating degradation in carbon steel piping. Consistent with the NRC's recommendations in Generic Letter 93-05, the containment spray piping design at the Harris Nuclear Plant is stainless steel, and thus should not be susceptible to the coating degradation described in the Generic Letter.
Conclusions Based upon the conclusions in NUREG-1366, HNP system design parameters that prevent clogging, and past performance testing results at HNP, the proposed line-item improvement to the HNP Technical Specifications is consistent with plant testing experience to date and with the guidance contained in Generic Letter 93-05 and in NUREG-1366.
Page El-2
1 I
1 r
ENCLOSURE TO SERIAL: HNP-96-094 ENCLOSURE 2 SHEARON HARIUS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CONTAINMENTSPRAY NOZZLE SURVEILLANCEINTERVAL 10 CFR 50.92 EVALUATION The Commission has provided standards in 10 CFR 50.92(c) for determining whether a significant hazards consideration exists. A proposed amendment to an operating license for a facility involves no significant hazards consideration ifoperation of the facility in accordance with the proposed amendment would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. Carolina Power & Light Company has reviewed this proposed license amendment request and determined that its adoption would not involve a significant hazards determination. The bases for this determination are as follows:
Pro osed Chan e The proposed amendment to TS 3/4.6.2, Containment Spray System, will extend the surveillance interval for performance of an air or smoke flow test through containment spray nozzles from once per five years to once per ten years. This change is consistent with plant testing experience to date and with the guidance in NRC Generic Letter 93-05, "Line Item Technical Specifications Improvements to Reduce Surveillance Requirements for Testing During Power Operations," and NUEEG-1366, "Improvements to Technical Specifications Surveillance Requirements."
Basis This change does not involve a significant hazards consideration for the following reasons:
- 1. The proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed extended testing frequency of containment spray nozzles will not affect any initiators of any previously evaluated accidents or change the manner of operation for any system or component. The containment spray system serves a mitigating function by removing heat and fission products from a post-accident containment atmosphere.
Increasing the surveillance test interval will not affect the system's ability to provide this function. Therefore, there would be no increase in the probability or consequences of an accident previously evaluated.
Page E2-1
k l'
C ~ V H ll V
~,
1 ~
)
ENCLOSURE TO SERIAL: HNP-96-094 The proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.
Since the proposed change affects only a surveillance frequency, it willnot involve any physical alterations to plant equipment or alter the manner in which any safety-related system performs its function. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed amendment does not involve a significant reduction in the margin of safety.
The proposed change does not affect any Final Safety Analysis Report (FSAR) Chapter 15 accident analyses or impact the margin of safety for the containment spray system as defined in the Bases to the Technical Specifications. Therefore, the proposed change does not involve a significant reduction in the margin of safety.
Page E2-2
II ENCLOSURE TO SERIAL: HNP-96-094 ENCLOSURE 3 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CONTAINMENTSPRAY NOZZLE SURVEILLANCEINTERVAL ENVIRONMENTALCONSIDERATIONS 10 CFR 51.22(c)(9) provides criterion for and identification of licensing and regulatory actions eligible for categorical exclusion from performing an environmental assessment. A proposed amendment to an operating license for a facility requires no environmental assessment ifoperation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration; (2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (3) result in a significant increase in individual or cumulative occupational radiation exposure. Carolina Power 2 Light Company has reviewed this request and determined that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of the amendment. The basis for this determination follows:
Pro osed Chan e The proposed amendment to TS 3/4.6.2, Containment Spray System, will extend the surveillance interval for performance of an air or smoke flow test through containment spray nozzles from once per five years to once per ten years. This change is consistent with plant testing experience to date and with the guidance in NRC Generic Letter 93-05, "Line Item Technical Specifications Improvements to Reduce Surveillance Requirements for Testing During Power Operations," and NUREG-1366, "Improvements to Technical Specifications Surveillance Requirements."
Basis The change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) for the following reasons:
- 1. As demonstrated in Enclosure 2, the proposed amendment does not involve a significant hazards consideration.
Page E3-1
ENCLOSURE TO SERIAL: HNP-96-094
- 2. The proposed amendment does not result in a significant change in the types or significant increase in the amounts of any efHuents that may be released offsite.
The proposed change does not involve any new equipment or require existing systems to perform a different type of function than they are currently designed to perform. The change does not introduce any new efHuents or increase the quantities of existing efHuents. As such, the change can not affect the types or amounts of any e61uents that may be released offsite.
- 3. The proposed amendment does not result in a significant increase in individual or cumulative occupational radiation exposure.
The proposed change does not result in any physical plant changes or new surveillances.
The reduced surveillance inter val should result in a decrease in radiation exposure, since it willlessen personnel entry into radiation-controlled areas of the plant. Therefore, the amendment has no affect on either individual or cumulative occupational radiation exposure.