ML18142B276: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NRC FOAM 1 5 U.Si NUCLEAR ACGULATOAY CO IZ.7III.NRC DISTRIBUTION FOII" PART 50 DOCKET MATERIAL ION DOCKET NUMBER 50-2/4 FILE'l4UMBEA INCIDEKZ REPORT J.P;O'Reilly.I i LETTER El ORIGINAL QCOerj 0 NOTOA IZ E D ZlUNCLASSIFIEO PROP INPUT FORM FROM'ochestereCas 6 Elec.Corp.Rochester N.Y.E..D.Whit , Jr.DATE OF DOCUMENT 7-15-76 DATE AECEIVEO 7-g-76 NUMBER OF COPIES RECEIVED 1 DESCAIPTION Ltr.'rans the'following......,I ENCLOSURE Li'censee event report(ROI/76-17) on 6-18-76 concerning Monitoring and Enrichment of Accumulator Boion'Concentration;............
{{#Wiki_filter:5                                           U.Si NUCLEAR ACGULATOAYCO        ION DOCKET NUMBER NRC FOAM          1 50-2/  4 IZ.7III FILE'l4UMBEA
(1 signed cy recieved)(2 pgs.)ACKN0%1 KDGKD Be NOT RzMOVz~~gmwQtaT i'3'iII'/~~4<<t 1PJ'~"~-RE Ginna>,f/1 NOTE:" IP"'PERSONNEL ZXFOSURE IS INVOIIVEB~cn>~
                      .NRC DISTRIBUTION FOII" PART 50 DOCKET MATERIAL                                     INCIDEKZ REPORT DATE OF DOCUMENT J.P; O'Reilly                                   FROM'ochestereCas 6 Elec. Corp.
~SEND DIRECTLY TO KREGER/J.COLLINS BRANCH CHIEF:{KS..POR~ZEOM.-
7-15-76 Rochester N.Y.                         DATE AECEIVEO
IIC~ST.: Pur le FOR ACTION/INFORMATION CRG'-1-76 SEN', TO ZA: "~,;INTERNAL DISTRI BUTION---NR-PDR--SGHRQEDER IPPOLITO UBKlN.NOVAK CHECK GRIMES CASE*<<TEDESCO MACCARY EISENHUT-BAER-'HAO VOLLMER BUNCH--..KREGER J.COLLINS LPDR: 'Roc ester TIC: EXTERNAL DISTRIBUTION CONTROL NUMBER 72 r f ,1 r 4 0"'
            .I            i                                      E.. D. Whit , Jr.
9 ill@'~l"k'~>!I/,/"lj'l";'"'OCHESTER GAS AND ELECTRIC CORPORATIO
7-g-76 LETTER                    0 NOTOA IZ E D            PROP                    INPUT FORM            NUMBER OF COPIES RECEIVED El ORIGINAL            ZlUNCLASSIFIEO                                                                      1 QCOerj DESCAIPTION                                                               ENCLOSURE Ltr.'rans the'following......                                     Li'censee event report(ROI/76-17) on 6-18-76 concerning Monitoring and Enrichment of
~~'tr~w,'F AVENUE, ROCHES (ER, N.Y.14649 LEON D.WHITE.JR.VICC I'RtSIDtRT 8" e T t I.t P v 0 h t ipt;sa 5JG 2700+yA c../Mr.James P.O'Reilly, Director U.S.Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Subject.Reportable Occurrence 76-17 (30-day report),"A" Accumulator level below Technical Specification limit"R.E.Ginna Nuclear Power Plant, Unit No.1 Docket No.50-244
              ,I                                                            Accumulator Boion 'Concentration;............
(1 signed cy recieved)
(2 pgs.)
ACKN0%1 KDGKD Be NOT RzMOVz
      ~~gmwQtaT i                       '
3'iII'/~~4<<t 1PJ
                      '~"~- RE Ginna>,f/1                                 NOTE:"   IP "'PERSONNEL ZXFOSURE IS INVOIIVEB~cn>~
SEND DIRECTLY TO KREGER/J .COLLINS
                                                                                                  '
FOR ACTION/INFORMATION            CRG    76 BRANCH         CHIEF:                     Pur  le
{KS..POR~ZEOM.-
IIC ~ST.:
SEN', TO ZA:     "~
                                                            ,; INTERNAL DISTRI BUTION
-   --NR -PDR-
                                                        *  <<
  - SGHRQEDER IPPOLITO UBKlN
      .NOVAK CHECK GRIMES CASE TEDESCO MACCARY EISENHUT
      -BAER-
                'HAO VOLLMER BUNCH
- -
    ..KREGER J. COLLINS EXTERNAL DISTRIBUTION                                                CONTROL NUMBER LPDR: 'Roc       ester TIC:
72


==Dear Mr.O'Reilly:==
r f ,1 r
In accordance with Technical Specifications, Article 6.9.2b, the attached report of Reportable Occurrence 76-17, 30-day, is hereby submitted.
4 0"'
Two additional copies of this letter and the attachment are enclosed.Very truly yours, t r tr/L.D.White, Jr.Attachment cc: Dr.Ernst Volgenau (30)Mr.William G.McDonald (3)  
 
~.lel,>,w,",1-i~K l~li (7  
9 ill@'~ l"k '~
~s CONTROL UCENSEE NAME[oaf N Y R E G 7 89 4 LER 76-17/3L~ICENSEE EVENT REPORT~BLOCK: (PLEASE PRINT ALL REQUIRED INFORIVIATIONg 1 6 UCENSE EVENT LCENSE NUMBER TYPE TYPE 1 0 0-0 0 0 0 0-0 0 4 1 1 1 1 L0003~I 14 15 25 26 30 31 32 REPORT REPORT CATEGORY TYPE SOURCE DOCKET NUMBER EVENT DATE REPORT DATE Qogcoov~~L~L 0 6 0-0 2 4 4 0 6 1 6 7 6 0 2 1 6 2 6 7 8 57 58 59 60 61 68 69 74 75 80 EVENT OESCRIPTION uring performance of procedure S-16.11,"Monitoring and Enrichment of Accumulator 7 8 9 80 I Boron Concentration,""A" Accumu drain valve was opened with controls at the rear of 7 89 80~04 ontrol board.The operator then proceeded to front of control board to monitor level 7 8 9 80 Qpg indicators reading more conservative than those at the rear, and noted level lowered to 0 il il i~80 rgg~]46%"B" Accumulator was at proper level.Proper (cont'd.under Additional Factors)COMPONENT MANUFACTURER 47 7 89 PRME SYSTEM CAUSE COMPONENT 7 8 9 10 11 12 17 43 44 48 CAUSE OESCRIPTION toOB]-16.11 did not provide precautions relative to operator remaining at valve controls 80 7'89 80~og during lowering level.As recommended by PORC (meeting 75-76, item 76-932)S-16.11 7 89~10 as.changed to incorporate the appropriate precautions.
                                                                                                      ~ ~ 'tr ~ w,
80 OTHER STATUS AMOUNT OF ACTIVITY OFFSITE CONSEQUENCES 7 89 FACIUTY STATUS%POWER@~i E~10 O 7 8 9 10 12 13 FORM OF ACTIVITY COATENT 7 8 9 10 11 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION IiioI~00 0 E NA 7 89 11 12 13 PERSONNEL INJURIES NUMBER DESCRIPTION tiiol~00 0 NA 7 89 11 12 METHOD OF DISCOVERY 44 45 46 44 45 DISCOVERY DESCRIPTION NA LOCATION OF RELEASE NA 80 60 60 7 89 LOSS OR OAMAGE TO FACILITY TYPE DESCRIPTION 7 69 10 PUBLICITY 7 89 NA SG 60 AOOITIONAL FACTORS[ice](cont'd.from Event Description) level was restored in 11 minutes.Corrective Action 7.8-9 60 Report 1081 was issued and documents the PORC-recommended actions.(Reportable
                        >!I
~19 Occurrence 76-l7, 30-day).7 89 NAME'ruce A.Snow 60 PHQNE.7 16/546-2700, ext.29 1-2 14'ERIC 0 4 o>>
/, / "lj
r~ears.r J}}
          'l";
              '"'OCHESTER ELECTRIC CORPORATIO
                                                                                                      'F GAS AND                                AVENUE, ROCHES ( ER, N.Y. 14649 LEON D. WHITE. JR.                                                                T t I. t P v 0 h t VICC I'RtSIDtRT 8" e            ipt;sa 5JG 2700
                                                                          +yA c..  /
Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania                  19406 Subject.                  Reportable Occurrence 76-17 (30-day report), "A"Accumulator level below Technical Specification limit "R. E. Ginna Nuclear Power Plant, Unit No. 1 Docket No. 50-244
 
==Dear Mr. O'Reilly:==
 
In accordance with Technical Specifications, Article 6.9.2b, the attached report of Reportable Occurrence 76-17, 30-day, is hereby submitted. Two additional copies of this letter and the attachment are enclosed.
Very truly yours, t
r   tr
                                                              /
L. D. White, Jr.
Attachment cc: Dr. Ernst Volgenau (30)
Mr. William G. McDonald (3)
 
                        ~.
lel,>,w,
                    ",1
      - i ~
K l~
li (7
 
4 LER     76-17/3L
~   s
                                                        ~  ICENSEE EVENT REPORT                           ~
CONTROL BLOCK:                                                               (PLEASE PRINT ALL REQUIRED INFORIVIATIONg 1                         6 UCENSEE                                                                                  UCENSE               EVENT NAME                                  LCENSE NUMBER                                   TYPE                 TYPE
[oaf N Y            R    E    G    1         0   0 0       0   0   0   0   0       0         4   1   1   1   1     L0003~I
                  ~
7 89                                  14     15                                             25     26                   30     31     32 REPORT     REPORT CATEGORY         TYPE   SOURCE             DOCKET NUMBER                         EVENT DATE                       REPORT DATE Qogcoov                           ~L       ~L       0   6   0   0       2   4   4       0   6     1   6   7   6       0   2   1     6   2     6 7   8         57     58       59       60     61                                 68   69                       74   75                           80 I
EVENT OESCRIPTION uring performance of procedure S-16.11, "Monitoring and Enrichment of Accumulator 7     8 9                                                                                                                                                 80 Boron Concentration," "A" Accumu drain valve was opened with controls at the rear of 7 89                                                                                                                                                       80
  ~04       ontrol board. The operator then proceeded to front of control board to monitor level 7     8 9                                                                                                                                                 80 Qpg indicators reading more conservative than those at the rear, and noted level lowered to "B"il Accumulator was at proper level. Proper (cont'd.
il                                                                                i                                                  80 rgg~]
46% 0 under Additional Factors)
                                                                                                                              ~
7 89                                                                     PRME                                                                             80 SYSTEM       CAUSE                                       COMPONENT            COMPONENT MANUFACTURER 7     8 9 10               11       12                       17         43           44                 47        48 CAUSE OESCRIPTION toOB]     -16.11 did not provide precautions relative to operator remaining at valve controls 7   '89                                                                                                                                                   80
~og during lowering level. As recommended by PORC (meeting 75-76, item 76-932) S-16.                                                                   11 7 89                                                                                                                                                       80
~10         as. changed to incorporate the appropriate precautions.
7     89     FACIUTY                                                           METHOD OF 80 STATUS             % POWER                 OTHER STATUS          DISCOVERY                      DISCOVERY DESCRIPTION
@~i             E             ~10         O                                                                       NA 7     8       9               10             12 13                         44      45      46                                                            60 FORM OF ACTIVITY       COATENT AMOUNT OF ACTIVITY                                            LOCATION OF RELEASE NA 7     8       9                 10     11                                   44        45 PERSONNEL EXPOSURES NUMBER           TYPE     DESCRIPTION IiioI   ~00         0           E                   NA 7     89               11       12     13                                                                                                                 60 PERSONNEL INJURIES NUMBER           DESCRIPTION tiiol   ~00         0                               NA 7     89               11   12 OFFSITE CONSEQUENCES 7     89 LOSS OR OAMAGE TO FACILITY TYPE       DESCRIPTION 7     69           10                                                                                                                                     SG PUBLICITY NA 7     89                                                                                                                                                 60 AOOITIONAL FACTORS
[ice] (cont'd. from                 Event Description) level was restored in 11 minutes.                                 Corrective Action 7   .8-9                                                                                                                                                 60 Report 1081 was issued and documents the PORC-recommended                                             actions.       (Reportable
~19 Occurrence                   76-l7, 30-day)         .
7 89                                                                                                                                                       60 NAME'ruce A. Snow                                                                 PHQNE.7 16/546-2700, ext. 29 1-2 14 4 o>>
                                                                                                                                            'ERIC  0
 
r r ears.
  ~
J}}

Revision as of 02:22, 21 October 2019

LER 1976-20-00 for R.E. Ginna, a Accumulator Level Below Technical Specification Limit
ML18142B276
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/19/1976
From: White L
Rochester Gas & Electric Corp
To: O'Reilly J
NRC/IE, NRC Region 1
References
LER 1976-20-00
Download: ML18142B276 (6)


Text

5 U.Si NUCLEAR ACGULATOAYCO ION DOCKET NUMBER NRC FOAM 1 50-2/ 4 IZ.7III FILE'l4UMBEA

.NRC DISTRIBUTION FOII" PART 50 DOCKET MATERIAL INCIDEKZ REPORT DATE OF DOCUMENT J.P; O'Reilly FROM'ochestereCas 6 Elec. Corp.

7-15-76 Rochester N.Y. DATE AECEIVEO

.I i E.. D. Whit , Jr.

7-g-76 LETTER 0 NOTOA IZ E D PROP INPUT FORM NUMBER OF COPIES RECEIVED El ORIGINAL ZlUNCLASSIFIEO 1 QCOerj DESCAIPTION ENCLOSURE Ltr.'rans the'following...... Li'censee event report(ROI/76-17) on 6-18-76 concerning Monitoring and Enrichment of

,I Accumulator Boion 'Concentration;............

(1 signed cy recieved)

(2 pgs.)

ACKN0%1 KDGKD Be NOT RzMOVz

~~gmwQtaT i '

3'iII'/~~4<<t 1PJ

'~"~- RE Ginna>,f/1 NOTE:" IP "'PERSONNEL ZXFOSURE IS INVOIIVEB~cn>~ ~

SEND DIRECTLY TO KREGER/J .COLLINS

'

FOR ACTION/INFORMATION CRG 76 BRANCH CHIEF: Pur le

{KS..POR~ZEOM.-

IIC ~ST.:

SEN', TO ZA: "~

,; INTERNAL DISTRI BUTION

- --NR -PDR-

  • <<

- SGHRQEDER IPPOLITO UBKlN

.NOVAK CHECK GRIMES CASE TEDESCO MACCARY EISENHUT

-BAER-

'HAO VOLLMER BUNCH

- -

..KREGER J. COLLINS EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR: 'Roc ester TIC:

72

r f ,1 r

4 0"'

9 ill@'~ l"k '~

~ ~ 'tr ~ w,

>!I

/, / "lj

'l";

'"'OCHESTER ELECTRIC CORPORATIO

'F GAS AND AVENUE, ROCHES ( ER, N.Y. 14649 LEON D. WHITE. JR. T t I. t P v 0 h t VICC I'RtSIDtRT 8" e ipt;sa 5JG 2700

+yA c.. /

Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Subject. Reportable Occurrence 76-17 (30-day report), "A"Accumulator level below Technical Specification limit "R. E. Ginna Nuclear Power Plant, Unit No. 1 Docket No. 50-244

Dear Mr. O'Reilly:

In accordance with Technical Specifications, Article 6.9.2b, the attached report of Reportable Occurrence 76-17, 30-day, is hereby submitted. Two additional copies of this letter and the attachment are enclosed.

Very truly yours, t

r tr

/

L. D. White, Jr.

Attachment cc: Dr. Ernst Volgenau (30)

Mr. William G. McDonald (3)

~.

lel,>,w,

",1

- i ~

K l~

li (7

4 LER 76-17/3L

~ s

~ ICENSEE EVENT REPORT ~

CONTROL BLOCK: (PLEASE PRINT ALL REQUIRED INFORIVIATIONg 1 6 UCENSEE UCENSE EVENT NAME LCENSE NUMBER TYPE TYPE

[oaf N Y R E G 1 0 0 0 0 0 0 0 0 0 4 1 1 1 1 L0003~I

~

7 89 14 15 25 26 30 31 32 REPORT REPORT CATEGORY TYPE SOURCE DOCKET NUMBER EVENT DATE REPORT DATE Qogcoov ~L ~L 0 6 0 0 2 4 4 0 6 1 6 7 6 0 2 1 6 2 6 7 8 57 58 59 60 61 68 69 74 75 80 I

EVENT OESCRIPTION uring performance of procedure S-16.11, "Monitoring and Enrichment of Accumulator 7 8 9 80 Boron Concentration," "A" Accumu drain valve was opened with controls at the rear of 7 89 80

~04 ontrol board. The operator then proceeded to front of control board to monitor level 7 8 9 80 Qpg indicators reading more conservative than those at the rear, and noted level lowered to "B"il Accumulator was at proper level. Proper (cont'd.

il i 80 rgg~]

46% 0 under Additional Factors)

~

7 89 PRME 80 SYSTEM CAUSE COMPONENT COMPONENT MANUFACTURER 7 8 9 10 11 12 17 43 44 47 48 CAUSE OESCRIPTION toOB] -16.11 did not provide precautions relative to operator remaining at valve controls 7 '89 80

~og during lowering level. As recommended by PORC (meeting 75-76, item 76-932) S-16. 11 7 89 80

~10 as. changed to incorporate the appropriate precautions.

7 89 FACIUTY METHOD OF 80 STATUS  % POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION

@~i E ~10 O NA 7 8 9 10 12 13 44 45 46 60 FORM OF ACTIVITY COATENT AMOUNT OF ACTIVITY LOCATION OF RELEASE NA 7 8 9 10 11 44 45 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION IiioI ~00 0 E NA 7 89 11 12 13 60 PERSONNEL INJURIES NUMBER DESCRIPTION tiiol ~00 0 NA 7 89 11 12 OFFSITE CONSEQUENCES 7 89 LOSS OR OAMAGE TO FACILITY TYPE DESCRIPTION 7 69 10 SG PUBLICITY NA 7 89 60 AOOITIONAL FACTORS

[ice] (cont'd. from Event Description) level was restored in 11 minutes. Corrective Action 7 .8-9 60 Report 1081 was issued and documents the PORC-recommended actions. (Reportable

~19 Occurrence 76-l7, 30-day) .

7 89 60 NAME'ruce A. Snow PHQNE.7 16/546-2700, ext. 29 1-2 14 4 o>>

'ERIC 0

r r ears.

~