ML18139B774: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 27: Line 27:
: 30. Turbine Tr:l.p Setpoint                      ~.A.                R                  R    Stop valve closure or low EH fluid pressure
: 30. Turbine Tr:l.p Setpoint                      ~.A.                R                  R    Stop valve closure or low EH fluid pressure
                                                                                                                                   *i
                                                                                                                                   *i
                                                                                                                                  -,
: 31. Seismic Instrumentation                      M                  R                  M
: 31. Seismic Instrumentation                      M                  R                  M
: 32. Reactor Trip Breaker                          N.A.                N.A.              M
: 32. Reactor Trip Breaker                          N.A.                N.A.              M
Line 33: Line 32:
: 34. Auxiliary Feedwater
: 34. Auxiliary Feedwater
: a.      Steam Generator Water                s                  R                  M Level Low-Low s
: a.      Steam Generator Water                s                  R                  M Level Low-Low s
                                                                                                                                -
: b.      RCP Undervoltage                                          R                  M
: b.      RCP Undervoltage                                          R                  M
: c.      S.I.                          - (All Safety Injection surveillance requirements)
: c.      S.I.                          - (All Safety Injection surveillance requirements)

Latest revision as of 00:58, 3 February 2020

Proposed Revision to Tech Spec Table 4.1-1,Item 31,changing Channel Calibr for Seismic Instrumentation from Semiannual to Refueling Frequency
ML18139B774
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/24/1982
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139B773 List:
References
NUDOCS 8203050235
Download: ML18139B774 (1)


Text

-*------- ------ --------- ---- ----

8203050235 820224 PDR ADQCI,( 05000280 p PDR

. - -*-- -- TABLE 4.1-1 CHANNEL DESCRIPTION CHECK CALIBRATE TEST REMARKS

25. Turbine First Stage Pressure s R M
26. Emergency Plan Radiati~n Instr._ *M R M
27. Environmental Radiation Monitors *M N.A. N.A. TLD Dosimeters
28. Logic Channel Testing N.A. N.A. M
29. Turbine Overspeed Protection N.A. R R Trip Chann_el (Electrical)
30. Turbine Tr:l.p Setpoint ~.A. R R Stop valve closure or low EH fluid pressure
  • i
31. Seismic Instrumentation M R M
32. Reactor Trip Breaker N.A. N.A. M
33. Reactor Coolant Pressure (Low) N.A. R N.A.
34. Auxiliary Feedwater
a. Steam Generator Water s R M Level Low-Low s
b. RCP Undervoltage R M
c. S.I. - (All Safety Injection surveillance requirements)
d. Station Blackout N.A. R N.A.
e. Main Feedwater Pump Trip N.A. N.A. R S - Each shift M - Monthly*

D - Daily P - Prior to each startup if not done previous week W.- Weekly R - Each Refueling Shutdown NA - Not applicable BW - Every two weeks SA - Semiannually AP - After each startup if not done previous week Q - Every 90 effective full power days - . 1

  • See Specification 4.lD