ML110260442: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:2010 MNGP ILT EXAMINATION OPERATING TEST COMMENTS Admin JPM e (SRO) Update performance step 3 to be critical and be more specific on the standard.
{{#Wiki_filter:2010 MNGP ILT EXAMINATION OPERATING TEST COMMENTS Admin JPM e (SRO) Update performance step 3 to     Changed step to critical and be critical and be more specific specified the standard to on the standard.                  include using the correct side of the EAL Board for the plant Mode.
Changed step to critical and specified the standard to include using the correct side of the EAL Board for the plant Mode. CR JPM aFor performance step 3 on page  
CR JPM a          For performance step 3 on page   Updated to 5 psig.
 
5 - update the evaluator cue for the correct suction pressure.
5 - update the evaluator cue for the correct suction pressure.
Updated to 5 psig.
CR JPM d         For Performance Step 5 add a     Added range of 2.44-2.56 range of gains that is expected for the candidates to enter.
CR JPM d For Performance Step 5 add a range of gains that is expected for the candidates to enter.
CR JPM e         For initial conditions state that Added maintenance was performed on channel A1 for performance plausibility.
Added range of 2.44
For performance step 15 add an     Added evaluator cue to state SPDS reads 20 mr/hr.
-2.56  CR JPM e For initial conditions state that maintenance was performed on channel A1 for performance plausibility.
CR JPM h         Update candidate turnover         Updated sheet with instructor turnover sheet.
Added  For performance step 15 add an evaluator cue to state SPDS reads 20 mr/hr.
In-Plant JPMs    No comments on the In-Plant JPMs Simulator         The comments for the dynamic Comments          simulator scenarios were only minor in nature, such as typographical errors and were not individually tracked. No significant changes were made.}}
Added  CR JPM h Update candidate turnover sheet with instructor turnover sheet. Updated In-Plant JPMsNo comments on the In
-Plant JPMs   Simulator CommentsThe comments for the dynamic simulator scenarios were only minor in nature, such as typographical errors and were not individually tracked. No significant changes were made.}}

Latest revision as of 05:12, 13 November 2019

2010 Monticello Nuclear Generating Plant Initial License Examination Operating Test Comments
ML110260442
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/17/2010
From: Mcneil D
Operations Branch III
To:
Northern States Power Co, Xcel Energy
References
Download: ML110260442 (1)


Text

2010 MNGP ILT EXAMINATION OPERATING TEST COMMENTS Admin JPM e (SRO) Update performance step 3 to Changed step to critical and be critical and be more specific specified the standard to on the standard. include using the correct side of the EAL Board for the plant Mode.

CR JPM a For performance step 3 on page Updated to 5 psig.

5 - update the evaluator cue for the correct suction pressure.

CR JPM d For Performance Step 5 add a Added range of 2.44-2.56 range of gains that is expected for the candidates to enter.

CR JPM e For initial conditions state that Added maintenance was performed on channel A1 for performance plausibility.

For performance step 15 add an Added evaluator cue to state SPDS reads 20 mr/hr.

CR JPM h Update candidate turnover Updated sheet with instructor turnover sheet.

In-Plant JPMs No comments on the In-Plant JPMs Simulator The comments for the dynamic Comments simulator scenarios were only minor in nature, such as typographical errors and were not individually tracked. No significant changes were made.