Letter Sequence Request |
|---|
|
Results
Other: DCL-13-007, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), DCL-13-011, Overall Integrated Plan in Response to March 12. 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), DCL-13-080, Pacific Gas and Electric Companys First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), DCL-13-081, First Six-Month Status Report in Response to March 12, 2012. Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event, DCL-15-026, Fourth Six-Month Status Report in Response to March 12, 2012, Commsission Order Modifying Licesnes with Regard to Requirements for Mititgstion Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), DCL-15-028, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), DCL-15-098, Pacific Gas and Electric Companys Fifth Six-Month Status Report in Response to March 12. 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), DCL-15-099, Fifth Six-Month Status Report in Response to March 12. 2012. Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), DCL-16-003, Notification of Full Compliance with Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, ML13364A192, ML14023A602, ML15189A338, ML15289A370
|
MONTHYEARDCL-13-007, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2013-02-27027 February 2013 Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other DCL-13-011, Overall Integrated Plan in Response to March 12. 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2013-02-27027 February 2013 Overall Integrated Plan in Response to March 12. 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML13178A3642013-07-0303 July 2013 Request for Additional Information, Overall Integrated Plan in Response to 3/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) Project stage: RAI DCL-13-073, Response to Request for Additional Information Regarding Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)2013-07-18018 July 2013 Response to Request for Additional Information Regarding Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) Project stage: Response to RAI DCL-13-081, First Six-Month Status Report in Response to March 12, 2012. Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event2013-08-22022 August 2013 First Six-Month Status Report in Response to March 12, 2012. Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event Project stage: Other 05000275/LER-2013-003, Regarding Actuation of Six Emergency Diesel Generators Due to Loss of Offsite Power2013-08-22022 August 2013 Regarding Actuation of Six Emergency Diesel Generators Due to Loss of Offsite Power Project stage: Request DCL-13-080, Pacific Gas and Electric Companys First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2013-08-22022 August 2013 Pacific Gas and Electric Companys First Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other DCL-13-094, And Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions Model 8-120B Shipping Cask2013-09-30030 September 2013 And Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions Model 8-120B Shipping Cask Project stage: Request DCL-13-095, Correction of Omissions in PG&E Letters DCL-13-018 and DCL-13-0352013-10-0303 October 2013 Correction of Omissions in PG&E Letters DCL-13-018 and DCL-13-035 Project stage: Request ML13311B3622013-11-25025 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation) Project stage: RAI ML14023A6022014-01-31031 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Diablo Canyon Power Plant, Units 1 and 2, TAC Nos.: MF0958 and MF0959 Project stage: Other ML13364A1922014-02-0303 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) Project stage: Other DCL-15-026, Fourth Six-Month Status Report in Response to March 12, 2012, Commsission Order Modifying Licesnes with Regard to Requirements for Mititgstion Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-02-23023 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012, Commsission Order Modifying Licesnes with Regard to Requirements for Mititgstion Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other DCL-15-028, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-02-23023 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ML15189A3382015-07-20020 July 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other DCL-15-098, Pacific Gas and Electric Companys Fifth Six-Month Status Report in Response to March 12. 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-26026 August 2015 Pacific Gas and Electric Companys Fifth Six-Month Status Report in Response to March 12. 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other DCL-15-099, Fifth Six-Month Status Report in Response to March 12. 2012. Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-26026 August 2015 Fifth Six-Month Status Report in Response to March 12. 2012. Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other ML15289A3702015-10-30030 October 2015 Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other DCL-16-003, Notification of Full Compliance with Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2016-01-0505 January 2016 Notification of Full Compliance with Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other 2013-09-30
[Table View] |
Text
Pacific Gas and Electric Company October 3, 201 3 PG&E Letter DCL-13-095 Barry S. Allen Site Vice President Diablo Canyon Power Plant Mail Code 104/ 6 P. O. Box 56 Avila Beach, CA 93424 805. 545.4888 Internal: 691. 4888 Fax: 805.545.6445 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 10 CFR 50.73 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Correction of Omissions in PG&E Letters DCL-13-018 and DCL-13-035 Dear Commissioners and Staff; Pacific Gas and Electric Company (PG&E) submitted DCL-13-018 for Licensee Event Report (LER) 1-2013-001-00 on March 4, 2013. PG&E submitted DCL-13-035 for supplemental LER 1-2013-001-01 on April 4, 2013. Both letters correctly referenced Diablo Canyon Unit 1, and its associated docket number, but failed to reference Unit 2 and its docket number. Both LERs 1-2013-001-00 and 1-2013-001-01 correctly referenced both Units 1 and 2, and the associated docket numbers.
PG&E is submitting this letter to correct the omission of Diablo Canyon Unit 2 and its docket number on the letters mentioned above.
PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.
Sincerely, dho6/50584737 cc:
Thomas R. Hipschman, NRC Senior Resident Inspector Jennivine K. Rankin, NRR Project Manager Steven A. Reynolds, Acting NRC Region IV INPO Diablo Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway. Comanche Peak. Diablo Canyon. Palo Verde. San Onofre. South Texas Project. Wolf Creek