|
---|
Category:Letter
MONTHYEARML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A0522023-10-0202 October 2023 Requalification Program Inspection IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-104, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-103, Inservice Inspection Examination Report2023-08-0303 August 2023 Inservice Inspection Examination Report ML23192A0782023-07-11011 July 2023 Operator Licensing Retake Examination Approval L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 ML23157A0722023-06-0606 June 2023 Notification of Conduct of a Fire Protection Team Inspection L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 ML23129A0312023-05-0909 May 2023 Reactor Operator Retake License Examination ML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report L-2023-053, Core Operating Limits Report for Cycle 232023-04-0505 April 2023 Core Operating Limits Report for Cycle 23 ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-023, Revised Steam Generator Tube Inspection Report2023-03-0303 March 2023 Revised Steam Generator Tube Inspection Report ML23020A1002023-03-0303 March 2023 OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter 2024-01-29
[Table view] Category:License-Operator
MONTHYEARML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23227A0892023-07-18018 July 2023 Final QA Related Forms ML23356A1592023-03-17017 March 2023 Final QA Related Forms SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters ML22173A0572022-06-22022 June 2022 Senior Reactor and Reactor Operator Initial License Examinations L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21307A2892021-11-0303 November 2021 September 8, 2021, NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20254A2722020-09-10010 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3).pdf ML20254A1282020-09-10010 September 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21025A4052020-09-0707 September 2020 Form ES-401-6 (Folder 1) ML20267A3982020-09-0707 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20267A3992020-09-0707 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20268A3222020-09-0707 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20268C1972020-09-0707 September 2020 Miscellaneous Exam Material (Folder 1) ML21025A4032020-09-0707 September 2020 Final QA Related Forms (Folder 1) ML21026A2282020-09-0707 September 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20268B4372020-08-10010 August 2020 Handouts to Applicants (Folder 3) ML20267A3922020-06-0909 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20267A1582020-06-0303 June 2020 Draft Written Examination (Folder 2) ML19352E3032019-12-17017 December 2019 Senior Reactor and Reactor Operator Initial License Examinations: Seabrook Station Unit No. 1 ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri SBK-L-18082, Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML18058A0592018-02-27027 February 2018 Initial Operator Licensing Written Examination Approval - Seabrook Station, Unit 1 ML18047A2502018-02-15015 February 2018 Initial Operator Licensing Operating Test Approval - Seabrook Station Unit No. 1 ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18120A2362017-09-22022 September 2017 Miscellaneous Exam Material (Folder 1) SBK-L-17151, Miscellaneous Exam Material (Folder 1)2017-09-22022 September 2017 Miscellaneous Exam Material (Folder 1) ML17180A2242017-06-28028 June 2017 Senior Reactor and Reactor Operator Initial License Examinations - Seabrook Station, Unit No. 1 SBK-L-17086, NRC Form 536 Operator Licensing Examination Data2017-05-19019 May 2017 NRC Form 536 Operator Licensing Examination Data ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 SBK-L-16121, Response to RIS-16-09, Preparation and Scheduling of Operator Licensing Examinations2016-07-20020 July 2016 Response to RIS-16-09, Preparation and Scheduling of Operator Licensing Examinations ML16194A0092016-07-11011 July 2016 NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter, Enclosures Withheld from Public) ML15274A2802015-10-0101 October 2015 Requalification Program Inspection - Seabrook Station, Unit 1 ML15119A3062015-04-28028 April 2015 Final Qa/Related Forms (Folder 1) ML15119A3102015-04-0202 April 2015 Miscellaneous Exam Material (Folder 1) ML15098A0592015-03-23023 March 2015 Seabrook - Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15098A1012015-03-23023 March 2015 Handouts to Applicants (Folder 3) ML15103A5662015-03-23023 March 2015 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML15098A0552015-03-19019 March 2015 Final Outlines (Folder 3) ML15076A0912015-03-17017 March 2015 Initial Operator Licensing Written Examination Approval (Seabrook Station, Unit 1) ML15098A1262015-03-0909 March 2015 Final Operating Exam (Sections a, B and C) (Folder 3) ML15103A5652015-02-20020 February 2015 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML15103A5692015-02-0505 February 2015 Draft Written Exam (Folder 2) ML15104A0692015-01-22022 January 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15103A5672014-12-22022 December 2014 Draft Outlines (Folder 2) ML13255A0022013-09-10010 September 2013 Requalification Program Inspection - SB 1 IR 05000443/20133012013-08-14014 August 2013 Er 05000443-13-301; 7-15-2013 to 7-24-2013; Seabrook Station, Unit No. 1 Initial Operator Licensing Examination Report ML13295A5462013-07-31031 July 2013 Seabrook - Final Qa/Related Forms (Folder 1) 2024-01-22
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23227A0892023-07-18018 July 2023 Final QA Related Forms ML23356A1592023-03-17017 March 2023 Final QA Related Forms SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters ML22173A0572022-06-22022 June 2022 Senior Reactor and Reactor Operator Initial License Examinations L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20254A2722020-09-10010 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3).pdf ML20254A1282020-09-10010 September 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20268A3222020-09-0707 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20267A3982020-09-0707 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20267A3992020-09-0707 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20268C1972020-09-0707 September 2020 Miscellaneous Exam Material (Folder 1) ML21025A4052020-09-0707 September 2020 Form ES-401-6 (Folder 1) ML21026A2282020-09-0707 September 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML21025A4032020-09-0707 September 2020 Final QA Related Forms (Folder 1) ML20268B4372020-08-10010 August 2020 Handouts to Applicants (Folder 3) ML20267A3922020-06-0909 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20267A1582020-06-0303 June 2020 Draft Written Examination (Folder 2) ML19352E3032019-12-17017 December 2019 Senior Reactor and Reactor Operator Initial License Examinations: Seabrook Station Unit No. 1 ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 SBK-L-18082, Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML18058A0592018-02-27027 February 2018 Initial Operator Licensing Written Examination Approval - Seabrook Station, Unit 1 ML18047A2502018-02-15015 February 2018 Initial Operator Licensing Operating Test Approval - Seabrook Station Unit No. 1 ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 SBK-L-17151, Miscellaneous Exam Material (Folder 1)2017-09-22022 September 2017 Miscellaneous Exam Material (Folder 1) ML18120A2362017-09-22022 September 2017 Miscellaneous Exam Material (Folder 1) ML17180A2242017-06-28028 June 2017 Senior Reactor and Reactor Operator Initial License Examinations - Seabrook Station, Unit No. 1 SBK-L-17086, NRC Form 536 Operator Licensing Examination Data2017-05-19019 May 2017 NRC Form 536 Operator Licensing Examination Data ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 SBK-L-16121, Response to RIS-16-09, Preparation and Scheduling of Operator Licensing Examinations2016-07-20020 July 2016 Response to RIS-16-09, Preparation and Scheduling of Operator Licensing Examinations ML16194A0092016-07-11011 July 2016 NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter, Enclosures Withheld from Public) ML15274A2802015-10-0101 October 2015 Requalification Program Inspection - Seabrook Station, Unit 1 ML15119A3062015-04-28028 April 2015 Final Qa/Related Forms (Folder 1) ML15119A3102015-04-0202 April 2015 Miscellaneous Exam Material (Folder 1) ML15103A5662015-03-23023 March 2015 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML15098A1012015-03-23023 March 2015 Handouts to Applicants (Folder 3) ML15098A0592015-03-23023 March 2015 Seabrook - Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15098A0552015-03-19019 March 2015 Final Outlines (Folder 3) ML15076A0912015-03-17017 March 2015 Initial Operator Licensing Written Examination Approval (Seabrook Station, Unit 1) ML15098A1262015-03-0909 March 2015 Final Operating Exam (Sections a, B and C) (Folder 3) ML15103A5652015-02-20020 February 2015 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML15103A5692015-02-0505 February 2015 Draft Written Exam (Folder 2) ML15104A0692015-01-22022 January 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15103A5672014-12-22022 December 2014 Draft Outlines (Folder 2) ML13255A0022013-09-10010 September 2013 Requalification Program Inspection - SB 1 IR 05000443/20133012013-08-14014 August 2013 Er 05000443-13-301; 7-15-2013 to 7-24-2013; Seabrook Station, Unit No. 1 Initial Operator Licensing Examination Report ML13295A5462013-07-31031 July 2013 Seabrook - Final Qa/Related Forms (Folder 1) ML13207A1472013-07-22022 July 2013 June 5, 2013, NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter) ML13206A3502013-07-11011 July 2013 Seabrook - Final Operating Exam (Section a, B, and C) (Folder 3) 2024-01-22
[Table view] |
Text
September 28, 2017 Docket 50-443 SBK-L-17151 United States Nuclear Regulatory Commission Attn: Mr. David Silk, Senior Operations Engineer/Chief Examiner 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Seabrook Station Submittal of Information for Operator Licensing Examinations NextEra Energy Seabrook, LLC was requested to furnish documentation to support the administration of Senior Reactor Operator and Reactor Operator licensing examinations scheduled for the week of February 26, 2018. The examination outlines were requested to be provided by September 29, 2017.
Per your request, NextEra Energy Seabrook, LLC encloses the examination outlines as follows:
ES-201-2, Examination Outline Quality Checklist ES-201-3, Exam Security Agreement Form ES-301-1, Administrative Topics ES-301-2, Control Room/In-Plant Systems Outline ES-301-5, Transient and Event Checklist ES-D-1 s, Scenario Outlines The information provided in the enclosure is confidential in nature and is not for release to the public Should you have any questions regarding this matter, please contact Mr. Christopher Adams, Operations Training Supervisor, at (603) 773-7683.
NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874
. U. S. Nuclear Regulatory Commission SBK-L-17151/Page 2 Sincerely, Licensing Manager cc (Without Enclosures):
Document Control Desk NRC Region I Administrator D. E. Jackson, NRC Region I Operations Branch Chief J. Poole, NRC Project Manager, Project Directorate I-2 NRC Senior Resident Inspector
- Confidential Information - Not for Release to the Public**
Enclosure to SBK-L-17151
- Confidential Information - Not for Release to the Public**
Per Form ES-201-1, "Examination Preparation Checklist, Target Date -150, Operating Test Outlines", this package contains the following documents:
- ES-201-2: Exam Quality Checklist
- ES-201-3: Exam Security Agreement Form
- ES-301-1: Administrative Topic Outline-RO
- ES-301-1: Administrative Topic Outline-SROI
- ES-301-1: Administrative Topic Outline-SROU
- ES-301-2: Control Room/In-Plant Systems Outline-RO
- ES-301-2: Control Room/In-Plant Systems Outline-SROI
- ES-301-2: Control Room/In-Plant Systems Outline-SROU
- ES-D-1: Scenario Outline-Scenario #1
- ES-D-1: Scenario Outline-Scenario #2
- ES-D-1: Scenario Outline-Scenario #3
- ES-D-1: Scenario Outline-Scenario #4
December 28, 2017 Docket 50-443 SBK-L-17218 United States Nuclear Regulatory Commission Attn: Mr. David Silk, Senior Operations Engineer/Chief Examiner 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Seabrook Station Submittal of Information for Operator Licensing Examinations NextEra Energy Seabrook, LLC was requested to furnish documentation to support the administration of Senior Reactor Operator and Reactor Operator licensing examinations scheduled for the week of February 26, 2018.
Per your request, NextEra Energy Seabrook, LLC encloses the examination outlines as follows:
Job Performance Measures A through T ES-301-1, Administrative Topics Outline, RO/ SROI / SROU ES-301-2, Control Room/In-Plant Systems Outline, RO/ SROI / SROU Scenario Exercise Guides 1 through 4 ES-D-1, Scenario Outline, SEG 1 through 4 ES-301-3, Operating Test Quality Checklist ES-301-4, Simulator Scenario Quality Checklist ES-301-5, Transient and Event Checklist ES-301-6, Competencies Checklist The information provided in the enclosure is confidential in nature and is not for release to the public Should you have any questions regarding this matter, please contact Mr. Christopher Adams, Operations Training Supervisor, at (603) 773-7683.
NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874
U.S. Nuclear Regulatory Commission SBK-L-17218/Page 2 Sincerely, NextEra Energy Seabrook, LLC Kenneth J. Browne Licensing Manager cc (Without Enclosures):
Document Control Desk NRC Region I Administrator D. E. Jackson, NRC Region I Operations Branch Chief J. Poole, NRC Project Manager, Project Directorate 1-2 NRC Senior Resident Inspector
SBK-L-17218 Submittal of Information for Operator Licensing Examinations (Without Enclosure)
Blair, W. e-mail Browne, K. e-mail Adams, C. e-mail Letter Distribution e-mail File 0018 01-48 RMD 02-06
- Confidential Information - Not for Release to the Public**
Enclosure to SBK-L-17218
- Confidential Information - Not for Release to the Public**
EXAM ITEM ANALYSIS (Page 1 of 1)
Exam ID# 2018 LOIT NRC EXAM Date Evaluation Instrument Administered:3/6/2018 Number of Trainees Evaluated: 9 Section A - Any question receiving greater than 50% failure rate ON/A List each question receiving greater than 50% failure rate.
Question Average Review Corrective Action Number Score(%) Conclusion*
30 44% G 72 22% G
- Review Conclusion A. Insufficient training for the learning objective tested B. Learning objectives not adequately covered in the lesson plan C. Poorly worded or invalid learning objective D. Poorly worded or invalid test item or answer E. Incorrect answer in the exam key F. More than one correct answer G. Question acceptable H. Other (state reason in table or on additional sheet)
Section B - Greater than 25% overall exam failure ~N/A I
Conclusion Summary Corrective Action I .*
~!~
Review performed b y : _ _ . _ ~ - - - - - - - - - - - - - Date: _
3
_/_<J_1/_J_~_
Approved by:
TR-M-230-1000-F09, Revision 0
--~1~:*~-~I-~:--~!~-=~-1--=--
- - ~-~-------------- --
f(to N .. ,
September 28, 2017 Docket 50-443 SBK-L-17151 United States Nuclear Regulatory Commission Attn: Mr. David Silk, Senior Operations Engineer/Chief Examiner 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Seabrook Station Submittal of Information for Operator Licensing Examinations NextEra Energy Seabrook, LLC was requested to furnish documentation to support the administration of Senior Reactor Operator and Reactor Operator licensing examinations scheduled for the week of February 26, 2018. The examination outlines were requested to be provided by September 29, 2017.
Per your request, NextEra Energy Seabrook, LLC encloses the examination outlines as follows:
ES-201-2, Examination Outline Quality Checklist ES-201-3, Exam Security Agreement Form ES-301-1, Administrative Topics ES-301-2, Control Room/In-Plant Systems Outline ES-301-5, Transient and Event Checklist ES-D-1 s, Scenario Outlines The information provided in the enclosure is confidential in nature and is not for release to the public Should you have any questions regarding this matter, please contact Mr. Christopher Adams, Operations Training Supervisor, at (603) 773-7683.
NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874
. U. S. Nuclear Regulatory Commission SBK-L-17151/Page 2 Sincerely, Licensing Manager cc (Without Enclosures):
Document Control Desk NRC Region I Administrator D. E. Jackson, NRC Region I Operations Branch Chief J. Poole, NRC Project Manager, Project Directorate I-2 NRC Senior Resident Inspector
- Confidential Information - Not for Release to the Public**
Enclosure to SBK-L-17151
- Confidential Information - Not for Release to the Public**
Per Form ES-201-1, "Examination Preparation Checklist, Target Date -150, Operating Test Outlines", this package contains the following documents:
- ES-201-2: Exam Quality Checklist
- ES-201-3: Exam Security Agreement Form
- ES-301-1: Administrative Topic Outline-RO
- ES-301-1: Administrative Topic Outline-SROI
- ES-301-1: Administrative Topic Outline-SROU
- ES-301-2: Control Room/In-Plant Systems Outline-RO
- ES-301-2: Control Room/In-Plant Systems Outline-SROI
- ES-301-2: Control Room/In-Plant Systems Outline-SROU
- ES-D-1: Scenario Outline-Scenario #1
- ES-D-1: Scenario Outline-Scenario #2
- ES-D-1: Scenario Outline-Scenario #3
- ES-D-1: Scenario Outline-Scenario #4
December 28, 2017 Docket 50-443 SBK-L-17218 United States Nuclear Regulatory Commission Attn: Mr. David Silk, Senior Operations Engineer/Chief Examiner 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Seabrook Station Submittal of Information for Operator Licensing Examinations NextEra Energy Seabrook, LLC was requested to furnish documentation to support the administration of Senior Reactor Operator and Reactor Operator licensing examinations scheduled for the week of February 26, 2018.
Per your request, NextEra Energy Seabrook, LLC encloses the examination outlines as follows:
Job Performance Measures A through T ES-301-1, Administrative Topics Outline, RO/ SROI / SROU ES-301-2, Control Room/In-Plant Systems Outline, RO/ SROI / SROU Scenario Exercise Guides 1 through 4 ES-D-1, Scenario Outline, SEG 1 through 4 ES-301-3, Operating Test Quality Checklist ES-301-4, Simulator Scenario Quality Checklist ES-301-5, Transient and Event Checklist ES-301-6, Competencies Checklist The information provided in the enclosure is confidential in nature and is not for release to the public Should you have any questions regarding this matter, please contact Mr. Christopher Adams, Operations Training Supervisor, at (603) 773-7683.
NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874
U.S. Nuclear Regulatory Commission SBK-L-17218/Page 2 Sincerely, NextEra Energy Seabrook, LLC Kenneth J. Browne Licensing Manager cc (Without Enclosures):
Document Control Desk NRC Region I Administrator D. E. Jackson, NRC Region I Operations Branch Chief J. Poole, NRC Project Manager, Project Directorate 1-2 NRC Senior Resident Inspector
SBK-L-17218 Submittal of Information for Operator Licensing Examinations (Without Enclosure)
Blair, W. e-mail Browne, K. e-mail Adams, C. e-mail Letter Distribution e-mail File 0018 01-48 RMD 02-06
- Confidential Information - Not for Release to the Public**
Enclosure to SBK-L-17218
- Confidential Information - Not for Release to the Public**
EXAM ITEM ANALYSIS (Page 1 of 1)
Exam ID# 2018 LOIT NRC EXAM Date Evaluation Instrument Administered:3/6/2018 Number of Trainees Evaluated: 9 Section A - Any question receiving greater than 50% failure rate ON/A List each question receiving greater than 50% failure rate.
Question Average Review Corrective Action Number Score(%) Conclusion*
30 44% G 72 22% G
- Review Conclusion A. Insufficient training for the learning objective tested B. Learning objectives not adequately covered in the lesson plan C. Poorly worded or invalid learning objective D. Poorly worded or invalid test item or answer E. Incorrect answer in the exam key F. More than one correct answer G. Question acceptable H. Other (state reason in table or on additional sheet)
Section B - Greater than 25% overall exam failure ~N/A I
Conclusion Summary Corrective Action I .*
~!~
Review performed b y : _ _ . _ ~ - - - - - - - - - - - - - Date: _
3
_/_<J_1/_J_~_
Approved by:
TR-M-230-1000-F09, Revision 0
--~1~:*~-~I-~:--~!~-=~-1--=--
- - ~-~-------------- --
f(to N .. ,