ML072080317: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:July 31, 2007Mr. Kerry WrightNuclear Training Manager FPL Energy Seabrook, LLC Seabrook Station P.O. Box 300 Seabrook, NH 03874
{{#Wiki_filter:July 31, 2007 Mr. Kerry Wright Nuclear Training Manager FPL Energy Seabrook, LLC Seabrook Station P.O. Box 300 Seabrook, NH 03874


==Dear Mr. Wright:==
==Dear Mr. Wright:==


The purpose of this letter is to inform you of the individual examination results for yourapplicants on the initial written examination conducted on July 6, 2007, and the walkthrough (overall) and/or simulator operating tests administered July 9 to July 11, 2007 at your facility.
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on July 6, 2007, and the walkthrough (overall) and/or simulator operating tests administered July 9 to July 11, 2007 at your facility.
This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021.Nine individuals were administered the examination and all passed.
This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021.
This information isconsidered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements theinformation contained in the related examination report for your facility which will be issued shortly.Enclosure 1 is the completed ES-501-2, Power Plant Licensing Examination Results Summary,and is a summary of overall examination results.Enclosure 2 contains the individual results ES-303-1 and 303-2, Operator License ExaminationReport, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent ofthe overall pass status. Each has authorized the release of this information to your facility by signing Block 19A of NRC Form 398.Enclosure 3 is a copy of the licenses.
Nine individuals were administered the examination and all passed. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. Each has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the licenses.
Thank you for your cooperation in this matter. Please refer any questions you have to me at(610) 337-5046.Sincerely,/RA/                                               Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Mr. Wright-2-Docket No. 50-443License No. NPF-86
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,
                                              /RA/
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety
 
Mr. Wright                                 Docket No. 50-443 License No. NPF-86


==Enclosures:==
==Enclosures:==
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 2. ES-303-1 and 303-2, Individual Examination Results
: 2. ES-303-1 and 303-2, Individual Examination Results
: 3. Licenses cc w/licenses:Mr. Gene F. St. Pierre, Site Vice President Mr. Wright-3-Distribution: w/o enclosures:Master Exam File Mr. Kerry WrightNuclear Training Manager FPL Energy Seabrook, LLC Seabrook Station P.O. Box 300 Seabrook, NH 03874
: 3. Licenses cc w/licenses:
Mr. Gene F. St. Pierre, Site Vice President
 
Mr. Wright                   Distribution: w/o enclosures:
Master Exam File
 
Mr. Kerry Wright Nuclear Training Manager FPL Energy Seabrook, LLC Seabrook Station P.O. Box 300 Seabrook, NH 03874


==Dear Mr. Wright:==
==Dear Mr. Wright:==


The purpose of this letter is to inform you of the individual examination results for yourapplicants on the initial written examination conducted on July 6, 2007, and the walkthrough (overall) and/or simulator operating tests administered July 9 to July 11, 2007 at your facility.
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on July 6, 2007, and the walkthrough (overall) and/or simulator operating tests administered July 9 to July 11, 2007 at your facility.
This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021.Nine individuals were administered the examination and all passed.
This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021.
This information isconsidered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements theinformation contained in the related examination report for your facility which will be issued shortly.Enclosure 1 is the completed ES-501-2, Power Plant Licensing Examination Results Summary,and is a summary of overall examination results.Enclosure 2 contains the individual results ES-303-1 and 303-2, Operator License ExaminationReport, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent ofthe overall pass status. Each applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398.Enclosure 3 is a copy of the licenses.
Nine individuals were administered the examination and all passed. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.
Thank you for your cooperation in this matter. Please refer any questions you have to me at(610) 337-5046.Sincerely,/RA/                                               Marvin D. Sykes, Chief Operations Branch Division of Reactor SafetySUNSI Review Complete:     MDS                     (Reviewer's Initials
Enclosure 1 is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results.
)ADAMS #:ML072080317ADAMS PKG. #: ML062050109 DOCUMENT NAME:
Enclosure 2 contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. Each applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398.
C:\FileNet\ML072080317.wpd After declaring this document "An Official Agency Record" it will without enclosures be released to the Public.To receive a copy of this document, indicate in the box:
Enclosure 3 is a copy of the licenses.
" C" = Copy without attachment/enclosure   " E" = Copy with attachment/enclosure
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
" N" = No copyOFFICERI/DRS/OBRI/DRS/OBRI/DRS/OBNAMECJBixler/CJBJGCaruso/JGCMDSykes/MDSDATE07/27/0707/ 31 /0707/31/07OFFICIAL RECORD COPY}}
Sincerely,
                                                                    /RA/
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety SUNSI Review Complete:         MDS               (Reviewers Initials)
ADAMS #:ML072080317                                                              ADAMS PKG. #: ML062050109 DOCUMENT NAME:
C:\FileNet\ML072080317.wpd After declaring this document An Official Agency Record it will without enclosures be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE              RI/DRS/OB              RI/DRS/OB                RI/DRS/OB NAME                CJBixler/CJB            JGCaruso/JGC              MDSykes/MDS DATE                07/27/07                07/ 31 /07                07/31/07 OFFICIAL RECORD COPY}}

Latest revision as of 05:12, 23 November 2019

NRC Exam Results Letter W/O Enclosures Dtd 7/31/2007
ML072080317
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 07/31/2007
From: Marvin Sykes
Operations Branch I
To: Wright K
Florida Power & Light Energy Seabrook
Sykes, Marvin D.
Shared Package
ML062050109 List:
References
ES-303-1, ES-303-2, ES-501-2
Download: ML072080317 (4)


Text

July 31, 2007 Mr. Kerry Wright Nuclear Training Manager FPL Energy Seabrook, LLC Seabrook Station P.O. Box 300 Seabrook, NH 03874

Dear Mr. Wright:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on July 6, 2007, and the walkthrough (overall) and/or simulator operating tests administered July 9 to July 11, 2007 at your facility.

This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021.

Nine individuals were administered the examination and all passed. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. Each has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the licenses.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety

Mr. Wright Docket No. 50-443 License No. NPF-86

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

Mr. Gene F. St. Pierre, Site Vice President

Mr. Wright Distribution: w/o enclosures:

Master Exam File

Mr. Kerry Wright Nuclear Training Manager FPL Energy Seabrook, LLC Seabrook Station P.O. Box 300 Seabrook, NH 03874

Dear Mr. Wright:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on July 6, 2007, and the walkthrough (overall) and/or simulator operating tests administered July 9 to July 11, 2007 at your facility.

This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021.

Nine individuals were administered the examination and all passed. This information is considered to be "proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.

Enclosure 1 is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results.

Enclosure 2 contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. Each applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398.

Enclosure 3 is a copy of the licenses.

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety SUNSI Review Complete: MDS (Reviewers Initials)

ADAMS #:ML072080317 ADAMS PKG. #: ML062050109 DOCUMENT NAME:

C:\FileNet\ML072080317.wpd After declaring this document An Official Agency Record it will without enclosures be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB JGCaruso/JGC MDSykes/MDS DATE 07/27/07 07/ 31 /07 07/31/07 OFFICIAL RECORD COPY