ML061070167: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:-3-B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 219 , are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
{{#Wiki_filter:       B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 219 , are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
C. Records ENO shall keep facility operating records in accordance with the requirements of the Technical Specifications.
C. Records ENO shall keep facility operating records in accordance with the requirements of the Technical Specifications.
D. Equalizer Valve Restriction  
D. Equalizer Valve Restriction - DELETED E. Recirculation Loop InoDerable - DELETED F. Fire Protection ENO shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the SER dated December 21, 1978 as supplemented subject to the following provision:
-DELETED E. Recirculation Loop InoDerable  
ENO may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
-DELETED F. Fire Protection ENO shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the SER dated December 21, 1978 as supplemented subject to the following provision:
G. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.5 (51 FR27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Pilgrim Nuclear Power Station Physical Security, Training and Qualification, and Safeguards Contingency Plan, Revision 0" submitted by letter dated October 13, 2004.
ENO may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.G. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.5 (51 FR27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
Amendment 244, 2A1-,216, 247, 219
The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Pilgrim Nuclear Power Station Physical Security, Training and Qualification, and Safeguards Contingency Plan, Revision 0" submitted by letter dated October 13, 2004.Amendment 244, 2A1-, 216, 247, 219 TABLE OF CONTENTS LIMiTIN- CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.6 PRIMARY SYSTEM BOUNDARY 4.6 3/4.6-1 A. Thermal and Pressurization Limitations A 3/4.6-1 B. Coolant Chemistry B 3/4.6-3 C. Coolant Leakage C 3/4.6-4 D. Safety and Relief Valves D 3/4.6-6 E. Jet Pumps E 3/4.6-7 F. Recirculation Loops Operating F 3/4.6-8 G. Structural Integrity G 3/4.6-8 BASES B3/4.6-1 l3.7 CONTAINMENT SYSTEMS 4.7 3/4.7-1 A. Primary Containment A 3/4.7-1 B. Standby Gas Treatment System and Control B Room High Efficiency Air Filtration System 3/4.7-11 C. Secondary Containment C 3/4.7-16 BASES B3/4.7-1 3.8 PLANT SYSTEMS 4.8 3/4.8-1 3.8.1 Main Condenser Offgas 4.8.1 3/4.8-1 3.8.2 Mechanical Vacuum Pump 4.8.2 3/4.8-2 BASES 83/4.8-1 3.9 AUXILIARY ELECTRICAL SYSTEM 4.9 3/4.9-1 A. Auxiliary Electrical Equipment A 3/4.9-1 B. Operation with Inoperable Equipment B 3/4.9-4 EASES B3/4.9-1 3.10 C:ORE ALTERATIONS 4.10 3/4.10-1 A. Refueling Interlocks A 3/4.10-1 B. C:ore Monitoring B 3/4.10-1 C. Spent Fuel Pool Water Level C 3/4.10-2 D. Multiple Control Rod Removal D 3/4.10-2 EASES 83/4.10-1 3.11 REACTOR FUEL ASSEMBLY 4.11 3/4.11-1 A. Average Planar Linear Heat Generation Rate A (APLHGR) 3/4.11-1 B. Linear Heat Generation Rate (LHGR) B 3/4.11-2 C. Minimum Critical Power Ratio (MCPR) C 3/4.11-2 D. Fower/Flow Relationship During Power D Operation 3/4.11-4 EASES B3/4.1 1-1 PNPS ii Amendment No.-t-7 1 9 219 2.0 SAFETY LIMITS 2.1 Safety Limits 2.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% of rated core flow: THERMAL POWER shall be < 25% of RATED THERMAL POWER.2.1.2 With the reactor steam dome pressure > 785 psig and core flow > 10% of rated core flow: MINIMUM CRITICAL POWER RATIO shall be > 1.06 for two recirculation loop operation or > 1.08 for single recirculation loop operation.
 
2.1.3 Whenever the reactor is in the cold shutdown condition with irradiated fuel in the reactor vessel, the water level shall not be less than 12 inches above the top of the normal active fuel zone.2.1.4 Reactor steam dome pressure shall be < 1325 psig at any time when irradiated fuel is present in the reactor vessel.2.2 Safety Limit Violation With any Safety Limit not met the following actions shall be met: 2.2.1 Within one hour notify the NRC Operations Center in accordance with 1 OCFR50.72.
TABLE OF CONTENTS LIMiTIN- CONDITIONS FOR OPERATION                       SURVEILLANCE REQUIREMENTS 3.6     PRIMARY SYSTEM BOUNDARY                                     4.6               3/4.6-1 A.     Thermal and Pressurization Limitations                       A               3/4.6-1 B. Coolant Chemistry                                             B               3/4.6-3 C.     Coolant Leakage                                               C               3/4.6-4 D. Safety and Relief Valves                                     D               3/4.6-6 E. Jet Pumps                                                     E               3/4.6-7 F. Recirculation Loops Operating                                 F               3/4.6-8 G.     Structural Integrity                                         G               3/4.6-8 BASES                                                                         B3/4.6-1 l 3.7   CONTAINMENT SYSTEMS                                           4.7               3/4.7-1 A.     Primary Containment                                           A               3/4.7-1 B.     Standby Gas Treatment System and Control                     B Room High Efficiency Air Filtration System                                 3/4.7-11 C. Secondary Containment                                         C               3/4.7-16 BASES                                                                           B3/4.7-1 3.8   PLANT SYSTEMS                                                 4.8               3/4.8-1 3.8.1 Main Condenser Offgas                                       4.8.1             3/4.8-1 3.8.2 Mechanical Vacuum Pump                                       4.8.2             3/4.8-2 BASES                                                                           83/4.8-1 3.9   AUXILIARY ELECTRICAL SYSTEM                                   4.9               3/4.9-1 A. Auxiliary Electrical Equipment                                 A               3/4.9-1 B. Operation with Inoperable Equipment                           B               3/4.9-4 EASES                                                                           B3/4.9-1 3.10   C:ORE ALTERATIONS                                           4.10               3/4.10-1 A. Refueling Interlocks                                           A               3/4.10-1 B. C:ore Monitoring                                               B               3/4.10-1 C. Spent Fuel Pool Water Level                                   C               3/4.10-2 D. Multiple Control Rod Removal                                   D               3/4.10-2 EASES                                                                           83/4.10-1 3.11   REACTOR FUEL ASSEMBLY                                       4.11               3/4.11-1 A.     Average Planar Linear Heat Generation Rate                     A (APLHGR)                                                                     3/4.11-1 B. Linear Heat Generation Rate (LHGR)                             B               3/4.11-2 C.     Minimum Critical Power Ratio (MCPR)                           C               3/4.11-2 D.     Fower/Flow Relationship During Power                           D Operation                                                                   3/4.11-4 EASES                                                                           B3/4.1 1-1 PNPS                                                   ii                           19 219 Amendment No.-t-7
2.2.2 Within two hours: A. Restore compliance with all Safety Limits, and B. Insert all insertable control rods.2.2.3 The Station Director and Senior Vice President  
 
-Nuclear and the Nuclear Safety Review and Audit Committee (NSRAC) shall be notified within 24 hours.2.2.4 A Licensee Event Report shall be prepared pursuant to 1 OCFR50.73.
2.0   SAFETY LIMITS 2.1   Safety Limits 2.1.1     With the reactor steam dome pressure < 785 psig or core flow < 10% of rated core flow:
The Licensee Event Report shall be submitted to the Commission, the Operations Review Committee (ORC), the NSRAC and the Station Director and Senior Vice President  
THERMAL POWER shall be < 25% of RATED THERMAL POWER.
-Nuclear within 30 days of the violation.
2.1.2     With the reactor steam dome pressure > 785 psig and core flow > 10% of rated core flow:
2.2.5 Critical operation of the unit shall not be resumed until authorized by the Commission.
MINIMUM CRITICAL POWER RATIO shall be > 1.06 for two recirculation loop operation or > 1.08 for single recirculation loop operation.
Amendment 16, 27, 42, 72, 133-4 16, 4 7 4 , 4 9 1 , 219 2-1 NOTES FOR TABLE 3.1.1 (Cont)2. Permissible to bypass, with control rod block, for reactor protection system reset in refuel and shutdown positions of the reactor mode switch.3. Permissible to bypass when reactor pressure is < 576 psig.4. Permissible to bypass when turbine first stage pressure is less than < 112 psig.5. IIRM's are bypassed when APRM's are onscale and the reactor mode switch is in the run position.6. The design permits closure of any two lines without a scram being initiated.
2.1.3     Whenever the reactor is in the cold shutdown condition with irradiated fuel in the reactor vessel, the water level shall not be less than 12 inches above the top of the normal active fuel zone.
: 7. When the reactor mode switch is in the Refuel position, the reactor vessel head is removed, and control rods are inserted in all core cells containing one or more fuel assemblies, these scram functions are not required.8. Not required to be operable when primary containment integrity is not required.9. Not required while performing low power physics tests at atmospheric pressure during or after refueling at power levels not to exceed 5 MW(t).10. Not required to be operable when the reactor pressure vessel head is not bolted to the vessel.11. Deleted 12. Deleted i3. An APRM will be considered inoperable if there are less than 2 LPRM inputs per level or there is less than 50% of the normal complement of LPRM's to an APRM.14. Deleted 15. The APRM high flux trip level setting for the flow bias function shall be as specified in the CORE OPERATING LIMITS REPORT. The APRM high flux trip level setting shall in no case exceed 120% of rated thermal power.16. The APRM (15%) high flux scram is bypassed when in the run mode.17. The APRM flow biased high flux scram is bypassed when in the refuel or startup/hot standby modes.18. Deleted.Amendment No. 462,4164, 469,219 3/4.1 -4 LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREMENTS 3.6 PRIMARY SYSTEM BOUNDARY (Cont)A. Thermal and Pressurization Limitations (Corit)In the event this requirement is not met, achieve stable reactor conditions with reactor vessel temperature above that defined by the appropriate curve and obtain an engineering evaluation to determine the appropriate course of action to take.4.6 PRIMARY SYSTEM BOUNDARY (Cont)A. Thermal and Pressurization Limitations (Cont)3. Tine reactor vessel head bolting studs shall not be under tension unless the temperature of the vessel head flange and the head is greater than 550F.4. The pump in an idle recirculation loop shall not be started unless the temperatures of the coolant within the idle and operating recirculation loops are within 50 0 F of each other.5. The reactor recirculation pumps shall not be started unless the coolant temperatures between the dome and the bottom head drain are within 145 0 F.3. When the reactor vessel head bolting studs are tensioned and the reactor is in a Cold Condition, the reactor vess;el shell temperature immediately below the head flange shall be permanently recorded.4. Prior to and during startup of an idle recirculation loop, the temperature of the reactor coolant in the operating and idle loops shall be permanently logged.5. Prior to starting a recirculation pump, the reactor coolant temperatures in the dome and in the bottom head drain shall be compared and permanently logged.Amendment No. 27, 28, 42, 82, 140, 209, 219, 3/4.6-2 LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.6 PRIMARY SYSTEM BOUNDARY (Cont) 4.6 PRIMARY SYSTEM BOUNDARY (Cont)D. Safety Relief Valves (Con't)4. Any safety relief valve whose discharge pipe temperature exceeds 212 0 F for 24 hours or more shall be removed at the next cold shutdown of 72 hours or more, tested in the as-found condition, and recalibrated as necessary prior to reinstallation.
2.1.4     Reactor steam dome pressure shall be < 1325 psig at any time when irradiated fuel is present in the reactor vessel.
Power operation shall not continue beyond 90 days from the initial discovery of discharge pipe temperatures in excess of 212 0 F for more than 24 hours without prior NRC approval of the engineering evaluation delineated in 3.15.D.3.5. The limiting conditions of operation for the instrumentation that monitors tail pipe temperature are given in Table 3.2-F.E. Jet Pumps E. Jet Pumps 1. Whenever the reactor is in the Startup or NOTES Run Modes, all jet pumps shall be 1. Not required to be performed until 4 hours Operable.
2.2   Safety Limit Violation With any Safety Limit not met the following actions shall be met:
If it is determined that a jet after the associated recirculation loop is in pump is inoperable, the reactor shall be operation.
2.2.1     Within one hour notify the NRC Operations Center in accordance with 10CFR50.72.
in Hot Shutdown within 12 hours.2. Not required to be performed until 24 hours after >25% Rated Thermal Power.Whenever there is recirculation flow with the reactor in the Startup or Run Modes, jet pump operability shall be checked daily by verifying at least one of the following criteria (1, 2, or 3)is satisfied for each operating recirculation loop: 1. Recirculation pump flow to speed ratio differs by s 5% from established patterns, and jet pump loop flow to recirculation pump speed ratio differs by s 5% from established patterns.2. Each jet pump diffuser to lower plenum differential pressure differs by s 2D% from established patterns.3. Each jet pump flow differs by < 1 C% from established patterns.Amendment No. 15, 56, 71, 93,133, 205, 3/4.6-7 219 LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.6 PRIMARY SYSTEM BOUNDARY (Cont)F. Recirculation Loons Operating During operation in the Run and Startup N/odes, at least one recirculation pump shall be operating.
2.2.2     Within two hours:
: 1. Whenever both recirculation pumps are in operation, pump speeds shall be maintained within 10% of each other when power level is greater than 80%and within 15% of each other when power level is less than or equal to 80%.2. Whenever a single recirculation loop is operating, the following limits are applied when the associated LCO is applicable:
A. Restore compliance with all Safety Limits, and B. Insert all insertable control rods.
a) LCO 3.11 .A, "Average Planar Linear Heat Generation Rate (APLHGR)," single loop operation limits specified in the COLR, b) LCO 3.11.C, "Minimum Critical Power Ratio (MCPR)," single loop operation limits specified in the COLR, and c) LCO 3.1, "Reactor Protection System," Average Power Range Monitor High Flux function, trip level setting for the flow bias function is reset for single loop operation per Table 3.1.1.3. If the requirements of Specification 3.6.F.1 or 3.6.F.2 are not met, restore compliance within 24 hours. If compliance is not restored or with no recirculation pumps in operation the reactor shall be in Hot Shutdown within 12 hours.G. Structural Integrity 1. The structural integrity of the primary system boundary shall be maintained at the level required by the ASME Boiler and Pressure Vessel Code, Section Xl"Rules for Inservice Inspection of Nuclear Power Plant Components," Articles IWA, IWB, IWC, IWD and IWF and mandatory appendices as required by 10CFR50.55a(g), except where specific relief has been granted by the NRC pursuant to IOCFR50.55a(g)(6)(i).
2.2.3     The Station Director and Senior Vice President - Nuclear and the Nuclear Safety Review and Audit Committee (NSRAC) shall be notified within 24 hours.
4.6 PRIMARY SYSTEM BOUNDARY (Cont)F. Recirculation Loops Ooeratina Recirculation pump speeds shall be checked and logged at least once per day.I G. Structural Integrity Inservice inspection of components shall be performed in accordance with the PNPS Inservice Inspection Program. The results obtained from compliance with this program will be evaluated at the completion of each ten year interval.
2.2.4     A Licensee Event Report shall be prepared pursuant to 10CFR50.73. The Licensee Event Report shall be submitted to the Commission, the Operations Review Committee (ORC), the NSRAC and the Station Director and Senior Vice President - Nuclear within 30 days of the violation.
The conclusions of this evaluation will be reviewed with tie NRC.I Amendment No. 19, 93, 133r 2194 314.6-8 LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.11 REACTOR FUEL ASSEMBLY Applicabilitv:
2.2.5     Critical operation of the unit shall not be resumed until authorized by the Commission.
The Limiting Conditions for Operation associated with fuel rods apply to those parameters which monitor the fuel rod operating conditions.
Amendment 16, 27, 42, 72, 133-4 16, 4   74
Obiective:
                                          ,4 91, 219                                         2-1
The Objective of Limiting Conditions for Operation is to assure the performance of the fuel rods.4.11 REACTOR FUEL ASSEMBLY Applicability:
 
The surveillance requirements apply to the parameters which monitor the fuel rod operating conditions.
NOTES FOR TABLE 3.1.1 (Cont)
Obiective:
: 2. Permissible to bypass, with control rod block, for reactor protection system reset in refuel and shutdown positions of the reactor mode switch.
The Objective of the Surveillance Requirements is to specify the iype and frequency of surveillance to be applied to the fuel rods.Specifications:
: 3. Permissible to bypass when reactor pressure is < 576 psig.
A. Average Planar Linear Heat Generation Rate (APLHGR)During operation at > 25% rated thermal I power, the APLHGR for each type of fuel as a function of average planar exposure shall not exceed the applicable limiting value specified in the CORE OPERATING LIMITS REPORT.Specifications:
: 4. Permissible to bypass when turbine first stage pressure is less than < 112 psig.
A. Average Planar Linear Heat Generation Rate (APLHGR)The APLHGR for each type of fuel as a function of average planar exposure shall be determined daily during reactor operation at 2 25% rated thermal power.If at any time during operation at > 25%1 rated thermal power the limiting value for APLHGR is being exceeded, action shall be initiated within 15 minutes to restore operation to within the prescribed limits. If the APLHGR is not returned to within the prescribed limits within two (2) hours, I reduce thermal power to < 25% within four (4) hours.Amendment No. 15, 24, 27, 42, 69, 100, 133, 219 3/4.1 1 -1 LIMITING CONDITIONS FOR OPERATION SLIRVEILLAN("F'E REQUIREMENTS 3.11 REACTOR FUEL ASSEMBLY (Cont)B. Linear Heat Generation Rate (LHGR)During operation at > 25% rated thermal powver, the LHGR shall not exceed the limnts specified in the CORE OPERATING LIMITS REPORT.If at any time during operation at > 25%rated thermal power, the limiting value for LHGaR is being exceeded, action shall be initiated within 15 minutes to restore operation to within the prescribed limits. If the LHGR is not returned to within the prescribed limits within two (2) hours, reduce thermal power to < 25% within four (4) hours.4.11 REACTOR FUEL ASSEMBLY (Cont)B. Linear Heat Generation Rate (LHGR)The LHGR as a function of core height shall be checked daily during reactor operation at 2 25% rated thermal power.C. Minimum Critical Power Ratio (MCPR)1. During operation at > 25% rated thermal power, MCPR shall be >the lACPR operating limit specified in the Core Operating Limits Report. If at any time during operation at > 25% rated thermal power, the limiting value for MCPR is being exceeded, action shall tie initiated within 15 minutes to restore operation to within the prescribed limits.If the steady state MCPR is not returned to within the prescribed limits within two (2) hours, reduce thermal power to < 25% within four (4) hours.C. Minimum Critical Power Ratio (MCF R)1. MCPR shall be determined daily during reactor power operation at > 250,; rated thermal power and following any change in power level or distribution that would cause operation with a limiting control rod pattern as specified in Table 3.2.C.1 Note 5.2. The value of T in Specification 3.11 .C.2.shall be equal to 1.0 unless determined from the result of surveillance testing of Specification 4.3.C as follows: a) T is defined as T'ave -TB T =1.252 -TB I Amendment No. 15, 27, 39, 12, 61, 105, 133,165, 206, 219 3/4.1 1-2}}
: 5. IIRM's are bypassed when APRM's are onscale and the reactor mode switch is in the run position.
: 6. The design permits closure of any two lines without a scram being initiated.
: 7. When the reactor mode switch is in the Refuel position, the reactor vessel head is removed, and control rods are inserted in all core cells containing one or more fuel assemblies, these scram functions are not required.
: 8. Not required to be operable when primary containment integrity is not required.
: 9. Not required while performing low power physics tests at atmospheric pressure during or after refueling at power levels not to exceed 5 MW(t).
: 10. Not required to be operable when the reactor pressure vessel head is not bolted to the vessel.
: 11. Deleted
: 12. Deleted i3. An APRM will be considered inoperable if there are less than 2 LPRM inputs per level or there is less than 50% of the normal complement of LPRM's to an APRM.
: 14. Deleted
: 15. The APRM high flux trip level setting for the flow bias function shall be as specified in the CORE OPERATING LIMITS REPORT. The APRM high flux trip level setting shall in no case exceed 120% of rated thermal power.
: 16. The APRM (15%) high flux scram is bypassed when in the run mode.
: 17. The APRM flow biased high flux scram is bypassed when in the refuel or startup/hot standby modes.
: 18. Deleted.
Amendment No. 462,4164, 469,219                                                                 3/4.1 -4
 
LIMITING CONDITION FOR OPERATION                 SURVEILLANCE REQUIREMENTS 3.6 PRIMARY SYSTEM BOUNDARY (Cont)               4.6 PRIMARY SYSTEM BOUNDARY (Cont)
A. Thermal and Pressurization Limitations        A. Thermal and Pressurization Limitations (Corit)                                           (Cont)
In the event this requirement is not met, achieve stable reactor conditions with reactor vessel temperature above that defined by the appropriate curve and obtain an engineering evaluation to determine the appropriate course of action to take.
: 3. Tine reactor vessel head bolting studs        3. When the reactor vessel head bolting shall not be under tension unless the           studs are tensioned and the reactor is in temperature of the vessel head flange             a Cold Condition, the reactor vess;el shell and the head is greater than 550F.               temperature immediately below the head flange shall be permanently recorded.
: 4. The pump in an idle recirculation loop         4. Prior to and during startup of an idle shall not be started unless the                  recirculation loop, the temperature of the temperatures of the coolant within the           reactor coolant in the operating and idle idle and operating recirculation loops are       loops shall be permanently logged.
within 500F of each other.
: 5. The reactor recirculation pumps shall not     5. Prior to starting a recirculation pump, the be started unless the coolant                    reactor coolant temperatures in the dome temperatures between the dome and the            and in the bottom head drain shall be bottom head drain are within 1450F.               compared and permanently logged.
Amendment No. 27, 28, 42, 82, 140, 209,                                                     3/4.6-2 219,
 
LIMITING CONDITIONS FOR OPERATION                  SURVEILLANCE REQUIREMENTS 3.6    PRIMARY SYSTEM BOUNDARY (Cont)            4.6     PRIMARY SYSTEM BOUNDARY (Cont)
D.     Safety Relief Valves (Con't)
: 4. Any safety relief valve whose discharge pipe temperature exceeds 2120 F for 24 hours or more shall be removed at the next cold shutdown of 72 hours or more, tested in the as-found condition, and recalibrated as necessary prior to reinstallation. Power operation shall not continue beyond 90 days from the initial discovery of discharge pipe temperatures in excess of 2120F for more than 24 hours without prior NRC approval of the engineering evaluation delineated in 3.15.D.3.
: 5. The limiting conditions of operation for the instrumentation that monitors tail pipe temperature are given in Table 3.2-F.
E. Jet Pumps                                       E. Jet Pumps
: 1. Whenever the reactor is in the Startup or                   NOTES Run Modes, all jet pumps shall be               1. Not required to be performed until 4 hours Operable. If it is determined that a jet           after the associated recirculation loop is in pump is inoperable, the reactor shall be           operation.
in Hot Shutdown within 12 hours.
: 2. Not required to be performed until 24 hours after >25% Rated Thermal Power.
Whenever there is recirculation flow with the reactor in the Startup or Run Modes, jet pump operability shall be checked daily by verifying at least one of the following criteria (1, 2, or 3) is satisfied for each operating recirculation loop:
: 1. Recirculation pump flow to speed ratio differs by s 5% from established patterns, and jet pump loop flow to recirculation pump speed ratio differs by s 5% from established patterns.
: 2. Each jet pump diffuser to lower plenum differential pressure differs by s 2D% from established patterns.
: 3. Each jet pump flow differs by < 1C%from established patterns.
Amendment No. 15, 56, 71, 93,133, 205,                                                   3/4.6-7 219
 
LIMITING CONDITIONS FOR OPERATION                 SURVEILLANCE REQUIREMENTS 3.6 PRIMARY SYSTEM BOUNDARY (Cont)                 4.6 PRIMARY SYSTEM BOUNDARY (Cont)
F. Recirculation Loons Operating                   F. Recirculation Loops Ooeratina                I During operation in the Run and Startup           Recirculation pump speeds shall be N/odes, at least one recirculation pump shall     checked and logged at least once per day.
be operating.
: 1. Whenever both recirculation pumps are in operation, pump speeds shall be maintained within 10% of each other when power level is greater than 80%
and within 15% of each other when power level is less than or equal to 80%.
: 2. Whenever a single recirculation loop is operating, the following limits are applied when the associated LCO is applicable:
a) LCO 3.11 .A, "Average Planar Linear Heat Generation Rate (APLHGR)," single loop operation limits specified in the COLR, b) LCO 3.11.C, "Minimum Critical Power Ratio (MCPR)," single loop operation limits specified in the COLR, and c) LCO 3.1, "Reactor Protection System," Average Power Range Monitor High Flux function, trip level setting for the flow bias function is reset for single loop operation per Table 3.1.1.
: 3. If the requirements of Specification 3.6.F.1 or 3.6.F.2 are not met, restore compliance within 24 hours. If compliance is not restored or with no recirculation pumps in operation the reactor shall be in Hot Shutdown within 12 hours.
G. Structural Integrity                            G. Structural Integrity
: 1. The structural integrity of the primary         Inservice inspection of components shall be system boundary shall be maintained at         performed in accordance with the PNPS the level required by the ASME Boiler           Inservice Inspection Program. The results and Pressure Vessel Code, Section Xl           obtained from compliance with this program "Rules for Inservice Inspection of             will be evaluated at the completion of each Nuclear Power Plant Components,"               ten year interval. The conclusions of this Articles IWA, IWB, IWC, IWD and IWF             evaluation will be reviewed with tie NRC.
and mandatory appendices as required by 10CFR50.55a(g), except where specific relief has been granted by the NRC pursuant to IOCFR50.55a(g)(6)(i).
I Amendment No. 19, 93, 133r 2194                                                  314.6-8
 
LIMITING CONDITIONS FOR OPERATION                  SURVEILLANCE REQUIREMENTS 3.11 REACTOR FUEL ASSEMBLY                        4.11 REACTOR FUEL ASSEMBLY Applicabilitv:                                    Applicability:
The Limiting Conditions for Operation            The surveillance requirements apply to the associated with fuel rods apply to those          parameters which monitor the fuel rod parameters which monitor the fuel rod            operating conditions.
operating conditions.
Obiective:                                        Obiective:
The Objective of Limiting Conditions for          The Objective of the Surveillance Operation is to assure the performance of          Requirements is to specify the iype and the fuel rods.                                     frequency of surveillance to be applied to the fuel rods.
Specifications:                                    Specifications:
A. Average Planar Linear Heat Generation        A. Average Planar Linear Heat Generation Rate (APLHGR)                                      Rate (APLHGR)
During operation at > 25% rated thermal            The APLHGR for each type of fuel as a I      power, the APLHGR for each type of fuel           function of average planar exposure shall as a function of average planar exposure          be determined daily during reactor shall not exceed the applicable limiting          operation at 2 25% rated thermal power.
value specified in the CORE OPERATING LIMITS REPORT.
If at any time during operation at > 25%
1      rated thermal power the limiting value for APLHGR is being exceeded, action shall be initiated within 15 minutes to restore operation to within the prescribed limits. If the APLHGR is not returned to within the prescribed limits within two (2) hours, I      reduce thermal power to < 25% within four (4)hours.
Amendment No. 15, 24, 27,42,    69, 100, 133, 219                                    3/4.1 1-1
 
LIMITING CONDITIONS FOR OPERATION                  SLIRVEILLAN("F'E REQUIREMENTS 3.11 REACTOR FUEL ASSEMBLY (Cont)                  4.11 REACTOR FUEL ASSEMBLY (Cont)
B. Linear Heat Generation Rate (LHGR)          B. Linear Heat Generation Rate (LHGR)
During operation at > 25% rated thermal             The LHGR as a function of core height powver, the LHGR shall not exceed the              shall be checked daily during reactor limnts specified in the CORE OPERATING              operation at 2 25% rated thermal power.
LIMITS REPORT.
If at any time during operation at > 25%
rated thermal power, the limiting value for LHGaR is being exceeded, action shall be initiated within 15 minutes to restore operation to within the prescribed limits. If the LHGR is not returned to within the prescribed limits within two (2) hours, reduce thermal power to < 25% within four (4) hours.
C. Minimum Critical Power Ratio (MCPR)            C. Minimum Critical Power Ratio (MCFR)
: 1. During operation at > 25% rated                  1. MCPR shall be determined daily during thermal power, MCPR shall be >the                  reactor power operation at > 250,; rated lACPR operating limit specified in the                                                       I thermal power and following any Core Operating Limits Report. If at any           change in power level or distribution time during operation at > 25% rated               that would cause operation with a thermal power, the limiting value for             limiting control rod pattern as specified MCPR is being exceeded, action shall               in Table 3.2.C.1 Note 5.
tie initiated within 15 minutes to restore operation to within the prescribed limits.
If the steady state MCPR is not                 2. The value of T in Specification 3.11 .C.2.
returned to within the prescribed limits           shall be equal to 1.0 unless determined within two (2) hours, reduce thermal               from the result of surveillance testing of power to < 25% within four (4) hours.             Specification 4.3.C as follows:
a)  T is defined as T'ave - TB T=
1.252 - TB Amendment No. 15, 27, 39, 12, 61, 105, 133,165, 206,                                    3/4.1 1-2 219}}

Latest revision as of 20:48, 23 November 2019

Tech Spec Pages for Amendment 219 Regarding Single Recirculation Loop Operation
ML061070167
Person / Time
Site: Pilgrim
Issue date: 04/12/2006
From:
Plant Licensing Branch III-2
To:
References
TAC MC4333
Download: ML061070167 (9)


Text

B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 219 , are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

C. Records ENO shall keep facility operating records in accordance with the requirements of the Technical Specifications.

D. Equalizer Valve Restriction - DELETED E. Recirculation Loop InoDerable - DELETED F. Fire Protection ENO shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the SER dated December 21, 1978 as supplemented subject to the following provision:

ENO may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

G. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.5 (51 FR27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Pilgrim Nuclear Power Station Physical Security, Training and Qualification, and Safeguards Contingency Plan, Revision 0" submitted by letter dated October 13, 2004.

Amendment 244, 2A1-,216, 247, 219

TABLE OF CONTENTS LIMiTIN- CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.6 PRIMARY SYSTEM BOUNDARY 4.6 3/4.6-1 A. Thermal and Pressurization Limitations A 3/4.6-1 B. Coolant Chemistry B 3/4.6-3 C. Coolant Leakage C 3/4.6-4 D. Safety and Relief Valves D 3/4.6-6 E. Jet Pumps E 3/4.6-7 F. Recirculation Loops Operating F 3/4.6-8 G. Structural Integrity G 3/4.6-8 BASES B3/4.6-1 l 3.7 CONTAINMENT SYSTEMS 4.7 3/4.7-1 A. Primary Containment A 3/4.7-1 B. Standby Gas Treatment System and Control B Room High Efficiency Air Filtration System 3/4.7-11 C. Secondary Containment C 3/4.7-16 BASES B3/4.7-1 3.8 PLANT SYSTEMS 4.8 3/4.8-1 3.8.1 Main Condenser Offgas 4.8.1 3/4.8-1 3.8.2 Mechanical Vacuum Pump 4.8.2 3/4.8-2 BASES 83/4.8-1 3.9 AUXILIARY ELECTRICAL SYSTEM 4.9 3/4.9-1 A. Auxiliary Electrical Equipment A 3/4.9-1 B. Operation with Inoperable Equipment B 3/4.9-4 EASES B3/4.9-1 3.10 C:ORE ALTERATIONS 4.10 3/4.10-1 A. Refueling Interlocks A 3/4.10-1 B. C:ore Monitoring B 3/4.10-1 C. Spent Fuel Pool Water Level C 3/4.10-2 D. Multiple Control Rod Removal D 3/4.10-2 EASES 83/4.10-1 3.11 REACTOR FUEL ASSEMBLY 4.11 3/4.11-1 A. Average Planar Linear Heat Generation Rate A (APLHGR) 3/4.11-1 B. Linear Heat Generation Rate (LHGR) B 3/4.11-2 C. Minimum Critical Power Ratio (MCPR) C 3/4.11-2 D. Fower/Flow Relationship During Power D Operation 3/4.11-4 EASES B3/4.1 1-1 PNPS ii 19 219 Amendment No.-t-7

2.0 SAFETY LIMITS 2.1 Safety Limits 2.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% of rated core flow:

THERMAL POWER shall be < 25% of RATED THERMAL POWER.

2.1.2 With the reactor steam dome pressure > 785 psig and core flow > 10% of rated core flow:

MINIMUM CRITICAL POWER RATIO shall be > 1.06 for two recirculation loop operation or > 1.08 for single recirculation loop operation.

2.1.3 Whenever the reactor is in the cold shutdown condition with irradiated fuel in the reactor vessel, the water level shall not be less than 12 inches above the top of the normal active fuel zone.

2.1.4 Reactor steam dome pressure shall be < 1325 psig at any time when irradiated fuel is present in the reactor vessel.

2.2 Safety Limit Violation With any Safety Limit not met the following actions shall be met:

2.2.1 Within one hour notify the NRC Operations Center in accordance with 10CFR50.72.

2.2.2 Within two hours:

A. Restore compliance with all Safety Limits, and B. Insert all insertable control rods.

2.2.3 The Station Director and Senior Vice President - Nuclear and the Nuclear Safety Review and Audit Committee (NSRAC) shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

2.2.4 A Licensee Event Report shall be prepared pursuant to 10CFR50.73. The Licensee Event Report shall be submitted to the Commission, the Operations Review Committee (ORC), the NSRAC and the Station Director and Senior Vice President - Nuclear within 30 days of the violation.

2.2.5 Critical operation of the unit shall not be resumed until authorized by the Commission.

Amendment 16, 27, 42, 72, 133-4 16, 4 74

,4 91, 219 2-1

NOTES FOR TABLE 3.1.1 (Cont)

2. Permissible to bypass, with control rod block, for reactor protection system reset in refuel and shutdown positions of the reactor mode switch.
3. Permissible to bypass when reactor pressure is < 576 psig.
4. Permissible to bypass when turbine first stage pressure is less than < 112 psig.
5. IIRM's are bypassed when APRM's are onscale and the reactor mode switch is in the run position.
6. The design permits closure of any two lines without a scram being initiated.
7. When the reactor mode switch is in the Refuel position, the reactor vessel head is removed, and control rods are inserted in all core cells containing one or more fuel assemblies, these scram functions are not required.
8. Not required to be operable when primary containment integrity is not required.
9. Not required while performing low power physics tests at atmospheric pressure during or after refueling at power levels not to exceed 5 MW(t).
10. Not required to be operable when the reactor pressure vessel head is not bolted to the vessel.
11. Deleted
12. Deleted i3. An APRM will be considered inoperable if there are less than 2 LPRM inputs per level or there is less than 50% of the normal complement of LPRM's to an APRM.
14. Deleted
15. The APRM high flux trip level setting for the flow bias function shall be as specified in the CORE OPERATING LIMITS REPORT. The APRM high flux trip level setting shall in no case exceed 120% of rated thermal power.
16. The APRM (15%) high flux scram is bypassed when in the run mode.
17. The APRM flow biased high flux scram is bypassed when in the refuel or startup/hot standby modes.
18. Deleted.

Amendment No. 462,4164, 469,219 3/4.1 -4

LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREMENTS 3.6 PRIMARY SYSTEM BOUNDARY (Cont) 4.6 PRIMARY SYSTEM BOUNDARY (Cont)

A. Thermal and Pressurization Limitations A. Thermal and Pressurization Limitations (Corit) (Cont)

In the event this requirement is not met, achieve stable reactor conditions with reactor vessel temperature above that defined by the appropriate curve and obtain an engineering evaluation to determine the appropriate course of action to take.

3. Tine reactor vessel head bolting studs 3. When the reactor vessel head bolting shall not be under tension unless the studs are tensioned and the reactor is in temperature of the vessel head flange a Cold Condition, the reactor vess;el shell and the head is greater than 550F. temperature immediately below the head flange shall be permanently recorded.
4. The pump in an idle recirculation loop 4. Prior to and during startup of an idle shall not be started unless the recirculation loop, the temperature of the temperatures of the coolant within the reactor coolant in the operating and idle idle and operating recirculation loops are loops shall be permanently logged.

within 500F of each other.

5. The reactor recirculation pumps shall not 5. Prior to starting a recirculation pump, the be started unless the coolant reactor coolant temperatures in the dome temperatures between the dome and the and in the bottom head drain shall be bottom head drain are within 1450F. compared and permanently logged.

Amendment No. 27, 28, 42, 82, 140, 209, 3/4.6-2 219,

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.6 PRIMARY SYSTEM BOUNDARY (Cont) 4.6 PRIMARY SYSTEM BOUNDARY (Cont)

D. Safety Relief Valves (Con't)

4. Any safety relief valve whose discharge pipe temperature exceeds 2120 F for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or more shall be removed at the next cold shutdown of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or more, tested in the as-found condition, and recalibrated as necessary prior to reinstallation. Power operation shall not continue beyond 90 days from the initial discovery of discharge pipe temperatures in excess of 2120F for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> without prior NRC approval of the engineering evaluation delineated in 3.15.D.3.
5. The limiting conditions of operation for the instrumentation that monitors tail pipe temperature are given in Table 3.2-F.

E. Jet Pumps E. Jet Pumps

1. Whenever the reactor is in the Startup or NOTES Run Modes, all jet pumps shall be 1. Not required to be performed until 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Operable. If it is determined that a jet after the associated recirculation loop is in pump is inoperable, the reactor shall be operation.

in Hot Shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

2. Not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after >25% Rated Thermal Power.

Whenever there is recirculation flow with the reactor in the Startup or Run Modes, jet pump operability shall be checked daily by verifying at least one of the following criteria (1, 2, or 3) is satisfied for each operating recirculation loop:

1. Recirculation pump flow to speed ratio differs by s 5% from established patterns, and jet pump loop flow to recirculation pump speed ratio differs by s 5% from established patterns.
2. Each jet pump diffuser to lower plenum differential pressure differs by s 2D% from established patterns.
3. Each jet pump flow differs by < 1C%from established patterns.

Amendment No. 15, 56, 71, 93,133, 205, 3/4.6-7 219

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.6 PRIMARY SYSTEM BOUNDARY (Cont) 4.6 PRIMARY SYSTEM BOUNDARY (Cont)

F. Recirculation Loons Operating F. Recirculation Loops Ooeratina I During operation in the Run and Startup Recirculation pump speeds shall be N/odes, at least one recirculation pump shall checked and logged at least once per day.

be operating.

1. Whenever both recirculation pumps are in operation, pump speeds shall be maintained within 10% of each other when power level is greater than 80%

and within 15% of each other when power level is less than or equal to 80%.

2. Whenever a single recirculation loop is operating, the following limits are applied when the associated LCO is applicable:

a) LCO 3.11 .A, "Average Planar Linear Heat Generation Rate (APLHGR)," single loop operation limits specified in the COLR, b) LCO 3.11.C, "Minimum Critical Power Ratio (MCPR)," single loop operation limits specified in the COLR, and c) LCO 3.1, "Reactor Protection System," Average Power Range Monitor High Flux function, trip level setting for the flow bias function is reset for single loop operation per Table 3.1.1.

3. If the requirements of Specification 3.6.F.1 or 3.6.F.2 are not met, restore compliance within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. If compliance is not restored or with no recirculation pumps in operation the reactor shall be in Hot Shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

G. Structural Integrity G. Structural Integrity

1. The structural integrity of the primary Inservice inspection of components shall be system boundary shall be maintained at performed in accordance with the PNPS the level required by the ASME Boiler Inservice Inspection Program. The results and Pressure Vessel Code, Section Xl obtained from compliance with this program "Rules for Inservice Inspection of will be evaluated at the completion of each Nuclear Power Plant Components," ten year interval. The conclusions of this Articles IWA, IWB, IWC, IWD and IWF evaluation will be reviewed with tie NRC.

and mandatory appendices as required by 10CFR50.55a(g), except where specific relief has been granted by the NRC pursuant to IOCFR50.55a(g)(6)(i).

I Amendment No. 19, 93, 133r 2194 314.6-8

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.11 REACTOR FUEL ASSEMBLY 4.11 REACTOR FUEL ASSEMBLY Applicabilitv: Applicability:

The Limiting Conditions for Operation The surveillance requirements apply to the associated with fuel rods apply to those parameters which monitor the fuel rod parameters which monitor the fuel rod operating conditions.

operating conditions.

Obiective: Obiective:

The Objective of Limiting Conditions for The Objective of the Surveillance Operation is to assure the performance of Requirements is to specify the iype and the fuel rods. frequency of surveillance to be applied to the fuel rods.

Specifications: Specifications:

A. Average Planar Linear Heat Generation A. Average Planar Linear Heat Generation Rate (APLHGR) Rate (APLHGR)

During operation at > 25% rated thermal The APLHGR for each type of fuel as a I power, the APLHGR for each type of fuel function of average planar exposure shall as a function of average planar exposure be determined daily during reactor shall not exceed the applicable limiting operation at 2 25% rated thermal power.

value specified in the CORE OPERATING LIMITS REPORT.

If at any time during operation at > 25%

1 rated thermal power the limiting value for APLHGR is being exceeded, action shall be initiated within 15 minutes to restore operation to within the prescribed limits. If the APLHGR is not returned to within the prescribed limits within two (2) hours, I reduce thermal power to < 25% within four (4)hours.

Amendment No. 15, 24, 27,42, 69, 100, 133, 219 3/4.1 1-1

LIMITING CONDITIONS FOR OPERATION SLIRVEILLAN("F'E REQUIREMENTS 3.11 REACTOR FUEL ASSEMBLY (Cont) 4.11 REACTOR FUEL ASSEMBLY (Cont)

B. Linear Heat Generation Rate (LHGR) B. Linear Heat Generation Rate (LHGR)

During operation at > 25% rated thermal The LHGR as a function of core height powver, the LHGR shall not exceed the shall be checked daily during reactor limnts specified in the CORE OPERATING operation at 2 25% rated thermal power.

LIMITS REPORT.

If at any time during operation at > 25%

rated thermal power, the limiting value for LHGaR is being exceeded, action shall be initiated within 15 minutes to restore operation to within the prescribed limits. If the LHGR is not returned to within the prescribed limits within two (2) hours, reduce thermal power to < 25% within four (4) hours.

C. Minimum Critical Power Ratio (MCPR) C. Minimum Critical Power Ratio (MCFR)

1. During operation at > 25% rated 1. MCPR shall be determined daily during thermal power, MCPR shall be >the reactor power operation at > 250,; rated lACPR operating limit specified in the I thermal power and following any Core Operating Limits Report. If at any change in power level or distribution time during operation at > 25% rated that would cause operation with a thermal power, the limiting value for limiting control rod pattern as specified MCPR is being exceeded, action shall in Table 3.2.C.1 Note 5.

tie initiated within 15 minutes to restore operation to within the prescribed limits.

If the steady state MCPR is not 2. The value of T in Specification 3.11 .C.2.

returned to within the prescribed limits shall be equal to 1.0 unless determined within two (2) hours, reduce thermal from the result of surveillance testing of power to < 25% within four (4) hours. Specification 4.3.C as follows:

a) T is defined as T'ave - TB T=

1.252 - TB Amendment No. 15, 27, 39, 12, 61, 105, 133,165, 206, 3/4.1 1-2 219