September 28, 2017 Docket 50-443 SBK-L-17151 United States Nuclear Regulatory Commission Attn: Mr. David Silk, Senior Operations Engineer/Chief Examiner 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Seabrook Station Submittal of Information for Operator Licensing Examinations NextEra Energy Seabrook, LLC was requested to furnish documentation to support the administration of Senior Reactor Operator and Reactor Operator licensing examinations scheduled for the week of February 26, 2018. The examination outlines were requested to be provided by September 29, 2017.

Per your request, NextEra Energy Seabrook, LLC encloses the examination outlines as follows:

ES-201-2, Examination Outline Quality Checklist ES-201-3, Exam Security Agreement Form ES-301-1, Administrative Topics ES-301-2, Control Room/In-Plant Systems Outline ES-301-5, Transient and Event Checklist ES-D-1 s, Scenario Outlines The information provided in the enclosure is confidential in nature and is not for release to the public Should you have any questions regarding this matter, please contact Mr. Christopher Adams, Operations Training Supervisor, at (603) 773-7683.

NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874

. U. S. Nuclear Regulatory Commission SBK-L-17151/Page 2 Sincerely, Licensing Manager cc (Without Enclosures):

Document Control Desk NRC Region I Administrator D. E. Jackson, NRC Region I Operations Branch Chief J. Poole, NRC Project Manager, Project Directorate I-2 NRC Senior Resident Inspector

    • Confidential Information - Not for Release to the Public**

Enclosure to SBK-L-17151

    • Confidential Information - Not for Release to the Public**

Per Form ES-201-1, "Examination Preparation Checklist, Target Date -150, Operating Test Outlines", this package contains the following documents:

  • ES-201-2: Exam Quality Checklist
  • ES-201-3: Exam Security Agreement Form
  • ES-301-1: Administrative Topic Outline-RO
  • ES-301-1: Administrative Topic Outline-SROI
  • ES-301-1: Administrative Topic Outline-SROU
  • ES-301-2: Control Room/In-Plant Systems Outline-RO
  • ES-301-2: Control Room/In-Plant Systems Outline-SROI
  • ES-301-2: Control Room/In-Plant Systems Outline-SROU
  • ES-D-1: Scenario Outline-Scenario #1
  • ES-D-1: Scenario Outline-Scenario #2
  • ES-D-1: Scenario Outline-Scenario #3
  • ES-D-1: Scenario Outline-Scenario #4

December 28, 2017 Docket 50-443 SBK-L-17218 United States Nuclear Regulatory Commission Attn: Mr. David Silk, Senior Operations Engineer/Chief Examiner 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Seabrook Station Submittal of Information for Operator Licensing Examinations NextEra Energy Seabrook, LLC was requested to furnish documentation to support the administration of Senior Reactor Operator and Reactor Operator licensing examinations scheduled for the week of February 26, 2018.

Per your request, NextEra Energy Seabrook, LLC encloses the examination outlines as follows:

Job Performance Measures A through T ES-301-1, Administrative Topics Outline, RO/ SROI / SROU ES-301-2, Control Room/In-Plant Systems Outline, RO/ SROI / SROU Scenario Exercise Guides 1 through 4 ES-D-1, Scenario Outline, SEG 1 through 4 ES-301-3, Operating Test Quality Checklist ES-301-4, Simulator Scenario Quality Checklist ES-301-5, Transient and Event Checklist ES-301-6, Competencies Checklist The information provided in the enclosure is confidential in nature and is not for release to the public Should you have any questions regarding this matter, please contact Mr. Christopher Adams, Operations Training Supervisor, at (603) 773-7683.

NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874

U.S. Nuclear Regulatory Commission SBK-L-17218/Page 2 Sincerely, NextEra Energy Seabrook, LLC Kenneth J. Browne Licensing Manager cc (Without Enclosures):

Document Control Desk NRC Region I Administrator D. E. Jackson, NRC Region I Operations Branch Chief J. Poole, NRC Project Manager, Project Directorate 1-2 NRC Senior Resident Inspector

SBK-L-17218 Submittal of Information for Operator Licensing Examinations (Without Enclosure)

Blair, W. e-mail Browne, K. e-mail Adams, C. e-mail Letter Distribution e-mail File 0018 01-48 RMD 02-06

    • Confidential Information - Not for Release to the Public**

Enclosure to SBK-L-17218

    • Confidential Information - Not for Release to the Public**

EXAM ITEM ANALYSIS (Page 1 of 1)

Exam ID# 2018 LOIT NRC EXAM Date Evaluation Instrument Administered:3/6/2018 Number of Trainees Evaluated: 9 Section A - Any question receiving greater than 50% failure rate ON/A List each question receiving greater than 50% failure rate.

Question Average Review Corrective Action Number Score(%) Conclusion*

30 44% G 72 22% G

  • Review Conclusion A. Insufficient training for the learning objective tested B. Learning objectives not adequately covered in the lesson plan C. Poorly worded or invalid learning objective D. Poorly worded or invalid test item or answer E. Incorrect answer in the exam key F. More than one correct answer G. Question acceptable H. Other (state reason in table or on additional sheet)

Section B - Greater than 25% overall exam failure ~N/A I

Conclusion Summary Corrective Action I .*

~!~

Review performed b y : _ _ . _ ~ - - - - - - - - - - - - - Date: _

3

_/_<J_1/_J_~_

Approved by:

TR-M-230-1000-F09, Revision 0

--~1~:*~-~I-~:--~!~-=~-1--=--

- - ~-~-------------- --

f(to N .. ,

September 28, 2017 Docket 50-443 SBK-L-17151 United States Nuclear Regulatory Commission Attn: Mr. David Silk, Senior Operations Engineer/Chief Examiner 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Seabrook Station Submittal of Information for Operator Licensing Examinations NextEra Energy Seabrook, LLC was requested to furnish documentation to support the administration of Senior Reactor Operator and Reactor Operator licensing examinations scheduled for the week of February 26, 2018. The examination outlines were requested to be provided by September 29, 2017.

Per your request, NextEra Energy Seabrook, LLC encloses the examination outlines as follows:

ES-201-2, Examination Outline Quality Checklist ES-201-3, Exam Security Agreement Form ES-301-1, Administrative Topics ES-301-2, Control Room/In-Plant Systems Outline ES-301-5, Transient and Event Checklist ES-D-1 s, Scenario Outlines The information provided in the enclosure is confidential in nature and is not for release to the public Should you have any questions regarding this matter, please contact Mr. Christopher Adams, Operations Training Supervisor, at (603) 773-7683.

NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874

. U. S. Nuclear Regulatory Commission SBK-L-17151/Page 2 Sincerely, Licensing Manager cc (Without Enclosures):

Document Control Desk NRC Region I Administrator D. E. Jackson, NRC Region I Operations Branch Chief J. Poole, NRC Project Manager, Project Directorate I-2 NRC Senior Resident Inspector

    • Confidential Information - Not for Release to the Public**

Enclosure to SBK-L-17151

    • Confidential Information - Not for Release to the Public**

Per Form ES-201-1, "Examination Preparation Checklist, Target Date -150, Operating Test Outlines", this package contains the following documents:

  • ES-201-2: Exam Quality Checklist
  • ES-201-3: Exam Security Agreement Form
  • ES-301-1: Administrative Topic Outline-RO
  • ES-301-1: Administrative Topic Outline-SROI
  • ES-301-1: Administrative Topic Outline-SROU
  • ES-301-2: Control Room/In-Plant Systems Outline-RO
  • ES-301-2: Control Room/In-Plant Systems Outline-SROI
  • ES-301-2: Control Room/In-Plant Systems Outline-SROU
  • ES-D-1: Scenario Outline-Scenario #1
  • ES-D-1: Scenario Outline-Scenario #2
  • ES-D-1: Scenario Outline-Scenario #3
  • ES-D-1: Scenario Outline-Scenario #4

December 28, 2017 Docket 50-443 SBK-L-17218 United States Nuclear Regulatory Commission Attn: Mr. David Silk, Senior Operations Engineer/Chief Examiner 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Seabrook Station Submittal of Information for Operator Licensing Examinations NextEra Energy Seabrook, LLC was requested to furnish documentation to support the administration of Senior Reactor Operator and Reactor Operator licensing examinations scheduled for the week of February 26, 2018.

Per your request, NextEra Energy Seabrook, LLC encloses the examination outlines as follows:

Job Performance Measures A through T ES-301-1, Administrative Topics Outline, RO/ SROI / SROU ES-301-2, Control Room/In-Plant Systems Outline, RO/ SROI / SROU Scenario Exercise Guides 1 through 4 ES-D-1, Scenario Outline, SEG 1 through 4 ES-301-3, Operating Test Quality Checklist ES-301-4, Simulator Scenario Quality Checklist ES-301-5, Transient and Event Checklist ES-301-6, Competencies Checklist The information provided in the enclosure is confidential in nature and is not for release to the public Should you have any questions regarding this matter, please contact Mr. Christopher Adams, Operations Training Supervisor, at (603) 773-7683.

NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874

U.S. Nuclear Regulatory Commission SBK-L-17218/Page 2 Sincerely, NextEra Energy Seabrook, LLC Kenneth J. Browne Licensing Manager cc (Without Enclosures):

Document Control Desk NRC Region I Administrator D. E. Jackson, NRC Region I Operations Branch Chief J. Poole, NRC Project Manager, Project Directorate 1-2 NRC Senior Resident Inspector

SBK-L-17218 Submittal of Information for Operator Licensing Examinations (Without Enclosure)

Blair, W. e-mail Browne, K. e-mail Adams, C. e-mail Letter Distribution e-mail File 0018 01-48 RMD 02-06

    • Confidential Information - Not for Release to the Public**

Enclosure to SBK-L-17218

    • Confidential Information - Not for Release to the Public**

EXAM ITEM ANALYSIS (Page 1 of 1)

Exam ID# 2018 LOIT NRC EXAM Date Evaluation Instrument Administered:3/6/2018 Number of Trainees Evaluated: 9 Section A - Any question receiving greater than 50% failure rate ON/A List each question receiving greater than 50% failure rate.

Question Average Review Corrective Action Number Score(%) Conclusion*

30 44% G 72 22% G

  • Review Conclusion A. Insufficient training for the learning objective tested B. Learning objectives not adequately covered in the lesson plan C. Poorly worded or invalid learning objective D. Poorly worded or invalid test item or answer E. Incorrect answer in the exam key F. More than one correct answer G. Question acceptable H. Other (state reason in table or on additional sheet)

Section B - Greater than 25% overall exam failure ~N/A I

Conclusion Summary Corrective Action I .*

~!~

Review performed b y : _ _ . _ ~ - - - - - - - - - - - - - Date: _

3

_/_<J_1/_J_~_

Approved by:

TR-M-230-1000-F09, Revision 0

--~1~:*~-~I-~:--~!~-=~-1--=--

- - ~-~-------------- --