HNP-98-141, Application for Amend to License NPF-63,further Revising TS 3.0.4 to Clarify Intent Re Mode Changes as Discussed in Proposed Bases.Change to Retyped Page TS 3.9.9,encl

From kanterella
(Redirected from ML18016A603)
Jump to navigation Jump to search
Application for Amend to License NPF-63,further Revising TS 3.0.4 to Clarify Intent Re Mode Changes as Discussed in Proposed Bases.Change to Retyped Page TS 3.9.9,encl
ML18016A603
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/01/1998
From: Scarola J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18016A604 List:
References
GL-87-09, GL-87-9, HNP-98-141, NUDOCS 9810070333
Download: ML18016A603 (5)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9810070333

'OC.DATE: 98/10/01 NOTARIZED: YES FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH."NAME/"

AUTHOR AFFILIATION SCAROLA,J.

Carolina Power E Light Co.

RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards retyped TS change page that was originally submitted in 980827 LAR.

DTSTRIBDTTON CODE:

A001D CORTES RECETVED:LTR \\

ENCL I

STRE:

TITLE: OR Submittal: General Distribution NOTES:Application for permit renewal filed.

DOCKET ¹ 05000400 C

A T

05000'40+

RECIPIENT ID CODE/NAME PD2-1 LA FLANDERS,S INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

0 1

1 RECIPIENT ID CODE/NAME PD2-1 PD IL'E VENTER 01 NRR DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPI'ES RECEIVED BY YOU OR YOUR'ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 13

Carolina Power &light Company PO Box 165 New Hill NC 27562 James Scarola Vice President Harris Nuclear Plant OCT -1 1998 SERIAL:

HNP-98-141 10CFR50.90 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT APPLICABILITYOF LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCEREQUIREMENTS - SUPPLEMENTALINFORMATION

Dear Sir or Madam:

By letter dated August 27, 1998, Carolina Power &Light Company (CP8cL) submitted a Request for License Amendment for the Harris Nuclear Plant (HNP). The proposed amendment revised Technical Specifications (TS) concerning the applicability ofLimitingConditions for Operation and Surveillance Requirements to be consistent with NRC Generic Letter (GL) 87-09, dated June 4, 1987.

Based on discussions with the NRC staff, HNP proposes to further revise TS 3.0.4 to clarify the intent regarding mode changes as discussed in the proposed Bases. Specifically, HNP proposes to add a phrase in TS 3.0.4 to clarify that TS 3.0.4 does not prevent passage through or to operational modes as required to perform a shutdown of the unit. This is consistent with guidance in the GL 87-09 Bases for TS 3.0.4 that states that this specification precludes placing the facility in a higher mode of operation. Therefore, the intent of this specification is not to preclude a unit shutdown.

In addition, this letter includes a change to a retyped page contained in the original submittal.

Specifically, the retyped TS 3.9.9 page was not consistent with the marked-up TS page in that the word "are" was inadvertently omitted. Enclosed is the retyped TS page.

These changes do not affect the conclusions of either the 10 CFR 50.92 Evaluation or the Environmental Considerations submitted as part of the original August 27, 1998 request.

Enclosure l provides the revised proposed TS p iges.

Please refer any questions regarding this submittal to Mr. J. H. Eads at (919) 362-2646.

tt i.

98i0070333 9'BiOOi PDR ADOCK 05000400 P

Sincerely, 5dl 3 Shearon Harris Road New Hill, NC Tel 919 362-2502 Fax 919 362-2095

MSE/mse

Enclosures:

1.

Technical Specification Pages.

James Scarola, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief, and the sources of his information are employees, contractors, and agents of Carolina Power 0 Light Company.

Notary (Seal)

My commission expires:

~~ggt&ttf~

Oy g~

~

so

>QTAQ o

g)

~UBL't4 Cygllllitllll Mr. J. B. Brady, NRC Sr. Resident Inspector Mr. Mel Fry, Acting Director, N.C. DEHNR Mr. S. C. Flanders, NRC Project Manager Mr. L. A. Reyes, NRC Regional Administrator

ENCLOSURE 1 TO SERIAL: HNP-98-141 SHEARON HARRIS NUCLEARPOWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT APPLICABILITYOF LIMITINGCONDITIONS FOR OPERATION ANDSURVEILLANCEREQUIREMENTS SUPPLEMENTALINFORMATION TECHNICALSPECIFICATION PAGES Page E1-1

P P

l-t