| | number = ML15245A003 | | | number = ML15245A003 |
| | issue date = 08/26/2015 | | | issue date = 08/26/2015 |
| | title = RAI for Browns Ferry Application to Require SLC Instrumentation in Additional Mode (MF5748, MF5749, and MF5750) | | | title = NRR E-mail Capture - RAI for Browns Ferry Application to Require SLC Instrumentation in Additional Mode (MF5748, MF5749, and MF5750) |
| | author name = Saba F | | | author name = Saba F |
| | author affiliation = NRC/NRR/DORL/LPLII-2 | | | author affiliation = NRC/NRR/DORL/LPLII-2 |
Latest revision as of 21:39, 4 December 2019
Letter Sequence RAI |
---|
|
|
MONTHYEARLR-N14-0183, Submittal of PWR Vessel Internals Inspection Plans for Aging Management of Reactor Internals2014-08-11011 August 2014 Submittal of PWR Vessel Internals Inspection Plans for Aging Management of Reactor Internals Project stage: Request CNL-14-166, Application to Revise Technical Specifications 3.3.6.1, Table 3.3.6.1-1, Function 5.g and Bases (BFN-TS-479)2015-02-17017 February 2015 Application to Revise Technical Specifications 3.3.6.1, Table 3.3.6.1-1, Function 5.g and Bases (BFN-TS-479) Project stage: Request ML15069A1812015-03-31031 March 2015 Request for Additional Information Aging Management Program Plan for Reactor Vessel Internals (TAC Nos. MF5149 and MF5150) Project stage: RAI ML15091A6972015-03-31031 March 2015 NRR E-mail Capture - Acceptance Review for Browns Ferry 1, 2, and 3 - Revise TS 3.3.6.1, Table 3.3.6.1-1, Function 5.g and Bases (BFN-TS-479) (MF5748, MF5749, and MF5750) Project stage: Acceptance Review ML15245A0032015-08-26026 August 2015 NRR E-mail Capture - RAI for Browns Ferry Application to Require SLC Instrumentation in Additional Mode (MF5748, MF5749, and MF5750) Project stage: RAI CNL-15-187, Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications (TS) 3.3.6.1, Table 3.3.6.1-1 to Require Standby Liquid Control (SLC) System Instrumentation In..2015-09-25025 September 2015 Response to NRC Request for Additional Information (RAI) Regarding Application to Revise Technical Specifications (TS) 3.3.6.1, Table 3.3.6.1-1 to Require Standby Liquid Control (SLC) System Instrumentation In.. Project stage: Response to RAI 2015-03-31
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24255A5802024-09-10010 September 2024 SLRA - Requests for Additional Information - Set 1 - Email from Jessica Hammock to James Barstow ML24170A6392024-06-17017 June 2024 Notification of Inspection and Request for Information ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A0272024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML23355A2202023-12-21021 December 2023 Radiation Protection Inspection - Inspection Report 2024-01 ML23332A0042023-11-27027 November 2023 NRR E-mail Capture - Request for Additional Information Related to Proposed Revised Alternative 0-ISI-47 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML24074A4172023-10-12012 October 2023 2024 EP Inspections RFI Email Confirmations: Redacted ML23243A9892023-08-29029 August 2023 Inspection Information Request ML23208A0872023-07-26026 July 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry 1, 2, and 3, Alternative Request 0-ISI-47 to Use an Alternative to ASME Code, Section XI, Examination Requirements for Examination Categories B-N-1 and B-N-2 ML23124A0082023-05-0303 May 2023 NRR E-mail Capture - Request for Additional Information Related to Proposed Alternative Requests for the 5th 10-Year Inservice Testing Interval for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML23117A0702023-04-26026 April 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry, 1, 2, and 3, License Amendment Request to Revise Tech Specs Surveillance Requirements 3.4.3.2 and 3.5.1.11 Safety Relief Valves (BFN TS-540) ML23097A0172023-04-0606 April 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry, Units 1, 2, and 3, License Amendment Request to Adopt TSTF-566-A and TSTF-580-A, Revision 1 ML23073A2082023-03-10010 March 2023 TVA Intentions on EA-22-122 - Choice Letter Response Email Message ML23073A2072023-03-10010 March 2023 TVA Intentions on EA-22-122 - Choice Letter Response Email Message - NRC Acknowledgement ML23075A0502023-03-10010 March 2023 TVA Intentions on EA-22-122 - Choice Letter Response Email Message and TVA Intentions on EA-22-122 - Choice Letter Response Email Message -- NRC Acknowledgement ML23052A0792023-02-21021 February 2023 NRR E-mail Capture - Acceptance Review for Browns Ferry and Sequoyah License Amendment Request to Adopt TSTF-541 ML23041A0022023-02-0909 February 2023 NRR E-mail Capture - Request for Additional Information Related to TVA Alternative Request BFN-0-ISI-32 (CNL-22-025) ML23013A1512023-01-13013 January 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Request to Use Later ASME OM Code Edition and Alternative Requests BFN-IST-01 Through BFN-IST-05 ML23017A0062023-01-12012 January 2023 Initial Information Request Inspection Report: 2023001 ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23004A0352023-01-0404 January 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry, Units 1, 2, and 3, License Amendment Request to Delete TS 3.6.3.1 by Adopting TSTF-478 ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22304A1852022-10-31031 October 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry, Units 1, 2, and 3, License Amendment Request to Remove Site Acreage Description from TS 4.1 ML22299A0292022-10-26026 October 2022 NRR E-mail Capture - Request for Additional Information for Relief Request BFN-2-ISI-003 Re Weld Examination Coverage ML22292A2722022-10-19019 October 2022 NRR E-mail Capture - Request for Additional Information Related to TVAs Request to Adopt TSTF-505 and TSTF-439 for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML22265A1492022-09-21021 September 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Alternative Request BFN-0-ISI-32 ML22259A0382022-09-14014 September 2022 NRR E-mail Capture - Browns Ferry TSTF-505 Audit Questions - Part 4 ML22259A0392022-09-14014 September 2022 NRR E-mail Capture - Browns Ferry TSTF-505 Audit Questions - Part 5 ML22259A0372022-09-13013 September 2022 NRR E-mail Capture - Browns Ferry TSTF-505 Audit Questions - Part 3 ML22238A0672022-08-24024 August 2022 NRR E-mail Capture - Browns Ferry TSTF-505 Audit Questions - Part 2 ML22238A0652022-08-19019 August 2022 NRR E-mail Capture - Browns Ferry TSTF-505 Audit Questions ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22208A2172022-07-15015 July 2022 NRR E-mail Capture - Request for Additional Information Related to TVA Relief Request BFN-21-ISI-02 (CNL-21-081) ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22173A1682022-06-21021 June 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Unit 2, Relief Request BFN-2-ISI-003 ML22168A0802022-06-17017 June 2022 NRR E-mail Capture - Request for Confirmation of Information and Additional Information Related to TVAs Request to Use Control Bay Chiller Cross-Tie ML22160A4742022-06-0303 June 2022 NRR E-mail Capture - Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Additional Information Re LAR to Use Advanced Framatome Methodologies in Support of Atrium 11 Fuel ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22168A0392022-05-13013 May 2022 NRR E-mail Capture - Draft Request for Confirmation of Information and Additional Information Related to TVAs Request to Use Control Bay Chiller Cross-Tie ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to TVAs Request to Revised the TVA Plants Radiological Emergency Plans ML22131A1692022-05-0303 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, License Amendment Request to Adopt TSTF-505 and TSTF-439 ML22091A1942022-03-0808 March 2022 2022 BFN POV Inspection Information Request ML22055A0772022-02-22022 February 2022 NRR E-mail Capture - Results of NRC SUNSI Review of Browns Ferry Nuclear Plant, Units 1, 2, and 3, Updated Final Safety Analysis Report, Amendment 29 ML22047A1612022-02-16016 February 2022 NRR E-mail Capture - Request for Additional Information Regarding TVAs Request to Expand the SFP Criticality Safety Analysis for Browns Ferry Nuclear Plant, Units 1, 2, and 3 2024-09-10
[Table view] |
Text
NRR-PMDAPEm Resource From: Saba, Farideh Sent: Wednesday, August 26, 2015 1:43 PM To: Williams, Gordon Robert (grwilliams1@tva.gov); Hammargren, Benjamin John Cc: Schrull, Edward Dustin (edschrull@tva.gov); Chernoff, Margaret
Subject:
RAI for Browns Ferry Application to require SLC instrumentation in additional mode (MF5748, MF5749, and MF5750)
Importance: High Gordon and Ben, By letter dated February 17, 2015, (Agencywide Documents Access and Management System Accession No. ML15050A179), Tennessee Valley Authority, (TVA, the licensee), submitted a license amendment request (LAR), regarding Browns Ferry Nuclear (BFN) Plant, Units 1, 2 and 3 to modify Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation to incorporate an additional mode of applicability for the Standby Liquid Control (SLC) System initiation instrumentation RAI STSB- 01:
The regulation at 10 CFR 50.36(c)(2) requires that Limiting Conditions for Operation (LCOs) be included in TSs. LCOs are the lowest functional capability or performance levels of equipment require or safe operation of a facility. LCOs must be established for items that meet one of four criteria contained in 10 CFR 50.36(c)(2)(ii). The regulations do not specify requirements for the contents of individual TSs.
The application states that the use of the SLCS [Standby Liquid Control system] to control suppression pool pH below 7 is further discussed in Final Safety Analysis Report Section 14.6.3.5. This FSAR section describes the use of the SLCS operation to add sodium pentaborate solution to the suppression pool water in order to maintain it below a pH of 7 following a LOCA event.
The NRC staff reviewed FSAR section 14.6.3.5. The FSAR section states that the buffering effect of SLCS injection within several hours is sufficient to offset the effects of these acids that are transported to the pool. Sufficient sodium pentaborate solution is available to maintain the suppression pool pH at or above 7.0 for 30 days post-accident. Section 3.8.1 of the FSAR states that the safety objective of the SLCS is to provide sufficient buffering agent to maintain the suppression pool pH at or above 7.0 following a DBA LOCA involving fuel damage. This is consistent with the safety evaluation for full scale implementation of the alternative source term amendment.
Please clarify (1) whether the post LOCA suppression pool pH is calculated to be below 7 or at or above 7; (2) clarify the SLC systems function in maintaining the post LOCA suppression pool pH; and (3) confirm that the calculated post LOCA suppression pool pH is consistent with the accident analysis assumptions.
As discussed with Mr. Ben Hammargren during our clarification call today (08/26/15), please respond to the above RAI by September 25, 2015.
Thank you, Farideh Farideh E. Saba, P.E.
Senior Project Manager 1
NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV 2
Hearing Identifier: NRR_PMDA Email Number: 2355 Mail Envelope Properties (Farideh.Saba@nrc.gov20150826134300)
Subject:
RAI for Browns Ferry Application to require SLC instrumentation in additional mode (MF5748, MF5749, and MF5750)
Sent Date: 8/26/2015 1:43:19 PM Received Date: 8/26/2015 1:43:00 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients:
"Schrull, Edward Dustin (edschrull@tva.gov)" <edschrull@tva.gov>
Tracking Status: None "Chernoff, Margaret" <Margaret.Chernoff@nrc.gov>
Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov>
Tracking Status: None "Hammargren, Benjamin John" <bjhammargren@tva.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2673 8/26/2015 1:43:00 PM Options Priority: High Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:
Recipients Received: