Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18017A92521 October 1999Application for Amend to License NPF-63,implementing Selected Improvements Described in GL 93-05
ML18017A85126 August 1999Application for Amend to License NPF-63,revising TS 3/4.9.4 & Associated Bases to Allow Penetrations Which Provide Direct Access from Containment Atmosphere to Outside Atmosphere to Remain Open During Refueling OperationsLocal Leak Rate Testing
ML18016B0504 August 1999Application for Amend to License NPF-63,revising TS to Incorporate Analytical Methodology References in TS 6.9.1.6.2 Which Are Used to Determine Core Operating Limits
ML18016B0432 August 1999Application for Amend to License NPF-63,revising TS 6.2.2.e to Require Either Operations Manager or off-shift Operations Superintendent to Hold SRO License
ML18016B0119 July 1999Application for Amend to License NPF-63,relocating TS 3/4.3.3.3,TS 3/4.3.3.4,TS 3/4.3.3.9 & TS 3/4.3.3.11 to Plant Procedure PLP-114, Relocated Tech Specs & Design Basis Requirements, IAW GL 95-10Overspeed trip
ML18016B0079 July 1999Application for Amend to License NPF-63,revising TS 3/4.2.2, TS 3/4.2.3 & TS 3/4.2.5,providing Clarification & Reducing Burden of Addl License Amend Processing by Implementing Guidance in GL 88-16 & NUREG-1431,Rev 1, Std TS W Plants.Power change
ML18016A98915 June 1999Application for Amend to License NPF-63,revising TS to Incorporate performance-based 10CFR50 App J,Option B for Type a Tests (Containment Integrated Leakage Rate Tests)
ML18016A9762 June 1999Application for Amend to License NPF-63,revising TS 6.5, Review & Audit, TS 6.8, Procedures & Program & TS 6.10, Record Retention.
ML18016A83826 February 1999Application for Amend to License NPF-63,revising TS Table Notations for TS Table 3.3-4, ESFAS Instrumentation Trip Setpoints. Description of Changes & Environmental Evaluation,Encl
ML18016A76823 December 1998Application for Amend to License NPF-63,revising TS 5.6, Fuel Storage, by Increasing Spent Fuel Storage Capacity by Adding Rack Modules to Pools 'C' & 'D.' Non-proprietary & Proprietary Licensing Repts Encl.Proprietary Info WithheldTime to boil
Earthquake
Power Uprate
Affidavit
ML18016A6031 October 1998Application for Amend to License NPF-63,further Revising TS 3.0.4 to Clarify Intent Re Mode Changes as Discussed in Proposed Bases.Change to Retyped Page TS 3.9.9,encl
ML18016A59223 September 1998Application for Amend to License NPF-63,revising TS 3/4.6.1.3 to Be Consistent with NUREG-1431,rev 1 Std Tech Specs,W Plants, Dtd Apr 1995 & to Clarify Requirements for Locking Air Lock Door ShutHigh Radiation Area
ML18016A5441 September 1998Application for Amend to License NPF-63,revising TS 3/4.9.11 to Require 23 Feet of Water Above Top of Fuel Rods within Irradiated Fuel Assemblies Seated in Storage Racks
ML18016A53927 August 1998Application for Amend to License NPF-63,revising TS Re Applicability of LCO & Surveillance Requirements,Per GL 87-09
ML18016A50314 August 1998Application for Amend to License NPF-63,deleting SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fuel Handling Bldg Emergency Exhaust Sys Is Locked in Balanced Position at Least Once Per 18 Months
ML18016A39924 April 1998Application for Amend to License NPF-63,revising TS 3/4.3.2, ESFAS Instrumentation, to Allow Two Hour Surveillance Interval to Facilitate Testing of 6.9 Kv Emergency Bus Undervoltage Relays
ML18016A34612 March 1998Application for Amend to License NPF-63,deleting TS SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fhb EES Is Locked in Balanced Position at Least Once Per 18 MonthsSafe Shutdown Earthquake
ML18016A25616 December 1997Application for Amend to License NPF-63,revising TS 4.7.1.2.1.a.2.a to Change Differential Pressure & Flow Requirements of Steam turbine-driven AFW Pump to Allow Testing of Pump at Lower Speed than Is Currently Performed
ML18016A22229 October 1997Application for Amend to License NPF-63,revising TS 3/4.8.1, AC Sources - Operating & Associated Bases to Clarify Intent of Ts,Per NUREG-1431,Rev 1
ML18012A81012 June 1997Application for Amend to License NPF-63,amending TS 6.0, Administrative Controls, TS 6.2.2.e & TS 6.2.2.f
ML18012A78416 May 1997Application for Amend to License NPF-63,informing That TS 4.6.2.3 a.2 Requires Verification at Least Once Per 31 Days of Cw Flow Rate of Greater than or Equal to 1425 Gpm to Each Containment Fan Cooler
ML18012A63423 April 1997Application for Amend to License NPF-63,incorporating Enhancements to TS Identified in Plant Review Performed IAW GL 96-01.Changes Affect Specs 4.3.2.1.1.a,4.3.2.1.4.b, 4.3.2.1.6.g,4.3.2.1.10.a,4.3.2.1.10.b & 4.7.3.b.3
ML18012A57617 March 1997Application for Amend to License NPF-63,revising Tech Specs Surveillances 4.1.2.2.c,4.5.2.e,4.6.2.1.c,4.6.2.2.c,4.6.3.2, 4.7.1.2.1.b,4.7.3b & 4.7.4.b to Delete Specific Restrictions in Text of Surveillances
ML18022B00214 March 1997Application for Amend to License NPF-63,increasing AOT for Refueling Water Storage Tank to Twelve Hs While Performing TS Surveillance 4.4.6.2.2
ML18022B00510 March 1997Application for Amend to License NPF-63,revising TS 3.5.1 to Provide Optional Method of Meeting Surveillance Requirement & to Add New Action Statement Re Boron Concentration
ML18022B00127 February 1997Application for Amend to License NPF-63,amending TS 3/4.4.5, Sgs, & Associated Bases,To Add Sleeve Installation as Alternative to Tube Plugging for Repairing Degraded ST Tubes.Trs encl.CEN-630-P,rev 1 WithheldNon-Destructive Examination
Safe Shutdown Earthquake
Hydrostatic
Nondestructive Examination
Stress corrosion cracking
Eddy Current Testing
Affidavit
ML18012A52918 February 1997Application for Amend to License NPF-63,revising Tech Specs 3/4.7.1, Turbine Cycle Safety Valves.
ML18012A4986 February 1997Application for Amend to License NPF-63,adding New Entry 3.0.5 to 3/4.0 Applicability.New 3.0.5 Provides Specific Guidance for Returning Equipment to Svc for Sole Purpose of Performing Testing to Demonstrate Operability
ML18012A49429 January 1997Application for Amend to License NPF-63,requesting to Add New Entry 3.0.5 to 3/4.0 to Provide Specific Guidance for Returning Equipment to Service in Order to Demonstrate Operability
ML18012A46210 January 1997Application for Amend to License NPF-63,requesting Rev to TS 4.8.1.1.2.h.2 Re Test Tanks & Nonisolable Piping at Test PressureSafe Shutdown
Hydrostatic
ML18012A44930 December 1996Application for Amend to License NPF-63,requesting Rev to Chemistry Data (Nickel Content) in TS 3/4.4.9 Re Pressure/ Temp LimitsPressure boundary leak
ML18012A41431 October 1996Application for Amend to License NPF-63,revising TSs Re Ultimate Heat Sink Level & TempUltimate heat sink
ML18012A3938 October 1996Application for Amend to License NPF-63,proposing to Implement Change to Bases for TSs 3/4.6.1.4 & 3/4.6.1.6 Revising Calculated Peak Pressure for MSLB Event
ML18012A37018 September 1996Application for Amend to License NPF-63,requesting Change in Diesel Fuel Oil Sys Pressure TestingSafe Shutdown
Hydrostatic
ML18012A30319 July 1996Application for Amend to License NPF-63,TS 3/4.6.2, Containment Spray Sys,Extending Surveillance Interval for Performance of Air or Smoke Flow Test Through CS Nozzles from Once Every 5 Years,To Once Every 10 Years
ML18012A25131 May 1996Application for Amend to License NPF-63,correcting Location Described for One of Three Triaxial Peak Accelerograph RecordersEarthquake
ML18012A18020 March 1996Application for Amend to License NPF-63,relocating TS 3.3.3.2, Movable Incore Detectors & Associated Bases, Consistent w/NUREG-1431 & GL 95-10Probabilistic Risk Assessment
ML18012A14116 February 1996Application for Amend to License NPF-63,revising TS 4.3.2 Re ESFAS Instrumentation
ML18011A8755 April 1995Application for Amend to License NPF-63,revising Portions of Section 3/4.9, Refueling Operations to Be Consistent W/ NUREG-1431 & Relocating Applicable Sections Per Commission Final Policy Statement
ML18011A87230 March 1995Application for Amend to License NPF-63,revising EDG SR Contained in Section 4.8.1.1.2 to Be Consistent w/NUREG-1431 New Std TS for Westinghouse Plants & Eliminating Need for Duplicate EDG Testing Being PerformedOverspeed trip
ML18011A85020 March 1995Application for Amend to License NPF-63 to Relocate Cycle Specific Overpower & Overtemperature Delta T Trip Setpoint Parameters to COLRAnticipated operational occurrence
ML18011A8113 March 1995Application for Amend to License NPF-63,eliminating Response Time Testing for Selected Pressure & Differential Pressure Sensors
ML18022A9476 February 1995Application for Amend to License NPF-63,revising TSs Re Relocation of Shutdown Margin Vs Boron ConcentrationShutdown Margin
ML18011A76919 January 1995Application for Amend to License NPF-63,revising TS SR 4.0.3 & Associated Bases to Provide for Delay in Which to Perform Surveillance Discovered Not Performed within Specified Frequency
ML18011A74119 December 1994Application for Amend to License NPF-63,requesting one-time Schedular Rev to TS Re Containment Leak Rate TestingLocal Leak Rate Testing
Integrated leak rate test
Exemption Request
ML18011A7156 December 1994Application for Amend to License NPF-63 to TS Re Revised TS Page Concerning Relocation of Selected TS in Accordance w/NUREG-1431
ML18011A7056 December 1994Application for Amend to License NPF-63,revising TS to Relocate Certain TS Requirements in Accordance w/NUREG-1431, Std Ts,Westinghouse Plants.
ML18011A68823 November 1994Application for Amend to License NPF-63 to TS Re Changes to ECCS Evaluation Model
ML18011A61424 October 1994Application for Amend to License NPF-63,relocating Selected TS Per NUREG-1431Overspeed trip
ML18011A58412 September 1994Application for Amend to License NPF-63,revising TS3/4.8.1, AC Sources & Associated Bases