MONTHYEARML20195B4371999-05-26026 May 1999 Application for Amend to License DPR-40,proposing to Relocate pressure-temp Curves,Predicated Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS pressure- Temp Limits Rept ML20205J7631999-03-31031 March 1999 Application for Amend to License DPR-40,increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate ML20203A0991999-01-29029 January 1999 Application for Amend to License DPR-40,relocating Three cycle-specific Parameter Limits from FCS TS to COLR ML20195K1771998-11-17017 November 1998 Revised Application for Amend to License DPR-40, Incorporating Addl Restrictions on Operation of MSSVs ML20154A0661998-09-28028 September 1998 Application for Amend to License DPR-40,allowing Installation of Capability for Override of Containment Isolation Actuation Signal Closure Signal to Containment Isolation Valves for RCS Letdown Flow ML20217B8181998-03-18018 March 1998 Application for Amend to License DPR-40,requesting Tech Specs Set Forth in App a to License Amended to Clearly Address Regulatory Requirements for Alternate Shutdown Panel & Auxiliary Feedwater Panel ML20217B8481998-03-18018 March 1998 Application for Amend to License DPR-40,changing TS 5.2 & 5.11.2 to Change Title of Shift Supervisor to Shift Manager ML20217P1981998-03-0303 March 1998 Application for Amend to License DPR-40,revising TS 2.6 & Basis by Replacing Refs to TS 3.5(4) W/Refs to TS 5.19 ML20199L8911998-01-30030 January 1998 Application for Amend to License DPR-40,relocating pressure- Temp Curves,Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS PT Limits Rept (PTLR) ML20199L7221998-01-30030 January 1998 Application for Amend to License DPR-40,requesting Deletion of Section 3.E, License Term from License ML20203G4101997-12-11011 December 1997 Application for Amend to License DPR-40,adding New LCO to TS 2.15 Pertaining to Inoperable ESF Logic Subsystem ML20199K1221997-11-21021 November 1997 Application for Amend to License DPR-40,revising Tech Specs 5.19 by Incorporating Editoral Changes & Two Exceptions to NEI-94-01,Rev 0, Industry Guideline for Implementing Performance-Based Option of 10CFR50,App J ML20217G4541997-10-0303 October 1997 Application for Amend to License DPR-40,revising TS Surveillance 3.9, Auxiliary Feedwater Sys, to Clarify What Flow Paths Are Required to Be Tested & Delete Specific Discharge Pressure ML20196J0781997-07-25025 July 1997 Application for Amend to License DPR-40,allowing Frequency of Conducting ILRT & Local Leak Rate Testing to Be Based on Component Performance & Implementing Option B of 10CFR50,App J ML20137Y1591997-04-17017 April 1997 Application for Amend to License DPR-40,requesting Rev to Administrative Controls Consistent w/NUREG-1432 Standard TS for Combustion Engineering Plants.Tech Specs Encl LIC-97-0049, Application for Amend to License DPR-40,incorporating Addl Restrictions on Operation of MSSVs1997-03-26026 March 1997 Application for Amend to License DPR-40,incorporating Addl Restrictions on Operation of MSSVs ML20138L4341997-02-20020 February 1997 Application for Amend to License DPR-40,requesting to Update TS Re Rev to Position Titles & Relocation of Controls for Personnel Working Hours ML20134N8491996-11-20020 November 1996 Application for Amend to License DPR-40,requesting Administrative Revisions to Paragraph 3,Table of Contents, Tech Spec 2.15 & Section 5 of Appendix a ML20129E4921996-10-24024 October 1996 Application for Amend to License DPR-40,TS 4.3.2, Reactor Core & Control, Allowing Use of Either Zircaloy or ZIRLO Cladding ML20129C2491996-10-22022 October 1996 Application for Amend to License DPR-40,revising TS 4.3.2, Reactor Core & Control & Adding Ref to WCAP-12610 in TS 5.9.5b ML20117B8771996-08-23023 August 1996 Application for Amend to OL Revising Paragraph 2.B of License to Allow Use of Source Matl as Reactor Fuel ML20115F9971996-07-15015 July 1996 Application for Amend to License DPR-40,revising Description of Reactor Core & Control & Adding Westinghouse Topical Rept List of Analytical Methods,Used to Determine Core Operating Limits ML20112D3151996-05-31031 May 1996 Application for Amend to License DPR-40,adding LCO for Trisodium Phosphate & Increasing Min Required Amount of Trisodium Phosphate Contained in Containment Sump Mesh Baskets ML20117H6951996-05-20020 May 1996 Application for Amend to License DPR-40,clarifying Surveillance Test Requirements in TS 3,1,Tables 3-1,3-2,3-3 & 3-3A ML20117H5871996-05-17017 May 1996 Application for Amend to License DPR-40,relocating Operability Requirements for Shock Suppressors (Snubbers) from TS to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements Into TS 3.3 ML20097C3031996-02-0101 February 1996 Application for Amend to License DPR-40,allowing Increase in Initial Nominal U-235 Enrichment Limit of Fuel Assemblies That May Be Stored in Spent Fuel Pool ML20100C0161996-01-22022 January 1996 Application for Amend to License DPR-40 Revising TS Re Requirement for Placing Sirw Tank low-level Channels in Bypass Rather than Trip ML20094N8571995-11-16016 November 1995 Application for Amend to License DPR-40,adding LCO & Surveillance Test for Safety Related Inverters & Deleting Nonsafety Related Instrument Buses LIC-95-0167, Application for Amend to License DPR-40,revising TS 2.7 Extending Allowed Outage Time from 7 Days Per Month to 7 Days W/Addl Once Per Cycle 10 Day Allowed Outage Time1995-09-0606 September 1995 Application for Amend to License DPR-40,revising TS 2.7 Extending Allowed Outage Time from 7 Days Per Month to 7 Days W/Addl Once Per Cycle 10 Day Allowed Outage Time ML20087E0241995-08-0404 August 1995 Application for Amend to License DPR-40,revising TS Re Reducing Min Operable Containment Radiation High Signal Channels ML20086L5921995-07-11011 July 1995 Application for Amend to License DPR-40,proposing TS Allowing Up to 24 Hours to Resotre SIT Operability If Inoperable ML20091G3651995-06-27027 June 1995 Application for Amend to License DPR-40.Amend Would Extend Allowed Outage Time for Inoperable LPSI Pump from 24 H to Seven Days ML20086D3601995-06-27027 June 1995 Application for Amend to License DPR-40.Amend Will Modify & Reformat TS Re Chemical & Vol Control Sys ML20084G7721995-05-31031 May 1995 Application for Amend to License DPR-40 to Provide Addl Restrictions on Operation of CCW Sys Heat Exchangers ML20083C0021995-05-0808 May 1995 Application for Amend to License DPR-40,incorporating Revs Per GL 93-05 to Specs 2.3,3.1,3.2,3.3 & 3.6 ML20082J0811995-04-0707 April 1995 Application for Amend to License DPR-40.Amend Would Incorporate Administrative Changes ML20087G9651995-04-0707 April 1995 Application for Amend to License DPR-40.Amend Would Relocate Axial Power Distribution Figure from TSs to Core Operating Limits Rept ML20080T9001995-03-0101 March 1995 Application for Amend to License DPR-40,incorporating Administrative Revs to TS 5.5 & 5.8,per GL 93-07, Mod of TS Administrative Control Requirements for Emergency & Security Plans & Revs Unrelated to GL to TS 2.5,2.8,2.11,3.2 & 3.10 ML20078P8191995-02-10010 February 1995 Application for Amend to License DPR-40,revising TS to Relocate Requirements for Incore Instrumentation Sys ML20077S1541995-01-0909 January 1995 Application for Amend to License DPR-40,revising Specs 2.22 & 3.1 to Delete Requirements for Toxic Gas Monitoring Sys ML20078G8951994-11-11011 November 1994 Application for Amend to License DPR-40,making Administrative Changes to TSs 5.2 & 5.5 ML20024J3911994-10-0707 October 1994 Application for Amend to License DPR-40,deleting SRs in TS 3.6(3)a for Eight Raw Water Backup Valves to Containment Cooling Coils,Deleting SRs in TS 3.2,Table 3-5,item 6 for 58 Raw Water Valves & Revising Basis of TS 2.4 ML20069H9061994-06-0606 June 1994 Application for Amend to License DPR-40,revising Ts,By Incorporating Changes to Credit Leak Before Break Methodology to Resolve USI A-2, Asymmetrical Blowdown Loads on Rpcs ML20069D8401994-05-25025 May 1994 Application for Amend to License DPR-40,requesting one-time Schedular Exemption from 10CFR50.36a(2) ML20062N4171993-12-28028 December 1993 Application for Amend to License DPR-40,revising TS Surveillance Test Frequency from Monthly to Quarterly for Several Channel Functional Tests for RPS & ESF Instrumentation & Controls ML20057F7191993-10-11011 October 1993 Application for Amend to License DPR-40,proposing Changes to TS 5.9.5 Deleting Revision Numbers & Dates of Core Reload Analysis Methodology Topical Reports ML20057B6891993-09-17017 September 1993 Application for Amend to License DPR-40,revising Spec 2.7 to Enable Current Configuration of Fuel Oil Sys for EDGs to Meet Capacity Requirements of IEEE-308,providing Fuel for 7 Days of DG Operation Following Most Limiting Accident ML20057B8101993-09-15015 September 1993 Application for Amend to License DPR-40,requesting TS in Appendix a Be Amended to Implement Changes That Move Fire Protection Requirements from TS Into USAR in Accordance W/Gl 86-10 & GL 88-12 ML20057A8941993-09-10010 September 1993 Application for Amend to License DPR-40,revising TS Section 5.9,5.11 & 5.16 to Reflect New 10CFR20 & Administrative Changes ML20056F4071993-08-20020 August 1993 Application for Amend to License DPR-40,incorporating Changes to Credit Leak Before Methodology to Resolve Unresolved Safety Issue A-2, Asymmetrical Blowdown Loads on Reactor Primary Coolant Sys 1999-05-26
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217B5201999-10-0606 October 1999 Amend 193 to License DPR-40,revising TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance Requirements for RCS Flow Rate ML20211L3441999-09-0202 September 1999 Corrected Tech Spec Page 2-50 to Amend 192 to License DPR-40.Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) ML20210G2131999-07-27027 July 1999 Amend 192 to License DPR-40,revising TS Sections 2.2 & 2.10. 2 to Relocate 3 cycle-specific Parameters to Core Operating Limits Repts ML20210D9861999-07-22022 July 1999 Amend 191 to License DPR-40,authorizing Rev to Licensing Basis as Described in Updated Safety Analysis Rept to Incorporate Mod for Overriding Containment Isolation Actuation Signal Closure Signal to Reactor Coolant Sys ML20195B4371999-05-26026 May 1999 Application for Amend to License DPR-40,proposing to Relocate pressure-temp Curves,Predicated Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS pressure- Temp Limits Rept ML20205Q5791999-04-15015 April 1999 Amend 190 to License DPR-40,revising TS 5.2.f & TS 5.11.2 to Change Title of Shift Supervisor to Shift Manager ML20205J7631999-03-31031 March 1999 Application for Amend to License DPR-40,increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate ML20207E9761999-03-0303 March 1999 Errata to Amend 188 to License DPR-40,correcting Incorrect Page Number,Missing Parenthesis & Misspelled Word ML20203A0991999-01-29029 January 1999 Application for Amend to License DPR-40,relocating Three cycle-specific Parameter Limits from FCS TS to COLR ML20198S4611998-12-31031 December 1998 Amend 188 to License DPR-40,revising TS 2.12, Control Room Sys, to Delete Limiting Condition for Operation & Surveillance for Control Room Temp ML20198S3731998-12-31031 December 1998 Amend 189 to License DPR-40,revising TS 2.1.6 to Restrict Number of Inoperable Main Steam Safety Valves When Reactor Critical & Revising Associated Basis ML20195K1771998-11-17017 November 1998 Revised Application for Amend to License DPR-40, Incorporating Addl Restrictions on Operation of MSSVs ML20154N2361998-10-19019 October 1998 Amend 187 to License DPR-40,revising TS 3.9 to Clarify Required Flow Paths for Auxiliary Feedwater Sys & Deleting Surveillance Requirement for Specific Auxiliary Feedwater Pump Discharge Pressure ML20154M4841998-10-19019 October 1998 Amend 186 to License DPR-40,revising TS 2.3 to Increase Allowed Outage Times for SIT ML20154A0661998-09-28028 September 1998 Application for Amend to License DPR-40,allowing Installation of Capability for Override of Containment Isolation Actuation Signal Closure Signal to Containment Isolation Valves for RCS Letdown Flow ML20217L0521998-03-23023 March 1998 Amend 185 to License DPR-40,revising TS to Implement 10CFR50,App J,Option B & to Allow Performance Based Changes in Conducting ILRT & Local Leak Rate Testing Types B & C & SER ML20217B8481998-03-18018 March 1998 Application for Amend to License DPR-40,changing TS 5.2 & 5.11.2 to Change Title of Shift Supervisor to Shift Manager ML20217B8181998-03-18018 March 1998 Application for Amend to License DPR-40,requesting Tech Specs Set Forth in App a to License Amended to Clearly Address Regulatory Requirements for Alternate Shutdown Panel & Auxiliary Feedwater Panel ML20217P1981998-03-0303 March 1998 Application for Amend to License DPR-40,revising TS 2.6 & Basis by Replacing Refs to TS 3.5(4) W/Refs to TS 5.19 ML20203M4121998-02-0303 February 1998 Amend 184 to License DPR-40,revising TS to Reflect Administrative Changes ML20199L7221998-01-30030 January 1998 Application for Amend to License DPR-40,requesting Deletion of Section 3.E, License Term from License ML20199L8911998-01-30030 January 1998 Application for Amend to License DPR-40,relocating pressure- Temp Curves,Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS PT Limits Rept (PTLR) ML20203A4131998-01-26026 January 1998 Amend 183 to License DPR-40,revises TS to Delete Requirements for Toxic Gas Monitoring Sys Contained in TS 2.22 & TS 3.1,table 3-3,item 29,for Toxic Chemicals Except Ammonia ML20203G4101997-12-11011 December 1997 Application for Amend to License DPR-40,adding New LCO to TS 2.15 Pertaining to Inoperable ESF Logic Subsystem ML20203E0171997-12-10010 December 1997 Corrected TS Pages 3-7 & 3-12 to Amend 182 to License DPR-40,adding Words That Were Omitted from TS Pages ML20199L0441997-11-24024 November 1997 Amend 182 to License DPR-40,revising TSs to Correct & Clarify Several Surveillance Test Requirements for Reactor Protection Sys & Other Plant Instrumentation & Control Sys ML20199K1221997-11-21021 November 1997 Application for Amend to License DPR-40,revising Tech Specs 5.19 by Incorporating Editoral Changes & Two Exceptions to NEI-94-01,Rev 0, Industry Guideline for Implementing Performance-Based Option of 10CFR50,App J ML20217G4541997-10-0303 October 1997 Application for Amend to License DPR-40,revising TS Surveillance 3.9, Auxiliary Feedwater Sys, to Clarify What Flow Paths Are Required to Be Tested & Delete Specific Discharge Pressure ML20196J0781997-07-25025 July 1997 Application for Amend to License DPR-40,allowing Frequency of Conducting ILRT & Local Leak Rate Testing to Be Based on Component Performance & Implementing Option B of 10CFR50,App J ML20137Y1591997-04-17017 April 1997 Application for Amend to License DPR-40,requesting Rev to Administrative Controls Consistent w/NUREG-1432 Standard TS for Combustion Engineering Plants.Tech Specs Encl ML20137L6121997-03-27027 March 1997 Amend 181 to License DPR-40,revising Section 5.2 of TS to Relocate Controls for Working Hours to Updated Safety Analysis Rept LIC-97-0049, Application for Amend to License DPR-40,incorporating Addl Restrictions on Operation of MSSVs1997-03-26026 March 1997 Application for Amend to License DPR-40,incorporating Addl Restrictions on Operation of MSSVs ML20138L4341997-02-20020 February 1997 Application for Amend to License DPR-40,requesting to Update TS Re Rev to Position Titles & Relocation of Controls for Personnel Working Hours ML20134N7651997-02-13013 February 1997 Amend 180 to License DPR-40,revises TS to Add Limiting Condition for Operation & Surveillance Test for Safety Related Inverters & Deletes Nonsafety Related Instrument Buses ML20133M6641997-01-15015 January 1997 Errata to Amend 179 to License DPR-40,revising Page 2-22 Which Incorrectly Stated Amount of Active TSP That Shall Be Contained in TSP Baskets ML20133C2741996-12-30030 December 1996 Amend 179 to License DPR-40,revising TSs to Increase Amount of TSP Dodecahydrate Located in Containment Sump Storage Baskets ML20134N8491996-11-20020 November 1996 Application for Amend to License DPR-40,requesting Administrative Revisions to Paragraph 3,Table of Contents, Tech Spec 2.15 & Section 5 of Appendix a ML20129H3261996-10-25025 October 1996 Amend 178 to License DPR-40,changing Section 4.3.2 of TS to Allow Use of Zircaloy or ZIRLO Fuel Cladding & to Use Depleted U as Reactor Fuel Matl ML20129E4921996-10-24024 October 1996 Application for Amend to License DPR-40,TS 4.3.2, Reactor Core & Control, Allowing Use of Either Zircaloy or ZIRLO Cladding ML20129C2491996-10-22022 October 1996 Application for Amend to License DPR-40,revising TS 4.3.2, Reactor Core & Control & Adding Ref to WCAP-12610 in TS 5.9.5b ML20128F6251996-10-0202 October 1996 Amend 177 to License DPR-40,modifying Paragraph 2.B.(2) W/Ref to 10CFR40 Allowing Use of Source Matl,In Form of Depleted or Natural U,As Reactor Fuel ML20129G2911996-09-27027 September 1996 Amend 176 to License DPR-40,revising Sections 2.18,3.14, 3.3 & 5.10 of TS to Relocate Snubber Operability Requirements to USAR ML20117B8771996-08-23023 August 1996 Application for Amend to OL Revising Paragraph 2.B of License to Allow Use of Source Matl as Reactor Fuel ML20115F9971996-07-15015 July 1996 Application for Amend to License DPR-40,revising Description of Reactor Core & Control & Adding Westinghouse Topical Rept List of Analytical Methods,Used to Determine Core Operating Limits ML20112D3151996-05-31031 May 1996 Application for Amend to License DPR-40,adding LCO for Trisodium Phosphate & Increasing Min Required Amount of Trisodium Phosphate Contained in Containment Sump Mesh Baskets ML20117H6951996-05-20020 May 1996 Application for Amend to License DPR-40,clarifying Surveillance Test Requirements in TS 3,1,Tables 3-1,3-2,3-3 & 3-3A ML20117H5871996-05-17017 May 1996 Application for Amend to License DPR-40,relocating Operability Requirements for Shock Suppressors (Snubbers) from TS to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements Into TS 3.3 ML20097C3031996-02-0101 February 1996 Application for Amend to License DPR-40,allowing Increase in Initial Nominal U-235 Enrichment Limit of Fuel Assemblies That May Be Stored in Spent Fuel Pool ML20100C0161996-01-22022 January 1996 Application for Amend to License DPR-40 Revising TS Re Requirement for Placing Sirw Tank low-level Channels in Bypass Rather than Trip ML20094N8571995-11-16016 November 1995 Application for Amend to License DPR-40,adding LCO & Surveillance Test for Safety Related Inverters & Deleting Nonsafety Related Instrument Buses 1999-09-02
[Table view] |
Text
.
.
'
BEFORE TFE U:IITED STATES UUCLEAR REGULATORY CO CIISSION In the Matter of )
OMAliA PUBLIC POWER DISTRICT ) Docket :To. 50-285 (Fort Calhoun Station, )
Unit No. 1) )
APPLICATION FOR OEND ENT OF OPERATING LICENSE Pursuant to Section 50 90 of the regulations of the U. S. Nuclear Regulatory Cc= mission ("the Cc= mission"), Omaha Public Power District
("the District"), holder of Facility Operating License No. DPR h0, here-with requests that Sections 2.19 and 3.15 of the Technical Specifications set forth in Appendix A to that License be amended to specify requirements for the cperation and surveillance of fire suppression systems scheduled to be installed at the Fort Calhoun Station in Deceuber,1979 The proposed changes in Technical Specifications are set forth in Attachment A to this Applicatien. A discussicn, whica demonstrates that the proposed changes do not involve significant hazards considerations ,
is appended in Attachment 3. The District has been informed by the Con =ission's Staff that the preposed Amendment does not require a fee, within the meaning of Section 170.22 of the regulations of the Nuclear Regulatory Con =ission. Tae proposed changes in specifications would not authorice any change in the types or any increase in the amounts of effluents or ar./ change in the authorized power level of the facility.
t i sZ.
1
,'i 77
_.
' 8
-
-
.
.
,
'.
-g-
'4EEF0E, Apulicant respectfully requests that Sections 2.19 and 3.15 of Appendix A to Facility Operating License No. DPR-40 be amended in the fom attached hereto as Attachment A.
OMAHA PUBLIC PO'4ER DISTRICT By W. C. Jones
,
Division Manager Production Operaticns Subscribed and sv: n to before me this day of , 1979 Notary Public
! d sturnat man . ,,,, ,, ,,,, -
i g a r a-j5'1"@ 'y comm s.m . , a ._
1 7'
J 'r, 7ai
-
.
.
.
2.0 LIMITI:lG CO:iDITIO:IS FOR OPERATIO I 2.19 Fire Protection System (Continued)
(3) The provisions set forth in Section 2.19(2) do not apply to time periods during which Centain=ent Integrated leak Rate Tests are being performed.
(h) Fire suppression water system shall be operable, except during system testing, jockey pu=p maintenance or training (not to exceed 7 consecutive days) with both fire pu=ps , each with a minimum capacity of 1800 gpm, with their discharge aligned to the fire suppression header and automatic initiation logic for each fire pump.
- a. With less than the above required equipment:
(i) restore the incperable equipment to operable status within 7 days.
(ii) if equiptent is not restored to operable status within 7 days, prepara and submit a report to the Iluelear Regulatory Commission, pursuant to Section 5 9 3.1 of the Technical Specifications, within the next 30 days , outlining the plans and procedures to be used to provide for the loss of the system and the cause of the mal-function.
- b. With no fire suppression water system cperable:
a-(i) establish a backup fire suppression water sys-tem within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. _
(ii) notify the Iluelear Regulatory Co==ission, pur-suant to Section 5.9 2.a of the Technical Specifications, outlining the cause of the =al-function, the actions taken, and the plans and schedule for restoring the system to operable status.
(iii) If (i) above cannot be fulfilled, place reactor in Hot Standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in Cold Shutdevn within the folleving thirty (30) hours.
(5) The sprinkler system in the Diesel Generator Roces, the sprinklers above the steam driven auxiliary feedvater pump , and the deluge system in the personnel corridor between fire areas 6 and 20 shall be operable except during system testing. If inoperable:
- a. Establish a continuous fire watch with backup fire ex-tinguishing equipment in the unprotected area within one hour, and _ , ,
,np b.
)O I3 Restere the system to operable status within 1h days or prepare and submit a report to the :iuclear Regulatory Cc==issica, pursuant to Section 5 9 3.1 of the Technical Specificaticas, within an additional 30 days , outlining the cause of the inoperability ana the plans for restoring the system to cperable status.
Amendment :To. 38 L91 ATTACH:E iT A
.
.
TABLE 2-8 FIRE HOSE STATIO:T LOCATIO?iS No. Location Elevation Size
- 1. FP L:I Intake Structure 1012'-6" 1 5"/2 5"
- 2. FP-h? Intake Structure 1012'-6" 1 5"/2 5" 3 FP-3C Yard Area At grade level 2 5"
- 4. .'7- 33 Yard Area -
At grade level 2.5" 5 FP-3A Yard Area At grade level 2.5"
- 6. FP-3F ' Yard Area At grade level 2 5" 7 FP-3E Yard Area At grade level 2.5"
- 8. FP-3D Yard Area At grade level 2.5" 9 FP-7A Auxiliary Building 989'-0" 1.5"/2 5"
- 10. FP-73 Auxiliar/ Building 989'-0" 1 5"/2 5"
- 11. > FP-7C Auxiliary Building 989'-0" 1 5"/2 5"
. 12. FP-7D Auxiliary Building 989'-0" 1 5"/2.5" 13 FF-7E Auxiliar/ Building 989'-C" 1 5"/2.5"
- 14. FP-7F Auxiliar/ Building 989'-0" 1.5"/2 5" 15 FP-8A Auriliarf Building 1011'-0" 1 5"/2.5"
- 16. FP-83 Auxiliary Building 1011'-0" 1 5"/2 5" 17 FP-8C Auxiliary Building 1011'-0" 1 5"/2 5"
- 18. FP-8D Auxiliary Building 1007'-6" 1 5"/2.5" 19 FP-8E Auxiliary 3uilding 1007'-6" 1 5"/2.5"
- 20. FP-8F Auxiliar/ Building 1007'-6" 1 5"/2 5"
- 21. FP-8G Auxiliary Building 1007'-6" 1 5"/2 5"
- 22. FP-8H Auxiliar/ Building 1007'-6" 1 5"/2 5" 23 FP-9A Auxiliary Building 1025'-0" 1 5"/2 5" 2h. FP-93 Auxiliary Building 1025'-0" 1.5"/2 5" 25 FP-9C Auxiliary Building 1025'-0" 1 5"/2 5" Amendment :To. 38 2-93 } ] } /;. }(
.
.
.
TABLE 2-8 (Continued)
FIRE HOSE STATION IOCATIO!iS No. Location Elevation Size
- 26. FP-10A Auxiliar/ Building 1036'-0" 1.5"/2 5" 27 FP-103 Auxiliar/ Building 1036'-0" 1.5"/2.5"
- 28. FP-10C Auxiliar/ Building 1036'-0" 1.5"/2.5" 29 FP-10D Auxiliar/ Building 1036'-0" 1.5"/2 5"
- 30. FP-10E Auxiliarf Building 1036'-0" 1.5"/2.5" 2-J ' _.
I 2-9h \
-
. .
- .
- 3. 0 SURVEILLA:TCE REQUIREICITS 3 15 Fire Protection System (Continued) 3 VeriP/ that each fire pump starts automatically on low fire system pressure to maintain the fire sup-pression water system pressure >100 psig.
_
- e. At least cace per 3 years by performing a flow test of the system in accordance with Chal ter 5, Section 11 of the Fire Protection Handbook,1kth Edition, published by the Ilational } ire Protection Associaticn using a clean water source.
- f. At least once per year by visually inspecting the strainer en the discharge side of the fire pu=ps to verify oper-ability.
(3) The sprinkler system in the Diesel Generator Rocms, the sprinklers above the steam driven auxiliary feedwater pu=p, and the deluge system in the persennel corridor between fire areas 6 and 20 shall be demonstrated to be operable:
- a. At least once per 18 months:
- 1. By visual inspection of the spray / sprinkler headers to verify their integrity.
f
- 2. By visual inspection of each spray / sprinkler nozzle to verify no blockage.
- >1
- b. At least once per 3 years by perr e-ing an air flow test through each open head spray / sprinkler header and verify-ing each open head spray / sprinkler nozzle is unobstructed.
(4) Each fire hose station designated in Table 2-8 shall be veri-fled to be operable:
- a. At least once per conth by visual inspection of the station to assure all equipment is available and the system pres-sure (as determined at the jockey pump pressure gauge) is within limits.
- b. At least once per 18 months by rencving the hose for in-spection and repacking and replacing all gaskets in the couplings that are degraded.
- c. At least cnce per 3 years by:
- 1. Partially opening the hose station valves to ve rify valve operability and no blockage.
- 2. Conducting a hose hydrostatic test in accordance with :iFPA requirements.
(5) Penetration fire barriers shall be verified to be functional (intact) by a visual inspection:
'
O
- a. Ac least cnce per 18 conths. 'l1I sX . V'. ')
i- U
- b. Prior to declaring a fire penetration seal functional folleving repairs or maintenance.
Arendnent :To. 40 3_81
, .
d
.
DISCUSSION In accordaace with Sections 3.1. 5, 3.1. 27, and 3.1. 28 of the Cc==ission's Safety Evaltation Report (SER) for the Fort Calhoun Station fire protection program, the C=aha Public Pcver District vill have fire water suppression systens installed, as noted in the proposed specifications, in Dece=ber, 1979 The proposed specifications specify limiting conditions for operation and survei'_lar.ce measures for:
- fire hose stations to be installed in the auxiliary building.
-
sprinkler system located above the steam driven auxilicry feed-water pump.
- deluge system located in the persennel corridor between fire areas 6 anc 20.
' lao proposed specifications are similar to model specifications re-e ived frca che Cc==ission in a letter dated June 17, 1977, and are identi-cal in content to those specifications for other fire water vrppressien sys-tems , approved by the Commission in AmenC=ent No. 38 to Operat.ing License DPR-40. 7nese specifications, if i=plemented, would not be ini=ical to the health and safety of the public or reduce the level of safety at the station.
I 4 g
.
7p J r 7O
- _ i ACAC:DZ:!T 3
.