ML18012A810

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-63,amending TS 6.0, Administrative Controls, TS 6.2.2.e & TS 6.2.2.f
ML18012A810
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/12/1997
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18012A811 List:
References
HNP-97-100, NUDOCS 9706230276
Download: ML18012A810 (14)


Text

$r CATEGORY 1

~

~r REGULATC INFORMATION DISTRIBUTION ITEM (RIDE)

ACCESSION -NBR: 9706230276 DOC.DATE: 97/06/12 NOTARIZED: YES DOCKET ¹ FAgIL:~0-40' Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400

.4 JTH . ~lAME AUTHOR AFFILIATION ROBINSON,W.R. Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Application for amend to License NPF-63,amending TS 6.0, "Administrative controls, including changes, replacing title "Shift Foreman."

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution T

NOTES:Application for permit renewal filed. 05000400 E

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 ROONEY,V 1 1 INTERNAL: ACRS 1 1 FILE CE SER~O 1 1 NRR/DE/ECGB/A 1 1 'NR /DE/EMCB 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13

I h ~

l

~

p Qli g ~

P

Carolina Power 8t Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant JUN 18 1'j97 SERIAL: HNP-97-100 10 CFR 50.90 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATIONDESCRIPTION TECHNICAL SPECIFICATION 6.0, ADMINISTRATIVECONTROLS

Dear Sir or Madam:

In accordance with the Code of Federal Regulations, Title 10, Part 50.90, Carolina Power &

Light Company (CP&L) requests a revision to the Technical Specifications (TS) for the Harris Nuclear Plant (HNP). The proposed amendment to TS 6.0, "Administrative Controls," includes changes which (1) replace the title "Shift Foreman" with "Superintendent - Shift Operations (S-SO)," wherever used, (2) replace the title "Vice President - Harris Nuclear Project" with "Vice President - Harris Nuclear Plant" in TS 6.1.2 consistent with other TS references to this position, (3) deletes the last sentence in TS 6.2.2.e which states that the Operations Supervisor will hold a Senior Reactor Operator (SRO) license, and (4) adds a new TS 6.2.2.f which states that "If the Manager - Operations does not hold a Senior Reactor Operator License, then a designated Operations middle manager shall hold a Senior Reactor Operator License." This will provide the equivalent off-shift SRO licensed supervision for operations and license activities, previously provided by the Operations Supervisor, without specifying a specific ~rr position title. These changes are being proposed to more accurately reflect the Operations organization in place at the Harris Nuclear Plant. The proposed changes affect current ~P specifications 6.1.2, 6.2.2, Table 6.2-1, 6.2.4.1, and 6.12.

t r

Enclosure 1 provides a description of the proposed changes and the basis for the changes. t Enclosure 2 details, in accordance with 10 CFR 50.91(a), the basis for the Company's I determination that the proposed changes do not involve a significant hazards consideration.

Enclosure 3 provides an environmental evaluation which demonstrates that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental assessment needs to be prepared in connection with the issuance of the amendment.

9706230276 9706i2 ADQC1tt, 05000400

'"'~'

, PDR PDR State Road1134 NewHill NC Tel 919362-2502 Fax 919362-2095

gi4 Document Control Desk HNP-97-100/ Page 2

' Enclosure 4 provides page change instructions for incorporating the proposed revisions.

Enclosure 5 provides the proposed Technical Specification pages.

CP&L requests that the proposed amendment be issued such that implementation will occur within 30 days of issuance to allow time for orderly inco'rporation into copies of the Technical Specifications.

Please refer any questions regarding this submittal to Ms. D. B. Alexander at (919) 362-3190.

Sincerely, W. R. Robinson Vice President Harris Nuclear Plant MGW/mgw

Enclosures:

1. Basis for Change Request
2. 10 CFR 50.92 Evaluation
3. Environmental Considerations
4. Page Change Instructions
5. Technical Specification Pages W. R. Robinson, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are employees, contractors, and agents of Carolina Power & Light Company.

Notary (

~n al)

My commission expires: p g No oo iZiimn~

S. Y4q+'g

+

Mr. J. B. Brady, NRC Sr. Resident Inspector Mr. M. Fry, N.C. DEHNR Mr. L. A. Reyes, NRC Regional Administrator PUBLIC Mr. V. L. Rooney, NRC Project Manager

",~PE COO~~;

Clitlliiiiiiii

~/

A I

I H g4l a

II t E

h I,

ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATIONDESCRIPTION TECHNICAL SPECIFICATION 6.0, ADMINISTRATIVECONTROLS BASIS FOR CHANGE RE UEST

~Back round Technical Specification (TS) 6.0, Administrative Controls, refers to the on-shift individual responsible for the control room command function as the Shift Foreman. The Harris Nuclear Plant (HNP) Operations organization currently refers to this position as the Superintendent-Shift Operations (S-SO). This TS also specifies minimum qualification for the Manager-Operations and Operations Supervisor.

On January 4, 1988, and as supplemented December 29, 1988 and January 16, 1989, Carolina Power &, Light (CP&L) requested a revision to TS 6.2.2.e. The requested revision changed a requirement for the Manager - Operations to hold a Senior Reactor Operator (SRO) license to allowing the Manager - Operations to either (1) hold an SRO license, or (2) have at one time held an SRO license on Harris or a similar plant. This revision was approved and issued as Operating License Amendment 9 on March 2, 1989. In the NRC's Evaluation and Safety Summary for Amendment 9, the staffs position with respect to license requirements for the Manager-Operations was that if the Manager - Operations does not hold an SRO license then a middle manager position, such as the Operations Supervisor, shall hold an SRO license. The Operations Supervisor position provided an additional level of supervision between the Manager-Operations and the Shift Foreman. There is no explicit requirement for this position in ANS 3.1 (September 1979 Draft) which is the governing standard for the HNP.

Therefore, TS 6.2.2.e states that the Manager - Operations shall either hold an SRO license or have at one time held an SRO license for a similar unit. The TS requires that the Operations Supervisor, an off-shift middle manager position, also hold an SRO license. The Operations Supervisor position no longer exists. The SRO licensed Superintendent - Work Coordination position at HNP currently provides immediate supervision to the Superintendent - Shift Operations for plant operations and license activities since the current Manager - Operations does not hold an SRO license. The Superintendent - Work Coordination reports to the Manager-Operations. The Manager - Operations provides supervisory support to the operating shifts for administrative and personnel matters.

This TS change proposes to revise TS 6.0, Administrative Controls, by (1) replacing the title "Shift Foreman" with "Superintendent - Shift Operations," wherever used (2) replacing the title "Vice President - Harris Nuclear Project" with "Vice President - Harris Nuclear Plant" in TS 6.1.2 consistent with other TS references to this position, (3) deleting the last sentence in TS 6.2.2.e which states that the Operations Supervisor will hold an SRO license, and (4) adding a new TS 6.2.2.f which states that "Ifthe Manager - Operations does not hold a Senior Reactor Operator License, then a designated Operations middle manager shall hold a Senior Reactor Operator License." This will provide the equivalent off-shift SRO licensed supervision for operations and license activities, previously provided by the Operations Supervisor, without specifying a specific position title.

Basis Changing the titles "Shift Foreman" to "Shift - Superintendent Operations (S-SO)" and "Vice President - Harris Nuclear Project" to "Vice President - Harris Nuclear Plant" are administrative changes. The S-SO continues to be the on-shift licensed SRO individual with the responsibility for the control room command function.

The Manager - Operations has the overall responsibility for management of planning, directing and coordinating operating activities in accordance with applicable regulations, polices and procedures. The Manager - Operations will continue to either hold an SRO license or have at one time held an SRO license at Harris or a similar unit. A licensed SRO middle manager is required for supervision of plant operations and license activities when the Manager - Operations does not hold an SRO license. The current Manager - Operations does not hold an SRO license but has previously held a license at Harris. Therefore, the SRO licensed Superintendent - Work Coordination currently provides the immediate supervision to the S-SO for plant operations and license activities. The current Manager - Operations provides supervision of the operating shifts for administrative and personnel matters. The Manager - Operations may assume the responsibilities of the designated Operations middle manager ifhe or she holds an SRO license.

This change will provide the equivalent off-shift SRO licensed supervision for plant operations and license activities without specifying a specific job title. The combination of the SRO licensed Operations middle manager and the Manager - Operations positions, when the Manager-Operations does not holds an SRO license, continues to fulfill the guidance of ANS 3.1 (September 1979 Draft) for the Operations Manager's position.

Conclusions The changes proposed by this amendment are being requested to more accurately reflect the Operations organization in place at the HNP. CPS'elieves that these changes are organizational and administrative in nature and can be implemented without any decrease in the overall safe and efficient operation of the unit.

,I

\p 1

ENCLOSURE2 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATIONDESCRIPTION TECHNICAL SPECIFICATION 6.0, ADMINISTRATIVECONTROLS 10 CFR 50.92 EVALUATION The Commission has provided standards in 10 CFR 50.92(c) for determining whether a significant hazards consideration exists. A proposed amendment to an operating license for a facility involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. Carolina Power & Light Company has reviewed this proposed license amendment request and determined that its adoption would not involve a significant hazards determination. The bases for this determination are as follows:

Pro osed Chan e This Technical Specification (TS) change proposes to revise TS 6.0, Administrative Controls, by (1) replacing the title "Shift Foreman" with "Superintendent - Shift Operations," wherever used (2) replacing the title "Vice President - Harris Nuclear Project" with "Vice President - Harris Nuclear Plant" in TS 6.1.2 consistent with other TS references to this position, (3) deleting the last sentence in TS 6.2.2.e which states that the Operations Supervisor will hold a Senior Reactor Operator (SRO) license, and (4) adding a new TS 6.2.2.f which states that "Ifthe Manager-Operations does not hold a Senior Reactor Operator License, then a designated Operations middle manager shall hold a Senior Reactor Operator License." This will provide the equivalent off-shift SRO licensed supervision for operations and license activities, previously provided by the Operations Supervisor, without specifying a specific position title.

Basis This change does not involve a significant hazards consideration for the following reasons:

The proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.

The proposed amendment deals with changing position titles and clarification of the Harris Nuclear Plant (HNP) Operations management organization and responsibilities.

The changes are considered to be administrative in nature and do not involve any modifications to any plant equipment or effect plant operation.

Therefore, there would be no increase in the probability or consequences of an accident previously evaluated.

.2: The proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.

The proposed amendment deals with changing position titles and clarification of the HNP Operations management organization and responsibilities. The changes are considered to be administrative in nature and do not involve any modifications to any plant equipment or effect plant operation.

Therefore, the proposed change does not create the possibility of a new or different kind of accident &om any accident previously evaluated.

3. The proposed amendment does not involve a significant reduction in the margin of safety.

The proposed amendment does not reduce the margin of safety as defined in the Safety Analysis Report or the bases contained in the Technical Specifications. The requirement to have a licensed SRO management position responsible for plant operations is maintained within the proposed amendment.

Therefore, the proposed change does not involve a significant reduction in the margin of safety.

E2-2

~ ~

o

ENCLOSURE3 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATIONDESCRIPTION TECHNICAL SPECIFICATION 6.0, ADMINISTRATIVECONTROLS ENVIRONMENTALCONSIDERATIONS 10 CFR 51.22(c)(9) provides criterion for and identification of licensing and regulatory actions eligible for categorical exclusion from performing an environmental assessment. A proposed amendment to an operating license for a facility requires no environmental assessment if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration; (2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (3) result in a significant increase in individual or cumulative occupational radiation exposure. Carolina Power & Light Company has reviewed this request and determined that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of the amendment. The basis for this determination follows:

Pro osed Chan e This Technical Specification (TS) change proposes to revise TS 6.0, Administrative Controls, by (1) replacing the title "Shift Foreman" with "Superintendent - Shift Operations," wherever used (2) replacing the title "Vice President - Harris Nuclear Project" with "Vice President - Harris Nuclear Plant" in TS 6.1.2 consistent with other TS references to this position, (3) deleting the last sentence in TS 6.2.2.e which states that the Operations Super visor will hold a Senior Reactor Operator (SRO) license, and (4) adding a new TS 6.2.2.f which states that "Ifthe Manager-Operations does not hold a Senior Reactor Operator License, then a designated Operations middle manager shall hold a Senior Reactor Operator License." This will provide the equivalent off-shift SRO licensed supervision for operations and license activities, previously provided by the Operations Supervisor, without specifying a specific position title.

Basis The change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) for the following reasons:

1. As demonstrated in Enclosure 2, the proposed amendment does not involve a significant hazards consideration.

E3-1

2.'he proposed amendment does not result in a significant change in the types or increase in the amounts of any effluents that may be released offsite.

The proposed changes are administrative in nature and do not involve any new equipment or require existing systems to perform a different type of function than they are currently designed to perform. The change does not introduce any new effluents or increase the quantities of existing effluents. As such, the change cannot affect the types or amounts of any effluents that may be released offsite.

3. The proposed amendment does not result in a significant increase in individual or cumulative occupational radiation exposure.

The proposed changes are administrative in nature and do not result in any physical plant changes or new surveillances which would require additional personnel entry into radiation controlled areas. Therefore, the amendment has no affect on either individual or cumulative occupational radiation exposure.

E3-2

ENCLOSURE4 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATIONDESCRIPTION TECHNICAL SPECIFICATION 6.0, ADMINISTRATIVECONTROLS PAGE CHANGE INSTRUCTIONS Removed Pa e d 6-1 6-1 6-la 6-la 6-5 6-5 6-6 6-6 6-26 6-26 6-27 6-27 E4-1