| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 November 7, 2013 Mr. Daniel Laing Manager, Training & Development Entergy Nuclear Northeast J. A. Fitzpatrick Nuclear Power Plant 268 Lake Road Lycoming, NY 13093 |
| | |
| November 7, 2013 | |
| | |
| Mr. Daniel Laing Manager, Training & Development Entergy Nuclear Northeast J. A. Fitzpatrick Nuclear Power Plant 268 Lake Road Lycoming, NY 13093 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SEPTEMBER 4, 2013, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR J. A. FITZPATRICK NUCLEAR POWER PLANT (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD (FROM PUBLIC) | | SEPTEMBER 4, 2013, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR J. A. FITZPATRICK NUCLEAR POWER PLANT (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD (FROM PUBLIC) |
|
| |
|
| ==Dear Mr. Laing:== | | ==Dear Mr. Laing:== |
|
| |
|
| On September 4, 2013, the NRC administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Sixteen applicants passed the exam and two failed. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual examination answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. | | On September 4, 2013, the NRC administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Sixteen applicants passed the exam and two failed. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual examination answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. |
| | | A copy of the BWR GFE and the answer key are available for your review on the NRCs website approximately 60 days following the examination administration date at: |
| A copy of the BWR GFE and the answer key are available for your review on the NRC's website approximately 60 days following the examination administration date at: | | http://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations.html. |
| http://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations.html. If you have any questions concerning the examination, please contact me at 610-337-5306. | | If you have any questions concerning the examination, please contact me at 610-337-5306. |
| Sincerely, | | Sincerely, |
| /RA/ Donald E. Jackson, Chief
| | /RA/ |
| | | Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-333 |
| Operations Branch | |
| | |
| Division of Reactor Safety Docket No. 50-333 | |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| (Non-Public): | | (Non-Public): |
| September 2013, NRC Generic Fundamentals Examination Roster Report on Total and Grade for J. A. Fitzpatrick Nuclear Power Plant Individual NRC Examination Answer Sheets | | September 2013, NRC Generic Fundamentals Examination Roster Report on Total and Grade for J. A. Fitzpatrick Nuclear Power Plant Individual NRC Examination Answer Sheets cc: w/o enclosures via ListServ |
|
| |
|
| cc: w/o enclosures via ListServ November 7, 2013
| | November 7, 2013 Mr. Daniel Laing Manager, Training & Development Entergy Nuclear Northeast J. A. Fitzpatrick Nuclear Power Plant 268 Lake Road Lycoming, NY 13093 |
| | |
| Mr. Daniel Laing Manager, Training & Development Entergy Nuclear Northeast J. A. Fitzpatrick Nuclear Power Plant | |
| | |
| 268 Lake Road Lycoming, NY 13093 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SEPTEMBER 4, 2013, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR J. A. FITZPATRICK NUCLEAR POWER PLANT (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD FROM PUBLIC) | | SEPTEMBER 4, 2013, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR J. A. FITZPATRICK NUCLEAR POWER PLANT (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD FROM PUBLIC) |
|
| |
|
| ==Dear Mr. Laing:== | | ==Dear Mr. Laing:== |
|
| |
|
| On September 4, 2013, the NRC administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Sixteen applicants passed the exam and two failed. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual examination answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. | | On September 4, 2013, the NRC administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Sixteen applicants passed the exam and two failed. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual examination answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. |
| | | A copy of the BWR GFE and the answer key are available for your review on the NRCs website approximately 60 days following the examination administration date at: |
| A copy of the BWR GFE and the answer key are available for your review on the NRC's website approximately 60 days following the examination administration date at: | | http://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations.html. |
| http://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations.html. If you have any questions concerning the examination, please contact me at 610-337-5306. | | If you have any questions concerning the examination, please contact me at 610-337-5306. |
| | | Sincerely, |
| Sincerely, | | /RA/ |
| | | Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-333 |
| /RA/ Donald E. Jackson, Chief Operations Branch | |
| | |
| Division of Reactor Safety Docket No. 50-333 | |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| (Non-Public): September 2013, NRC Generic Fundamentals Examination Roster Report on Total and Grade for J. A. Fitzpatrick Nuclear Power Plant Individual NRC Examination Answer Sheets cc w/o enclosures via ListServ | | (Non-Public): |
| | | September 2013, NRC Generic Fundamentals Examination Roster Report on Total and Grade for J. A. Fitzpatrick Nuclear Power Plant Individual NRC Examination Answer Sheets cc w/o enclosures via ListServ DOCUMENT NAME: G:\DRS\Operations Branch\GFE\2013\FP09-04-GFE ResultsLtr.docx ADAMS PACKAGE NO.: ML13108A011 ADAMS NO.: ML13312A206 Non-Sensitive Publicly Available SUNSI Review Sensitive OFFICE RI/DRS/OB RI/DRS/OB NAME CBixler/CB DEJackson/DJ DATE 11/07/13 11/07/13 OFFICIAL RECORD COPY}} |
| DOCUMENT NAME: G:\DRS\Operations Branch\GFE\2013\FP09-04-GFE ResultsLtr.docx ADAMS PACKAGE NO.: ML13108A011 ADAMS NO.: ML13312A206 SUNSI Review Non-Sensitive Sensitive Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME CBixler/CB DEJackson/DJ DATE 11/07/13 11/07/13 OFFICIAL RECORD COPY}} | |
|
---|
Category:Letter
MONTHYEARIR 05000333/20230042024-02-0707 February 2024 Integrated Inspection Report 05000333/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200012/2023001 ML24037A0102024-02-0606 February 2024 Requalification Program Inspection ML24018A0012024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000333/2024010) and Request for Information ML24004A2302024-01-0808 January 2024 Project Manager Reassignment ML23356A0832024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0058 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines JAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications IR 05000333/20234012023-12-0808 December 2023 Cybersecurity Inspection Report 05000333/2023401 (Cover Letter Only) RS-23-126, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) JAFP-23-0069, Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements JAFP-23-0057, and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use IR 05000333/20230032023-11-13013 November 2023 Integrated Inspection Report 05000333/2023003 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000333/20230102023-10-26026 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000333/2023010 JAFP-23-0059, Registration of Spent Fuel Cask Use2023-10-24024 October 2023 Registration of Spent Fuel Cask Use IR 05000333/20233012023-10-19019 October 2023 Initial Operator Licensing Examination Report 05000333/2023301 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans JAFP-23-0050, Physical Security Plan, Revision 242023-08-31031 August 2023 Physical Security Plan, Revision 24 JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis IR 05000333/20230052023-08-31031 August 2023 Updated Inspection Plan for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2023005) JAFP-23-0047, Correction to the 2022 Annual Radioactive Effluent Release Report2023-08-30030 August 2023 Correction to the 2022 Annual Radioactive Effluent Release Report ML23228A1342023-08-16016 August 2023 Licensed Operator Positive Fitness-For-Duty Test IR 05000333/20230022023-08-0707 August 2023 Integrated Inspection Report 05000333/2023002 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0043, 10 CFR 50.46 Annual Report2023-07-31031 July 2023 10 CFR 50.46 Annual Report JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance ML23208A1622023-07-27027 July 2023 Operator Licensing Examination Approval IR 05000333/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000333/2023402 IR 05000333/20230112023-07-25025 July 2023 Post-Approval Site Inspection for License Renewal - Phase 4 Inspection Report 05000333/2023011 IR 05000333/20235012023-07-20020 July 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000333/2023501 JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation IR 05000333/20234202023-06-26026 June 2023 Security Baseline Inspection Report 05000333 2023420 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23164A0322023-06-13013 June 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000333/2023010 ML23152A0042023-06-0101 June 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000333/2023401 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling JAFP-23-0025, 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Annual Radiological Environmental Operating Report IR 05000333/20230012023-05-0303 May 2023 Integrated Inspection Report 05000333/2023001 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI JAFP-23-0023, 2022 Annual Radioactive Effluent Release Report2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report IR 05000333/20230122023-04-13013 April 2023 Quadrennial Fire Protection Inspection Report 05000333/2023012 ML23095A3722023-04-0505 April 2023 2023 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations IR 05000333/20220042023-03-20020 March 2023 Integrated Inspection Report 05000333/2022004 JAFP-23-0010, 2022 REIRS Transmittal of NRC Form 52023-03-20020 March 2023 2022 REIRS Transmittal of NRC Form 5 ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 2024-02-07
[Table view] Category:License-Operator
MONTHYEARML23228A1342023-08-16016 August 2023 Licensed Operator Positive Fitness-For-Duty Test RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML24008A0302022-11-0909 November 2022 Examination Administrative Files ML22252A0102022-09-0909 September 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22252A0052022-09-0909 September 2022 Final Qa/Related Forms (Folder 1) ML23004A1022022-08-30030 August 2022 Draft Written Examination and Operating Test Outlines (Folder 2) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22073A1112022-03-14014 March 2022 Requalification Program Inspection IR 05000333/20213012021-10-0505 October 2021 Initial Operator Licensing Examination Report 05000333/2021301 ML22355A6492021-08-30030 August 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22355A6502021-08-30030 August 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML23004A0932021-08-30030 August 2021 Final Qa/Related Forms (Folder 1) ML22355A6482021-08-30030 August 2021 Final Written Exam and Operating Test Outlines (Folder 3) ML21019A4472021-01-20020 January 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A2042020-04-15015 April 2020 March 4, 2020, Nrc Generic Fundamentals Examination Results for James A. Fitzpatrick Nuclear Power Plant (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20087G8522020-03-27027 March 2020 Ja Fitzpatrick - Final Operating Test (Sections a, B, and C) (Folder 3) ML20087H5142020-03-27027 March 2020 Ja Fitzpatrick Final Written Exam Questions and Answer Key ML20078K2112020-03-19019 March 2020 Requalification Program Inspection - James A. Fitzpatrick Nuclear Power Plant ML21056A3072020-03-12012 March 2020 Handouts to Applicants (Folder 3) ML21056A2852020-02-15015 February 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21056A2842020-02-15015 February 2020 Final Qa/Related Forms (Folder 1) ML20043C8092020-02-11011 February 2020 Operator Licensing Examination Approval ML21056A3062020-02-10010 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20260H1532020-01-24024 January 2020 Draft Written Examination (Folder 2) ML20260H1542020-01-24024 January 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML20260H1522019-10-14014 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML20260H1502019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20260H1512019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML19211C3782019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19008A1022019-01-0707 January 2019 Operator Licensing Examination Approval ML18163A2922018-06-12012 June 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18134A2302018-05-14014 May 2018 Operator Licensing Examination Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18086B7042018-03-27027 March 2018 Dec. 2016 GFE Post-Exam Comment and Response ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18029A5822018-01-29029 January 2018 Requalification Program Inspection ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17313A2752017-11-0808 November 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17034A1132017-02-0202 February 2017 December 7, 2016, NRC Generic Fundamentals Examination Results for J. A. Fitzpatrick Nuclear Power Plant (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 JAFP-16-0118, NRC Form 536, Operator Licensing Examination Data for Calendar Years 2018 to 20212016-07-18018 July 2016 NRC Form 536, Operator Licensing Examination Data for Calendar Years 2018 to 2021 ML16145A3832016-04-0606 April 2016 Final Qa/Related Forms (Folder 1) ML16145A3692016-03-24024 March 2016 Miscellaneous Exam Material (Folder 1) ML16085A2472016-03-0303 March 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16081A1592016-03-0303 March 2016 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML16085A2462016-03-0101 March 2016 Final Outlines (Folder 3) 2023-08-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML24008A0302022-11-0909 November 2022 Examination Administrative Files ML22252A0052022-09-0909 September 2022 Final Qa/Related Forms (Folder 1) ML22252A0102022-09-0909 September 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML23004A1022022-08-30030 August 2022 Draft Written Examination and Operating Test Outlines (Folder 2) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000333/20213012021-10-0505 October 2021 Initial Operator Licensing Examination Report 05000333/2021301 ML22355A6492021-08-30030 August 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22355A6502021-08-30030 August 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML22355A6482021-08-30030 August 2021 Final Written Exam and Operating Test Outlines (Folder 3) ML23004A0932021-08-30030 August 2021 Final Qa/Related Forms (Folder 1) ML21019A4472021-01-20020 January 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A2042020-04-15015 April 2020 March 4, 2020, Nrc Generic Fundamentals Examination Results for James A. Fitzpatrick Nuclear Power Plant (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20087G8522020-03-27027 March 2020 Ja Fitzpatrick - Final Operating Test (Sections a, B, and C) (Folder 3) ML20087H5142020-03-27027 March 2020 Ja Fitzpatrick Final Written Exam Questions and Answer Key ML20078K2112020-03-19019 March 2020 Requalification Program Inspection - James A. Fitzpatrick Nuclear Power Plant ML21056A3072020-03-12012 March 2020 Handouts to Applicants (Folder 3) ML21056A2842020-02-15015 February 2020 Final Qa/Related Forms (Folder 1) ML21056A2852020-02-15015 February 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20043C8092020-02-11011 February 2020 Operator Licensing Examination Approval ML21056A3062020-02-10010 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20260H1542020-01-24024 January 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20260H1532020-01-24024 January 2020 Draft Written Examination (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML20260H1512019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20260H1522019-10-14014 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML20260H1502019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML19211C3782019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19008A1022019-01-0707 January 2019 Operator Licensing Examination Approval ML18163A2922018-06-12012 June 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18134A2302018-05-14014 May 2018 Operator Licensing Examination Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18086B7042018-03-27027 March 2018 Dec. 2016 GFE Post-Exam Comment and Response ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17313A2752017-11-0808 November 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17034A1132017-02-0202 February 2017 December 7, 2016, NRC Generic Fundamentals Examination Results for J. A. Fitzpatrick Nuclear Power Plant (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 JAFP-16-0118, NRC Form 536, Operator Licensing Examination Data for Calendar Years 2018 to 20212016-07-18018 July 2016 NRC Form 536, Operator Licensing Examination Data for Calendar Years 2018 to 2021 ML16145A3832016-04-0606 April 2016 Final Qa/Related Forms (Folder 1) ML16145A3692016-03-24024 March 2016 Miscellaneous Exam Material (Folder 1) ML16081A1592016-03-0303 March 2016 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML16085A2472016-03-0303 March 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16085A2462016-03-0101 March 2016 Final Outlines (Folder 3) ML16085A2482016-03-0101 March 2016 Handouts to Applicants - Summary of References(Folder 3) ML16081A0772016-02-29029 February 2016 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML16085A2492016-02-25025 February 2016 Final Operating Exam (Sections a, B, and C) (Folder 3) ML16055A0012016-02-23023 February 2016 Initial Operator Licensing Operating Test Approval - James A. Fitzpatrick Nuclear Power Plant 2023-06-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 November 7, 2013 Mr. Daniel Laing Manager, Training & Development Entergy Nuclear Northeast J. A. Fitzpatrick Nuclear Power Plant 268 Lake Road Lycoming, NY 13093
SUBJECT:
SEPTEMBER 4, 2013, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR J. A. FITZPATRICK NUCLEAR POWER PLANT (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD (FROM PUBLIC)
Dear Mr. Laing:
On September 4, 2013, the NRC administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Sixteen applicants passed the exam and two failed. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual examination answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets.
A copy of the BWR GFE and the answer key are available for your review on the NRCs website approximately 60 days following the examination administration date at:
http://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations.html.
If you have any questions concerning the examination, please contact me at 610-337-5306.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-333
Enclosures:
(Non-Public):
September 2013, NRC Generic Fundamentals Examination Roster Report on Total and Grade for J. A. Fitzpatrick Nuclear Power Plant Individual NRC Examination Answer Sheets cc: w/o enclosures via ListServ
November 7, 2013 Mr. Daniel Laing Manager, Training & Development Entergy Nuclear Northeast J. A. Fitzpatrick Nuclear Power Plant 268 Lake Road Lycoming, NY 13093
SUBJECT:
SEPTEMBER 4, 2013, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR J. A. FITZPATRICK NUCLEAR POWER PLANT (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD FROM PUBLIC)
Dear Mr. Laing:
On September 4, 2013, the NRC administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Sixteen applicants passed the exam and two failed. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual examination answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets.
A copy of the BWR GFE and the answer key are available for your review on the NRCs website approximately 60 days following the examination administration date at:
http://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations.html.
If you have any questions concerning the examination, please contact me at 610-337-5306.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-333
Enclosures:
(Non-Public):
September 2013, NRC Generic Fundamentals Examination Roster Report on Total and Grade for J. A. Fitzpatrick Nuclear Power Plant Individual NRC Examination Answer Sheets cc w/o enclosures via ListServ DOCUMENT NAME: G:\DRS\Operations Branch\GFE\2013\FP09-04-GFE ResultsLtr.docx ADAMS PACKAGE NO.: ML13108A011 ADAMS NO.: ML13312A206 Non-Sensitive Publicly Available SUNSI Review Sensitive OFFICE RI/DRS/OB RI/DRS/OB NAME CBixler/CB DEJackson/DJ DATE 11/07/13 11/07/13 OFFICIAL RECORD COPY