Category:Letter
MONTHYEARIR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 L-2024-058, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-038, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-037, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update 2024-09-25
[Table view] Category:License-Operator
MONTHYEARML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23227A0892023-07-18018 July 2023 Final QA Related Forms ML23356A1592023-03-17017 March 2023 Final QA Related Forms SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters ML22173A0572022-06-22022 June 2022 Senior Reactor and Reactor Operator Initial License Examinations L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21307A2892021-11-0303 November 2021 September 8, 2021, NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20254A2722020-09-10010 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3).pdf ML20254A1282020-09-10010 September 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21025A4052020-09-0707 September 2020 Form ES-401-6 (Folder 1) ML20267A3982020-09-0707 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20267A3992020-09-0707 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20268A3222020-09-0707 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20268C1972020-09-0707 September 2020 Miscellaneous Exam Material (Folder 1) ML21025A4032020-09-0707 September 2020 Final QA Related Forms (Folder 1) ML21026A2282020-09-0707 September 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20268B4372020-08-10010 August 2020 Handouts to Applicants (Folder 3) ML20267A3922020-06-0909 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20267A1582020-06-0303 June 2020 Draft Written Examination (Folder 2) ML19352E3032019-12-17017 December 2019 Senior Reactor and Reactor Operator Initial License Examinations: Seabrook Station Unit No. 1 ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri SBK-L-18082, Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML18058A0592018-02-27027 February 2018 Initial Operator Licensing Written Examination Approval - Seabrook Station, Unit 1 ML18047A2502018-02-15015 February 2018 Initial Operator Licensing Operating Test Approval - Seabrook Station Unit No. 1 ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 SBK-L-17151, Miscellaneous Exam Material (Folder 1)2017-09-22022 September 2017 Miscellaneous Exam Material (Folder 1) ML18120A2362017-09-22022 September 2017 Miscellaneous Exam Material (Folder 1) ML17180A2242017-06-28028 June 2017 Senior Reactor and Reactor Operator Initial License Examinations - Seabrook Station, Unit No. 1 SBK-L-17086, NRC Form 536 Operator Licensing Examination Data2017-05-19019 May 2017 NRC Form 536 Operator Licensing Examination Data ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 SBK-L-16121, Response to RIS-16-09, Preparation and Scheduling of Operator Licensing Examinations2016-07-20020 July 2016 Response to RIS-16-09, Preparation and Scheduling of Operator Licensing Examinations ML16194A0092016-07-11011 July 2016 NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter, Enclosures Withheld from Public) ML15274A2802015-10-0101 October 2015 Requalification Program Inspection - Seabrook Station, Unit 1 ML15119A3062015-04-28028 April 2015 Final Qa/Related Forms (Folder 1) ML15119A3102015-04-0202 April 2015 Miscellaneous Exam Material (Folder 1) ML15103A5662015-03-23023 March 2015 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML15098A0592015-03-23023 March 2015 Seabrook - Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15098A1012015-03-23023 March 2015 Handouts to Applicants (Folder 3) ML15098A0552015-03-19019 March 2015 Final Outlines (Folder 3) ML15076A0912015-03-17017 March 2015 Initial Operator Licensing Written Examination Approval (Seabrook Station, Unit 1) ML15098A1262015-03-0909 March 2015 Final Operating Exam (Sections a, B and C) (Folder 3) ML15103A5652015-02-20020 February 2015 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML15103A5692015-02-0505 February 2015 Draft Written Exam (Folder 2) ML15104A0692015-01-22022 January 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15103A5672014-12-22022 December 2014 Draft Outlines (Folder 2) ML13255A0022013-09-10010 September 2013 Requalification Program Inspection - SB 1 IR 05000443/20133012013-08-14014 August 2013 Er 05000443-13-301; 7-15-2013 to 7-24-2013; Seabrook Station, Unit No. 1 Initial Operator Licensing Examination Report ML13295A5462013-07-31031 July 2013 Seabrook - Final Qa/Related Forms (Folder 1) 2024-01-22
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23227A0892023-07-18018 July 2023 Final QA Related Forms ML23356A1592023-03-17017 March 2023 Final QA Related Forms SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters ML22173A0572022-06-22022 June 2022 Senior Reactor and Reactor Operator Initial License Examinations L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20254A2722020-09-10010 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3).pdf ML20254A1282020-09-10010 September 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20268C1972020-09-0707 September 2020 Miscellaneous Exam Material (Folder 1) ML21025A4032020-09-0707 September 2020 Final QA Related Forms (Folder 1) ML21026A2282020-09-0707 September 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML21025A4052020-09-0707 September 2020 Form ES-401-6 (Folder 1) ML20267A3982020-09-0707 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20268A3222020-09-0707 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20267A3992020-09-0707 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20268B4372020-08-10010 August 2020 Handouts to Applicants (Folder 3) ML20267A3922020-06-0909 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20267A1582020-06-0303 June 2020 Draft Written Examination (Folder 2) ML19352E3032019-12-17017 December 2019 Senior Reactor and Reactor Operator Initial License Examinations: Seabrook Station Unit No. 1 ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 SBK-L-18082, Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML18058A0592018-02-27027 February 2018 Initial Operator Licensing Written Examination Approval - Seabrook Station, Unit 1 ML18047A2502018-02-15015 February 2018 Initial Operator Licensing Operating Test Approval - Seabrook Station Unit No. 1 ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18120A2362017-09-22022 September 2017 Miscellaneous Exam Material (Folder 1) SBK-L-17151, Miscellaneous Exam Material (Folder 1)2017-09-22022 September 2017 Miscellaneous Exam Material (Folder 1) ML17180A2242017-06-28028 June 2017 Senior Reactor and Reactor Operator Initial License Examinations - Seabrook Station, Unit No. 1 SBK-L-17086, NRC Form 536 Operator Licensing Examination Data2017-05-19019 May 2017 NRC Form 536 Operator Licensing Examination Data ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 SBK-L-16121, Response to RIS-16-09, Preparation and Scheduling of Operator Licensing Examinations2016-07-20020 July 2016 Response to RIS-16-09, Preparation and Scheduling of Operator Licensing Examinations ML16194A0092016-07-11011 July 2016 NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter, Enclosures Withheld from Public) ML15274A2802015-10-0101 October 2015 Requalification Program Inspection - Seabrook Station, Unit 1 ML15119A3062015-04-28028 April 2015 Final Qa/Related Forms (Folder 1) ML15119A3102015-04-0202 April 2015 Miscellaneous Exam Material (Folder 1) ML15098A1012015-03-23023 March 2015 Handouts to Applicants (Folder 3) ML15103A5662015-03-23023 March 2015 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML15098A0592015-03-23023 March 2015 Seabrook - Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15098A0552015-03-19019 March 2015 Final Outlines (Folder 3) ML15076A0912015-03-17017 March 2015 Initial Operator Licensing Written Examination Approval (Seabrook Station, Unit 1) ML15098A1262015-03-0909 March 2015 Final Operating Exam (Sections a, B and C) (Folder 3) ML15103A5652015-02-20020 February 2015 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML15103A5692015-02-0505 February 2015 Draft Written Exam (Folder 2) ML15104A0692015-01-22022 January 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15103A5672014-12-22022 December 2014 Draft Outlines (Folder 2) ML13255A0022013-09-10010 September 2013 Requalification Program Inspection - SB 1 IR 05000443/20133012013-08-14014 August 2013 Er 05000443-13-301; 7-15-2013 to 7-24-2013; Seabrook Station, Unit No. 1 Initial Operator Licensing Examination Report ML13295A5462013-07-31031 July 2013 Seabrook - Final Qa/Related Forms (Folder 1) ML13207A1472013-07-22022 July 2013 June 5, 2013, NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter) ML13206A3502013-07-11011 July 2013 Seabrook - Final Operating Exam (Section a, B, and C) (Folder 3) 2024-01-22
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406-2713 December 17, 2019 Mr. Don Moul Vice President, Nuclear Division and Chief Nuclear Officer Florida Power & Light Company Mail Stop: NT3/JW 15430 Endeavor Drive Jupiter, FL 33478
SUBJECT:
SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS - SEABROOK STATION UNIT NO. 1
Dear Mr. Moul:
In a telephone conversation on December 5, 2019, between Mr. Thomas Setzer, Senior Operations Engineer, and Mr. Chris Adams, Training Manager, arrangements were made for the administration of licensing examinations at Seabrook Station Unit No. 1 during the week of August 3, 2020. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of July 6, 2020.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 11 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by March 6, 2020. The NRC staff will provide the written examination outline by January 21, 2020. The written examinations, operating tests, and the supporting reference materials identified in Attachment 3 of ES-201 will be due by May 20, 2020. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled.
To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above.
D. Moul 2 In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests, along with any video and audio recordings of the dynamic operating tests, until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if possible). Contact Mr. Thomas Setzer to determine the method for submission of waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the guidelines for receiving waiver or excusal requests call for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, Personal Qualification Statement-Licensee, or as directed by Mr. Thomas Setzer when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for this voluntary information is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to FOIA, Privacy and Information Collections Branch (T-5 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
Public Protection Notification The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection unless the document requesting or requiring the collection displays a valid OMB control number.
D. Moul 3 In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requesting for Withholding, of the Agencys Rules of Practice, a copy of this letter will be available electronically for public inspection through the Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on the NRCs website at http://www.nrc.gov/reading-rm/adams.html.
After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
Thank you for your cooperation in this matter. Mr. Chris Adams has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Thomas Setzer at (610) 337-5165 or myself at (610) 337-5306.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-443 License No. NPF-86 cc: Distribution via ListServ
D. Moul 4
SUBJECT:
SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS - SEABROOK STATION UNIT NO. 1 DATED DECEMBER 17, 2019 DISTRIBUTION:
DLew, RA (R1ORAMAIL Res)
RLorson, DRA (R1ORAMAIL Res)
DCollins, DRP (R1DRPMAIL Res)
BWelling, DRP (R1DRPMAIL Res)
JYerokun, DRS (R1DRSMAIL Res PKrohn, DRS (R1DRSMAIL Res)
BBickett, DRP PFinney, DRP PCataldo, DRP, SRI TDaun, DRP, RI ACass, DRP, Resident AA JQuichocho, RI, OEDO RidsNrrPMSeabrook Resource RidsNrrDorlLpl1 Resource ROPreports Resource DOCUMENT NAME: G:\DRS\Operations Branch\SETZER\Exam FY20 -
Seabrook\2020SeabrookCorpNotifyLtr.docx ADAMS PKG: ML19105A186 ADAMS ACCESSION NO.: ML19352E303 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB:CE RI/DRS/OB NAME TSetzer/DJ DJackson DATE 12/17/2019 12/17/2019 OFFICIAL RECORD COPY