Letter Sequence Draft Other |
---|
|
Results
Other: ML20055D883, ML20055E009, ML20057E559, ML20057E560, ML20087G852, ML20087H514, ML20184A247, ML20184A248, ML20240A318, ML20240A322, ML20254A128, ML20254A272, ML20268A322, ML20268B437, ML20268C197, ML20274A136, ML20279A331, ML20297A306, ML20300A556, ML20301A632, ML20302A234, ML20302A235, ML20303A011, ML20303A016, ML20307A010, ML20307A019, ML20321A279, ML20322A350, ML20323A018, ML20325A031, ML20328A162, ML20329A432, ML20329A442, ML20350B716, ML20350B723, ML20350B739, ML20350B785, ML21012A270, ML21025A073, ML21025A143, ML21025A403, ML21025A405, ML21025A414, ML21040A471, ML21040A483, ML21043A207, ML21050A084, ML21050A119, ML21050A227, ML21056A220... further results
|
MONTHYEARML20055E0202019-04-22022 April 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20260H1522019-10-14014 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20260H1512019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) Project stage: Draft Other ML20260H1502019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20055E0132019-10-15015 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20055E0172019-10-28028 October 2019 Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) Project stage: Draft Other ML20055E0152019-10-28028 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20055E0122019-10-28028 October 2019 NRC Comments on Draft Licensee-Developed Operating Test Project stage: Draft Other ML20055E0092020-01-15015 January 2020 Final Q/A Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML20055D8832020-01-15015 January 2020 Final Qa/Related Forms (Folder 1) Project stage: Other ML20260H1542020-01-24024 January 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20260H1532020-01-24024 January 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML21025A4142020-02-0707 February 2020 Original Questions for Modified Questions Project stage: Other ML21025A1432020-02-0707 February 2020 ES-401-6 (Folder 1) Project stage: Other ML21025A0732020-02-0707 February 2020 Final QA Related Forms (Folder 1) Project stage: Other ML20279A3312020-02-0707 February 2020 Handouts to Applicants (Folder 3) Project stage: Other ML20274A1362020-02-0707 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML20274A1052020-02-0707 February 2020 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20274A0922020-02-0707 February 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20274A0832020-02-0707 February 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20274A0662020-02-0707 February 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20057E5602020-02-0707 February 2020 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML20057E5592020-02-0707 February 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML21056A3062020-02-10010 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML21056A2852020-02-15015 February 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML21056A2842020-02-15015 February 2020 Final Qa/Related Forms (Folder 1) Project stage: Other ML21056A3072020-03-12012 March 2020 Handouts to Applicants (Folder 3) Project stage: Other ML20087H5142020-03-27027 March 2020 Ja Fitzpatrick Final Written Exam Questions and Answer Key Project stage: Other ML20087G8522020-03-27027 March 2020 Ja Fitzpatrick - Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML20267A1582020-06-0303 June 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20267A3922020-06-0909 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML21056A2232020-06-30030 June 2020 Final Written Examination and Operating Test Outlines (Folder 3) Project stage: Other ML21056A2212020-06-30030 June 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) Project stage: Other ML21056A2202020-06-30030 June 2020 Final Qa/Related Forms (Folder 1) Project stage: Other ML20260H1672020-06-30030 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20260H1662020-06-30030 June 2020 Draft Written Examination (Folder 2), Test Answer Key Project stage: Draft Other ML20260H1652020-06-30030 June 2020 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20260H1642020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) Project stage: Draft Other ML20260H1632020-06-30030 June 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) Project stage: Draft Other ML20184A2482020-06-30030 June 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) Project stage: Other ML20184A2472020-06-30030 June 2020 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other ML20303A0122020-07-0202 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) Project stage: Draft Other ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) Project stage: Draft Other ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20303A0142020-08-0707 August 2020 Draft Written Examination (Folder 2) Project stage: Draft Other ML20268B4372020-08-10010 August 2020 Handouts to Applicants (Folder 3) Project stage: Other ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) Project stage: Draft Other ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) Project stage: Draft Other ML20240A3222020-08-27027 August 2020 Final Operating Test (Sections a, B, and C) (Folder 3) Project stage: Other 2020-03-12
[Table View] |
|
---|
Category:License-Operator
MONTHYEARML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23227A0892023-07-18018 July 2023 Final QA Related Forms ML23356A1592023-03-17017 March 2023 Final QA Related Forms SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters ML22173A0572022-06-22022 June 2022 Senior Reactor and Reactor Operator Initial License Examinations L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21307A2892021-11-0303 November 2021 September 8, 2021, NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20254A2722020-09-10010 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3).pdf ML20254A1282020-09-10010 September 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21025A4052020-09-0707 September 2020 Form ES-401-6 (Folder 1) ML20267A3982020-09-0707 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20267A3992020-09-0707 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20268A3222020-09-0707 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20268C1972020-09-0707 September 2020 Miscellaneous Exam Material (Folder 1) ML21025A4032020-09-0707 September 2020 Final QA Related Forms (Folder 1) ML21026A2282020-09-0707 September 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20268B4372020-08-10010 August 2020 Handouts to Applicants (Folder 3) ML20267A3922020-06-0909 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20267A1582020-06-0303 June 2020 Draft Written Examination (Folder 2) ML19352E3032019-12-17017 December 2019 Senior Reactor and Reactor Operator Initial License Examinations: Seabrook Station Unit No. 1 ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri SBK-L-18082, Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML18058A0592018-02-27027 February 2018 Initial Operator Licensing Written Examination Approval - Seabrook Station, Unit 1 ML18047A2502018-02-15015 February 2018 Initial Operator Licensing Operating Test Approval - Seabrook Station Unit No. 1 ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 SBK-L-17151, Miscellaneous Exam Material (Folder 1)2017-09-22022 September 2017 Miscellaneous Exam Material (Folder 1) ML18120A2362017-09-22022 September 2017 Miscellaneous Exam Material (Folder 1) ML17180A2242017-06-28028 June 2017 Senior Reactor and Reactor Operator Initial License Examinations - Seabrook Station, Unit No. 1 SBK-L-17086, NRC Form 536 Operator Licensing Examination Data2017-05-19019 May 2017 NRC Form 536 Operator Licensing Examination Data ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 SBK-L-16121, Response to RIS-16-09, Preparation and Scheduling of Operator Licensing Examinations2016-07-20020 July 2016 Response to RIS-16-09, Preparation and Scheduling of Operator Licensing Examinations ML16194A0092016-07-11011 July 2016 NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter, Enclosures Withheld from Public) ML15274A2802015-10-0101 October 2015 Requalification Program Inspection - Seabrook Station, Unit 1 ML15119A3062015-04-28028 April 2015 Final Qa/Related Forms (Folder 1) ML15119A3102015-04-0202 April 2015 Miscellaneous Exam Material (Folder 1) ML15103A5662015-03-23023 March 2015 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML15098A0592015-03-23023 March 2015 Seabrook - Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15098A1012015-03-23023 March 2015 Handouts to Applicants (Folder 3) ML15098A0552015-03-19019 March 2015 Final Outlines (Folder 3) ML15076A0912015-03-17017 March 2015 Initial Operator Licensing Written Examination Approval (Seabrook Station, Unit 1) ML15098A1262015-03-0909 March 2015 Final Operating Exam (Sections a, B and C) (Folder 3) ML15103A5652015-02-20020 February 2015 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML15103A5692015-02-0505 February 2015 Draft Written Exam (Folder 2) ML15104A0692015-01-22022 January 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15103A5672014-12-22022 December 2014 Draft Outlines (Folder 2) ML13255A0022013-09-10010 September 2013 Requalification Program Inspection - SB 1 IR 05000443/20133012013-08-14014 August 2013 Er 05000443-13-301; 7-15-2013 to 7-24-2013; Seabrook Station, Unit No. 1 Initial Operator Licensing Examination Report ML13295A5462013-07-31031 July 2013 Seabrook - Final Qa/Related Forms (Folder 1) 2024-01-22
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23227A0892023-07-18018 July 2023 Final QA Related Forms ML23356A1592023-03-17017 March 2023 Final QA Related Forms SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters ML22173A0572022-06-22022 June 2022 Senior Reactor and Reactor Operator Initial License Examinations L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20254A2722020-09-10010 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3).pdf ML20254A1282020-09-10010 September 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20268C1972020-09-0707 September 2020 Miscellaneous Exam Material (Folder 1) ML21025A4032020-09-0707 September 2020 Final QA Related Forms (Folder 1) ML21026A2282020-09-0707 September 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML21025A4052020-09-0707 September 2020 Form ES-401-6 (Folder 1) ML20267A3982020-09-0707 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20268A3222020-09-0707 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20267A3992020-09-0707 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20268B4372020-08-10010 August 2020 Handouts to Applicants (Folder 3) ML20267A3922020-06-0909 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20267A1582020-06-0303 June 2020 Draft Written Examination (Folder 2) ML19352E3032019-12-17017 December 2019 Senior Reactor and Reactor Operator Initial License Examinations: Seabrook Station Unit No. 1 ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 SBK-L-18082, Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML18058A0592018-02-27027 February 2018 Initial Operator Licensing Written Examination Approval - Seabrook Station, Unit 1 ML18047A2502018-02-15015 February 2018 Initial Operator Licensing Operating Test Approval - Seabrook Station Unit No. 1 ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18120A2362017-09-22022 September 2017 Miscellaneous Exam Material (Folder 1) SBK-L-17151, Miscellaneous Exam Material (Folder 1)2017-09-22022 September 2017 Miscellaneous Exam Material (Folder 1) ML17180A2242017-06-28028 June 2017 Senior Reactor and Reactor Operator Initial License Examinations - Seabrook Station, Unit No. 1 SBK-L-17086, NRC Form 536 Operator Licensing Examination Data2017-05-19019 May 2017 NRC Form 536 Operator Licensing Examination Data ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 SBK-L-16121, Response to RIS-16-09, Preparation and Scheduling of Operator Licensing Examinations2016-07-20020 July 2016 Response to RIS-16-09, Preparation and Scheduling of Operator Licensing Examinations ML16194A0092016-07-11011 July 2016 NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter, Enclosures Withheld from Public) ML15274A2802015-10-0101 October 2015 Requalification Program Inspection - Seabrook Station, Unit 1 ML15119A3062015-04-28028 April 2015 Final Qa/Related Forms (Folder 1) ML15119A3102015-04-0202 April 2015 Miscellaneous Exam Material (Folder 1) ML15098A1012015-03-23023 March 2015 Handouts to Applicants (Folder 3) ML15103A5662015-03-23023 March 2015 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML15098A0592015-03-23023 March 2015 Seabrook - Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15098A0552015-03-19019 March 2015 Final Outlines (Folder 3) ML15076A0912015-03-17017 March 2015 Initial Operator Licensing Written Examination Approval (Seabrook Station, Unit 1) ML15098A1262015-03-0909 March 2015 Final Operating Exam (Sections a, B and C) (Folder 3) ML15103A5652015-02-20020 February 2015 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML15103A5692015-02-0505 February 2015 Draft Written Exam (Folder 2) ML15104A0692015-01-22022 January 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15103A5672014-12-22022 December 2014 Draft Outlines (Folder 2) ML13255A0022013-09-10010 September 2013 Requalification Program Inspection - SB 1 IR 05000443/20133012013-08-14014 August 2013 Er 05000443-13-301; 7-15-2013 to 7-24-2013; Seabrook Station, Unit No. 1 Initial Operator Licensing Examination Report ML13295A5462013-07-31031 July 2013 Seabrook - Final Qa/Related Forms (Folder 1) ML13207A1472013-07-22022 July 2013 June 5, 2013, NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter) ML13206A3502013-07-11011 July 2013 Seabrook - Final Operating Exam (Section a, B, and C) (Folder 3) 2024-01-22
[Table view] |
Text
ES-401 Written Examination Review Worksheet Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.
Q LOK LOD Source Status 8. Explanation (F/H) (1-5) Stem Cred. Job- Q- SRO (B/M/N) (U/E/S)
Cues T/F Partial Minutia #/Units Backward Focus Dist Link K/A Only K/A mismatch, distractor A is correct also. Rewrote Distractor A.
Changed The reactor is still critical to Power Range channels are 6%.
1 H 3 X X B U This indicates that the heat being removed is equivalent to maximum decay heat load. The reactor is subcritical however, 6% power exceeds the required 5% to transition out of FR-S.1 at step 7. This sets the question up so that the student must still utilize knowledge of step 8, but better aligns with the K/A for decay heat only and not heat from power operation.
2 H 3 B S 3 H 3 N E Changed distractors to normal and prohibited 4 H 3 N E Edited stem to what is the first action Changed stem statement to What is the cause of these 5 H 3 B E indications.
K/A not matched well. Added bullet in the stem to discuss alarm.
6 H 3 X B E Added details to stem about alarm response manual.
Subset issue with distractors A and C. Rewrote question with edits.
7 H 2 N S 8 F 2 N E Edited stem to remove bullets and just ask question directly.
Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts:
- 1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
- 2. Enter the level of difficulty (LOD) of each question a 1 (easy) to 5 (difficult); questions with a difficulty between 2 and 4 are acceptable.
- 3. Check the appropriate box if a psychometric flaw is identified:
- Stem Focus: The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
- Cues: The stem or distractors contain cues (e.g., clues, specific determiners, phrasing, length).
- T/F: The answer choices are a collection of unrelated true/false statements.
- Cred. Dist.: The distractors are not credible; single implausible distractors should be repaired, and more than one is unacceptable.
- Partial: One or more distractors are partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by the stem).
- 4. Check the appropriate box if a job content flaw is identified:
- Job Link: The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).
- Minutia: The question requires the recall of knowledge that is too specific for the closed-reference test mode (i.e., it is not required to be known from memory).
- #/Units: The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
ES-401 Written Examination Review Worksheet Form ES-401-9
- Backward: The question requires reverse logic or application compared to the job requirements.
- 5. Check questions that are sampled for conformance with the approved K/A and those K/As that are designated SRO-only. (K/A and license-level mismatches are unacceptable.)
- 6. Enter questions source: (B)ank, (M)odified, or (N)ew. Verify that (M)odified questions meet the criteria of Form ES-401, Section D.2.f.
- 7. Based on the reviewers judgment, is the question, as written, (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
- 8. At a minimum, explain any U status ratings (e.g., how the Appendix B psychometric attributes are not being met).
ES-401 3 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.
Q LOK LOD Source Status 8. Explanation (F/H) (1-5) Stem Cred. Job- Q- SRO (B/M/N) (U/E/S)
Cues T/F Partial Minutia #/Units Backward Focus Dist Link K/A Only 9 H 3 N E Changed question to station blackout conditions.
10 F 2 N S 11 F 3 N S 12 H 3 N S 13 F 2 N S K/A Mismatch. Question rewritten to ask for the reasons 14 H 3 X B U why pertaining to actions in EOPs for loss of instrument air.
15 F 3 B S 16 H 3 B E Typo in stem on RH-V22 corrected 17 F 2 B E Rewrote distractor A to make more plausible.
18 H 3 B E Typo form - edited to from 19 F 2 N S 20 F 3 M E C is implausible. Rewrote C 21 F 3 B S Edited stem to next and edited distractor A to continue to 22 H 3 N E lower A is correct also. Changed distractor trip the reactor to Insert control rods to 10 steps above the RIL.
23 H 3 X N U Added in accordance with OS1000.07, Approach to Criticality?.
24 F 2 B S Upped the difficulty by having candidate calculate subcooling 25 H 2 B E needed for question instead of being given the subcooling.
ES-401 4 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.
Q LOK LOD Source Status 8. Explanation (F/H) (1-5) Stem Cred. Job- Q- SRO (B/M/N) (U/E/S)
Cues T/F Partial Minutia #/Units Backward Focus Dist Link K/A Only Changed question from Can one CCP be stopped and why, or why not? to Can one CCP be stopped at this time and why, or why not?
Changed C from: No. Subcooling must be greater than the value required in step 13c. This ensures adequate subcooling will be maintained after one CCP is stopped.
to: No. Subcooling must be greater than the value required in step 13c Changed D from: No. Subcooling requirements apply until hot leg temperatures are below 250 F. Then adequate subcooling will be maintained after one CCP is stopped.
to: No. Subcooling requirements apply until hot leg temperatures are below 250 F.
C2 and D2 implausible - equalizing boron is not connected 26 F 3 X N U with PTS. Rewrote C2 and D2.
27 H 3 B E Stem edited to check that the penetrations are isolated 28 F 3 B S B is implausible, a mistake should not result in a positive 29 F 2 B E outcome. Rewrote question.
30 H 3 B S A is not plausible Changed RCS Temp column to Stable in 31 H 3 E U distractor A3.
32 F 3 X N U C and D implausible. Edited C1 and D1 33 H 3 N S 34 F 3 N S Edited stem to automatic and made distractors look more 35 F 3 B E similar 36 H 3 B S
ES-401 5 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.
Q LOK LOD Source Status 8. Explanation (F/H) (1-5) Stem Cred. Job- Q- SRO (B/M/N) (U/E/S)
Cues T/F Partial Minutia #/Units Backward Focus Dist Link K/A Only There is no time element in the stem to know when things are occurring, so A could be correct also. Edited stem and distractors to include heaters and PORVS.
37 H 3 X B U Changed question from PT-455 failing low to 457 failing low with an alternate channel alignment. This avoids overlap with Sim Scenario #1.
38 F 2 B S 39 H 2 M S 40 F 2 B S K/A mismatch, question does not ask about bus power 41 H 3 X B U supplies. Rewrote question.
K/A mismatch, question does not ask about bus power 42 H 3 X N U supplies. Rewrote question.
43 F 3 B S Stem and distractors read awkwardly. Rewrote stem and 44 H 3 B E distractors to include due to.
45 H 3 B S 46 H 3 B E Simplified the stem to less bullets.
Question does not ask about D/G load limits. Rewrote 47 F 2 X B U question.
48 F 3 B E Typo, changed stem to de-energized 49 F 3 N E Added IAW procedure to stem 50 F 3 B S 51 F 3 N S 52 F 3 B E A is implausible. Rewrote A
ES-401 6 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.
Q LOK LOD Source Status 8. Explanation (F/H) (1-5) Stem Cred. Job- Q- SRO (B/M/N) (U/E/S)
Cues T/F Partial Minutia #/Units Backward Focus Dist Link K/A Only 53 H 2 B S Rewrote distractors to ask only 1 part instead of 2 part 54 H 3 B E dstractors. Rewrote question to include both Phase A and B.
55 H 3 B S A2 and B2 are not plausible as AFD is not a concern at 56 F 3 X N U startup. Rewrote distractors.
57 H 3 B S 58 H 2 N S 59 H 3 B E Edited distractors to two columns instead of three Question required to be rewritten. Original question had 60 F 2 N E implausible distractor and poor stem focus 61 H 3 B S 62 H 2 B S 63 F 3 N E Added plausibility statements for A, B, and C.
64 H 3 N S 65 H 2 N S 66 F 2 B E Edited stem from could to would 67 F 3 N S Increased the difficulty by changing the distractors to 68 H 2 N E unidentified leakage from pressure boundary 69 F 2 B S
ES-401 7 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.
Q LOK LOD Source Status 8. Explanation (F/H) (1-5) Stem Cred. Job- Q- SRO (B/M/N) (U/E/S)
Cues T/F Partial Minutia #/Units Backward Focus Dist Link K/A Only 70 H 3 B S 71 F 3 B S The question is too system specific for Tier 3. Question has 72 F 3 N E been rewritten.
73 F 3 B S The question is too system specific for Tier 3. Question has 74 H 3 B E been rewritten.
75 H 3 N S 76 H 3 B S Rewrote question so that SRO must select recovery 77 F 3 X N U procedure.
A2 and C2 are not plausible. Rewrote question based on 78 H 3 X N U further feedback on using reference Distractors C and D do not reference procedures like A and B 79 H 3 N E do. Rewrite stem to include procedure name and edited all distractors.
80 H 2 N S B and D are implausible. There is nothing in the stem on loss of emergency coolant, so ECA-1.1 is not plausible. Rewrote 81 H 2 X N U distractors. Added and in accordance with that procedure, why to question stem.
K/A mismatch. Rewrote question to test ability to diagnose 82 H 3 X N U rod on bottom.
83 H 3 N E Edited distractors referring to TS 3.3.1 action 6 (B and D) 84 H 3 B S Added per ES-0.2, Natural Circulation Cooldown to 85 H 2 N S question stem.
ES-401 8 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.
Q LOK LOD Source Status 8. Explanation (F/H) (1-5) Stem Cred. Job- Q- SRO (B/M/N) (U/E/S)
Cues T/F Partial Minutia #/Units Backward Focus Dist Link K/A Only Edited stem to reflect prior to stopping D RCP. Also edited 86 H 2 N E distractors to remove stop the D RCP 87 H 3 B S 88 H 3 X N U Not SRO only as a TS bases question. Rewrote question 89 H 3 N S 90 H 3 X N U K/A not matched. Rewrote question.
Edited distractors to remove the statement Verify that the 91 H 3 B E containment ventilation systems are isolated, since this is in all 4 distractors.
Changed:
Radiation Monitor RM-6549, Lo Range Spent Fuel Pool goes into high alarm. What procedure will be entered (1) and what actions will be taken to minimize personnel exposure (2)?
92 H 3 N E to:
Plant conditions:
- Radiation Monitor RM-6549, Lo Range Spent Fuel Pool is in high alarm.
- Spent Fuel Pool Level is 25.5 feet.
Added in FR.H-1, Response to Loss of Secondary Heat 93 H 3 N E Sink? to question stem.
B and D are implausible because they are CROs. Rewrote 94 F 2 X N U distractors 95 H 3 N E Rewrote distractors to 2x2 format, 2 column 96 F 3 B S 97 H 3 B S 98 F 2 B S 99 H 2 B S
ES-401 9 Form ES-401-9
- 1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.
Q LOK LOD Source Status 8. Explanation (F/H) (1-5) Stem Cred. Job- Q- SRO (B/M/N) (U/E/S)
Cues T/F Partial Minutia #/Units Backward Focus Dist Link K/A Only 100 H 3 N E Edited stem to state when ECA-0.0 was entered (at step 5)