ML061220322: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:U.S. Department 400 Seventh Street, S.W.of Transportation Washington, D.C. 20'590 Maritime Administration February 28, 2006 U.S. Nuclear Regulatory Commission ATTN: Alexander Adams, Mail Stoo 012-G13 Washington, DC 20555-0001
{{#Wiki_filter:U.S. Department                                                                     400 Seventh Street, S.W.
of Transportation                                                                   Washington, D.C. 20'590 Maritime Administration February 28, 2006 U.S. Nuclear Regulatory Commission ATTN: Alexander Adams, Mail Stoo 012-G13 Washington, DC 20555-0001


==Subject:==
==Subject:==
License NS-1, Docket No. 50-238; N.S. SAVANNAH Annual Report for CY 20(15  
License NS-1, Docket No. 50-238; N.S. SAVANNAH Annual Report for CY 20(15


==Dear Mr. Adams:==
==Dear Mr. Adams:==
This letter constitutes the Maritime Administration's (MARAD) annual report of activities for the Nuclear Ship SAVANNAH (NSS) for Calendar Year 2005. The SAVANNAH remains securely moored at MARAD's James River Reserve Fleet, near Newport News, Virginia.
 
The physical facility status is substantially unchanged from CY 2004.A number of significant activities were completed and undertaken onboard the NSS during CY 2005.Most notably, MARAD completed its corrective action in response to violation number 2001-201-Cl1, and submitted a letter reply on that subject on March 18, 2005. An internal reorganization resulted in reestablishment of the SAVANNAH Technical Staff in May 2005 as the organizational unit responsible for all NSS program activities.
This letter constitutes the Maritime Administration's (MARAD) annual report of activities for the Nuclear Ship SAVANNAH (NSS) for Calendar Year 2005. The SAVANNAH remains securely moored at MARAD's James River Reserve Fleet, near Newport News, Virginia. The physical facility status is substantially unchanged from CY 2004.
Radiological and environmental characterization scoping surveys were performed in March-April 2005 to support pre-decommissioning planning; unexpected results th refrom required additional surveys and destructive sampling activities that were conducted through August 2005. Results of these activities were presented to the NRC in a public meeting in Rockville on November 2,2005.As has become routine practice, the details of these activities are found in the two enclosed documents; a) the minutes of the NSS Review and Audit Committee annual meeting held at the James River Reserve Fleet on December 15, 2005, and b) the NSS Annual (Radiological)
A number of significant activities were completed and undertaken onboard the NSS during CY 2005.
Survey prepare&by General Health Physics, Inc. Additional activities not included in the committee minutes, as well as several, regulatory reports are incorporated within the remainder of this letter.Decommissioning Funding Statement (ref. I0 CFR 50. 750() and 50. 75(e,) (iv)): The N.S. SAt VANNAH (NSS) and its nuclear reactor are federally ownedfacilities, represented by the United States Department of Transportation, acting by and through the Maritime Administration.
Most notably, MARAD completed its corrective action in response to violation number 2001-201-Cl1, and submitted a letter reply on that subject on March 18, 2005. An internal reorganization resulted in reestablishment of the SAVANNAH Technical Staff in May 2005 as the organizational unit responsible for all NSS program activities. Radiological and environmental characterization scoping surveys were performed in March-April 2005 to support pre-decommissioning planning; unexpected results th refrom required additional surveys and destructive sampling activities that were conducted through August 2005. Results of these activities were presented to the NRC in a public meeting in Rockville on November 2,2005.
As such, fundingfor the decommissioning and disposal of the NSS reactor and nuclear systems components and waste must be provided by appropriationsfrom the United States Congress.MARAD maintains noffunding reserve, nor does it accumulate or collectfunds as described in the CFR reference.
As has become routine practice, the details of these activities are found in the two enclosed documents; a) the minutes of the NSS Review and Audit Committee annual meeting held at the James River Reserve Fleet on December 15, 2005, and b) the NSS Annual (Radiological) Survey prepare&
As has been previously noted in correspondence and dialogue, the Congress.. A N.S. SAVANNAH CY 2005 Annual Report License NS-1, Docket No. 50-238 February 28, 2006 appropriatedfunds to commence decommissioning of the NSSbeginning in FY2005. Appropriated funds in .FY's 2005 and 2006 total $5.0Mless rescissions.
by General Health Physics, Inc. Additional activities not included in the committee minutes, as well as several, regulatory reports are incorporated within the remainder of this letter.
The President's FY2007 Budget Request includes an additional  
DecommissioningFundingStatement (ref. I0 CFR 50.750() and 50. 75(e,)                 (iv)):
$10. OM to continue NSS activities.
The N.S. SAt VANNAH (NSS) and its nuclearreactorarefederally ownedfacilities,representedby the UnitedStates Departmentof Transportation,actingby andthrough the MaritimeAdministration. As such,fundingfor the decommissioning and disposalof the NSS reactorand nuclear systems components and waste must be providedby appropriationsfromthe UnitedStates Congress.
Additionalfunding requests are expected to be developed and included infuture budgets. MARAD expects to complete a comprehensive decommissioning cost estimate in CY2006.Changes. Tests and Experiments
MARAD maintainsnoffunding reserve, nor does it accumulate or collectfunds as describedin the CFR reference. As has been previously noted in correspondenceanddialogue, the Congress
[ref: IO CFR 50.59(d)(2)I:
                                                                                                              ..A
In August 2005, MARAD conducted destructive sampling of the NSS Reactor Pressure Vessel wall, outer two core thermal shield barriers, and inner and outer annular walls of the Neutron Shield Ta'ik for the purpose of radiological classification.
 
MARAD completed a 50.59 evaluation of the experiment, using the most recentformal FSAR and correspondence and safety evaluations contained in the several licensing actions completed subsequent to that FSAR.Other significant activities onboard the SAVANNAH included a number of familiarization and orientation tours for senior Department of Transportation and MARAD officials and staff. Also during the calendar year MARAD hosted pre-decommissioning site inspections and Q&A sessions for potential decommissioning bidders, and engineering/planning contractors.
N.S. SAVANNAH CY 2005 Annual Report License NS-1, Docket No. 50-238 February 28, 2006 appropriatedfundsto commence decommissioning of the NSSbeginning in FY2005. Appropriated funds in .FY's 2005 and 2006 total$5.0Mless rescissions. The President'sFY2007 Budget Request includes an additional$10. OM to continue NSS activities. Additionalfundingrequests are expected to be developedand includedinfuture budgets. MARAD expects to complete a comprehensive decommissioning cost estimate in CY2006.
These activities were conducted within the bounds of the Technical Specifications, yet represented a substantially increased level of activity onboard the ship as compared to any year since the ship relocated to the James River Reserve Fleet in 1994.As always, MARAD is most appreciative of the support that NRC extends to the SAVANNAH.Please feel free to contact me at any time if you have any questions regarding MARAD's N.S.SAVANNAH activities.
Changes. Tests and Experiments [ref: IO CFR 50.59(d)(2)I:
Sincerely, Erhard W. Koehler Senior Technical Advisor, N.S. SAVANNAH Enclosures N.S. SAVANNAH CY 2005 Annual Report License NS-1, Docket No. 50-238 February 28, 2006 E. Koehlcr\ek\02-28-2006 cc: MAR-600, 610 (rf, wc), 610.1, 610.2, 610.3, 610.4, 611 (pg, jw), 612, 613 MRG-7100, 7600 (fh), 7700 General Health Physics (J. Davis)U.S. Army Humphreys Engineer Center (D. Breeden)
In August 2005, MARAD conducteddestructive samplingof the NSS Reactor Pressure Vessel wall, outer two core thermalshield barriers,and innerand outerannularwalls ofthe Neutron Shield Ta'ik for the purpose ofradiologicalclassification. MARAD completed a 50.59 evaluation of the experiment, usingthe most recentformalFSAR and correspondenceandsafety evaluationscontained in the severallicensingactions completed subsequent to that FSAR.
U.S. Department of Transportation Maritime Administration 400 Seventh Street, S.W.Washington, D.C. 20590 Nuclear Ship SAVANNAH Minutes of the Annual Meeting of the Review and Audit Committee Covering Calendar Year 2005 James River Reserve Fleet Fort Eustis, Virginia December 15, 2005 License NS-1 Docket No. 50-238.7--I I,-
Other significant activities onboard the SAVANNAH included a number of familiarization and orientation tours for senior Department of Transportation and MARAD officials and staff. Also during the calendar year MARAD hosted pre-decommissioning site inspections and Q&A sessions for potential decommissioning bidders, and engineering/planning contractors. These activities were conducted within the bounds of the Technical Specifications, yet represented a substantially increased level of activity onboard the ship as compared to any year since the ship relocated to the James River Reserve Fleet in 1994.
N/S SAVANNAH Review & Audit Committee CY 2005 Annual Meeting December 15, 2005 Minutes of the Calendar Year 2005 annual meeting of the Nuclear Ship SAVANNAH Review and Audit Committee, held at the James River Reserve Fleet on Wednesday, December 15, 2005.I. MEMBERS PRESENT: Erharc. Koehler*, Senior Technical Advisor /Committee Chair John Wiegand, Decommissioning Program Manager Greg Thornton, Facility Site Manager John ETavis*, General Health Physics, Inc. (rep USACE)Fred Hoffmann*, James River Reserve Fleet Michael Buonopane, Volpe Centert Chris Zevitas, Volpe Center Guests present and participating in the meeting included John Osborne, a subcontractor for Sayres and Associates, Inc., and Bill Halloran of the Volpe Center II. AGENDA TOPICS See attachment 1 for the agenda and agenda topics.III. WELCOME Mr. Koehler convened the meeting at 09:30 am. A quorum was present. The meeting was convened for the purpose of discussing those topics within the purview of the members present, and to support the annual reporting requirements to the NRC.Section 3.6 of the NSS Technical Specifications (TS) requires the Review and Audit Committee to meet at least annually to review and discuss events of the preceding period. The committee last met on August 30, 2005 (to discuss Classification of the RPV), at the James River Reserve Fleet (JRRF), aboard the NS SAVANNAH.
As always, MARAD is most appreciative of the support that NRC extends to the SAVANNAH.
The minutes of that meeting were briefly reviewed without comment.IV. DISCUSSION A. Significant Events of CY 2005: Mr. Koehler opened the committee's discussion of significant events following an introduction of all present at the* Denotes member required for quorum.t U.S. :Dept of Trans; Research and Innovative Technology Admin; Volpe National Transportation Systems Center 1 N/S SAVANNAH Review & Audit Committee CY 20(05 Annual Meeting December 15, 2005 meeting. Mr. Koehler then identified the following significant events: 1. Decommissionilg Planning Activities In late 2004, MARAD accepted an unsolicited proposal submitted by WPI* to conduct a radiological and environmental characterization scoping survey of the ship. The physical work was performed onboard the ship in March and April 2005. The survey made two significant findings with respect to physical conditions on the ship.First, the dose rates measured in proximity of the Reactor Pressure Vessel and Neutron Thermal Shield tank were much less than predicted by calculation (updated in 2003/2004 by WPI). Second, WPI discovered Primary Cooling water in both steam generator u-tube heat exchangers.
Please feel free to contact me at any time if you have any questions regarding MARAD's N.S.
The initial response to the discovery of the primary system watert was to conduct a more detailed survey to quantify the quantity and location of remaining water.The revised estimate indicates approximately 1,500 gals of Primary Cooling water in the lower head of the RPV, lower legs of the primary piping to the pressurizer and to/from each steam generator heat exchanger.
SAVANNAH activities.
In response to the much lower RPV dose rates, MARkD determined to conduct physical sampling of the RPV outer wall, selected internals, and the Neutron Thermal Shield Tank, and develop actual radiological profile of the constituent materials.
Sincerely, Erhard W. Koehler Senior Technical Advisor, N.S. SAVANNAH Enclosures
The sampling was accomplished in August 2005, by drilling a series of holes from the exterior circumference of the NTS tank through to the second interior thermal shield baffle. The collected sample material was removed from the ship and analyzed in accordance with Part 61 requirements.
 
The draft results* WPI previously held contracts with MARAD in 2002 thru 2004 to perform decommissioning planning and studies; develop emergency response plans and training programs; and oversee implementation of MARAD's SAVANNAH Emergency Radiological Assistance Team (SERAT).t Previous reports since 1976 established the expected baseline -that all remaining primary system water was entrained in the Reactor Pressure Vessel lower head, below the lowermost primary leg nozzles. In the 30 years since, the shio has been subjected to normal movements caused by sea action, and list/trim adjustments made for towing and drydocking.
N.S. SAVANNAH CY 2005 Annual Report License NS-1, Docket No. 50-238 February 28, 2006 E. Koehlcr\ek\02-28-2006 cc: MAR-600, 610 (rf, wc), 610.1, 610.2, 610.3, 610.4, 611 (pg, jw), 612, 613 MRG-7100, 7600 (fh), 7700 General Health Physics (J. Davis)
Such movements are theorized to have caused the migration of water from the RPV lower head.2 N/S SAVANNAH Review & Audit Committee CY 20015 Annual Meeting December 15, 2005 from this testing indicates that the RPV will be a CLASS A waste package.The RPV sampling results and other items were presented to the NRC in a public meeting on Nov. 2 nd, 2005 as well as to each of the potential waste disposal sites (Barnwell and Envirocare of Utah) and their host states of Utah and South Carolina.Other pre-decommissioning planning activities are described in the following paragraphs.
U.S. Army Humphreys Engineer Center (D. Breeden)
: 2. Oreanization In 2005, MARAD re-established the SAVANNAH Technical Staff (STS) as an organizational entity within the Office of Ship Operations.
 
Erhard Koehler heads the STS and is supported by: John Wiegand, the Decommissioning Program Manager; and Cindy Bearor, Documentation Manager. We soon hope to welcome Greg Thornton permanently, as the Facility Site Manager. We have also asked the DOT Volpe Center to help us with some of our activities as is represented by their presence here today. We also anticipate that Argonne National Laboratory (DOE Facility) and US Merchant Marine Academy at Kings Point (Engineering Department) will also soon join us on the team.3. License Activities MARAD completed its correction of conditions contributing to license violation 2001-201-01 in March 2005, and submitted a letter reply to NRC on March 18, 2005.Further discussion of this item is in paragraph V.D of this report.It is anticipated that we will dry-dock the ship during calendar year 2006 in preparation for upcoming decommissioning activities.
U.S. Department                                           400 Seventh Street, S.W.
The STS also plans to declare formally our intent to decommission in mid-year.MARAD contracted with Sayres and Associates, Inc. to provide support in re-establishing MARAD's licensing support activities.
of Transportation                                          Washington, D.C. 20590 Maritime Administration Nuclear Ship SAVANNAH Minutes of the Annual Meeting of the Review and Audit Committee Covering Calendar Year 2005 James River Reserve Fleet Fort Eustis, Virginia December 15, 2005 License NS-1 Docket No. 50-238
Specifically they have been assisting with the Quality Assurance Program. They also conducted a regulatory self-assessment to determine our licensing base-line.
                                . 7
This document will assist in setting the stage for the licensed operations preparatory 3
                  --I                           I,-
N/S SAVANNAH Review & Audit Committee CY 2005 Annual Meeting December 15, 2005 to our license amendment requesting permission to decommission the facility.
 
Some preliminary changes will be submitted in early calendar year 2006 regarding cur organization changes in preparation for decommissioning.
N/S SAVANNAH Review & Audit Committee CY 2005 Annual Meeting                                   December 15, 2005 Minutes of the Calendar Year 2005 annual meeting of the Nuclear Ship SAVANNAH Review and Audit Committee, held at the James River Reserve Fleet on Wednesday, December 15, 2005.
I. MEMBERS PRESENT:
Erharc. Koehler*, Senior Technical Advisor /Committee Chair John Wiegand, Decommissioning Program Manager Greg Thornton, Facility Site Manager John ETavis*, General Health Physics, Inc. (rep USACE)
Fred Hoffmann*, James River Reserve Fleet Michael Buonopane, Volpe Centert Chris Zevitas, Volpe Center Guests present and participating in the meeting included John Osborne, a subcontractor for Sayres and Associates, Inc., and Bill Halloran of the Volpe Center II. AGENDA TOPICS See attachment 1 for the agenda and agenda topics.
III. WELCOME Mr. Koehler convened the meeting at 09:30 am.                   A quorum was present.     The meeting was convened for the purpose of discussing those topics within the purview of the members present, and to support the annual reporting requirements to the NRC.
Section 3.6 of the NSS Technical Specifications (TS) requires the Review and Audit Committee to meet at least annually to review and discuss events of the preceding period. The committee last met on August 30, 2005 (to discuss Classification of the RPV), at the James River Reserve Fleet (JRRF), aboard the NS SAVANNAH.                   The minutes of that meeting were briefly reviewed without comment.
IV. DISCUSSION A. Significant Events of CY 2005:
Mr. Koehler opened the committee's discussion of significant events following an introduction of all present at the
* Denotes member required for quorum.
t U.S. :Dept of Trans; Research and Innovative Technology Admin; Volpe National Transportation Systems Center 1
 
N/S SAVANNAH Review & Audit Committee CY 20(05 Annual Meeting                                     December 15, 2005 meeting.       Mr. Koehler     then     identified   the following significant events:
: 1. Decommissionilg Planning Activities In late 2004, MARAD accepted an unsolicited proposal submitted by WPI*         to conduct       a radiological   and environmental characterization scoping survey of the ship. The physical work was performed onboard the ship in March and April 2005. The survey made two significant findings with respect to physical conditions on the ship.
First, the dose rates measured in proximity of the Reactor Pressure Vessel and Neutron Thermal Shield tank were much less than predicted by calculation (updated in 2003/2004 by WPI).           Second, WPI discovered Primary Cooling water in both steam generator u-tube heat exchangers.
The initial response to the discovery of the primary system watert was to conduct a more detailed survey to quantify the quantity and location of remaining water.
The revised estimate indicates approximately 1,500 gals of Primary Cooling water in the lower head of the RPV, lower legs of the primary piping to the pressurizer and to/from each steam generator heat exchanger.
In response to the much lower RPV dose rates, MARkD determined to conduct physical sampling of the RPV outer wall, selected internals, and the Neutron Thermal Shield Tank, and develop actual radiological profile of the constituent materials. The sampling was accomplished in August 2005, by drilling a series of holes from the exterior circumference of the NTS tank through to the second interior thermal shield baffle.               The collected sample material was removed from the ship and analyzed in accordance with Part 61 requirements. The draft results
* WPI previously held contracts with MARAD in 2002 thru 2004 to perform decommissioning planning and studies; develop emergency response plans and training programs; and oversee implementation of MARAD's SAVANNAH Emergency Radiological Assistance Team (SERAT).
t Previous reports since 1976 established the expected baseline - that all remaining primary system water was entrained in the Reactor Pressure Vessel lower head, below the lowermost primary leg nozzles. In the 30 years since, the shio has been subjected to normal movements caused by sea action, and list/trim adjustments made for towing and drydocking. Such movements are theorized to have caused the migration of water from the RPV lower head.
2
 
N/S SAVANNAH Review & Audit Committee CY 20015 Annual Meeting                               December 15, 2005 from this testing indicates that the RPV will be a CLASS A waste package.
The RPV sampling results and other items were presented to the NRC in a public meeting on Nov. 2 nd, 2005 as well as to each of the potential waste disposal sites (Barnwell and Envirocare of Utah) and their host states of Utah and South Carolina.
Other     pre-decommissioning     planning   activities are described in the following paragraphs.
: 2. Oreanization In 2005, MARAD re-established the SAVANNAH Technical Staff (STS) as an organizational entity within the Office of Ship Operations. Erhard Koehler heads the STS and is supported by: John Wiegand, the Decommissioning Program Manager; and Cindy Bearor, Documentation Manager.         We soon hope to welcome Greg Thornton permanently, as the Facility Site Manager. We have also asked the DOT Volpe Center to help us with some of our activities as is represented by their presence here today.             We also anticipate       that Argonne     National   Laboratory (DOE Facility) and US Merchant Marine Academy at Kings Point (Engineering Department) will also soon join us on the team.
: 3. License Activities MARAD completed its correction of conditions contributing to license violation 2001-201-01 in March 2005, and submitted a letter reply to NRC on March 18, 2005.
Further discussion of this item is in paragraph V.D of this report.
It is anticipated that we will dry-dock the ship during calendar year         2006   in   preparation   for upcoming decommissioning activities. The STS also plans to declare formally our intent to decommission in mid-year.
MARAD contracted with Sayres and Associates, Inc. to provide support in re-establishing MARAD's licensing support activities.           Specifically they have been assisting with the Quality Assurance Program. They also conducted a regulatory self-assessment to determine our licensing base-line.         This document will assist in setting the stage for the licensed operations preparatory 3
 
N/S SAVANNAH Review & Audit Committee CY 2005 Annual Meeting                                 December 15, 2005 to our license amendment requesting permission to decommission the facility. Some preliminary changes will be submitted in early calendar year 2006 regarding cur organization changes in preparation for decommissioning.
: 4. Technical Specification Revisions Substantive revisions to the Technical Specifications are in development, and will be discussed further elsewhere.
: 4. Technical Specification Revisions Substantive revisions to the Technical Specifications are in development, and will be discussed further elsewhere.
B. JRRF Annual Activities:
B. JRRF Annual Activities:
Fred Hoffmann provided a brief review of JRRF activities regarding the NS SAVANNAH.
Fred Hoffmann provided a brief review of JRRF activities regarding the NS SAVANNAH. These included:
These included:* Routine scheduled maintenance onboard the ship.* Response to alarms as they appear.* The annual underwater hull survey was completed in March 2005.* Hanging Anode System (fleet cathodic protection) is in working order.o We will need to service the on-board system during dry-docking to ensure that it is in good working order when layberthed.
* Routine scheduled maintenance onboard the ship.
Mr. Hoffmann suggested the possibility of welding more sacrificial anodes on the hull -(2) anodes forward on the bow and additional anodes on the rudder. These can be made available to use from the fleet. The JRRF will place a pallet of zinc anodes on deck prior to departure for dry-docking.
* Response to alarms as they appear.
C. Radiological Surveillance and Monitoring John Davis indicated that quarterly radiological surveys indicated no noticeable changes to measured dose rates.V. REVIEW OF TECHNICAL SPECIFICATION REQUIREMENTS In accordance with paragraph 3.6.3 of the TS, the Committee is specifically required to review the following items: 4 N/S SAVANNAH Review & Audit Committee CY 2005 Annual Meeting December 15, 2005 A. Proposed changes to Technical Specifications.
* The annual underwater hull survey was completed in March 2005.
* Hanging Anode System (fleet cathodic protection)         is in working order.
o We will need to service the on-board system during dry-docking to ensure that it is in good working order when layberthed. Mr. Hoffmann suggested the possibility of welding more sacrificial anodes on the hull -         (2) anodes forward on the bow and additional anodes on the rudder. These can be made available to use from the fleet.         The JRRF will place a pallet of zinc anodes on deck prior to departure for dry-docking.
C. Radiological Surveillance and Monitoring John Davis indicated that quarterly radiological surveys indicated no noticeable changes to measured dose rates.
V. REVIEW OF TECHNICAL SPECIFICATION REQUIREMENTS In accordance with paragraph 3.6.3 of the TS, the Committee is specifically required to review the following items:
4
 
N/S SAVANNAH Review & Audit Committee CY 2005 Annual Meeting                                             December 15, 2005 A. Proposed changes to Technical Specifications.
AI draft of proposed changes is still in development.
AI draft of proposed changes is still in development.
There has been a long-standing desire on the part of the committee membership to review and revise the TS. At this time the STS is contemplating a change in the staff organization as presented in the technical specifications in order to position the "license house" for decommissioning.
There has been a long-standing desire on the part of the committee membership to review and revise the TS.                           At this time the STS is contemplating a change in the staff organization as presented in the technical specifications in order to position the "license house" for decommissioning.
This change will replace the tech spec in whole to accommodate this organization change and allow for layberthing the ship alongside a pier. This is currently being referred to as an v'administrative amendment." The current planning schedule calls for a final document by the end of December 2005 i'author's note -the revised TS remains under development in February 2006).B1. Proposed changes or modifications to the vessel's controlled radiation area entry alarm system or containment system.* The reactor shield plug in way of the personnel air-lcck entrance way into the containment vessel (aft manway) was removed to support the characterization survey by WPI.The plug is stowed adjacent to the manway.* The committee discussed restoring the chain fall system to permit safe removal and replacement of the shield plug during pre-decommissioning activities.
This change will replace the tech spec in whole to accommodate this organization change and allow for layberthing the ship alongside a pier. This is currently being referred to as an v'administrative amendment."             The current planning schedule calls for a final document by the end of December 2005 i'author's note - the revised TS remains under development in February 2006).
Further investigation will be made before deciding on a course of action.* WPI restored ventilation to the Containment Vessel to carry out personnel access during characterization activities.
B1. Proposed changes or modifications to the vessel's controlled radiation area entry alarm system or containment system.
The modified system uses the nitrogen purge piping for supply and exhaust. Supply air is provided from the ship's interior dehumidified air distribution ducting. The discharge of the ventilation cycle is through a HEPA filter located in the secondary containment.
* The reactor shield plug in way of the personnel air-lcck entrance way into the containment vessel (aft manway) was removed to support the characterization survey by WPI.
This system mimics the installed (disabled)
The plug is stowed adjacent to the manway.
CV ventilation system, which was determined incapable of restoration at the time. The modified system was retained after the characterization activities were completed to facilitate periodic CV entries during pre-decommissioning.
* The committee discussed restoring the chain fall system to permit safe removal and replacement of the shield plug during     pre-decommissioning             activities.             Further investigation will be made before deciding on a course of action.
5 N/S SAVANNAH Review & Audit Committee CY 200C5 Annual Meeting December 15, 2005 C. Substantive changes to radiation surveys or security surveillance procedures.
* WPI restored ventilation to the Containment Vessel to carry out personnel access during characterization activities. The modified system uses the nitrogen purge piping for supply and exhaust.                 Supply air is provided from the ship's interior dehumidified air distribution ducting.     The discharge of the ventilation cycle is through a HEPA filter located in the                             secondary containment. This system mimics the installed (disabled)
: 1. Radiation Surveys Based on the results of the Characterization Survey completed by WPI, a recommendation was made to reduce the scope of the routine monitoring and surveillance program by removing survey locations in cargo holds number 1, 2 and 3. No decision was made at the meeting.2. Security Surveillance Procedures Routine security surveillance continued throughout CY 2005.D. Reported violations of Technical Specifications No new TS violations were cited during the reporting period.On March 18, 2005 MARAD submitted its letter reply to violation number 2001-201-01, noting that the conditions described (failure to have a health physicist on call within two hours of the ship and failure to have an Emergency Radiological Assistance team available) as a violation of TS Section 3.1 had been corrected.
CV ventilation system, which was determined incapable of restoration at the time.                 The modified system was retained after the characterization activities were completed to facilitate periodic CV entries during pre-decommissioning.
The NRC response noted the correction, and anticipates a future audit to validate the correction.
5
E. License Event Reports No LER's were noted during the reporting period.F. Annual reports to the NRC The CY 2004 annual report was submitted to the NRC by letter dated March 4, 2005.VI. OTHER TOPICS AL. Security Issues None were noted.B. Funding A dedicated appropriation to fund SAVANNAH activities was approved by Congress and signed by the President in FY 2005.The President's Budget request for FY 2006 continues to include SAVANNAH funding. At the time of the meeting, the FY 2006 Department of Transportation appropriations bills were 6 N/S SAVANNAH Review & Audit Committee CY 2005 Annual Meeting December 15, 2005 being reconciled in conference committee, and MARAD is operating on a Continuing Resolution.
 
C. Status of SERAT* The SERAT Team conducted a training exercise and drill in January 2005. The team deployed to the ship.* A table-top drill was conducted in March 2005. {Note: this originally planned as a full drill, but reduced to table top drill due to weather. The completion of this drill was the last activity required to complete the correction of violation 2001-201-01 (see previous note).* We are due for a drill in February -March 2006 time frame.* Jefferson Labs (DOE facility) is funded through August 2006 to provide emergency radiological health physics coverage in support of MARAD and SERAT activities.
N/S SAVANNAH Review & Audit Committee CY 200C5 Annual Meeting                                           December 15, 2005 C. Substantive changes to radiation surveys or security surveillance procedures.
* The committee discussed the necessity to retain a SERAT capability once the ship shifts to layberth in 2006.John Davis noted that if the layberth is Baltimore, he is within two-hours driving distance.I}. Decommissioning No formal action on decommissioning was undertaken in CY 2005;however, substantial pre-decommissioning activities were undertaken as described herein. A decommissioning amendment request is anticipated in CY 2006.E. License Amendment No license amendments were prepared or submitted during CY 2005. Two license amendments are under development for proposed submittal in CY 2006. The first will revise the TS, to include substantial revisions to the described MARAD organization, and to permit the ship to be berthed at a layberth (commercial pier) outside of the JRRF. The second amendment will combine the PSDAR and Decommissioning authorization request.7 N/S SAVANNAH Review & Audit Committee CY 2005 Annual Meeting December 15, 2005 F. Independent Oversight Committee In the proposed Technical Specification revision, the Review and Audit Committee will be redefined to function as an independent oversight committee.
: 1. Radiation Surveys Based on the results of the Characterization Survey completed by WPI, a recommendation was made to reduce the scope of the routine monitoring and surveillance program by removing survey locations in cargo holds number 1, 2 and 3. No decision was made at the meeting.
G. Status of RPV Waste Classification The preliminary review of the waste classification study based on drill sampling performed, indicates that the RPV as a package meets the criteria for CLASS A. This means that the nuclear waste may be disposed of either at Barnwell, SC or in the Envirocare of Utah site.II. Other 1. Action Items i. Volpe to take action on identifying DOE Points of Contact for other disposal sites.8 GENERAL HEALTH PHYSICS, INC.7217 LOCKPOT PL #203 LoRON VA 22079 703 550-7525, 1-800 247-6572 FAx: 703 550-7525 Februaiy 16, 2006 Mr Erhardt Koehler Division of Ship Maintenance  
: 2. Security Surveillance Procedures Routine security surveillance             continued throughout CY 2005.
& Repair U.S. Maritime Administration Washington DC 20590  
D. Reported violations of Technical Specifications No new TS violations were cited during the reporting period.
On March 18, 2005 MARAD submitted its                         letter reply to violation number 2001-201-01, noting that the conditions described (failure to have a health physicist on call within two hours of the ship and failure to have an Emergency Radiological Assistance team available) as a violation of TS Section 3.1 had been corrected.                 The NRC response noted the correction, and anticipates a future audit to validate the correction.
E. License Event Reports No LER's were noted during the reporting period.
F. Annual reports to the NRC The CY 2004 annual report was submitted to the NRC by letter dated March 4, 2005.
VI. OTHER TOPICS AL. Security Issues None were noted.
B. Funding A dedicated appropriation to fund SAVANNAH activities was approved by Congress and signed by the President in FY 2005.
The President's Budget request for FY 2006 continues to include SAVANNAH funding. At the time of the meeting, the FY 2006 Department of Transportation appropriations bills were 6
 
N/S SAVANNAH Review & Audit Committee CY 2005 Annual Meeting                               December 15, 2005 being reconciled in conference committee,           and MARAD is operating on a Continuing Resolution.
C. Status of SERAT
* The SERAT Team conducted a training exercise and drill in January 2005. The team deployed to the ship.
* A table-top drill     was conducted in March 2005.   {Note:
this originally planned as a full drill, but reduced to table top drill due to weather. The completion of this drill was the last activity required to complete the correction of violation 2001-201-01 (see previous note).
* We are due for a drill in February -       March 2006 time frame.
* Jefferson Labs (DOE facility) is funded through August 2006 to provide emergency radiological health physics coverage in support of MARAD and SERAT activities.
* The committee discussed the necessity to retain a SERAT capability once the ship shifts to layberth in 2006.
John Davis noted that if the layberth is Baltimore, he is within two-hours driving distance.
I}. Decommissioning No formal action on decommissioning was undertaken in CY 2005; however,     substantial pre-decommissioning activities were undertaken as described herein. A decommissioning amendment request is anticipated in CY 2006.
E. License Amendment No license amendments were prepared or submitted during CY 2005.     Two license amendments are under development for proposed submittal in CY 2006. The first will revise the TS, to include substantial revisions to the described MARAD organization, and to permit the ship to be berthed at a layberth (commercial pier) outside of the JRRF.         The second amendment will       combine   the PSDAR and Decommissioning authorization request.
7
 
N/S SAVANNAH Review & Audit Committee CY 2005 Annual Meeting                             December 15, 2005 F. Independent Oversight Committee In the proposed Technical Specification revision, the Review and Audit Committee will be redefined to function as an independent oversight committee.
G. Status of RPV Waste Classification The preliminary review of the waste classification study based on drill sampling performed, indicates that the RPV as a package meets the criteria for CLASS A. This means that the nuclear waste may be disposed of either at Barnwell, SC or in the Envirocare of Utah site.
II. Other
: 1. Action Items
: i. Volpe to take action on identifying DOE Points of Contact for other disposal sites.
8
 
GENERAL HEALTH PHYSICS, INC.
7217 LOCKPOTPL #203 LoRON VA 22079 703 550-7525, 1-800 247-6572 FAx: 703 550-7525 Februaiy 16, 2006 Mr Erhardt Koehler Division of Ship Maintenance & Repair U.S. Maritime Administration Washington DC 20590


==Dear Sir:==
==Dear Sir:==
Attached is the 2005 report for the NS Savannah.
 
Two water activities are irregular, because of high dissolved solids in the sample. High dissolved solids result in a small sample volume. The samples are for the I st quarter part aft and 2nd quarter stb aft.If you have any questions please feel free to contact me.Sincerely yours, CHP President V!E7S Savana[Zh Annual Suney Location uREM/hr Alpha dpm/100cm 2 Beta dpm/100 cm 2 NAVIGATION BRIDGE Pilot House at helm 3.0 13 mda Bridge Wing port side 3.0 mda mda Fire Stat. #1 near chart rm 2.0 mda mda Fan rm port side gen. rm 3.5 mda mda E.O.G. rm 4.0 mda mda BOAT D)ECK Chief Eng. State rm port side 3.5 mda mda Cpt. State rm starboard side 2.5 mda mda Fire Stat. #2 port side 3.0 mda mda Officer`s lounge aft 3.5 mda mda Hallway floor port side 3.0 mda mda Forward state rm starboard side 3.0 mda 42 Hallway floor forward center 3.5 mda mda PROMENADE DECK Top of reactor hatch 4.0 mda mda StarboEird side of reactor hatch 4.5 mda 56 Top of Hatch #4 3.5 mda mda Between Hatch #3 & #4 3.5 mda mda Bow center of deck 3.5 mda mda Center of Main Lounge 4.0 mda mda Center of Veranda 3.5 11 mda Fire Stat. #7 starboard side 3.0 mda mda Between Veranda & Swimming Pool 4.0 mda mda Library 3.5 mda mda Thursday, February 16, 2006 age I of 9 A1O6t) g7 4 ?
Attached is the 2005 report for the NS Savannah. Two water activities are irregular, because of high dissolved solids in the sample. High dissolved solids result in a small sample volume. The samples are for the I st quarter part aft and 2nd quarter stb aft.
Location uREM/hr Alpha dpmllO00cm 2 Beta dpm/1lOO cm 2 Hallway in front of Main Lounge 3.0 mda mda Veranda port side forward 4.0 mda mda Bar at Veranda 4.5 mda mda REACTOR SPACE Hot pipe forward entry hatch 31 x x I meter forward of tab tank 1 5 x x At lab tank 33 x x Pipe elbow port side forward 50 x x'Hot' pipe near entry hatch x mda mda Containment vessel middle of catwalk 1 5 mda mda Lab tank surface 7.5 mda 48 Open valve next to lab tank 1 0 x x Containment vessel middle of catwalk 8.0 x x Piping at the port side forward catw 9.5 x x Middle of catwalk port side 27 mda mda Piping at the port side middle of ca 1 9 mda mda Valve handle port side aft 1 2 x x Damp nrea on floor middle of catwalk 1 3 1 6 mda Containment vessel starboard side af 49 x x Inside entry hatch pipe x mda mda FAN ROOM At floor rm center 3.0 x x Electric motor 4.5 mda mda Control box 2.5 mda mda CABIN Bi B2 On drums of PC's in Cabin B-i 3.5 mda mda Averago reading of Cabin B-3 4.0 x x On floorof Cabin B-i x mda mda Drum lid in Cabin B-I x mda 52 III E II C II E II E II VI I r II E II E II VI I rl II VI ICIIV II VI I F1 II C 1113 11V II E II r, II E II r, II r II E II E II E II Ell C II E II IC II E 1113 II C II IC II C II VI IC: II E I Thursday, February 16, 2006 Page 2 of 9 Location uREM/hr Alpha dprnllO0cm 2 Beta dpm/1lOO cm 2 STB3 STABILIZER RM At entrance door 3.0 x x Average background 4.5 x x Catwal Lower level x mda mda Catwalc Upper level x mda mda PORT STABILIZER RM At access hatch 3.0 x x At cat~alk upper level 8.0 x x At internally contaminated strainer 28 x x Diaphragm valve 32 x x Pipe to left of diaphragm valve 65 x x Internally contaminated valves x mda mda Control valve lower deck x mda mda Volume! Chambers x mda 46 Elbow diaphragm valve x mda mda STB CHARGING PUMP RM Outside hatch 3.5 x x Inside hatch 10 mda mda Center of floor x mda mda Pipe back of pump motor 60 mda mda Pipe in back of pump x mda mda Top of pump x mda mda Backside of pump x mda mda Center of floor 21 mda 39 Outside. of hatch x mda mda Air ducl at pump x mda mda Pump riotor x mda mda PORT CHARGING PUMP RM Outside. door 1 m from deck 5.5 x x Betweei pumps 27 x x Thursday, February 16, 2006 Page 3 of 9 Locati'on uREM/hr Alpha dpmllO00cm 2 Beta dpm/1lOO cm 2 Deck at hatch x mda mda Acccess hatch x mda mda Deck by pumps x mda mda Floor between pumps x mda mda Pump in front of rm x mda mda x COLD CHEM LAB Background in Cold Chem Lab 8 x x Ventilalion system/lead blanket 49 x x Drain (ID deck) 240 x x Fume hood (D deck) 29 x x Top of storage tank 30 x x Air samnpler (D deck) 36 x x Floor under air sampler (D deck) 15 x x Ledge of fume hood 60 x x Floor ir front of ventilation system 1 1 x x Ventilaltion system 17 x x Ledge of fume hood (D deck) x mda mda Drain (C' deck) x mda mda Floor under air sampler (D deck) x mda mda Floor front of vent system (C deck) x mda mda Air Sampler (D deck) x mda mda Floor uinder fume hood x mda 58 Shelving (C deck) x mda mda Top of storage tank x mda mda Valve near floor (D deck) x mda mda HOT CHEM LAB Background in hot chemn lab 5.0 x x Waste collection tank I11 x x Sink 4.0 x x Doorway to hot chemn lab 3.5 x x Under sink 3.5 x x III I II 3IIC IE I I I CI CII10I1 1,I C113IIV E I .I I 3 1 711C I17 I I II I rIICIIVII131 C 1 IIEl 113IIEIILII EIIC I V IC 1 Thursday, February 16, 2006 Page 4 of 9 Location uREM/hr Alpha dpmllO0cm 2 Beta dpm/1lOO cm 2 Sink drain 8.0 mda mda Inside waste collection tank 6.0 mda mda Fume hood inside 3.5 mda mda Floor inside door 4.0 mda mda Intake for hood 2.5 mda mda CARGO HOLD 2B3 Floor s':arboard side forward 3.0 mda mda Floor st:arboard side center 3.0 mda mda Floor sltarboard side aft 3.0 mda mda Floor aft center 4.0 mda mda Floor part side aft 2.5 mda mda Floor p~rt side center 4.0 mda mda Floor p~rt side forward 3.5 mda mda Floor forward center 3.5 mda mda CARGO HOLD 2C 2.5 mda mda Floor part side center 3.0 mda mda Floor port side forward 3.5 mda mda Floor forward center 2.5 mda mda Floor slarboard side forward 2.5 mda 44 Floor slarboard side center 3.5 mda mda Floor slarboard side aft 3.5 mda mda Floor al't center 4.0 mda mda Floor port side aft 3.5 mda mda Floor 14, cargo hold 3.0 mda mda CARGC) HOLD 2D Starbocird aft 4.5 mda mda Starboard amidships left 2.5 mda mda StarboE'rd amidships right 3.0 mda' mda Starboard bow 3.0 mda mda Centerline bow 2.5 mda mda Thu rsday, February 16, 2006 Page 5 of 9 Location uREM/hr Alpha dpmll 00cm 2 Beta dpm/1lOO cm 2 Ports.I...e  
If you have any questions please feel free to contact me.
.. ..bow. .. ...3. .0.. ... .. ... .. ... .. ... ..... ..... .. ... ....... .Port side amishps3.0 mda mda Port side aftshps3.5 mda mda Centerline aft 2.5 mda mda Average 3.5 x x Maximum 4.5 x x 2 TANK, TOP Floor forward & starboard of sailboat 2.5 mda mda Floor sailboat center port side 3.0 8 mda Floor sailboat aft starboard 3.0 mda mda Floor sailboat center starboard 3.5 mda mda CARGO HOLD 38 At stairwell entering hold 3.5 mda mda Floor center forward 2.5 mda mda Floor s:arboard side forward 4.0 mda mda Floor starboard side center 3.0 mda mdda Floor s 4 arboard side aft 2.5 mda mda Floor canter aft 2.5 mda mda Floor port side aft 3.5 mda mda Floor at display center 2.5 mda mda Floor part side forward 2.5 mda mda Averag e 3.5 x x Maximum 4.0 x x CARGC) HOLD 3C Floor sltarboard side 3.0 mda mda Floor sltarboard center 2.5 mda mda At door starboard aft 3.0 mda mda Center aft vent 2.0 mda 38 Floor p~rt side aft 3.5 mda mda Floor port side center 3.5 mda mda Thursday, February 16, 2006 Page 6 of 9 Location uREM/hr Alpha dpmllO00cm 2 Beta dpm/1lOO cm 2 Floor starboard forward 3.0 mda mda Vent ccenter forward 3.0 mda mda Average 3.5 x x Maximum 3.0 x x CARGO HOLD 3D Floor port side forward 3.0 mda mda Floor port aft 3.5 mda mda Floor center aft 3.0 mda mda Floor sltarboard aft 2.5 mda 46 Floor sltarboard forward 3.5 mda mda Floor forward center 2.5 mda mda CARGO HOLD 4B3 Men's restrm 3.0 mda mda Floor port side center 3.5 mda mda Floor by door to 3B3 port side 2.5 mda mda Floor b:, handrail port side 3.5 mda mda Floor by handrail starboard side for 4.0 14 mda Floor by handrail starboard side cen 3.5 mda mda Floor by handrail starboard side aft 3.0 mda mda CARGO HOLD 4C Port side aft 4.0 x x Centerline aft 1 1 x x Starboard side aft 3.5 x x Max. reading along stern bulkhead 16 x x Floor at aft center (@ Max. Reading) 4.5 mda mda Starboard forward floor 4.0 mda mda CARGO HOLD 4D Floor at stem bulkhead 3.5 mda mda Floor starboard side 3.0 mda mda HIM II ClIE II El IC lir I Ici I IS, I IC] I rl II VI IC II VI IV. I I 171111. Ila lit! II VI I r II IN II r II 11 II MI IC II IN, II ElIcIlEllm II In II 13 II C II Cl IC II CIIE II a I Thursday, February 16, 2006 Page 7 of 9 Location uREM/hr Alpha dpmllO00cm 2 Beta dpm/1lOO cm 2 Under barrier rope 3.5 8 mda Floor sltarboard side forward 2.5 mda mda Floor port side forward 3.0 mda mda Floor port side center 4.0 mda mda Floor pr~rt side aft 3.0 mda mda 4 TANK TOP At laddear entering hold forward 3.5 mda mda CylindrIcal equipment on floor forwa 2.5 mda mda Cylindrical equipment-center of hold 3.0 x x Averag3 background 3.0 x x At wall port side aft 2.5 x x Platform center aft 3.0 x x Platform starboard side aft 3.5 x x At wall starboard side aft 3.0 x x Cylindrical equipment on floor forwa 3.5 mda mda Floor slarboard side forward 2.5 mda mda Floor slarboard side center 3.0 mda mda FLoor starboard side aft 3.5 mda mda Floor slarboard side aft 3.5 mda mda Wall center aft 3.5 mda mda Floor port side aft 2.5 mda 56 Floor port side center 3.0 mda. mda Floor port side forward 3.0 mda mda x-- No measurement required MDA for alpha = 6.5 dpm/100 cm2 MDA for beta =35.0 dpm/100cm2 Thursday, February 16, 2006 Page 8 of 9 Tid Exposure(2005)
Sincerely yours, CHP President
Badge Nuimber o are I are 2 are 3 are 4 are 5 are 6 are 7 are 8are 9 are 10 are 11 are 12 are 13 are 14 are 15 are 16 are 17 are 18 are 19 are 20 are 21 are 22 are 23 are 24 are 25 are 26 are 27 are 1st Half (MR)29 38 23 23 25 23 23 22 26 23 23 24 20 21 21 22 21 37 28 21 25 20 32 21 21 19 22 15 2nd Half (MR)29 32 25 26 27 29 25 24 27 25 24 25 22 19 24 24 24 33 26 23 25 19 34 23 22 22 25 24 Total (nmR)58 70 48 49 52 51 48 46 53 48 47 49 42 38 45 46 45 70 54 44 50 39 66 44 43 41 47 48 I t r sd, y, .e b r u a r y 1 6 , 2 Iii g eIIo f. 2. ., ...... .....II --.... .... C .-...Thursday,;
 
F'ehruary I6, 2006 P -!izf' age I of 2 Bad4,ge Number 28 are 29 are 30 are 31 are 32 are 33 are Ist Half (nR)21 20 23 18 19 18 2nd Half (MR)21 23 22 20 1s 20 Total (mR)42 43 45 38 37 38 Tihursil.ty, Februiary 16, 2006 Page 2 of 2 Water Activity 2005 Fieldl Field2 Field3 Field4 FieldS Field6 Quarter Location Alpha(pCi/l)
V!E7S Savana[Zh Annual Suney Location                           uREM/hr Alpha dpm/100cm 2 Beta dpm/100 cm 2 NAVIGATION BRIDGE Pilot House at helm                     3.0   13                 mda Bridge Wing port side                     3.0   mda                 mda Fire Stat. #1 near chart rm             2.0   mda                 mda Fan rm port side gen. rm                 3.5   mda                 mda E.O.G. rm                               4.0   mda                 mda BOAT D)ECK Chief Eng. State rm port side           3.5   mda                 mda Cpt. State rm starboard side             2.5   mda                 mda Fire Stat. #2 port side                 3.0   mda                 mda Officer`s lounge aft                     3.5   mda                 mda Hallway floor port side                 3.0   mda                 mda Forward state rm starboard side         3.0   mda                 42 Hallway floor forward center             3.5   mda                 mda PROMENADE DECK Top of reactor hatch                     4.0   mda                 mda StarboEird side of reactor hatch         4.5   mda                 56 Top of Hatch #4                         3.5   mda                 mda Between Hatch #3 & #4                   3.5   mda                 mda Bow center of deck                       3.5   mda                 mda Center of Main Lounge                   4.0   mda                 mda Center of Veranda                       3.5   11                 mda Fire Stat. #7 starboard side             3.0   mda                 mda Between Veranda & Swimming Pool         4.0   mda                 mda Library                                 3.5   mda                 mda Thursday, February 16, 2006 age I of 9 A1O6t)     g7 4 ?
Alpha LLD Beta(pCiA)
 
Beta LLD 1st Port Fwd 24.66+1-1937 73.87 164.3+/-36.46 71.17 Port Aft <LLD 5.7 11.54+/-3.66 7.76 2nd Stb Fwd <LLD 2.7 10.08+1-1.95 3.53 Stb Aft <LLD 73.88 <LID 68.92 3rd Port Fwd <LID 2.94 6.91+1-1.78 3.55 Port Aft <LLD 3.67 <LLD 5.21 4th Stb Fwd 3.06+/-1.1 2.86 <LLD 3.63 Stb Aft <LLD 2.86 8.97+/-1.89 3.53#Name? Page! of 1#1Name?Page I of I Sediment Activity 2005 Field Fied2 Fied3 Field4 FieldM Field6 Quarter Location Alpha(pCi/gr)
Location                                           uREM/hr                         Alpha dpmllO00cm 2                               Beta dpm/1lOO cm 2 Hallway in front of Main Lounge                           3.0                             mda                                                 mda Veranda port side forward                                 4.0                             mda                                                 mda Bar at Veranda                                           4.5                             mda                                                 mda REACTOR SPACE Hot pipe forward entry hatch                             31                               x                                                   x I meter forward of tab tank                               15                              x                                                   x At lab tank                                               33                             x                                                   x Pipe elbow port side forward                             50                             x                                                   x
Alpha LLD Beta(pCi/gr)
'Hot' pipe near entry hatch                               x                               mda                                                 mda Containment vessel middle of catwalk                       15                              mda                                                 mda Lab tank surface                                         7.5                             mda                                               48 Open valve next to lab tank                               10                              x                                                   x Containment vessel middle of catwalk                     8.0                             x                                                   x Piping at the port side forward catw                     9.5                             x                                                   x Middle of catwalk port side                               27                             mda                                                 mda Piping at the port side middle of ca                     19                              mda                                                 mda Valve handle port side aft                                 12                              x                                                   x Damp nrea on floor middle of catwalk                       13                              16                                                  mda Containment vessel starboard side af                     49                             x                                                   x Inside entry hatch pipe                                   x                               mda                                                 mda FAN ROOM At floor rm center                                         3.0                             x                                                   x Electric motor                                             4.5                             mda                                                 mda Control box                                               2.5                             mda                                                 mda CABIN Bi B2 On drums of PC's in Cabin B-i                             3.5                             mda                                                 mda Averago reading of Cabin B-3                               4.0                             x                                                   x On floorof Cabin B-i                                       x                               mda                                                 mda Drum lid in Cabin B-I                                     x                               mda                                                 52 III EIICIIEIIEIIVI Ir  II E II E II VI I rl II VI ICIIV II VI I F1II C 1113 11V II E II r, II E II r, II r II E II E II E II Ell C II E II ICII E 1113 II C II ICII C II VI IC: II E I Thursday, February 16, 2006                                     Page 2 of 9
Beta LLD)st PortFwd <LLD 3.01 8.61+1-1.40 2.7 Port Aft <LLD 2.98 9.11+/-1.43 2.71 2nd Stb Fwd <LLD 3.01 6.45+/-1.29 2.70 Stb Aft <LLD 2.95 6.40+/-1.30 2.69 3rd Port Fwd <LLD 2.84 7.8+1-1.37 2.71 Port Aft 3.70+/-1.88 3.67 10.88+/-1.34 2.70 4th Stb Fwd <LLD 3.01 7.29+/-1.31 2.71 Stb Afl <LLD 3.01 6.15+/-1.28 2.70 Thursday.
 
February 16, 2006 Page I of I}}
Location                             uREM/hr Alpha dprnllO0cm 2 Beta dpm/1lOO cm 2 STB3 STABILIZER RM At entrance door                           3.0   x                   x Average background                         4.5   x                   x Catwal Lower level                       x     mda               mda Catwalc Upper level                       x     mda               mda PORT STABILIZER RM At access hatch                           3.0     x                 x At cat~alk upper level                   8.0   x                   x At internally contaminated strainer       28     x                 x Diaphragm valve                           32     x                 x Pipe to left of diaphragm valve           65     x                   x Internally contaminated valves           x       mda               mda Control valve lower deck                 x     mda                 mda Volume! Chambers                         x     mda                 46 Elbow diaphragm valve                     x     mda                 mda STB CHARGING PUMP RM Outside hatch                             3.5   x                   x Inside hatch                             10     mda                 mda Center of floor                           x     mda                 mda Pipe back of pump motor                   60     mda                 mda Pipe in back of pump                     x     mda                 mda Top of pump                               x     mda                 mda Backside of pump                         x     mda                 mda Center of floor                           21     mda                 39 Outside. of hatch                         x     mda                 mda Air ducl at pump                         x     mda                 mda Pump riotor                               x     mda                 mda PORT CHARGING PUMP RM Outside. door 1m from deck               5.5   x                   x Betweei pumps                             27     x                   x Thursday, February 16, 2006 Page 3 of 9
 
Locati'on                                   uREM/hr                       Alpha dpmllO00cm 2                   Beta dpm/1lOO cm 2 Deck at hatch                                     x                             mda                               mda Acccess hatch                                     x                             mda                               mda Deck by pumps                                     x                             mda                               mda Floor between pumps                               x                             mda                               mda Pump in front of rm                               x                             mda                               mda x
COLD CHEM LAB Background in Cold Chem Lab                       8                             x                                   x Ventilalion system/lead blanket                   49                             x                                 x Drain (IDdeck)                                   240                           x                                 x Fume hood (D deck)                               29                             x                                 x Top of storage tank                               30                             x                                 x Air samnpler (D deck)                             36                             x                                 x Floor under air sampler (D deck)                   15                           x                                 x Ledge of fume hood                               60                           x                                   x Floor ir front of ventilation system             11                            x                                 x Ventilaltion system                               17                           x                                   x Ledge of fume hood (D deck)                       x                             mda                               mda Drain (C'deck)                                   x                             mda                               mda Floor under air sampler (D deck)                 x                             mda                               mda Floor front of vent system (C deck)               x                             mda                               mda Air Sampler (D deck)                             x                             mda                               mda Floor uinder fume hood                           x                             mda                               58 Shelving (C deck)                               x                               mda                               mda Top of storage tank                             x                             mda                                 mda Valve near floor (D deck)                       x                             mda                                 mda HOT CHEM LAB Background in hot chemn lab                       5.0                           x                                 x Waste collection tank                             I11                         x                                   x Sink                                             4.0                           x                                 x Doorway to hot chemn lab                         3.5                           x                                 x Under sink                                       3.5                           x                                 x II 3IICIEIE II I CI. ICII10I1 III1,II C113IIV                 I 3 1 711C I17 I   I II I rIICIIVII131 C 1 IIEl 113IIEIILII EIIC I V IC1 Thursday, February 16, 2006                             Page 4 of 9
 
Location                             uREM/hr Alpha dpmllO0cm 2 Beta dpm/1lOO cm 2 Sink drain                               8.0   mda                 mda Inside waste collection tank             6.0   mda                 mda Fume hood inside                           3.5   mda               mda Floor inside door                       4.0   mda               mda Intake for hood                         2.5   mda               mda CARGO HOLD 2B3 Floor s':arboard side forward             3.0   mda               mda Floor st:arboard side center             3.0   mda               mda Floor sltarboard side aft                 3.0   mda               mda Floor aft center                         4.0   mda               mda Floor part side aft                       2.5   mda               mda Floor p~rt side center                   4.0   mda               mda Floor p~rt side forward                   3.5   mda               mda Floor forward center                     3.5   mda               mda CARGO HOLD 2C                             2.5   mda               mda Floor part side center                   3.0   mda               mda Floor port side forward                   3.5   mda               mda Floor forward center                     2.5   mda               mda Floor slarboard side forward             2.5   mda               44 Floor slarboard side center               3.5   mda               mda Floor slarboard side aft                 3.5   mda               mda Floor al't center                         4.0   mda               mda Floor port side aft                       3.5   mda               mda Floor 14, cargo hold                     3.0   mda               mda CARGC) HOLD 2D Starbocird aft                           4.5   mda               mda Starboard amidships left                 2.5   mda               mda StarboE'rd amidships right               3.0   mda'               mda Starboard bow                             3.0   mda               mda Centerline bow                           2.5   mda               mda Thu rsday, February 16, 2006 Page 5 of 9
 
Location                             uREM/hr                 Alpha dpmll 00cm 2         Beta dpm/1lOO cm 2 Ports.I...e bow... ..     .. ...       . 3..0.... .. . .. .. . .. .. . .. . . . .. . . . .. .. . .. . . . .... .
Port side amishps3.0                                           mda                           mda Port side aftshps3.5                                           mda                           mda Centerline aft                             2.5                 mda                           mda Average                                     3.5                 x                             x Maximum                                     4.5                 x                             x 2 TANK, TOP Floor forward & starboard of sailboat       2.5                 mda                           mda Floor sailboat center port side             3.0                 8                             mda Floor sailboat aft starboard               3.0                 mda                           mda Floor sailboat center starboard             3.5                 mda                           mda CARGO HOLD 38 At stairwell entering hold                 3.5                 mda                           mda Floor center forward                       2.5                 mda                           mda Floor s:arboard side forward               4.0                 mda                           mda Floor starboard side center                 3.0                 mda                           mdda Floor s4arboard  side aft                 2.5                 mda                           mda Floor canter aft                           2.5                 mda                           mda Floor port side aft                         3.5                 mda                           mda Floor at display center                     2.5                 mda                           mda Floor part side forward                     2.5                 mda                           mda Averag e                                   3.5                 x                             x Maximum                                     4.0                 x                             x CARGC) HOLD 3C Floor sltarboard side                     3.0                 mda                           mda Floor sltarboard center                   2.5                 mda                           mda At door starboard aft                       3.0                 mda                           mda Center aft vent                           2.0                 mda                           38 Floor p~rt side aft                         3.5                 mda                           mda Floor port side center                     3.5                 mda                           mda Thursday, February 16, 2006               Page 6 of 9
 
Location                                       uREM/hr                       Alpha dpmllO00cm 2                 Beta dpm/1lOO cm 2 Floor starboard forward                               3.0                         mda                                   mda Vent ccenter forward                                 3.0                         mda                                   mda Average                                               3.5                         x                                     x Maximum                                               3.0                         x                                     x CARGO HOLD 3D Floor port side forward                               3.0                         mda                                   mda Floor port aft                                       3.5                         mda                                   mda Floor center aft                                     3.0                         mda                                   mda Floor sltarboard aft                                 2.5                         mda                                   46 Floor sltarboard forward                             3.5                         mda                                   mda Floor forward center                                 2.5                         mda                                   mda CARGO HOLD 4B3 Men's restrm                                         3.0                         mda                                   mda Floor port side center                               3.5                         mda                                   mda Floor by door to 3B3 port side                       2.5                         mda                                   mda Floor b:, handrail port side                         3.5                         mda                                   mda Floor by handrail starboard side for                 4.0                         14                                   mda Floor by handrail starboard side cen                 3.5                         mda                                   mda Floor by handrail starboard side aft                 3.0                         mda                                   mda CARGO HOLD 4C Port side aft                                         4.0                         x                                     x Centerline aft                                       11                          x                                     x Starboard side aft                                   3.5                         x                                     x Max. reading along stern bulkhead                     16                         x                                     x Floor at aft center (@Max. Reading)                   4.5                         mda                                   mda Starboard forward floor                               4.0                         mda                                   mda CARGO HOLD 4D Floor at stem bulkhead                               3.5                         mda                                   mda Floor starboard side                                 3.0                         mda                                 mda HIM IIClIE IIEl IC lir IIci IIS,IIC] Irl IIVI ICIIVI IV.II171111. Ila lit!IIVI Ir IIINIIr II11IIMI ICIIIN, IIElIcIlEllm II InII 13II CIICl ICIICIIE IIa I Thursday, February 16, 2006                               Page 7 of 9
 
Location                             uREM/hr   Alpha dpmllO00cm 2 Beta dpm/1lOO cm 2 Under barrier rope                       3.5     8                   mda Floor sltarboard side forward             2.5     mda                 mda Floor port side forward                   3.0     mda                 mda Floor port side center                   4.0     mda                 mda Floor pr~rt side aft                     3.0     mda                 mda 4 TANK TOP At laddear entering hold forward         3.5     mda                 mda CylindrIcal equipment on floor forwa     2.5     mda                 mda Cylindrical equipment-center of hold     3.0   x                   x Averag3 background                       3.0   x                   x At wall port side aft                     2.5   x                   x Platform center aft                       3.0   x                   x Platform starboard side aft               3.5   x                   x At wall starboard side aft               3.0   x                   x Cylindrical equipment on floor forwa     3.5   mda                 mda Floor slarboard side forward             2.5   mda                 mda Floor slarboard side center               3.0   mda                 mda FLoor starboard side aft                 3.5   mda                 mda Floor slarboard side aft                 3.5   mda                 mda Wall center aft                           3.5   mda                 mda Floor port side aft                       2.5   mda                 56 Floor port side center                   3.0   mda.               mda Floor port side forward                   3.0   mda                 mda x-- No measurement required MDA for alpha = 6.5 dpm/100 cm2 MDA for beta =35.0 dpm/100cm2 Thursday, February 16, 2006 Page 8 of 9
 
Tid Exposure(2005)
Badge Nuimber                           1st Half(MR)                    2nd Half (MR)            Total (nmR) o are                                  29                              29                        58 I are                                  38                              32                        70 2 are                                 23                              25                        48 3 are                                 23                              26                        49 4 are                                   25                              27                        52 5 are                                 23                              29                        51 6 are                                 23                              25                        48 7 are                                 22                              24                        46 8are                                   26                              27                        53 9 are                                 23                              25                        48 10 are                               23                              24                        47 11 are                               24                              25                        49 12 are                                 20                              22                        42 13 are                                 21                              19                        38 14 are                                 21                              24                        45 15 are                                 22                              24                        46 16 are                               21                              24                        45 17 are                                 37                              33                        70 18 are                                 28                              26                        54 19 are                                 21                              23                        44 20 are                                 25                              25                        50 21 are                                 20                              19                        39 22 are                                 32                              34                        66 23 are                                 21                              23                        44 24 are                                 21                              22                        43 25 are                                 19                              22                        41 26 are                                 22                              25                        47 27 are                                 15                              24                        48 I  t r sd, y, . e br uar y 16, 2 Iii              . , . . . . .. . .  . . . II  -  - . ... . .      .. C  . -  . g eIIo .f. . 2.
Thursday,; F'ehruaryI6, 2006                                                                      -!izf'        Page I of 2
 
Bad4,ge Number                  Ist Half (nR) 2nd Half(MR) Total (mR) 28 are                        21            21          42 29 are                        20            23          43 30 are                        23            22          45 31 are                        18            20          38 32 are                        19            1s          37 33 are                        18            20          38 Tihursil.ty, Februiary16, 2006                                        Page 2 of 2
 
Water Activity 2005 Fieldl  Field2  Field3      Field4    FieldS        Field6 Quarter Location Alpha(pCi/l) Alpha LLD Beta(pCiA)    Beta LLD 1st    Port Fwd 24.66+1-1937 73.87    164.3+/-36.46 71.17 Port Aft <LLD        5.7      11.54+/-3.66  7.76 2nd      Stb Fwd  <LLD        2.7      10.08+1-1.95  3.53 Stb Aft  <LLD        73.88    <LID          68.92 3rd      Port Fwd <LID        2.94      6.91+1-1.78  3.55 Port Aft <LLD        3.67      <LLD          5.21 4th      Stb Fwd  3.06+/-1.1  2.86      <LLD          3.63 Stb Aft  <LLD        2.86      8.97+/-1.89  3.53 Page! of 1
#Name?
#1Name?                                                        Page I of I
 
Sediment Activity 2005 Field                  Fied2    Fied3        Field4    FieldM      Field6 Quarter                Location Alpha(pCi/gr) Alpha LLD Beta(pCi/gr) Beta LLD
)st                   PortFwd <LLD         3.01     8.61+1-1.40 2.7 Port Aft <LLD         2.98     9.11+/-1.43 2.71 2nd                   Stb Fwd <LLD         3.01     6.45+/-1.29 2.70 Stb Aft <LLD         2.95     6.40+/-1.30 2.69 3rd                     Port Fwd <LLD         2.84     7.8+1-1.37   2.71 Port Aft 3.70+/-1.88   3.67     10.88+/-1.34 2.70 4th                     Stb Fwd <LLD         3.01     7.29+/-1.31 2.71 Stb Afl <LLD         3.01     6.15+/-1.28 2.70 Thursday. February 16, 2006                                                   Page I of I}}

Latest revision as of 19:15, 23 November 2019

License NS-1, N. S. Savannah Annual Report for Cy 2005
ML061220322
Person / Time
Site: NS Savannah
Issue date: 02/28/2006
From: Koehler E
US Dept of Transportation, Maritime Admin
To: Alexander Adams
NRC/NRR/ADRA/DNRL
References
Download: ML061220322 (25)


Text

U.S. Department 400 Seventh Street, S.W.

of Transportation Washington, D.C. 20'590 Maritime Administration February 28, 2006 U.S. Nuclear Regulatory Commission ATTN: Alexander Adams, Mail Stoo 012-G13 Washington, DC 20555-0001

Subject:

License NS-1, Docket No. 50-238; N.S. SAVANNAH Annual Report for CY 20(15

Dear Mr. Adams:

This letter constitutes the Maritime Administration's (MARAD) annual report of activities for the Nuclear Ship SAVANNAH (NSS) for Calendar Year 2005. The SAVANNAH remains securely moored at MARAD's James River Reserve Fleet, near Newport News, Virginia. The physical facility status is substantially unchanged from CY 2004.

A number of significant activities were completed and undertaken onboard the NSS during CY 2005.

Most notably, MARAD completed its corrective action in response to violation number 2001-201-Cl1, and submitted a letter reply on that subject on March 18, 2005. An internal reorganization resulted in reestablishment of the SAVANNAH Technical Staff in May 2005 as the organizational unit responsible for all NSS program activities. Radiological and environmental characterization scoping surveys were performed in March-April 2005 to support pre-decommissioning planning; unexpected results th refrom required additional surveys and destructive sampling activities that were conducted through August 2005. Results of these activities were presented to the NRC in a public meeting in Rockville on November 2,2005.

As has become routine practice, the details of these activities are found in the two enclosed documents; a) the minutes of the NSS Review and Audit Committee annual meeting held at the James River Reserve Fleet on December 15, 2005, and b) the NSS Annual (Radiological) Survey prepare&

by General Health Physics, Inc. Additional activities not included in the committee minutes, as well as several, regulatory reports are incorporated within the remainder of this letter.

DecommissioningFundingStatement (ref. I0 CFR 50.750() and 50. 75(e,) (iv)):

The N.S. SAt VANNAH (NSS) and its nuclearreactorarefederally ownedfacilities,representedby the UnitedStates Departmentof Transportation,actingby andthrough the MaritimeAdministration. As such,fundingfor the decommissioning and disposalof the NSS reactorand nuclear systems components and waste must be providedby appropriationsfromthe UnitedStates Congress.

MARAD maintainsnoffunding reserve, nor does it accumulate or collectfunds as describedin the CFR reference. As has been previously noted in correspondenceanddialogue, the Congress

..A

N.S. SAVANNAH CY 2005 Annual Report License NS-1, Docket No. 50-238 February 28, 2006 appropriatedfundsto commence decommissioning of the NSSbeginning in FY2005. Appropriated funds in .FY's 2005 and 2006 total$5.0Mless rescissions. The President'sFY2007 Budget Request includes an additional$10. OM to continue NSS activities. Additionalfundingrequests are expected to be developedand includedinfuture budgets. MARAD expects to complete a comprehensive decommissioning cost estimate in CY2006.

Changes. Tests and Experiments [ref: IO CFR 50.59(d)(2)I:

In August 2005, MARAD conducteddestructive samplingof the NSS Reactor Pressure Vessel wall, outer two core thermalshield barriers,and innerand outerannularwalls ofthe Neutron Shield Ta'ik for the purpose ofradiologicalclassification. MARAD completed a 50.59 evaluation of the experiment, usingthe most recentformalFSAR and correspondenceandsafety evaluationscontained in the severallicensingactions completed subsequent to that FSAR.

Other significant activities onboard the SAVANNAH included a number of familiarization and orientation tours for senior Department of Transportation and MARAD officials and staff. Also during the calendar year MARAD hosted pre-decommissioning site inspections and Q&A sessions for potential decommissioning bidders, and engineering/planning contractors. These activities were conducted within the bounds of the Technical Specifications, yet represented a substantially increased level of activity onboard the ship as compared to any year since the ship relocated to the James River Reserve Fleet in 1994.

As always, MARAD is most appreciative of the support that NRC extends to the SAVANNAH.

Please feel free to contact me at any time if you have any questions regarding MARAD's N.S.

SAVANNAH activities.

Sincerely, Erhard W. Koehler Senior Technical Advisor, N.S. SAVANNAH Enclosures

N.S. SAVANNAH CY 2005 Annual Report License NS-1, Docket No. 50-238 February 28, 2006 E. Koehlcr\ek\02-28-2006 cc: MAR-600, 610 (rf, wc), 610.1, 610.2, 610.3, 610.4, 611 (pg, jw), 612, 613 MRG-7100, 7600 (fh), 7700 General Health Physics (J. Davis)

U.S. Army Humphreys Engineer Center (D. Breeden)

U.S. Department 400 Seventh Street, S.W.

of Transportation Washington, D.C. 20590 Maritime Administration Nuclear Ship SAVANNAH Minutes of the Annual Meeting of the Review and Audit Committee Covering Calendar Year 2005 James River Reserve Fleet Fort Eustis, Virginia December 15, 2005 License NS-1 Docket No. 50-238

. 7

--I I,-

N/S SAVANNAH Review & Audit Committee CY 2005 Annual Meeting December 15, 2005 Minutes of the Calendar Year 2005 annual meeting of the Nuclear Ship SAVANNAH Review and Audit Committee, held at the James River Reserve Fleet on Wednesday, December 15, 2005.

I. MEMBERS PRESENT:

Erharc. Koehler*, Senior Technical Advisor /Committee Chair John Wiegand, Decommissioning Program Manager Greg Thornton, Facility Site Manager John ETavis*, General Health Physics, Inc. (rep USACE)

Fred Hoffmann*, James River Reserve Fleet Michael Buonopane, Volpe Centert Chris Zevitas, Volpe Center Guests present and participating in the meeting included John Osborne, a subcontractor for Sayres and Associates, Inc., and Bill Halloran of the Volpe Center II. AGENDA TOPICS See attachment 1 for the agenda and agenda topics.

III. WELCOME Mr. Koehler convened the meeting at 09:30 am. A quorum was present. The meeting was convened for the purpose of discussing those topics within the purview of the members present, and to support the annual reporting requirements to the NRC.

Section 3.6 of the NSS Technical Specifications (TS) requires the Review and Audit Committee to meet at least annually to review and discuss events of the preceding period. The committee last met on August 30, 2005 (to discuss Classification of the RPV), at the James River Reserve Fleet (JRRF), aboard the NS SAVANNAH. The minutes of that meeting were briefly reviewed without comment.

IV. DISCUSSION A. Significant Events of CY 2005:

Mr. Koehler opened the committee's discussion of significant events following an introduction of all present at the

  • Denotes member required for quorum.

t U.S. :Dept of Trans; Research and Innovative Technology Admin; Volpe National Transportation Systems Center 1

N/S SAVANNAH Review & Audit Committee CY 20(05 Annual Meeting December 15, 2005 meeting. Mr. Koehler then identified the following significant events:

1. Decommissionilg Planning Activities In late 2004, MARAD accepted an unsolicited proposal submitted by WPI* to conduct a radiological and environmental characterization scoping survey of the ship. The physical work was performed onboard the ship in March and April 2005. The survey made two significant findings with respect to physical conditions on the ship.

First, the dose rates measured in proximity of the Reactor Pressure Vessel and Neutron Thermal Shield tank were much less than predicted by calculation (updated in 2003/2004 by WPI). Second, WPI discovered Primary Cooling water in both steam generator u-tube heat exchangers.

The initial response to the discovery of the primary system watert was to conduct a more detailed survey to quantify the quantity and location of remaining water.

The revised estimate indicates approximately 1,500 gals of Primary Cooling water in the lower head of the RPV, lower legs of the primary piping to the pressurizer and to/from each steam generator heat exchanger.

In response to the much lower RPV dose rates, MARkD determined to conduct physical sampling of the RPV outer wall, selected internals, and the Neutron Thermal Shield Tank, and develop actual radiological profile of the constituent materials. The sampling was accomplished in August 2005, by drilling a series of holes from the exterior circumference of the NTS tank through to the second interior thermal shield baffle. The collected sample material was removed from the ship and analyzed in accordance with Part 61 requirements. The draft results

  • WPI previously held contracts with MARAD in 2002 thru 2004 to perform decommissioning planning and studies; develop emergency response plans and training programs; and oversee implementation of MARAD's SAVANNAH Emergency Radiological Assistance Team (SERAT).

t Previous reports since 1976 established the expected baseline - that all remaining primary system water was entrained in the Reactor Pressure Vessel lower head, below the lowermost primary leg nozzles. In the 30 years since, the shio has been subjected to normal movements caused by sea action, and list/trim adjustments made for towing and drydocking. Such movements are theorized to have caused the migration of water from the RPV lower head.

2

N/S SAVANNAH Review & Audit Committee CY 20015 Annual Meeting December 15, 2005 from this testing indicates that the RPV will be a CLASS A waste package.

The RPV sampling results and other items were presented to the NRC in a public meeting on Nov. 2 nd, 2005 as well as to each of the potential waste disposal sites (Barnwell and Envirocare of Utah) and their host states of Utah and South Carolina.

Other pre-decommissioning planning activities are described in the following paragraphs.

2. Oreanization In 2005, MARAD re-established the SAVANNAH Technical Staff (STS) as an organizational entity within the Office of Ship Operations. Erhard Koehler heads the STS and is supported by: John Wiegand, the Decommissioning Program Manager; and Cindy Bearor, Documentation Manager. We soon hope to welcome Greg Thornton permanently, as the Facility Site Manager. We have also asked the DOT Volpe Center to help us with some of our activities as is represented by their presence here today. We also anticipate that Argonne National Laboratory (DOE Facility) and US Merchant Marine Academy at Kings Point (Engineering Department) will also soon join us on the team.
3. License Activities MARAD completed its correction of conditions contributing to license violation 2001-201-01 in March 2005, and submitted a letter reply to NRC on March 18, 2005.

Further discussion of this item is in paragraph V.D of this report.

It is anticipated that we will dry-dock the ship during calendar year 2006 in preparation for upcoming decommissioning activities. The STS also plans to declare formally our intent to decommission in mid-year.

MARAD contracted with Sayres and Associates, Inc. to provide support in re-establishing MARAD's licensing support activities. Specifically they have been assisting with the Quality Assurance Program. They also conducted a regulatory self-assessment to determine our licensing base-line. This document will assist in setting the stage for the licensed operations preparatory 3

N/S SAVANNAH Review & Audit Committee CY 2005 Annual Meeting December 15, 2005 to our license amendment requesting permission to decommission the facility. Some preliminary changes will be submitted in early calendar year 2006 regarding cur organization changes in preparation for decommissioning.

4. Technical Specification Revisions Substantive revisions to the Technical Specifications are in development, and will be discussed further elsewhere.

B. JRRF Annual Activities:

Fred Hoffmann provided a brief review of JRRF activities regarding the NS SAVANNAH. These included:

  • Routine scheduled maintenance onboard the ship.
  • Response to alarms as they appear.
  • The annual underwater hull survey was completed in March 2005.

o We will need to service the on-board system during dry-docking to ensure that it is in good working order when layberthed. Mr. Hoffmann suggested the possibility of welding more sacrificial anodes on the hull - (2) anodes forward on the bow and additional anodes on the rudder. These can be made available to use from the fleet. The JRRF will place a pallet of zinc anodes on deck prior to departure for dry-docking.

C. Radiological Surveillance and Monitoring John Davis indicated that quarterly radiological surveys indicated no noticeable changes to measured dose rates.

V. REVIEW OF TECHNICAL SPECIFICATION REQUIREMENTS In accordance with paragraph 3.6.3 of the TS, the Committee is specifically required to review the following items:

4

N/S SAVANNAH Review & Audit Committee CY 2005 Annual Meeting December 15, 2005 A. Proposed changes to Technical Specifications.

AI draft of proposed changes is still in development.

There has been a long-standing desire on the part of the committee membership to review and revise the TS. At this time the STS is contemplating a change in the staff organization as presented in the technical specifications in order to position the "license house" for decommissioning.

This change will replace the tech spec in whole to accommodate this organization change and allow for layberthing the ship alongside a pier. This is currently being referred to as an v'administrative amendment." The current planning schedule calls for a final document by the end of December 2005 i'author's note - the revised TS remains under development in February 2006).

B1. Proposed changes or modifications to the vessel's controlled radiation area entry alarm system or containment system.

  • The reactor shield plug in way of the personnel air-lcck entrance way into the containment vessel (aft manway) was removed to support the characterization survey by WPI.

The plug is stowed adjacent to the manway.

  • The committee discussed restoring the chain fall system to permit safe removal and replacement of the shield plug during pre-decommissioning activities. Further investigation will be made before deciding on a course of action.
  • WPI restored ventilation to the Containment Vessel to carry out personnel access during characterization activities. The modified system uses the nitrogen purge piping for supply and exhaust. Supply air is provided from the ship's interior dehumidified air distribution ducting. The discharge of the ventilation cycle is through a HEPA filter located in the secondary containment. This system mimics the installed (disabled)

CV ventilation system, which was determined incapable of restoration at the time. The modified system was retained after the characterization activities were completed to facilitate periodic CV entries during pre-decommissioning.

5

N/S SAVANNAH Review & Audit Committee CY 200C5 Annual Meeting December 15, 2005 C. Substantive changes to radiation surveys or security surveillance procedures.

1. Radiation Surveys Based on the results of the Characterization Survey completed by WPI, a recommendation was made to reduce the scope of the routine monitoring and surveillance program by removing survey locations in cargo holds number 1, 2 and 3. No decision was made at the meeting.
2. Security Surveillance Procedures Routine security surveillance continued throughout CY 2005.

D. Reported violations of Technical Specifications No new TS violations were cited during the reporting period.

On March 18, 2005 MARAD submitted its letter reply to violation number 2001-201-01, noting that the conditions described (failure to have a health physicist on call within two hours of the ship and failure to have an Emergency Radiological Assistance team available) as a violation of TS Section 3.1 had been corrected. The NRC response noted the correction, and anticipates a future audit to validate the correction.

E. License Event Reports No LER's were noted during the reporting period.

F. Annual reports to the NRC The CY 2004 annual report was submitted to the NRC by letter dated March 4, 2005.

VI. OTHER TOPICS AL. Security Issues None were noted.

B. Funding A dedicated appropriation to fund SAVANNAH activities was approved by Congress and signed by the President in FY 2005.

The President's Budget request for FY 2006 continues to include SAVANNAH funding. At the time of the meeting, the FY 2006 Department of Transportation appropriations bills were 6

N/S SAVANNAH Review & Audit Committee CY 2005 Annual Meeting December 15, 2005 being reconciled in conference committee, and MARAD is operating on a Continuing Resolution.

C. Status of SERAT

  • The SERAT Team conducted a training exercise and drill in January 2005. The team deployed to the ship.
  • A table-top drill was conducted in March 2005. {Note:

this originally planned as a full drill, but reduced to table top drill due to weather. The completion of this drill was the last activity required to complete the correction of violation 2001-201-01 (see previous note).

  • We are due for a drill in February - March 2006 time frame.
  • Jefferson Labs (DOE facility) is funded through August 2006 to provide emergency radiological health physics coverage in support of MARAD and SERAT activities.
  • The committee discussed the necessity to retain a SERAT capability once the ship shifts to layberth in 2006.

John Davis noted that if the layberth is Baltimore, he is within two-hours driving distance.

I}. Decommissioning No formal action on decommissioning was undertaken in CY 2005; however, substantial pre-decommissioning activities were undertaken as described herein. A decommissioning amendment request is anticipated in CY 2006.

E. License Amendment No license amendments were prepared or submitted during CY 2005. Two license amendments are under development for proposed submittal in CY 2006. The first will revise the TS, to include substantial revisions to the described MARAD organization, and to permit the ship to be berthed at a layberth (commercial pier) outside of the JRRF. The second amendment will combine the PSDAR and Decommissioning authorization request.

7

N/S SAVANNAH Review & Audit Committee CY 2005 Annual Meeting December 15, 2005 F. Independent Oversight Committee In the proposed Technical Specification revision, the Review and Audit Committee will be redefined to function as an independent oversight committee.

G. Status of RPV Waste Classification The preliminary review of the waste classification study based on drill sampling performed, indicates that the RPV as a package meets the criteria for CLASS A. This means that the nuclear waste may be disposed of either at Barnwell, SC or in the Envirocare of Utah site.

II. Other

1. Action Items
i. Volpe to take action on identifying DOE Points of Contact for other disposal sites.

8

GENERAL HEALTH PHYSICS, INC.

7217 LOCKPOTPL #203 LoRON VA 22079 703 550-7525, 1-800 247-6572 FAx: 703 550-7525 Februaiy 16, 2006 Mr Erhardt Koehler Division of Ship Maintenance & Repair U.S. Maritime Administration Washington DC 20590

Dear Sir:

Attached is the 2005 report for the NS Savannah. Two water activities are irregular, because of high dissolved solids in the sample. High dissolved solids result in a small sample volume. The samples are for the I st quarter part aft and 2nd quarter stb aft.

If you have any questions please feel free to contact me.

Sincerely yours, CHP President

V!E7S Savana[Zh Annual Suney Location uREM/hr Alpha dpm/100cm 2 Beta dpm/100 cm 2 NAVIGATION BRIDGE Pilot House at helm 3.0 13 mda Bridge Wing port side 3.0 mda mda Fire Stat. #1 near chart rm 2.0 mda mda Fan rm port side gen. rm 3.5 mda mda E.O.G. rm 4.0 mda mda BOAT D)ECK Chief Eng. State rm port side 3.5 mda mda Cpt. State rm starboard side 2.5 mda mda Fire Stat. #2 port side 3.0 mda mda Officer`s lounge aft 3.5 mda mda Hallway floor port side 3.0 mda mda Forward state rm starboard side 3.0 mda 42 Hallway floor forward center 3.5 mda mda PROMENADE DECK Top of reactor hatch 4.0 mda mda StarboEird side of reactor hatch 4.5 mda 56 Top of Hatch #4 3.5 mda mda Between Hatch #3 & #4 3.5 mda mda Bow center of deck 3.5 mda mda Center of Main Lounge 4.0 mda mda Center of Veranda 3.5 11 mda Fire Stat. #7 starboard side 3.0 mda mda Between Veranda & Swimming Pool 4.0 mda mda Library 3.5 mda mda Thursday, February 16, 2006 age I of 9 A1O6t) g7 4  ?

Location uREM/hr Alpha dpmllO00cm 2 Beta dpm/1lOO cm 2 Hallway in front of Main Lounge 3.0 mda mda Veranda port side forward 4.0 mda mda Bar at Veranda 4.5 mda mda REACTOR SPACE Hot pipe forward entry hatch 31 x x I meter forward of tab tank 15 x x At lab tank 33 x x Pipe elbow port side forward 50 x x

'Hot' pipe near entry hatch x mda mda Containment vessel middle of catwalk 15 mda mda Lab tank surface 7.5 mda 48 Open valve next to lab tank 10 x x Containment vessel middle of catwalk 8.0 x x Piping at the port side forward catw 9.5 x x Middle of catwalk port side 27 mda mda Piping at the port side middle of ca 19 mda mda Valve handle port side aft 12 x x Damp nrea on floor middle of catwalk 13 16 mda Containment vessel starboard side af 49 x x Inside entry hatch pipe x mda mda FAN ROOM At floor rm center 3.0 x x Electric motor 4.5 mda mda Control box 2.5 mda mda CABIN Bi B2 On drums of PC's in Cabin B-i 3.5 mda mda Averago reading of Cabin B-3 4.0 x x On floorof Cabin B-i x mda mda Drum lid in Cabin B-I x mda 52 III EIICIIEIIEIIVI Ir II E II E II VI I rl II VI ICIIV II VI I F1II C 1113 11V II E II r, II E II r, II r II E II E II E II Ell C II E II ICII E 1113 II C II ICII C II VI IC: II E I Thursday, February 16, 2006 Page 2 of 9

Location uREM/hr Alpha dprnllO0cm 2 Beta dpm/1lOO cm 2 STB3 STABILIZER RM At entrance door 3.0 x x Average background 4.5 x x Catwal Lower level x mda mda Catwalc Upper level x mda mda PORT STABILIZER RM At access hatch 3.0 x x At cat~alk upper level 8.0 x x At internally contaminated strainer 28 x x Diaphragm valve 32 x x Pipe to left of diaphragm valve 65 x x Internally contaminated valves x mda mda Control valve lower deck x mda mda Volume! Chambers x mda 46 Elbow diaphragm valve x mda mda STB CHARGING PUMP RM Outside hatch 3.5 x x Inside hatch 10 mda mda Center of floor x mda mda Pipe back of pump motor 60 mda mda Pipe in back of pump x mda mda Top of pump x mda mda Backside of pump x mda mda Center of floor 21 mda 39 Outside. of hatch x mda mda Air ducl at pump x mda mda Pump riotor x mda mda PORT CHARGING PUMP RM Outside. door 1m from deck 5.5 x x Betweei pumps 27 x x Thursday, February 16, 2006 Page 3 of 9

Locati'on uREM/hr Alpha dpmllO00cm 2 Beta dpm/1lOO cm 2 Deck at hatch x mda mda Acccess hatch x mda mda Deck by pumps x mda mda Floor between pumps x mda mda Pump in front of rm x mda mda x

COLD CHEM LAB Background in Cold Chem Lab 8 x x Ventilalion system/lead blanket 49 x x Drain (IDdeck) 240 x x Fume hood (D deck) 29 x x Top of storage tank 30 x x Air samnpler (D deck) 36 x x Floor under air sampler (D deck) 15 x x Ledge of fume hood 60 x x Floor ir front of ventilation system 11 x x Ventilaltion system 17 x x Ledge of fume hood (D deck) x mda mda Drain (C'deck) x mda mda Floor under air sampler (D deck) x mda mda Floor front of vent system (C deck) x mda mda Air Sampler (D deck) x mda mda Floor uinder fume hood x mda 58 Shelving (C deck) x mda mda Top of storage tank x mda mda Valve near floor (D deck) x mda mda HOT CHEM LAB Background in hot chemn lab 5.0 x x Waste collection tank I11 x x Sink 4.0 x x Doorway to hot chemn lab 3.5 x x Under sink 3.5 x x II 3IICIEIE II I CI. ICII10I1 III1,II C113IIV I 3 1 711C I17 I I II I rIICIIVII131 C 1 IIEl 113IIEIILII EIIC I V IC1 Thursday, February 16, 2006 Page 4 of 9

Location uREM/hr Alpha dpmllO0cm 2 Beta dpm/1lOO cm 2 Sink drain 8.0 mda mda Inside waste collection tank 6.0 mda mda Fume hood inside 3.5 mda mda Floor inside door 4.0 mda mda Intake for hood 2.5 mda mda CARGO HOLD 2B3 Floor s':arboard side forward 3.0 mda mda Floor st:arboard side center 3.0 mda mda Floor sltarboard side aft 3.0 mda mda Floor aft center 4.0 mda mda Floor part side aft 2.5 mda mda Floor p~rt side center 4.0 mda mda Floor p~rt side forward 3.5 mda mda Floor forward center 3.5 mda mda CARGO HOLD 2C 2.5 mda mda Floor part side center 3.0 mda mda Floor port side forward 3.5 mda mda Floor forward center 2.5 mda mda Floor slarboard side forward 2.5 mda 44 Floor slarboard side center 3.5 mda mda Floor slarboard side aft 3.5 mda mda Floor al't center 4.0 mda mda Floor port side aft 3.5 mda mda Floor 14, cargo hold 3.0 mda mda CARGC) HOLD 2D Starbocird aft 4.5 mda mda Starboard amidships left 2.5 mda mda StarboE'rd amidships right 3.0 mda' mda Starboard bow 3.0 mda mda Centerline bow 2.5 mda mda Thu rsday, February 16, 2006 Page 5 of 9

Location uREM/hr Alpha dpmll 00cm 2 Beta dpm/1lOO cm 2 Ports.I...e bow... .. .. ... . 3..0.... .. . .. .. . .. .. . .. . . . .. . . . .. .. . .. . . . .... .

Port side amishps3.0 mda mda Port side aftshps3.5 mda mda Centerline aft 2.5 mda mda Average 3.5 x x Maximum 4.5 x x 2 TANK, TOP Floor forward & starboard of sailboat 2.5 mda mda Floor sailboat center port side 3.0 8 mda Floor sailboat aft starboard 3.0 mda mda Floor sailboat center starboard 3.5 mda mda CARGO HOLD 38 At stairwell entering hold 3.5 mda mda Floor center forward 2.5 mda mda Floor s:arboard side forward 4.0 mda mda Floor starboard side center 3.0 mda mdda Floor s4arboard side aft 2.5 mda mda Floor canter aft 2.5 mda mda Floor port side aft 3.5 mda mda Floor at display center 2.5 mda mda Floor part side forward 2.5 mda mda Averag e 3.5 x x Maximum 4.0 x x CARGC) HOLD 3C Floor sltarboard side 3.0 mda mda Floor sltarboard center 2.5 mda mda At door starboard aft 3.0 mda mda Center aft vent 2.0 mda 38 Floor p~rt side aft 3.5 mda mda Floor port side center 3.5 mda mda Thursday, February 16, 2006 Page 6 of 9

Location uREM/hr Alpha dpmllO00cm 2 Beta dpm/1lOO cm 2 Floor starboard forward 3.0 mda mda Vent ccenter forward 3.0 mda mda Average 3.5 x x Maximum 3.0 x x CARGO HOLD 3D Floor port side forward 3.0 mda mda Floor port aft 3.5 mda mda Floor center aft 3.0 mda mda Floor sltarboard aft 2.5 mda 46 Floor sltarboard forward 3.5 mda mda Floor forward center 2.5 mda mda CARGO HOLD 4B3 Men's restrm 3.0 mda mda Floor port side center 3.5 mda mda Floor by door to 3B3 port side 2.5 mda mda Floor b:, handrail port side 3.5 mda mda Floor by handrail starboard side for 4.0 14 mda Floor by handrail starboard side cen 3.5 mda mda Floor by handrail starboard side aft 3.0 mda mda CARGO HOLD 4C Port side aft 4.0 x x Centerline aft 11 x x Starboard side aft 3.5 x x Max. reading along stern bulkhead 16 x x Floor at aft center (@Max. Reading) 4.5 mda mda Starboard forward floor 4.0 mda mda CARGO HOLD 4D Floor at stem bulkhead 3.5 mda mda Floor starboard side 3.0 mda mda HIM IIClIE IIEl IC lir IIci IIS,IIC] Irl IIVI ICIIVI IV.II171111. Ila lit!IIVI Ir IIINIIr II11IIMI ICIIIN, IIElIcIlEllm II InII 13II CIICl ICIICIIE IIa I Thursday, February 16, 2006 Page 7 of 9

Location uREM/hr Alpha dpmllO00cm 2 Beta dpm/1lOO cm 2 Under barrier rope 3.5 8 mda Floor sltarboard side forward 2.5 mda mda Floor port side forward 3.0 mda mda Floor port side center 4.0 mda mda Floor pr~rt side aft 3.0 mda mda 4 TANK TOP At laddear entering hold forward 3.5 mda mda CylindrIcal equipment on floor forwa 2.5 mda mda Cylindrical equipment-center of hold 3.0 x x Averag3 background 3.0 x x At wall port side aft 2.5 x x Platform center aft 3.0 x x Platform starboard side aft 3.5 x x At wall starboard side aft 3.0 x x Cylindrical equipment on floor forwa 3.5 mda mda Floor slarboard side forward 2.5 mda mda Floor slarboard side center 3.0 mda mda FLoor starboard side aft 3.5 mda mda Floor slarboard side aft 3.5 mda mda Wall center aft 3.5 mda mda Floor port side aft 2.5 mda 56 Floor port side center 3.0 mda. mda Floor port side forward 3.0 mda mda x-- No measurement required MDA for alpha = 6.5 dpm/100 cm2 MDA for beta =35.0 dpm/100cm2 Thursday, February 16, 2006 Page 8 of 9

Tid Exposure(2005)

Badge Nuimber 1st Half(MR) 2nd Half (MR) Total (nmR) o are 29 29 58 I are 38 32 70 2 are 23 25 48 3 are 23 26 49 4 are 25 27 52 5 are 23 29 51 6 are 23 25 48 7 are 22 24 46 8are 26 27 53 9 are 23 25 48 10 are 23 24 47 11 are 24 25 49 12 are 20 22 42 13 are 21 19 38 14 are 21 24 45 15 are 22 24 46 16 are 21 24 45 17 are 37 33 70 18 are 28 26 54 19 are 21 23 44 20 are 25 25 50 21 are 20 19 39 22 are 32 34 66 23 are 21 23 44 24 are 21 22 43 25 are 19 22 41 26 are 22 25 47 27 are 15 24 48 I t r sd, y, . e br uar y 16, 2 Iii . , . . . . .. . . . . . II - - . ... . . .. C . - . g eIIo .f. . 2.

Thursday,; F'ehruaryI6, 2006 -!izf' Page I of 2

Bad4,ge Number Ist Half (nR) 2nd Half(MR) Total (mR) 28 are 21 21 42 29 are 20 23 43 30 are 23 22 45 31 are 18 20 38 32 are 19 1s 37 33 are 18 20 38 Tihursil.ty, Februiary16, 2006 Page 2 of 2

Water Activity 2005 Fieldl Field2 Field3 Field4 FieldS Field6 Quarter Location Alpha(pCi/l) Alpha LLD Beta(pCiA) Beta LLD 1st Port Fwd 24.66+1-1937 73.87 164.3+/-36.46 71.17 Port Aft <LLD 5.7 11.54+/-3.66 7.76 2nd Stb Fwd <LLD 2.7 10.08+1-1.95 3.53 Stb Aft <LLD 73.88 <LID 68.92 3rd Port Fwd <LID 2.94 6.91+1-1.78 3.55 Port Aft <LLD 3.67 <LLD 5.21 4th Stb Fwd 3.06+/-1.1 2.86 <LLD 3.63 Stb Aft <LLD 2.86 8.97+/-1.89 3.53 Page! of 1

  1. Name?
  1. 1Name? Page I of I

Sediment Activity 2005 Field Fied2 Fied3 Field4 FieldM Field6 Quarter Location Alpha(pCi/gr) Alpha LLD Beta(pCi/gr) Beta LLD

)st PortFwd <LLD 3.01 8.61+1-1.40 2.7 Port Aft <LLD 2.98 9.11+/-1.43 2.71 2nd Stb Fwd <LLD 3.01 6.45+/-1.29 2.70 Stb Aft <LLD 2.95 6.40+/-1.30 2.69 3rd Port Fwd <LLD 2.84 7.8+1-1.37 2.71 Port Aft 3.70+/-1.88 3.67 10.88+/-1.34 2.70 4th Stb Fwd <LLD 3.01 7.29+/-1.31 2.71 Stb Afl <LLD 3.01 6.15+/-1.28 2.70 Thursday. February 16, 2006 Page I of I