{{#Wiki_filter:Pacific Gas and Electric Company October 3, 2 01 3 PG&E Letter DCL-13-095 B arry S. A ll en Site Vice Presiden t Diablo C a nyon P ow e r P lan t Mail Code 104/6 P. O. Box 56 Avila Beach , CA 93424 805.545.4 888 I n terna l: 6 91.4888 Fax: 805.545.6445 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 10 CFR 50.73 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Correction of Omissions in PG&E Letters DCL-13-018 and DCL-13-035 Dear Commissioners and Staff; Pacific Gas and Electric Company (PG&E) submitted DCL-13-018 for Licensee Event Report (LER) 1-2013-001-00 on March 4, 2013. PG&E submitted DCL-13-035 for supplemental LER 1-2013-001-01 on April 4, 2013. Both letters correctly referenced Diablo Canyon Unit 1, and its associated docket number, but failed to reference Unit 2 and its docket number. Both LERs 1-2013-001-00 and 1-2013-001-01 correctly referenced both Units 1 and 2, and the associated docket numbers. PG&E is submitting this letter to correct the omission of Diablo Canyon Unit 2 and its docket number on the letters mentioned above. PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. Sincerely, dho6/50584737 cc: Thomas R. Hipschman, NRC Senior Resident Inspector Jennivine K. Rankin, NRR Project Manager Steven A. Reynolds, Acting NRC Region IV INPO Diablo Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway. Comanche Peak. Diablo Canyon. Palo Verde. San Onofre. South Texas Project. Wolf Creek}}
{{#Wiki_filter:Pacific Gas and Electric Company Barry S. Allen          Diablo Canyon Power Plan t Site Vice President      Mail Code 104/ 6 P. O. Box 56 Avila Beach , CA 93424 805. 545 .4888 October 3, 201 3                                                                                  Interna l: 691. 4888 Fax : 805.545.6445 PG&E Letter DCL-13-095 U.S. Nuclear Regulatory Commission                                                         10 CFR 50.73 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Correction of Omissions in PG&E Letters DCL-13-018 and DCL-13-035 Dear Commissioners and Staff; Pacific Gas and Electric Company (PG&E) submitted DCL-13-018 for Licensee Event Report (LER) 1-2013-001-00 on March 4, 2013. PG&E submitted DCL-13-035 for supplemental LER 1-2013-001-01 on April 4, 2013. Both letters correctly referenced Diablo Canyon Unit 1, and its associated docket number, but failed to reference Unit 2 and its docket number. Both LERs 1-2013-001-00 and 1-2013-001-01 correctly referenced both Units 1 and 2, and the associated docket numbers.
PG&E is submitting this letter to correct the omission of Diablo Canyon Unit 2 and its docket number on the letters mentioned above.
PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.
Sincerely, dho6/50584737 cc:           Thomas R. Hipschman, NRC Senior Resident Inspector Jennivine K. Rankin, NRR Project Manager Steven A. Reynolds, Acting NRC Region IV INPO Diablo Distribution A member of the   STARS (Strategic Teaming and   Resource   Sharing)   Alliance Callaway . Comanche Peak . Diablo Canyon . Palo Verde . San Onofre. South Texas Project . Wolf Creek}}

Latest revision as of 13:52, 4 November 2019

Correction of Omissions in PG&E Letters DCL-13-018 and DCL-13-035
ML13277A111
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/03/2013
From: Allen B
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-13-095
Download: ML13277A111 (1)


Text

Pacific Gas and Electric Company Barry S. Allen Diablo Canyon Power Plan t Site Vice President Mail Code 104/ 6 P. O. Box 56 Avila Beach , CA 93424 805. 545 .4888 October 3, 201 3 Interna l: 691. 4888 Fax : 805.545.6445 PG&E Letter DCL-13-095 U.S. Nuclear Regulatory Commission 10 CFR 50.73 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Correction of Omissions in PG&E Letters DCL-13-018 and DCL-13-035 Dear Commissioners and Staff; Pacific Gas and Electric Company (PG&E) submitted DCL-13-018 for Licensee Event Report (LER) 1-2013-001-00 on March 4, 2013. PG&E submitted DCL-13-035 for supplemental LER 1-2013-001-01 on April 4, 2013. Both letters correctly referenced Diablo Canyon Unit 1, and its associated docket number, but failed to reference Unit 2 and its docket number. Both LERs 1-2013-001-00 and 1-2013-001-01 correctly referenced both Units 1 and 2, and the associated docket numbers.

PG&E is submitting this letter to correct the omission of Diablo Canyon Unit 2 and its docket number on the letters mentioned above.

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

Sincerely, dho6/50584737 cc: Thomas R. Hipschman, NRC Senior Resident Inspector Jennivine K. Rankin, NRR Project Manager Steven A. Reynolds, Acting NRC Region IV INPO Diablo Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway . Comanche Peak . Diablo Canyon . Palo Verde . San Onofre. South Texas Project . Wolf Creek