ML18011A705
| ML18011A705 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 12/06/1994 |
| From: | Robinson W CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18011A707 | List: |
| References | |
| RTR-NUREG-1431 HO-941106, NUDOCS 9412140064 | |
| Download: ML18011A705 (2) | |
Text
P RIGRITY (ACCELERATED RIDS PROCESSIi REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION,NBR:9412140064 DOC.DATE: 94/12/06 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROBINSON,W.R.
Carolina Power S Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Application for amend to license NPF-63 to TS re rev to plant TS to relocate certain TS requirements in accordance w/NUREG-1431, "Std TS,Westinghouse Plants."
DISTRIBDTION CODE AOOID COPIES RECEIVED'LTRL ENCL L SIZE TITLE: OR Submittal:
General Distribution DOCKET 05000400 P
R' NOTES:Application for permit renewal filed.
o5ooo4oo R
RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 6
6 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD FILE CENTE~
RR/DSSA/SCSB NRR/DSSA/SRXB OGC/HDS2 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
0 1
1 D
0 C
U M
N NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE 'O'ASTE! CONTACT'I'IIE DOCL'i!ENTCONTROL DESK, ROOI1I Pl-37 (EXT.
04-0083 ) TO ELIl1IINATEYOUR NAifE PROi!
DISTRIBUTIONLIS'I'S I'OR DOCL'0 !EN'I'S YOL'ON"I'EED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 18 ENCL 17
Carolina Power &Light Company PO Box 165 New Hill NC 27562 NG-eSN Letter Number: HO-941106 William R. Robinson Vice President Harris Nuclear Plant SERIAL: HNP-94-094 10 CFR 50.90 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REVISED TECHNICALSPECIFICATION PAGE - RELOCATION OF SELECTED TECHNICALSPECIFICATIONS IN ACCORDANCE WITH NUREG-1431 Gentlemen:
On October 24, 1994, Carolina Power & Light Company requested a revision to the Shearon Harris Nuclear Power Plant (SHNPP) Technical Specifications (TS) to relocate certain TS requirements in accordance with NUREG-1431, "Standard Technical Specifications, Westinghouse Plants."
On November 4, 1994, the NRC issued Amendment No. 51 to the SHNPP TS to revise TS 3/4.8.1, AC Sources, and associated Bases to be consistent with NUREG-1431.
This amendment independently changed a page which is currently under NRC staff review from our October 24, 1994 request.
Enclosure 1 provides revised TS page x (Index), which reflects the changes issued with Amendment No. 51, as well as the proposed changes in our October 24, 1994 submittal.
Accordingly, this page should be substituted for the corresponding page in our October 24, 1994 request.
Thus, there is no new information provided in the enclosure.
Please refer any questions regarding this submittal to Mr. D. C. McCarthy at (919) 362-2100.
Sincerely, hlmr W. R. Robinson Enclosure Mr. Dayne H. Brown Mr. S. D. Ebneter Mr. S. A. Elrod eygp~400gq Mr. N. B. L PDR ADOCK 05000400 PDR State Road 1134 New Hill NC Tel 919 362-2502 Fax 919 362-6950