ML19352E303

From kanterella
Jump to navigation Jump to search
Senior Reactor and Reactor Operator Initial License Examinations: Seabrook Station Unit No. 1
ML19352E303
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 12/17/2019
From: Diane Jackson
Operations Branch I
To: Moul D
Florida Power & Light Co
Shared Package
ML19105A186 List:
References
Download: ML19352E303 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713 December 17, 2019 Mr. Don Moul Vice President, Nuclear Division and Chief Nuclear Officer Florida Power & Light Company Mail Stop: NT3/JW 15430 Endeavor Drive Jupiter, FL 33478

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS - SEABROOK STATION UNIT NO. 1

Dear Mr. Moul:

In a telephone conversation on December 5, 2019, between Mr. Thomas Setzer, Senior Operations Engineer, and Mr. Chris Adams, Training Manager, arrangements were made for the administration of licensing examinations at Seabrook Station Unit No. 1 during the week of August 3, 2020. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of July 6, 2020.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by March 6, 2020. The NRC staff will provide the written examination outline by January 21, 2020. The written examinations, operating tests, and the supporting reference materials identified in Attachment 3 of ES-201 will be due by May 20, 2020. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled.

To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above.

D. Moul 2 In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests, along with any video and audio recordings of the dynamic operating tests, until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if possible). Contact Mr. Thomas Setzer to determine the method for submission of waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.

Although the guidelines for receiving waiver or excusal requests call for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.

Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, Personal Qualification Statement-Licensee, or as directed by Mr. Thomas Setzer when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.

Paperwork Reduction Act Statement This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.

The burden to the public for this voluntary information is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to FOIA, Privacy and Information Collections Branch (T-5 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

Public Protection Notification The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection unless the document requesting or requiring the collection displays a valid OMB control number.

D. Moul 3 In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requesting for Withholding, of the Agencys Rules of Practice, a copy of this letter will be available electronically for public inspection through the Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on the NRCs website at http://www.nrc.gov/reading-rm/adams.html.

After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.

Thank you for your cooperation in this matter. Mr. Chris Adams has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Thomas Setzer at (610) 337-5165 or myself at (610) 337-5306.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-443 License No. NPF-86 cc: Distribution via ListServ

D. Moul 4

SUBJECT:

SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS - SEABROOK STATION UNIT NO. 1 DATED DECEMBER 17, 2019 DISTRIBUTION:

DLew, RA (R1ORAMAIL Res)

RLorson, DRA (R1ORAMAIL Res)

DCollins, DRP (R1DRPMAIL Res)

BWelling, DRP (R1DRPMAIL Res)

JYerokun, DRS (R1DRSMAIL Res PKrohn, DRS (R1DRSMAIL Res)

BBickett, DRP PFinney, DRP PCataldo, DRP, SRI TDaun, DRP, RI ACass, DRP, Resident AA JQuichocho, RI, OEDO RidsNrrPMSeabrook Resource RidsNrrDorlLpl1 Resource ROPreports Resource DOCUMENT NAME: G:\DRS\Operations Branch\SETZER\Exam FY20 -

Seabrook\2020SeabrookCorpNotifyLtr.docx ADAMS PKG: ML19105A186 ADAMS ACCESSION NO.: ML19352E303 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB:CE RI/DRS/OB NAME TSetzer/DJ DJackson DATE 12/17/2019 12/17/2019 OFFICIAL RECORD COPY