{{#Wiki_filter:Charles R. Pierce Southern Nuclear Regulatory Affairs Director Operating Company. Inc. 4 0 I nverness Cente r Parkway P o s t Office Box 1295 B irmi ngham , Alabama 35 201 Tel 2 0 5.9 9 2.7 872 F ax 2 0 5 9927 601 December 23, 2013 SOUTHERN '\ COMPANY Docket Nos: 50-321 50-424 NL-13-2576 50-366 50-425 U. S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Units 1 and Vogtle Electric Generating Plant Units 1 and 10 CFR 50.46 ECCS Evaluation Model Annual Report for Ladies and Gentlemen:
{{#Wiki_filter:Charles R. Pierce             Southern Nuclear Regulatory Affairs Director   Operating Company. Inc.
Southern Nuclear Operating Company (SNC) is the licensed operator for the Edwin I. Hatch Nuclear Plant (Hatch) and Vogtle Electric Generating Plant (Vogtle).
40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7872 Fax 205 9927601 December 23, 2013                                                       SOUTHERN ' \
The requirements of 10 CFR 50.46(a)(3)(ii) include an annual report by licensees of changes to or errors in acceptable emergency core cooling system (ECCS) models that affect the temperature calculation and the estimated effect of changes or errors on the limiting ECCS analYSis.
COMPANY Docket Nos:           50-321 50-424                                     NL-13-2576 50-366 50-425 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Units 1 and 2 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Ladies and Gentlemen:
Accordingly, the reports required by 10 CFR 50.46(a)(3)(ii) for Hatch and Vogtle is provided in Enclosures 1 and 2, respectively.
Southern Nuclear Operating Company (SNC) is the licensed operator for the Edwin I. Hatch Nuclear Plant (Hatch) and Vogtle Electric Generating Plant (Vogtle). The requirements of 10 CFR 50.46(a)(3)(ii) include an annual report by licensees of changes to or errors in acceptable emergency core cooling system (ECCS) models that affect the temperature calculation and the estimated effect of changes or errors on the limiting ECCS analYSis. Accordingly, the reports required by 10 CFR 50.46(a)(3)(ii) for Hatch and Vogtle is provided in Enclosures 1 and 2, respectively. The resulting peak cladding temperature (PCT) for Hatch and Vogtle continue to meet the criterion of 10 CFR 50.46(b)(1) (i.e., S 2200°F).
The resulting peak cladding temperature (PCT) for Hatch and Vogtle continue to meet the criterion of 10 CFR 50.46(b)(1) (i.e., S 2200°F). This letter contains no NRC commitments.
This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.
If you have any questions, please contact Ken McElroy at (205) 992-7369.
Respectfully submitted, C. R. Pierce Regulatory Affairs Director CRP/RM..I/lac
Respectfully submitted, C. R. Pierce Regulatory Affairs Director CRP/RM..I/lac  


==Enclosures:==
==Enclosures:==
Edwin I. Hatch Nuclear Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 U. S. Nuclear Regulatory Commission NL-13-2576 Page 2 Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President  
: 1. Edwin I. Hatch Nuclear Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012
&CEO Mr. D. G. Bost, Executive Vice President  
: 2. Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012
&Chief Nuclear Officer Mr. D. R. Vineyard, Vice President  
 
-Hatch Mr. T. E. Tynan, Vice President  
U. S. Nuclear Regulatory Commission NL-13-2576 Page 2 cc:  Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Mr. D. R. Vineyard, Vice President - Hatch Mr. T. E. Tynan, Vice President - Vogtle Mr. D. R. Madison, Vice President - Fleet Operations Mr. B. L. Ivey, Vice President - Regulatory Affairs RType: CHA02.004; CVC7000 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. E. D. Morris, Senior Resident Inspector - Hatch Mr. L. M. Cain, Senior Resident Inspector - Vogtle Mr. R.E. Martin, NRR Project Manager - Hatch, Vogtle
-Vogtle Mr. D. R. Madison, Vice President  
 
-Fleet Operations Mr. B. L. Ivey, Vice President  
Edwin I. Hatch Nuclear Plant Units 1 and 2 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Enclosure 1 Edwin I. Hatch Nuclear Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 to NL-13-2576 Edwin I. Hatch Nuclear Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Edwin I. Hatch Nuclear Plant Unit 1 SAFERIGESTR-LOCA Analysis Model Table 1-1 a - Summary of Changes/Errors (2012)
-Regulatory Affairs RType: CHA02.004; CVC7000 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. E. D. Morris, Senior Resident Inspector  
Estimated Descri ption                           Effect (f1 PCT)
-Hatch Mr. L. M. Cain, Senior Resident Inspector  
PRIME code implementation for fuel rod T/M performance, 10 replacing GESTR Table 1-1 b - Cumulative Impact of Changes/Errors GE14 Description f1IPCTI (OF)
-Vogtle Mr. R.E. Martin, NRR Project Manager -Hatch, Vogtle Edwin I. Hatch Nuclear Plant Units 1 and Vogtle Electric Generating Plant Units 1 and 10 CFR 50.46 ECCS Evaluation Model Annual Report for Enclosure Edwin I. Hatch Nuclear Plant Units 1 and 10 CFR 50.46 ECCS Evaluation Model Annual Report for Enclosure 1 to NL-13-2576 Edwin I. Hatch Nuclear Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Edwin I. Hatch Nuclear Plant Unit 1 SAFERIGESTR-LOCA Analysis Model Table 1-1a -Summary of Changes/Errors (2012) Descri ption PRIME code implementation for fuel rod T/M performance, replacing GESTR Table 1-1 b -Cumulative Impact of Changes/Errors Description
* Changes/Errors Previously Reported (Reference 1)                 0
* Changes/Errors Previously Reported (Reference
* Current Year - 2012 (Reference 2)                               10 10 Cumulative Total E1-1 to NL-13-2576 Edwin I. Hatch Nuclear Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Edwin I. Hatch Nuclear Plant Unit 2 SAFERIGESTR-LOCA Analysis Model Table 1-2a - Summary of Changes/Errors (2012)
: 1)
Estimated Description                           Effect (Ll PCT)
* Current Year -2012 (Reference
PRIME code implementation for fuel rod T/M performance, 10 replacing GESTR Table 1-2b - Cumulative Impact of Changes/Errors GE14 Description LlIPCTI (OF)
: 2) Cumulative Total (f1 10 GE14 10 Enclosure 1 to NL-13-2576 Edwin I. Hatch Nuclear Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Edwin I. Hatch Nuclear Plant Unit 2 SAFERIGESTR-LOCA Analysis Model Table 1-2a -Summary of Changes/Errors (2012) Description PRIME code implementation for fuel rod T/M performance, replacing GESTR Table 1-2b -Cumulative Impact of Changes/Errors Description
* Changes/Errors Previously Reported (Reference 1)                 0
* Changes/Errors Previously Reported (Reference
* Current Year - 2012 (Reference 3)                               10 10 Cumulative Total E1-2 to NL-13-2576 Edwin I. Hatch Nuclear Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012
: 1)
* Current Year -2012 (Reference
: 3) Cumulative Total (Ll 10 (OF) 0 10 10 Enclosure 1 to NL-13-2576 Edwin I. Hatch Nuclear Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012  


==References:==
==References:==
Letter from Mark J. Ajluni to USNRC (NL-12-2567), "Edwin I. Hatch Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2011," dated December 18, 2012. GNF Supplemental Reload Licensing Report 00N0481-SRLR Revision 0 Class I December 2013, "Supplemental Reload Licensing Report for Edwin I. Hatch Nuclear Power Plant Unit 1 Reload 26 Cycle 27'. GNF Supplemental Reload licensing Report 0000-0145-7166-SRLR Revision o Class I December 2012, "Supplemental Reload Licensing Report for Edwin I. Hatch Nuclear Power Plant Unit 2 Reload 22 Cycle 23".
: 1. Letter from Mark J. Ajluni to USNRC (NL-12-2567), "Edwin I. Hatch Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2011," dated December 18, 2012.
Edwin I. Hatch Nuclear Plant Units 1 and Vogtle Electric Generating Plant Units 1 and 10 CFR 50.46 ECCS Evaluation Model Annual Report for Enclosure Vogtle Electric Generating Plant Units 1 and 10 CFR 50.46 ECCS Evaluation Model Annual Report for Enclosure 2 to NL-13-2576 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Vogtle Electric Generating Plant -Unit 1 BASH Large Break LOCA Evaluation Table 1-1 a -Summary of Changes/Errors (2012) Estimated Description Effect PCn None affecting PCT* N/A Table 1-1b -Cumulative Impact of Changes/Errors Descri ption (OF)
: 2. GNF Supplemental Reload Licensing Report 00N0481-SRLR Revision 0 Class I December 2013, "Supplemental Reload Licensing Report for Edwin I.
* Changes/Errors Previously Reported (Reference 1)* 0*
Hatch Nuclear Power Plant Unit 1 Reload 26 Cycle 27'.
* Summary of Changes/Errors (2012) (Reference 2)* 0* Cumulative Total 0
: 3. GNF Supplemental Reload licensing Report 0000-0145-7166-SRLR Revision o Class I December 2012, "Supplemental Reload Licensing Report for Edwin I. Hatch Nuclear Power Plant Unit 2 Reload 22 Cycle 23".
* On October 18, 2012, a Significant Change/Error Report for Vogtle was submitted (Reference 1). This " reset" the baseline PCT for reporting purposes.
E1-3
There were no additional changes/errors in 2012 from those reported in Reference
 
: 1.
Edwin I. Hatch Nuclear Plant Units 1 and 2 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Enclosure 2 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 to NL-13-2576 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Vogtle Electric Generating Plant - Unit 1 BASH Large Break LOCA Evaluation Table 1-1 a - Summary of Changes/Errors (2012)
Enclosure 2 to NL-13-2576 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Vogtle Electric Generating Plant -Unit 1 Appendix K Small Break LOCA Evaluation Table 1-1 c -Summary of Changes/Errors (2012) Description None affecting PCT Table 1-1d -Cumulative Impact of Changes/Errors Description
Estimated Description                                 Effect
* Changes/Errors Previously Reported (Reference
(~  PCn None affecting PCT*                                                       N/A Table 1-1b - Cumulative Impact of Changes/Errors
: 1)
                                                                          ~IPCTI Descri ption (OF)
* Changes/Errors 2012 Calendar Year (Reference
* Changes/Errors Previously Reported (Reference 1)*                       0*
: 2) Cumulative Total N/A (OF) 0 0 0 Enclosure 2 to NL-13-2576 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Vogtle Electric Generating Plant -Unit 2 BASH Large Break LOCA Evaluation Table 1-2a -Summary of Changes/Errors (2012) Estimated Description Effect (f1 PCT) None affecting pcr N/A Table 1-2b -Cumulative Impact of Changes/Errors f1IPCTI Description (OF)
* Summary of Changes/Errors (2012) (Reference 2)*                         0*
* Changes/Errors Previously Reported (Reference 1)* 0*
Cumulative Total           0
* Summary of Changes/Errors (2012) (Reference 2)* 0* Cumulative Total 0
* On October 18, 2012, a Significant Change/Error Report for Vogtle was submitted (Reference 1). This "reset" the baseline PCT for reporting purposes.
There were no additional changes/errors in 2012 from those reported in Reference 1.
E2-1 to NL-13-2576 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Vogtle Electric Generating Plant - Unit 1 Appendix K Small Break LOCA Evaluation Table 1-1 c - Summary of Changes/Errors (2012)
Estimated Description                           Effect
(~  PCT)
None affecting PCT                                                 N/A Table 1-1d - Cumulative Impact of Changes/Errors
                                                                  ~IPCTI Description (OF)
* Changes/Errors Previously Reported (Reference 1)                 0
* Changes/Errors 2012 Calendar Year (Reference 2)                 0 Cumulative Total     0 E2-2 to NL-13-2576 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Vogtle Electric Generating Plant - Unit 2 BASH Large Break LOCA Evaluation Table 1-2a - Summary of Changes/Errors (2012)
Estimated Description                                   Effect (f1 PCT)
None affecting pcr                                                       N/A Table 1-2b - Cumulative Impact of Changes/Errors f1IPCTI Description (OF)
* Changes/Errors Previously Reported (Reference 1)*                       0*
* Summary of Changes/Errors (2012) (Reference 2)*                         0*
Cumulative Total             0
* On October 18, 2012, a Significant Change/Error Report for Vogtle was submitted (Reference 1). This "resef' the baseline peT for reporting purposes.
* On October 18, 2012, a Significant Change/Error Report for Vogtle was submitted (Reference 1). This "resef' the baseline peT for reporting purposes.
There were no additional changes/errors in 2012 from those reported in Reference
There were no additional changes/errors in 2012 from those reported in Reference 1.
: 1.
E2-3
. Enclosure 2 to NL-13-2576 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Vogtle Electric Generating Plant -Unit 2 Appendix K Small Break LOCA Evaluation Table 1-2c -Summary of Changes/Errors (2012) Description None affecting PCT Table 1-2d -Cumulative Impact of Changes/Errors Descri ption
 
* Changes/Errors Previously Reported (Reference
. Enclosure 2 to NL-13-2576 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Vogtle Electric Generating Plant - Unit 2 Appendix K Small Break LOCA Evaluation Table 1-2c - Summary of Changes/Errors (2012)
: 1)
Estimated Description                           Effect
* Changes/Errors 2012 Calendar Year (Reference
(~  PCT)
: 2) Cumulative Total N/A (OF) 0 0 0 Enclosure 2 to NL-13-2576 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012  
None affecting PCT                                                 N/A Table 1-2d - Cumulative Impact of Changes/Errors
                                                                    ~IPCTI Descri ption (OF)
* Changes/Errors Previously Reported (Reference 1)                 0
* Changes/Errors 2012 Calendar Year (Reference 2)                 0 Cumulative Total     0 E2-4 to NL-13-2576 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012


==References:==
==References:==
Letter from Mark J. Ajluni to USNRC (NL-12-1957), "Vogtle Electric Generating Plant 1 0 CFR 50.46 ECCS Evaluation Model Annual Report for 2011 and Significant Change/Error Report," dated October 18, 2012. Westinghouse letter LTR-LlS-13-68, "A. W. Vogtle Units 1 and 210 CFR 50.46 Annual Notification and Reporting for 2012," dated March 1, 2013.}}
: 1. Letter from Mark J. Ajluni to USNRC (NL-12-1957), "Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2011 and Significant Change/Error Report," dated October 18, 2012.
: 2. Westinghouse letter LTR-LlS-13-68, "A. W. Vogtle Units 1 and 210 CFR 50.46 Annual Notification and Reporting for 2012," dated March 1, 2013.
E2-5}}

Latest revision as of 10:55, 4 November 2019

CFR50.46 ECCS Evaluation Model Annual Report for 2012
ML13357A710
Person / Time
Site: Hatch, Vogtle  Southern Nuclear icon.png
Issue date: 12/23/2013
From: Pierce C
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-13-2576
Download: ML13357A710 (12)


Text

Charles R. Pierce Southern Nuclear Regulatory Affairs Director Operating Company. Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7872 Fax 205 9927601 December 23, 2013 SOUTHERN ' \

COMPANY Docket Nos: 50-321 50-424 NL-13-2576 50-366 50-425 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Units 1 and 2 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Ladies and Gentlemen:

Southern Nuclear Operating Company (SNC) is the licensed operator for the Edwin I. Hatch Nuclear Plant (Hatch) and Vogtle Electric Generating Plant (Vogtle). The requirements of 10 CFR 50.46(a)(3)(ii) include an annual report by licensees of changes to or errors in acceptable emergency core cooling system (ECCS) models that affect the temperature calculation and the estimated effect of changes or errors on the limiting ECCS analYSis. Accordingly, the reports required by 10 CFR 50.46(a)(3)(ii) for Hatch and Vogtle is provided in Enclosures 1 and 2, respectively. The resulting peak cladding temperature (PCT) for Hatch and Vogtle continue to meet the criterion of 10 CFR 50.46(b)(1) (i.e., S 2200°F).

This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.

Respectfully submitted, C. R. Pierce Regulatory Affairs Director CRP/RM..I/lac

Enclosures:

1. Edwin I. Hatch Nuclear Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012
2. Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012

U. S. Nuclear Regulatory Commission NL-13-2576 Page 2 cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Mr. D. R. Vineyard, Vice President - Hatch Mr. T. E. Tynan, Vice President - Vogtle Mr. D. R. Madison, Vice President - Fleet Operations Mr. B. L. Ivey, Vice President - Regulatory Affairs RType: CHA02.004; CVC7000 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. E. D. Morris, Senior Resident Inspector - Hatch Mr. L. M. Cain, Senior Resident Inspector - Vogtle Mr. R.E. Martin, NRR Project Manager - Hatch, Vogtle

Edwin I. Hatch Nuclear Plant Units 1 and 2 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Enclosure 1 Edwin I. Hatch Nuclear Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 to NL-13-2576 Edwin I. Hatch Nuclear Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Edwin I. Hatch Nuclear Plant Unit 1 SAFERIGESTR-LOCA Analysis Model Table 1-1 a - Summary of Changes/Errors (2012)

Estimated Descri ption Effect (f1 PCT)

PRIME code implementation for fuel rod T/M performance, 10 replacing GESTR Table 1-1 b - Cumulative Impact of Changes/Errors GE14 Description f1IPCTI (OF)

  • Changes/Errors Previously Reported (Reference 1) 0
  • Current Year - 2012 (Reference 2) 10 10 Cumulative Total E1-1 to NL-13-2576 Edwin I. Hatch Nuclear Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Edwin I. Hatch Nuclear Plant Unit 2 SAFERIGESTR-LOCA Analysis Model Table 1-2a - Summary of Changes/Errors (2012)

Estimated Description Effect (Ll PCT)

PRIME code implementation for fuel rod T/M performance, 10 replacing GESTR Table 1-2b - Cumulative Impact of Changes/Errors GE14 Description LlIPCTI (OF)

  • Changes/Errors Previously Reported (Reference 1) 0
  • Current Year - 2012 (Reference 3) 10 10 Cumulative Total E1-2 to NL-13-2576 Edwin I. Hatch Nuclear Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012

References:

1. Letter from Mark J. Ajluni to USNRC (NL-12-2567), "Edwin I. Hatch Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2011," dated December 18, 2012.
2. GNF Supplemental Reload Licensing Report 00N0481-SRLR Revision 0 Class I December 2013, "Supplemental Reload Licensing Report for Edwin I.

Hatch Nuclear Power Plant Unit 1 Reload 26 Cycle 27'.

3. GNF Supplemental Reload licensing Report 0000-0145-7166-SRLR Revision o Class I December 2012, "Supplemental Reload Licensing Report for Edwin I. Hatch Nuclear Power Plant Unit 2 Reload 22 Cycle 23".

E1-3

Edwin I. Hatch Nuclear Plant Units 1 and 2 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Enclosure 2 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 to NL-13-2576 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Vogtle Electric Generating Plant - Unit 1 BASH Large Break LOCA Evaluation Table 1-1 a - Summary of Changes/Errors (2012)

Estimated Description Effect

(~ PCn None affecting PCT* N/A Table 1-1b - Cumulative Impact of Changes/Errors

~IPCTI Descri ption (OF)

  • Changes/Errors Previously Reported (Reference 1)* 0*
  • Summary of Changes/Errors (2012) (Reference 2)* 0*

Cumulative Total 0

  • On October 18, 2012, a Significant Change/Error Report for Vogtle was submitted (Reference 1). This "reset" the baseline PCT for reporting purposes.

There were no additional changes/errors in 2012 from those reported in Reference 1.

E2-1 to NL-13-2576 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Vogtle Electric Generating Plant - Unit 1 Appendix K Small Break LOCA Evaluation Table 1-1 c - Summary of Changes/Errors (2012)

Estimated Description Effect

(~ PCT)

None affecting PCT N/A Table 1-1d - Cumulative Impact of Changes/Errors

~IPCTI Description (OF)

  • Changes/Errors Previously Reported (Reference 1) 0
  • Changes/Errors 2012 Calendar Year (Reference 2) 0 Cumulative Total 0 E2-2 to NL-13-2576 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Vogtle Electric Generating Plant - Unit 2 BASH Large Break LOCA Evaluation Table 1-2a - Summary of Changes/Errors (2012)

Estimated Description Effect (f1 PCT)

None affecting pcr N/A Table 1-2b - Cumulative Impact of Changes/Errors f1IPCTI Description (OF)

  • Changes/Errors Previously Reported (Reference 1)* 0*
  • Summary of Changes/Errors (2012) (Reference 2)* 0*

Cumulative Total 0

  • On October 18, 2012, a Significant Change/Error Report for Vogtle was submitted (Reference 1). This "resef' the baseline peT for reporting purposes.

There were no additional changes/errors in 2012 from those reported in Reference 1.

E2-3

. Enclosure 2 to NL-13-2576 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 Vogtle Electric Generating Plant - Unit 2 Appendix K Small Break LOCA Evaluation Table 1-2c - Summary of Changes/Errors (2012)

Estimated Description Effect

(~ PCT)

None affecting PCT N/A Table 1-2d - Cumulative Impact of Changes/Errors

~IPCTI Descri ption (OF)

  • Changes/Errors Previously Reported (Reference 1) 0
  • Changes/Errors 2012 Calendar Year (Reference 2) 0 Cumulative Total 0 E2-4 to NL-13-2576 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012

References:

1. Letter from Mark J. Ajluni to USNRC (NL-12-1957), "Vogtle Electric Generating Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2011 and Significant Change/Error Report," dated October 18, 2012.
2. Westinghouse letter LTR-LlS-13-68, "A. W. Vogtle Units 1 and 210 CFR 50.46 Annual Notification and Reporting for 2012," dated March 1, 2013.

E2-5