License Amendment Request Implementation Requirement for Requested License Changes to Allow Single Recirculation Loop Operation
ML060090365
Person / Time
Site: Pilgrim
Issue date: 12/29/2005
From: Balduzzi M
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC MC4333
Download: ML060090365 (2)


Text

r- U

%--Entergy Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Michael A. Balduzzi Site Vice President December 29, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 License Amendment Request

-[mplementation Requirement for RequestedLicense-Changes to Allow -

Single Recirculation Loop Operation

Reference:

1. Entergy Letter, 2.04.074, License Amendment Request, Single loop Operation, dated September 2,2004. (TAC No. MC4333)

LETTER NUMBER: 2.05.089

Dear Sir or Madam:

In Reference 1; Entergy Nuclear Operations, Inc. (Entergy) submitted a proposed license amendment to revise the Pilgrim Station Operating License and Technical Specifications to allow continued plant operation with a single recirculation loop in service.

Entergy requests 120 days to implement the approved changes.

The information contained in this letter does not invalidate the no significant hazard conclusions previously submitted in Reference 1. There are no commitments contained in this letter.

If you have any questions or require additional information, please contact Bryan Ford at

1508) 830-8403. ;-

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 29th day of December, 2005.

I ' I - ' t.

1$1*.2 1'.

PC C30

Entergy Nuclear Operations, Inc. Letter No. 2.05.089 Pilgrim Nuclear Power Station Page 2 CC:

Mr. James Shea, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406

--- Senior Residenttnspector- - we Pilgrim Nuclear Power Station Mr. Robert Walker, Director Radiation Control Program Commonwealth of Massachusetts 90 Washington Street Dorchester, MA 02121 Ms. Cristine McCombs, Director Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702

__7 7-:7- - -.- __ . :--- - -

'a- ww%Awqp *-I ~