ML110700256: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 CENG a joint venture of Coflstelhatofl 4j19Ie Enemrgy0 CALVERT CLIFFS NUCLEAR POWER PLANT February 1, 2011 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
{{#Wiki_filter:Calvert Cliffs Nuclear Power Plant                               1650 Calvert Cliffs Parkway Lusby, Maryland 20657 CENG a joint venture of Coflstelhatofl     4j19Ie Enemrgy0 CALVERT CLIFFS NUCLEAR POWER PLANT February 1, 2011 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:             Document Control Desk
Document Control Desk  


==SUBJECT:==
==SUBJECT:==
Calvert Cliffs Nuclear Power Plant; Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Independent Spent Fuel Storage Installation; Docket No. 72-8 Emergency Action Level Changes  
Calvert Cliffs Nuclear Power Plant; Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Independent Spent Fuel Storage Installation; Docket No. 72-8 Emergency Action Level Changes


==REFERENCE:==
==REFERENCE:==
(a) Nuclear Energy Institute (NEI) 99-01, Revision 5, "Methodology for Development of Emergency Action Levels," dated February 2008 (ADAMS Accession No. ML080450149)
(a)     Nuclear Energy Institute (NEI) 99-01, Revision 5, "Methodology for Development of Emergency Action Levels," dated February 2008 (ADAMS Accession No. ML080450149)
Calvert Cliffs Nuclear Power Plant requests Nuclear Regulatory Commission (NRC) approval for the adoption of revised Emergency Action Levels (EALs) for use at the Calvert Cliffs Nuclear Power Plant in accordance with 10 CFR Part 50, Appendix E, Section IV(B)(1).
Calvert Cliffs Nuclear Power Plant requests Nuclear Regulatory Commission (NRC) approval for the adoption of revised Emergency Action Levels (EALs) for use at the Calvert Cliffs Nuclear Power Plant in accordance with 10 CFR Part 50, Appendix E, Section IV(B)(1). The revised EALs are based on Reference (a). Current Calvert Cliffs EALs are based on NEI 99-01, Revision 4.
The revised EALs are based on Reference (a). Current Calvert Cliffs EALs are based on NEI 99-01, Revision 4.Nuclear Regulatory Commission approval is requested by February 1, 2012, with the EAL changes being implemented within 180 days after approval.
Nuclear Regulatory Commission approval is requested by February 1, 2012, with the EAL changes being implemented within 180 days after approval. The implementation time was selected to allow operator and Emergency Response Organization familiarization.
The implementation time was selected to allow operator and Emergency Response Organization familiarization.
Emergency preparedness representatives from the Maryland Department of the Environment, Maryland Department of Natural Resources, and the affected counties have reviewed and are in agreement with the proposed EAL changes.
Emergency preparedness representatives from the Maryland Department of the Environment, Maryland Department of Natural Resources, and the affected counties have reviewed and are in agreement with the proposed EAL changes.Attachment (1) provides the EAL Technical Bases (strike out version) and Attachment (2) provides the clean version. The Technical Bases document provides an explanation and rationale for each EAL.Attachment (3) provides the EAL Comparison Matrix, which provides a line-by-line comparison of the EALs contained in NEI 99-01, Revision 5 to the proposed Calvert Cliffs EALs. Offsite agency approvals are contained in Attachment (4). Also attached is a compact disk containing the EAL supporting documentation (Attachment 5).y/j 41 1 fMio-t ,-.
Attachment (1) provides the EAL Technical Bases (strike out version) and Attachment (2) provides the clean version. The Technical Bases document provides an explanation and rationale for each EAL.
Document Control Desk February 1, 2011 Page 2 Should you have questions regarding this matter, please contact me at (410) 495-5216 or Mr. Douglas E. Lauver at (410) 495-5219.Very truly yours, for Michael J. Fick Director-Emergency Preparedness MJF/PSF/bjd Attachments:
Attachment (3) provides the EAL Comparison Matrix, which provides a line-by-line comparison of the EALs contained in NEI 99-01, Revision 5 to the proposed Calvert Cliffs EALs. Offsite agency approvals are contained in Attachment (4). Also attached is a compact disk containing the EAL supporting documentation (Attachment 5).
(1)(2)(3)(4)(5)EAL Technical Bases (strike out version)EAL Technical Bases EAL Comparison Matrix Offsite Agency Approvals EAL Supporting Documentation (CD)cc: D. V. Pickett, NRC W. M. Dean, NRC Resident Inspector, NRC S. Gray, DNR}}
y/j41 1fMio Afi* -t ,-.
 
Document Control Desk February 1, 2011 Page 2 Should you have questions regarding this matter, please contact me at (410) 495-5216 or Mr. Douglas E. Lauver at (410) 495-5219.
Very truly yours, for Michael J. Fick Director-Emergency Preparedness MJF/PSF/bjd Attachments:   (1)   EAL Technical Bases (strike out version)
(2)    EAL Technical Bases (3)    EAL Comparison Matrix (4)    Offsite Agency Approvals (5)    EAL Supporting Documentation (CD) cc:     D. V. Pickett, NRC                                Resident Inspector, NRC W. M. Dean, NRC                                   S. Gray, DNR}}

Latest revision as of 03:10, 13 November 2019

Independent Spent Fuel Storage Installation, Emergency Action Level Changes
ML110700256
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/01/2011
From: Fick M
Constellation Energy Nuclear Group, Calvert Cliffs, EDF Development
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML110700256 (2)


Text

Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 CENG a joint venture of Coflstelhatofl 4j19Ie Enemrgy0 CALVERT CLIFFS NUCLEAR POWER PLANT February 1, 2011 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant; Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Independent Spent Fuel Storage Installation; Docket No. 72-8 Emergency Action Level Changes

REFERENCE:

(a) Nuclear Energy Institute (NEI) 99-01, Revision 5, "Methodology for Development of Emergency Action Levels," dated February 2008 (ADAMS Accession No. ML080450149)

Calvert Cliffs Nuclear Power Plant requests Nuclear Regulatory Commission (NRC) approval for the adoption of revised Emergency Action Levels (EALs) for use at the Calvert Cliffs Nuclear Power Plant in accordance with 10 CFR Part 50, Appendix E, Section IV(B)(1). The revised EALs are based on Reference (a). Current Calvert Cliffs EALs are based on NEI 99-01, Revision 4.

Nuclear Regulatory Commission approval is requested by February 1, 2012, with the EAL changes being implemented within 180 days after approval. The implementation time was selected to allow operator and Emergency Response Organization familiarization.

Emergency preparedness representatives from the Maryland Department of the Environment, Maryland Department of Natural Resources, and the affected counties have reviewed and are in agreement with the proposed EAL changes.

Attachment (1) provides the EAL Technical Bases (strike out version) and Attachment (2) provides the clean version. The Technical Bases document provides an explanation and rationale for each EAL.

Attachment (3) provides the EAL Comparison Matrix, which provides a line-by-line comparison of the EALs contained in NEI 99-01, Revision 5 to the proposed Calvert Cliffs EALs. Offsite agency approvals are contained in Attachment (4). Also attached is a compact disk containing the EAL supporting documentation (Attachment 5).

y/j41 1fMio Afi* -t ,-.

Document Control Desk February 1, 2011 Page 2 Should you have questions regarding this matter, please contact me at (410) 495-5216 or Mr. Douglas E. Lauver at (410) 495-5219.

Very truly yours, for Michael J. Fick Director-Emergency Preparedness MJF/PSF/bjd Attachments: (1) EAL Technical Bases (strike out version)

(2) EAL Technical Bases (3) EAL Comparison Matrix (4) Offsite Agency Approvals (5) EAL Supporting Documentation (CD) cc: D. V. Pickett, NRC Resident Inspector, NRC W. M. Dean, NRC S. Gray, DNR